Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Nickel-hydrogen separator development

The separator technology is a critical element in the nickel-hydrogen (Ni-H2) systems. Previous research and development work carried out at NASA Lewis Research Center has determined that separators made from zirconium oxide (ZrO2) and potassium titanate (PKT) fibers will function satisfactorily in Ni-H2 cells without exhibiting the problems associated with the asbestos separators. These separators and their characteristics were previously discussed. A program was established to transfer the separator technology into a commercial production line. A detailed plan of this program will be presented and the preliminary results will be discussed.

Gonzalez-Sanabria, O. D.↗

College Bound with the Office of Educational Programs

The Educational Programs Office at NASA Glenn Research Center hosts a variety of programs that takes on the hard task of getting students of all ages interested in pursuing careers in science, mathematics, and engineering. To help assist students along the way there are many programs to participate in such as: the explorers, shadowing opportunities, and paid internships. The Educational Programs Office not only creates learning opportunities for students, they also host workshops to help educators enhance their knowledge these fields. This summer I assisted Marie Borowski in the Educational Programs Office with the Tennessee State University College Bound Program. The Tennessee state University College Bound Program is an intensive two-week summer academic workshop designed to introduce minority students to the profession of engineering. NASA Glenn Research Center sent forty dedicated students on a bus to Nashville, Tennessee to experience college life as a whole. At the college the students day consisted of a math class, aeronautics, ACT/SAT preparation, writing and research, African American Culture, computer science, and study sessions. The students also went on educational field trips to the Fisk Museum, the Space and Rocket Center, and the Parthenon Museum. On the last day of the program the students competed in an oratorical contest where the students made a Powerpoint presentation on the class that they enjoyed the most. There were many processes that had to be put into action for the college bound program to run smoothly. The process started in early January with the preparation of applications. Once prepared, the applications were then sent to schools and past participants in hopes of receiving a well-qualified pool of applicants. Once the applications were received, a prescreening is done which ensures all of the information is complete. Then, they are reviewed by a panel, using a rubric to evaluate them, and the semifinalists are then selected. Interviews are held with the students and their parents had to be interviewed by a panel of judges and graded on a rubric. The scores were added up and the forty students were selected. My job this summer was getting the students ready to leave for Tennessee. My job consisted of working very closely with my mentor, Marie Borowski, compile the student data to provide it to the chaperones, TSU records, and NASA records. I learned about the vital communication between the NASA and the TSU program managers. After all the planning was done and the program had begun I had a chance to fly to Tennessee for six days to observe the students daily activities. The students had adjusted very well to the intense schedule, and seemed very enthusiastic about the activities to follow. The whole group was very attentive and enthusiastic program be longer. My goals for the summer were all met. I wanted to learn and retain all the information I possibly could on the job I was given. I was very happy with the end result.

Neal, Brittany D.↗

Pressure Flammability Thresholds of Selected Aerospace Materials

A test program was performed to determine the highest pressure in oxygen where materials used in the planned NASA Constellation Program Orion Crew Exploration Vehicle (CEV) Crew Module (CM) would not propagate a flame if an ignition source was present. The test methodology used was similar to that previously used to determine the maximum oxygen concentration (MOC) at which self-extinguishment occurs under constant total pressure conditions. An upward limiting pressure index (ULPI) was determined, where approximately 50 percent of the materials self-extinguish in a given environment. Following this, the maximum total pressure (MTP) was identified; where all samples tested (at least five) self-extinguished following the NASA-STD-6001.A Test 1 burn length criteria. The results obtained on seven materials indicate that the non-metallic materials become flammable in oxygen between 0.4 and 0.9 psia.

Hirsch, David B.↗

SOFIA: Flying the Telescope

The primary focus of this paper is how the flight test team for the Stratospheric Observatory For Infrared Astronomy (SOFIA) re-cast an extensive developmental test program to meet key milestones while simultaneously ensuring safe certification of the airframe and delivery of an operationally relevant platform, ultimately saving the overall program from financial demise. Following a brief introduction to the observatory and what it is designed to do, SOFIAs planned developmental test program is summarized, including analysis and design philosophy, envelope expansion, model validation and airframe certification. How NASA used lessons learned from other aircraft that employed open cavities in flight is explained as well as how and why the chosen design was selected. The approach to aerodynamic analysis, including bare airframe testing, wind tunnel testing, computational fluid dynamics and finite element modeling proved absolutely critical. Despite a solid analytical foundation, many unknowns remained. History provides several examples of disastrous effects on both systems and flight safety if cavity design is not approached properly. For these reasons, an extensive test plan was developed to ensure a safe and thorough build-up for envelope expansion, airframe certification and early science missions. Unfortunately, as is often the case, because of chronic delays in overall program execution, severe schedule and funding pressures were present. If critical milestones were not met, domestic as well as international funding was in serious jeopardy, and the demise of the entire program loomed large. Concentrating on rigorous model validation, the test team challenged certification requirements, increased test efficiency and streamlined engineering analysis. This resulted in the safe reduction of test point count by 72%, meeting all program milestones and a platform that soundly satisfied all operational science requirements. Results from early science missions are shown and a proof of concept mission for which SOFIA was opportunely positioned is showcased. Success on this time-critical mission to observe a rare astronomical event proved the usefulness of an airborne observatory and the value in waiting for the capability provided by SOFIA. Finally, lessons learned in the test program are presented with emphasis on how lessons from previous aircraft and successful test programs were applied to SOFIA. Effective application of these lessons was crucial to the success of the SOFIA flight test program. SOFIA is an international cooperative program between NASA and the German Space Agency, DLR. It is a 2.5 meter (100-inch) telescope mounted in a Boeing 747SP aircraft used for astronomical observations at altitudes above 35,000 feet. SOFIA will accommodate a host of scientific instruments from the international science community and has a planned operational lifespan of more than 20 years.

Asher, Troy A.↗

Microgravity science and applications overview - Research, facility and instrumentation development, Space Station Freedom operations and utilization planning

An overview is provided of NASA's Microgravity Science and Applications Program, with emphasis on plans for evolution to the Space Station. The Microgravity Science and Applications Division program consists of two major parts including the ground-based research program and the flight program. Transition to flight experiment status may occur only after the ground-based research and testing demonstrates sufficient technical maturity to assure that scientific objectives can be met in space with a high degree of success. Program strategy calls for a transition to the Space Station Freedom before the end of the century. In this connection, six multi-user facilities are planned to be phased into operation aboard the Space Station over an extended time frame. It is projected that the design of these facilities will evolve based on experience with precursor experiment hardware designed and operated on Skylab and other carriers.

Kicza, M. E.↗

Navstar Global Positioning System (GPS) clock program: Present and future

Global Positioning System (GPS) program status are discussed and plans for ensuring the long term continuation of the program are presented. Performance of GPS clocks is presented in terms of on orbit data as portrayed by GPS master control station kalman filter processing. The GPS Clock reliability program is reviewed in depth and future plans fo the overall clock program are published.

Tennant, D. M.↗

Nickel-hydrogen separator development

The separator technology is a critical element in the nickel-hydrogen (Ni-H2) systems. Previous research and development work carried out at NASA Lewis Research Center has determined that separators made from zirconium oxide (ZrO2) and potassium titanate (PKT) fibers will function satisfactorily in Ni-H2 cells without exhibiting the problems associated with the asbestos separators. A program has been established to transfer the separator technology into a commercial production line. A detailed plan of this program will be presented and the preliminary results will be discussed.

Gonzalez-Sanabria, O. D.↗

Strategic plan, 1985

The Lewis Strategic Plan was updated for 1985 and beyond. Major programs for the space station, the advanced turboprop, the Advanced Communications Technology Satellite (ACTS), and the Altitude Wind Tunnel were begun or greatly expanded during 1984. In parallel, The Lewis aeropropulsion research and technology program was extensively evaluated and reviewed; a reduced and reoriented program emerged. The thrusts and implementation plans for these programs are described as they pertain to the individual directorates. Other key accomplishments and plans are summarized.

Source record↗

NASA's satellite relay tracking and data acquisition program

The Tracking and Data Acquisition System (TDAS) is currently being planned to support NASA missions and the Space Station and will serve as a replacement to the present Tracking and Data Relay Satellite System (TDRSS). Its operational date is currently projected for the late 1990s. Near term objectives involve the definition of a TDAS architecture, the development of functional and performance specifications and implementation of a TDRSS-to-TDAS transition plan. The present paper provides an overview of the baseline TDAS architecture and summarizes key ingredients of system and technology studies in progress. In particular, this paper addresses a summary of projected mission requirements for the TDAS era; a characterization of the space segment constellation; use of lasers, 60 GHz, and multibeam 30/20 GHz technologies; ground architecture and operational interfaces; a distributed hardware/software processing concept for more flexible and reliable interfaces, signal processing and operations. Also included is a status summary of the TDAS program plan for the 1984-1990 time frame. Finally, an overview is presented of NASA's current plans to augment the TDRSS to meet the Space Station IOC requirements in the time period 1993-2000.

Schwartz, J. J.↗

Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan (CY 2021)

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2021 at the U.S. Department of Energy Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring is performed by the GWPP. Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12. Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. The following sections of this report provide details regarding the CY 2021 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding a data summary table presented in Section 4) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2021) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F. Modifications to the CY 2021 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. Each modification to the monitoring program will be approved by the Y-12 GWPP manager and documented as an addendum to this sampling and analysis plan.

54 ENVIRONMENTAL SCIENCES↗

Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Planetary exploration through year 2000, a core program: Mission operations

In 1980 the NASA Advisory Council created the Solar System Exploratory Committee (SSEC) to formulate a long-range program of planetary missions that was consistent with likely fiscal constraints on total program cost. The SSEC had as its primary goal the establishment of a scientifically valid, affordable program that would preserve the nation's leading role in solar system exploration, capitalize on two decades of investment, and be consistent with the coordinated set of scientific stategies developed earlier by the Committe on Planetary and Lunar Exploration (COMPLEX). The result of the SSEC effort was the design of a Core Program of planetary missions to be launched by the year 2000, together with a realistic and responsible funding plan. The Core Program Missions, subcommittee activities, science issues, transition period assumptions, and recommendations are discussed.

Source record↗

Remote sensing as a source of data for outdoor recreation planning

Specific data needs for outdoor recreation planning and the ability of tested remote sensors to provide sources for these data are examined. Data needs, remote sensor capabilities, availability of imagery, and advantages and problems of incorporating remote sensing data sources into ongoing planning data collection programs are discussed in detail. Examples of the use of imagery to derive data for a range of common planning analyses are provided. A selected bibliography indicates specific uses of data in planning, basic background materials on remote sensing technology, and sources of information on environmental information systems expected to use remote sensing to provide new environmental data of use in outdoor recreation planning.

Reed, W. E.↗

Engineering development program of a closed aluminum-oxygen semi-cell system for an unmanned underwater vehicle: An update

Most emerging unmanned undersea vehicle (UUV) missions require significantly longer range and endurance than is achievable with existing battery technology. The Aluminum-Oxygen (Al-O2) semi-cell is a candidate technology capable of providing a significant improvement in endurance compared to the silver-zinc battery technology currently used in UUVs and compares favorably to other proposed UUV power systems not only in performance, but also in safety and logistics. An Al-O2 semi-cell system is under development by Loral Defense Systems-Akron (Loral) for the ARPA/Navy 44 in. diameter UUV test vehicle. The power plant consists of a cell stack, gas management, oxygen storage, electrolyte management, coolant and controller subsystems, designed to replace the existing silver-zinc battery and meet existing weight, volume, electrical and thermal requirements, therefore minimizing modifications to the UUV. A detailed system design is complete. A component and material endurance test to evaluate compatibility and reliability of various material arid components is complete. Sub scale (Short stack) system testing is completed. A full-scale demonstration unit is now under construction in the second half of 1995. The full scale demonstration test will simulate environmental conditions of the operational system. This paper summarizes the results of the extensive short stack and endurance test programs, describes the plan for full-scale testing, and concludes with a brief discussions of future directions for this technology. This program is sponsored by ARPA Maritime Systems Technology Office under NASA contract NAS3-26715.

Gregg, Dane W.↗

An overview of the Space Station Technology/Advanced Development Program

The Advanced Technology Plan of the Fiscal Year (FY) 1986 is designed to focus on the most promising technology options applicable to the Space Station (SS), selected from the list of tasks identified by the FY 1984 Technology Program as the most critical technologies to be developed for the initial SS Initial Operating Capability. Most of the current activities are in the stages of manufacture and life tests of specific SS subsystems. Special attention is given to major technologies, which include power systems (PSs) (with emphasis on a Solar Dynamic PS concept); the thermal control system (with the focus on the 'thermal bus' concept); the environmental control and life support system; and the data management system; all are illustrated schematically. Other tasks, including dynamics, communications, extravehicular activities, mechanics, propulsion, and fluid, as well as the tasks of cost, maintainability, automation and robotics, and productivity are discussed.

Carlisle, R. F.↗