Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

NPP Structure, System, Component and Decommissioning Activity based Radiological Environmental Impact Evaluation - 18254

Nuclear power plant consists of Structures, Systems and Components (SSCs), and decommissioning activity and radiological environmental impact evaluation item are identified and may be tracked to SSC. The breakdown structures for SCCs, decommissioning activities, and radiological environmental impact evaluation items are illustrated, respectively. A matrix is provided possibly to identify and manage the radioactive environmental impact evaluation items corresponding to the decommissioning activities in SCCs. This matching relation and breakdown structures are expected to help not only to identify radiological environmental impact with its cause, but also to establish countermeasure to the lowest manageable level, focusing on SSCs and decommissioning activities. This approach is also applicable to decommissioning other nuclear facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Retrieval and Inspection Operations in Hanford Tank 241-AY-102 - 18234

In August 2012, a periodic annulus inspection of tank 241-AY-102 (AY-102) identified a leak from the primary tank into the secondary containment. A pumping plan was developed in 2013 to provide a path forward for recommended remediation actions to be implemented as part of the AY-102 Recovery Project. On March 21, 2014, the Washington State Department of Ecology issued an Administrative Order requiring Washington River Protection Solutions and the United States Department of Energy to conduct actions related to and including the removal of waste from AY-102. The parties agreed to resolve the appeal of the Administrative Order through a Settlement Agreement which addressed the remaining requirements and implemented enforceable milestone dates, including completion of waste removal operations, and performance of an inspection aimed at determining the cause of the leak. The AY-102 Recovery Project was developed to address the Settlement Agreement requirements. While retrieval of waste from Single-Shell Tanks has been performed at Hanford for decades, retrieval from Double-Shell Tank AY-102 required adaptation of the existing technologies to a new environment on a larger scale than previously encountered. Despite countless challenges and obstacles encountered throughout, the project successfully completed system design, fabrication, installation, testing, and retrieval operations within a highly compressed, aggressive schedule. Waste removal activities in AY-102 completed in February 2017. Subsequent inspection activities were completed as part of a multi-step process aimed at determining the likely cause of failure and assessing the feasibility of repair. A variety of input data were used in evaluating the likely failure mechanism, such as video examinations that revealed numerous through-floor penetrations and significant degradation across the visible surface area. Based on the operational history of the tank, corrosion testing and analysis, and the visual appearance of the confirmed leak sites, service-induced pitting corrosion due to the historic waste composition and operating conditions appears to be the primary degradation mechanism leading to failure of the tank. The inspection data has demonstrated that repairing and returning AY-102 to service would likely introduce substantial technical, logistical, and financial challenges due to the extent of bottom-plate damage. As a result, tank AY-102 will ultimately be closed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Towards a Robust System-of-Systems Control Architecture for Robotics - 18359

This paper presents the methodology and results of developing and implementing a system-of-systems architecture for controlling many robotic systems within the context of industrial facilities, where the life of the facility will be far longer than the life of the robotics, due to software updates and accelerated digital obsolescence. The use cases are the JET and ITER fusion research reactors. Remote maintenance is both device defining and mission critical for a future fusion reactor and we foresee the need to utilise a considerable number of robotic devices within an overall digital control architecture. The paper will explore the challenges of long term management of digital complexity using the real experience of JET over the last 20 years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Resourcing Strategies for the NRU Reactor Shutdown Planning and Execution - 19218

The National Research Universal Reactor (NRU) was commissioned in 1957. The NRU was fundamental for the development of the Candu reactors and, until 2016, quietly responsible for producing 40 percent of the world's supply of medical isotopes for diagnosis and cancer therapy. The Government of Canada decided in 2015 to discontinue operation as of March 31, 2018 due to challenges associated with running a 60-year old nuclear reactor. Anticipating this closing date allowed the Permanent Safe Shutdown Project (PSSP) to transition the NRU from an operating reactor to a state suitable for Storage with Surveillance. One of the biggest challenges to address was human resource management, which was rightly identified as the key to keeping the project within schedule and budget. The dilemma was, how to keep the work force motivated to contribute with the preparation of the shutdown while addressing job security concerns. This paper summarises Canadian Nuclear Laboratories (CNL) challenges and strategies to secure specialized subject matter experts, trades and operators for planning and executing the NRU reactor shutdown Project. The discussion also includes the solutions and lessons learned to date. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CSA, the French LILW Disposal Facility: Taking Stock of the 30 years' Operating Experience - 20009

French Andra's currently operational LILW repository, Aube disposal facility, is almost 30 years old. From the beginning, the repository has benefited from the lessons learned from the first disposal facility, the CSM. It has nevertheless continued to evolve, to improve and to adapt, seeking to gain in efficiency, safety and cost optimization. This is a look at what has changed at the CSA since 1992 - and the effect these changes had on its operating practices, construction principles and the entire management organization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Department of Energy Soil and Groundwater Science and Technology Needs, Plans and Initiatives

This paper presents the process used by the Department of Energy (DOE) Environmental Management (EM) Program to collect and prioritize DOE soil and groundwater site science and technology needs, develop and document strategic plans within the EM Engineering and Technology Roadmap, and establish specific program and project initiatives for inclusion in the EM Multi-Year Program Plan. The paper also presents brief summaries of the goals and objectives for the established soil and groundwater initiatives.

54 ENVIRONMENTAL SCIENCES↗

International Safeguards Technology and Policy Education and Training Pilot Programs

A major focus of the National Nuclear Security Administration-led Next Generation Safeguards Initiative (NGSI) is the development of human capital to meet present and future challenges to the safeguards regime. An effective university-level education in safeguards and related disciplines is an essential element in a layered strategy to rebuild the safeguards human resource capacity. NNSA launched two pilot programs in 2008 to develop university level courses and internships in association with James, Martin Center for Nonproliferation Studies (CNS) at the Monterey Institute of International Studies (MIIS) and Texas A&M University (TAMU). These pilot efforts involved 44 students in total and were closely linked to hands-on internships at Los Alamos National Laboratory (LANL) and Lawrence Livermore National Laboratory (LLNL). The Safeguards and Nuclear Material Management pilot program was a collaboration between TAMU, LANL, and LLNL. The LANL-based coursework was shared with the students undertaking internships at LLNL via video teleconferencing. A weeklong hands-on exercise was also conducted at LANL. A second pilot effort, the International Nuclear Safeguards Policy and Information Analysis pilot program was implemented at MIIS in cooperation with LLNL. Speakers from MIIS, LLNL, and other U.S. national laboratories (LANL, BNL) delivered lectures for the audience of 16 students. The majority of students were senior classmen or new master's degree graduates from MIIS specializing in nonproliferation policy studies. The two pilots programs concluded with an NGSI Summer Student Symposium, held at LLNL, where 20 students participated in LLNL facility tours and poster sessions. The value of bringing together the students from the technical and policy pilots was notable and will factor into the planning for the continued refinement of the two programs in the coming years.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

ELECTRICAL SAFETY IMPROVEMENT PROJECT A COMPLEX WIDE TEAMING INITIATIVE

This paper describes the results of a year-long project, sponsored by the Energy Facility Contractors Group (EFCOG) and designed to improve overall electrical safety performance throughout Department of Energy (DOE)-owned sites and laboratories. As evidenced by focused metrics, the Project was successful primarily due to the joint commitment of contractor and DOE electrical safety experts, as well as significant support from DOE and contractor senior management. The effort was managed by an assigned project manager, using classical project-management principles that included execution of key deliverables and regular status reports to the Project sponsor. At the conclusion of the Project, the DOE not only realized measurable improvement in the safety of their workers, but also had access to valuable resources that will enable them to do the following: evaluate and improve electrical safety programs; analyze and trend electrical safety events; increase electrical safety awareness for both electrical and non-electrical workers; and participate in ongoing processes dedicated to continued improvement.

42 ENGINEERING↗

DEPARTMENT OF ENERGY SOIL AND GROUNDWATER SCIENCE AND TECHNOLOGY NEEDS, PLANS AND INITIATIVES

This paper presents the process used by the Department of Energy (DOE) Environmental Management (EM) Program to collect and prioritize DOE soil and groundwater site science and technology needs, develop and document strategic plans within the EM Engineering and Technology Roadmap, and establish specific program and project initiatives for inclusion in the EM Multi-Year Program Plan. The paper also presents brief summaries of the goals and objectives for the established soil and groundwater initiatives.

54 ENVIRONMENTAL SCIENCES↗

Housing Stock Characterization Study: An Innovative Approach to Measuring Retrofit Impact

A residential energy efficiency retrofit loan program depends on a self-sustaining finance option and optimized retrofit measures that recoup their unsubsidized costs through energy bill savings alone within the useful life of the retrofit. A first step in evaluating retrofit options is to measure and verify their energy savings. This report evaluates Orlando Utilities Commission (OUC)residential energy-efficiency demand side management (DSM) programs to assess their relative energy and economic performance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Housing Stock Characterization Study: An Innovative Approach to Measuring Retrofit Impact

A residential energy efficiency retrofit loan program depends on a self-sustaining finance option and optimized retrofit measures that recoup their unsubsidized costs through energy bill savings alone within the useful life of the retrofit. A first step in evaluating retrofit options is to measure and verify their energy savings. This report evaluates Orlando Utilities Commission (OUC) residential energy-efficiency demand side management (DSM) programs to assess their relative energy and economic performance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cold Commissioning Simulant Selection for the Hanford Tank Waste Treatment Plant LAW Facility - 18465

Commissioning the Low-Activity Waste (LAW) Facility of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) will require large volumes (∼2,000,000 liters) of a non-radioactive, chemically analogous waste simulant. Cold commissioning will provide for operator training in an integrated facility, demonstration of mechanical process equipment capacity, environmental performance demonstration of emissions control systems, and process control systems shakedown and tuning. Selection of the cold commissioning simulant is following a structured four-phase process to arrive at the preferred composition and recipe. Phases I, II and III are complete. Phase I laid the framework for decision making with preparation of a Project Management Plan, an update to the Simulant Development, Approval, Validation, and Documentation procedure, and a kickoff meeting to gather stakeholder input into the simulant definition and selection criteria. Phase II consisted of a comprehensive literature search and compilation of LAW simulant recipes, followed by initial screening against the selection criteria identified in Phase I. This process identified 72 candidate simulant recipes and down-selected 9 for further study. Phase III studies involved a) statistical comparisons of the similarity of candidate simulant compositions to the tank waste feed vector, b) process modelling of the commissioning sequence with each simulant to estimate glass former and simulant material consumption, offgas and effluent volumes and compositions, and product glass volumes and compositions, and c) evaluation of simulants against the immobilized LAW glass composition algorithm to determine allo able waste loading to ensure compliance with product specifications and process constraints. The results of these studies identified two of the candidate recipes to be carried forward to full-scale testing. Phase IV consists of testing these two recipes at vendor facilities to determine scalability, fabricability, and stability of the simulants when produced at industrial scale. Scalability is the ability to take a recipe from bench scale (1 to 40 liters) batch size to full scale (>35,000 liters) batch size. Fabricability is the ability of a recipe to be prepared in large batches without the need for complex or expensive mechanical equipment, heating, or cooling systems. Stability is the ability of a simulant to withstand long term storage and variations in environmental conditions without unacceptable changes in key characteristics (the set of chemical, physical, and rheological parameters that the simulant is intended to exhibit during cold commissioning tests). Simulants will also be tested for compatibility with other startup material (i.e., frit), tuning simulants, and environmental performance demonstration test spiking solutions to ensure against unexpected situations. Using a structured process is essential when making high impact decisions such as waste simulant selection. Proper planning and a clear explanation of how the decision process will unfold is key to obtaining stakeholder buy-in as more information is gathered. The documentation resulting from this structured selection process will be compiled and summarized in a Cold Commissioning Simulant Definition deliverable due to the Department of Energy 24 months before the start of Cold Commissioning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Topolgy Agnostic Hot-Spot Avoidance with InfiniBand

InfiniBand has become a very popular interconnect, due to its advanced features and open standard. Large scale InfiniBand clusters are becoming very popular, as reflected by the TOP 500 supercomputer rankings. However, even with popular topologies like constant bi-section bandwidth Fat Tree, hot-spots may occur with InfiniBand, due to inappropriate configuration of network paths, presence of other jobs in the network and un-availability of adaptive routing. In this paper, we present a hot-spot avoidance layer (HSAL) for InfiniBand, which provides hot-spot avoidance using path bandwidth estimation and multi-pathing using LMC mechanism, without taking the network topology into account. We propose an adaptive striping policy with batch based striping and sorting approach, for efficient utilization of disjoint network paths. Integration of HSAL with MPI, the de facto programming model of clusters, shows promising results with collective communication primitives and MPI applications.

97 MATHEMATICS AND COMPUTING↗

Using Unit-Cost Indices in the Management of Innovative Projects

With effective investment of financial resources, industrial innovations are key aspects of macroeconomic strategy. The authors propose the use of unit characteristics of capital investments, operational costs, and profits in project management. The fundamentals of using unit-cost indices are outlined for gate and kinetic approaches, Gantt charts, and assessments of investment effectiveness.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Implementing a Direct-Feed Low-Activity Waste Capability in the Hanford Waste Treatment Plant - 18332

The original design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE) has developed a sequenced approach to completing the WTP Project, beginning with feeding some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. Sending low-activity waste from the tank farms to the LAW Facility is referred to as direct-feed LAW (DFLAW). Under this plan, low-activity waste will be pretreated in the Hanford tank farms for cesium and solids separation to meet LAW Facility waste acceptance criteria and produce an acceptable low-activity waste product. The waste feed will then be transferred to the LAW Facility where it will be immobilized in glass, poured into stainless steel containers, and then transported by truck to the Integrated Disposal Facility, a mixed low-level waste disposal site located in the Hanford 200 East Area. The DFLAW operation will deliver about 1 million gallons of double-shell tank waste for treatment each year of operation, and nominally produce 21 metric tons of immobilized low-activity waste glass per day. The resultant freed space in the double-shell tanks will support safe tank farm operations and staging of additional waste for treatment. In December 2016 DOE executed a contract modification and approved a change to the project's performance baseline to complete the LAW Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. The contract modification and revised performance baseline support completion and hot commissioning of WTP facilities needed for DFLAW operations is as early as January 2022. DOE has made significant progress on design, equipment procurements, and civil construction of modifications required to implement the DFLAW capability in the WTP, including progress on civil construction of a new effluent management facility, which will process secondary liquid waste resulting from LAW Facility vitrification operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site 2014 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada National Security Site, Nye County, Nevada. Groundwater samples from the aquifer immediately below the Area 5 RWMS have been collected and analyzed and static water levels have been measured in this aquifer since 1993. This report updates these data to include the 2014 results. Analysis results for leachate contaminants collected from the mixed-waste cell at the Area 5 RWMS (Cell 18) are also included. During 2014, groundwater samples were collected and static water levels were measured at three wells surrounding the Area 5 RWMS. Groundwater samples were collected at wells UE5PW-1, UE5PW-2, and UE5PW-3 on March 11 and August 12, 2014, and static water levels were measured at each of these wells on March 10, June 2, August 11, and October 14, 2014. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. General water chemistry (cations and anions) was also measured. Results from samples collected in 2014 are within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. The data from the shallow aquifer indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS, and there were no significant changes in measured groundwater parameters compared to previous years. Leachate from above the primary liner of Cell 18 drains into a sump and is collected in a tank at the ground surface. Cell 18 began receiving waste in January 2011. Samples were collected from the tank when the leachate volume approached the 3,000-gallon tank capacity. Leachate samples have been collected 16 times since January 2011. During 2014, samples were collected on February 25, March 5, May 20, August 12, September 16, November 11, and December 16. Each leachate sample was analyzed for toxicity characteristic contaminants and polychlorinated biphenyls (PCB). Beginning with the sample from July 31, 2013, pH and specific conductance were also measured. Leachate analysis results show no evidence of contamination. Results for toxicity characteristic contaminants are all below regulatory levels and analysis quantification limits. No quantifiable PCB levels were detected in any sample. Results for pH and specific conductance are also within expected ranges. After analysis, leachate was pumped from the collection tank and used in Cell 18 for dust control. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ITER Construction--Plant System Integration

This brief paper introduces how the ITER will be built in the international collaboration. The ITER Organization plays a central role in constructing ITER and leading it into operation. Since most of the ITER components are to be provided in-kind from the member countries, integral project management should be scoped in advance of real work. Those include design, procurement, system assembly, testing, licensing and commissioning of ITER.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗