Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operator decision support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) cleanup mission at Oak Ridge National Laboratory (ORNL) includes dispositioning facilities, contaminated legacy materials/waste, and contamination sources and remediation of soil under facilities, groundwater, and surface water to support final Records of Decision (RODs). The Integrated Facilities Disposition Project (IFDP) is a roughly $15B project for completion of the EM mission at Oak Ridge, with a project duration of up to 35 years. The IFDP Mission Need Statement - Critical Decision-0 (CD-0) - was approved by DOE in July 2007, and the IFDP Alternative Selection and Cost Range - Critical Decision-1 (CD-1) - was approved in November 2008. The IFDP scope includes reconfiguration of waste collection and treatment systems as needed to complete the IFDP remediation and decontamination and decommissioning (D&D) missions in a safe and cost-effective manner while maintaining compliance with all governing regulations and bodies and preserving the support of continuing operations at ORNL. A step in the CD-1 approval process included an external technical review (ETR) of technical approaches proposed in the CD-1 document related to the facility reconfiguration for the ORNL radioactive waste and liquid low-level waste management systems. The ETR team recommended that the IFDP team consider the use of trenchless technologies for installing pipelines underground in and around contaminated sites as part of the alternatives evaluations required in support of the CD-2 process. The team specifically recommended evaluating trenchless technologies for installing new pipes in existing underground pipelines as an alternative to conventional open trench installation methods. Potential benefits could include reduction in project costs, less costly underground piping, fewer disruptions of ongoing and surface activities, and lower risk for workers. While trenchless technologies have been used extensively in the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES&H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

03 NATURAL GAS↗

Probabilistic Deliverability Assessment of Distributed Energy Resources via Scenario-Based AC Optimal Power Flow

As electric grids decarbonize and distributed energy resources (DERs) become increasingly prevalent, interconnection assessments must evolve to reflect operational variability and control flexibility. This paper highlights key modeling limitations observed in practice and reviews approaches for modeling uncertainty. It then introduces a Probabilistic Deliverability Assessment (PDA) framework designed to complement and extend existing procedures. The framework integrates scenario-based AC optimal power flow (AC OPF), corrective dispatch, and optional multi-temporal constraints. Together, these form a structured methodology for quantifying DER utilization, deliverability, and reliability under uncertainty in load, generation, and topology. Outputs include interpretable metrics with confidence intervals that inform siting decisions and evaluate compliance with reliability thresholds across sampled operating conditions. A case study on Puerto Rico’s publicly available bulk power system model demonstrates the framework’s application using minimal input data, consistent with current interconnection practice. Across staged fossil generation retirements, the PDA identifies high-value DER sites and regions requiring additional reactive power support. Results are presented through mean dispatch signals, reliability metrics, and geospatial visualizations, demonstrating how the framework provides transparent, data-driven siting recommendations. The framework’s modular design supports incremental adoption within existing workflows, encouraging broader use of AC OPF in interconnection and planning contexts.

14 SOLAR ENERGY↗

The application of simulation modeling to the cost and performance ranking of solar thermal power plants

Small solar thermal power systems (up to 10 MWe in size) were tested. The solar thermal power plant ranking study was performed to aid in experiment activity and support decisions for the selection of the most appropriate technological approach. The cost and performance were determined for insolation conditions by utilizing the Solar Energy Simulation computer code (SESII). This model optimizes the size of the collector field and energy storage subsystem for given engine generator and energy transport characteristics. The development of the simulation tool, its operation, and the results achieved from the analysis are discussed.

Rosenberg, L. S.↗

SERVIR's Contributions and Benefits to Belize thru Spatial Data Infrastructure (SDI) Development

Dan Irwin, the SERVIR Project Manager is being honored with the privilege of delivering the opening remarks at Belize s second celebration of GIS Day, a weeklong event to be held at the University of Belize's campus in the nation s capital, Belmopan. The request has been extended by the GIS Day Planning Committee which operates under the auspices of Belize s Ministry of Natural Resources & the Environment, which is the focal ministry for SERVIR. In the 20-30 min. allotted for the opening remarks, the SERVIR Project Manager will expound on how SERVIR, operating under the auspices of NASA s Ecological Forecasting Program, contributes to spatial data infrastructure (SDI) development in Belize. NASA s contributions to the region - particularly work under the Mesoamerican Biological Corridor - will be highlighted. Continuing, the remarks will discuss SERVIR s role in Belize s steadily expanding SDI, particularly in the context of delivering integrated decision support products via web-based infrastructure. The remarks will close with a call to the parties assembled to work together in the application of Earth Observation Systems technologies for the benefit of Belizean society as a whole. NASA s strong presence in Belize s GIS Day celebrations will be highlighted as sustained goodwill of the American people - in partial fulfillment of goals set forth under the Global Earth Observation System of Systems (GEOSS).

Irwin, Daniel E.↗

Johnson Space Center's Risk and Reliability Analysis Group 2008 Annual Report

The Johnson Space Center (JSC) Safety & Mission Assurance (S&MA) Directorate s Risk and Reliability Analysis Group provides both mathematical and engineering analysis expertise in the areas of Probabilistic Risk Assessment (PRA), Reliability and Maintainability (R&M) analysis, and data collection and analysis. The fundamental goal of this group is to provide National Aeronautics and Space Administration (NASA) decisionmakers with the necessary information to make informed decisions when evaluating personnel, flight hardware, and public safety concerns associated with current operating systems as well as with any future systems. The Analysis Group includes a staff of statistical and reliability experts with valuable backgrounds in the statistical, reliability, and engineering fields. This group includes JSC S&MA Analysis Branch personnel as well as S&MA support services contractors, such as Science Applications International Corporation (SAIC) and SoHaR. The Analysis Group s experience base includes nuclear power (both commercial and navy), manufacturing, Department of Defense, chemical, and shipping industries, as well as significant aerospace experience specifically in the Shuttle, International Space Station (ISS), and Constellation Programs. The Analysis Group partners with project and program offices, other NASA centers, NASA contractors, and universities to provide additional resources or information to the group when performing various analysis tasks. The JSC S&MA Analysis Group is recognized as a leader in risk and reliability analysis within the NASA community. Therefore, the Analysis Group is in high demand to help the Space Shuttle Program (SSP) continue to fly safely, assist in designing the next generation spacecraft for the Constellation Program (CxP), and promote advanced analytical techniques. The Analysis Section s tasks include teaching classes and instituting personnel qualification processes to enhance the professional abilities of our analysts as well as performing major probabilistic assessments used to support flight rationale and help establish program requirements. During 2008, the Analysis Group performed more than 70 assessments. Although all these assessments were important, some were instrumental in the decisionmaking processes for the Shuttle and Constellation Programs. Two of the more significant tasks were the Space Transportation System (STS)-122 Low Level Cutoff PRA for the SSP and the Orion Pad Abort One (PA-1) PRA for the CxP. These two activities, along with the numerous other tasks the Analysis Group performed in 2008, are summarized in this report. This report also highlights several ongoing and upcoming efforts to provide crucial statistical and probabilistic assessments, such as the Extravehicular Activity (EVA) PRA for the Hubble Space Telescope service mission and the first fully integrated PRAs for the CxP's Lunar Sortie and ISS missions.

Valentine, Mark↗

Human Automation Teaming: Lessons Learned and Future Directions

Full autonomy seems to be the goal for system developers in almost every area of the economy. However, as we move from automated systems to autonomous systems, designers have needed to insert humans to oversee automation that has traditionally been brittle or incomplete. This creates its own problems as the operator is usually out of the loop when the automation hands over problems that it cannot handle. To better handle these situations, it has been proposed that we develop human automation teams that have shared goals and objectives to support task performance. This paper will describe an initial model of Human Automation Teaming (HAT) which has three elements: transparency, bi-directional communications, and human-directed execution. Transparency in our model is a method for giving insight into the reasoning behind automated recommendations and actions, bi-directional communication allows the operator to communicate directly with the automation, and finally the automation defers execution to the human. The model was implemented through a number of features on an electronic flight bag (EFB) which are described in the paper. The EFB was installed in a mid-fidelity flight simulator and used by 12 airline pilots to support diversion decisions during off-nominal flight scenarios. Pilots reported that working with the HAT automation made diversion decisions easier and reduced their workload. They also reported that the information provided about diversion airports was similar to what they would receive from ground dispatch, thus making coordination with dispatch easier and less time consuming. These HAT features engender more trust in the automation when appropriate, and less when not, allowing improved supervision of automated functions by flight crews.

Human-Autonomy Teaming↗

Supporting automation in spacecraft activity planning with simulation and visualization

Automation is gaining momentum in spacecraft operations, however, at a much slower pace than comparable application domains. The reasons behind slow adoption is (1) the need for high reliability and (2) the limited interaction between human operators and the automated systems. For automated systems to be adopted and trusted by humans, humans need to gain intuition about the decision making process of the automated system and trust in its execution [1]. In this paper, we present how simulation and visualization can enhance adoption of an automated on-board activity scheduling system, specifically in the context of Mars2020 rover mission[2]. The visualization aims to communicate to the users degree of variance and uncertainty in possible schedule execution. Our preliminary validation results suggest that the proposed visualization increases operators’ confidence in—and likelihood of adopting—the automated scheduling system.

Chien, Steve↗

Evolvable Mars Campaign Long Duration Habitation Strategies: Architectural Approaches to Enable Human Exploration Missions

The Evolvable Mars Campaign (EMC) is the current NASA Mars mission planning effort which seeks to establish sustainable, realistic strategies to enable crewed Mars missions in the mid-2030s timeframe. The primary outcome of the Evolvable Mars Campaign is not to produce "The Plan" for sending humans to Mars, but instead its intent is to inform the Human Exploration and Operations Mission Directorate near-term key decisions and investment priorities to prepare for those types of missions. The FY'15 EMC effort focused upon analysis of integrated mission architectures to identify technically appealing transportation strategies, logistics build-up strategies, and vehicle designs for reaching and exploring Mars moons and Mars surface. As part of the development of this campaign, long duration habitats are required which are capable of supporting crew with limited resupply and crew abort during the Mars transit, Mars moons, and Mars surface segments of EMC missions. In particular, the EMC design team sought to design a single, affordable habitation system whose manufactured units could be outfitted uniquely for each of these missions and reused for multiple crewed missions. This habitat system must provide all of the functionality to safely support 4 crew for long durations while meeting mass and volume constraints for each of the mission segments set by the chosen transportation architecture and propulsion technologies. This paper describes several proposed long-duration habitation strategies to enable the Evolvable Mars Campaign through improvements in mass, cost, and reusability, and presents results of analysis to compare the options and identify promising solutions. The concepts investigated include several monolithic concepts: monolithic clean sheet designs, and concepts which leverage the co-manifested payload capability of NASA's Space Launch System (SLS) to deliver habitable elements within the Universal Payload Adaptor between the SLS upper stage and the Orion/Service module on the top of the vehicle. Multiple modular habitat options for Mars surface and in-space missions are also considered with various functionality and volume splits between modules to find the best balance of reducing the single largest mass which must be delivered to a destination and reducing the number of separate elements which must be launched. Analysis results presented for each of these concepts in this paper include mass/volume/power sizing using parametric sizing tools, identification of unique operational constraints, and limited comments on the additional impacts of reusability/dormancy on system design. Finally, recommendations will be made for promising solutions which will be carried forward for consideration in the Evolvable Mars Campaign work.

Simon, Matthew A.↗

Advanced construction management for lunar base construction - Surface operations planner

The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.

Kehoe, Robert P.↗

Toward Greener and More Sustainable Manufacture of Bauxite-Derived Adsorbents for Water Defluoridation

The bauxite-derived adsorbent, activated alumina (AA), has a current annual global market of over 600 million USD, and of this, more than one-third of AA is used for defluoridation of fluoride-bearing water. The commonly used Bayer process for production of AA suffers from thermodynamic inefficiency, thereby raising costs, and also causes significant environmental damage. Here, we evaluate three other bauxite-derived adsorbents as alternatives to AA for water defluoridation: Mildly processed bauxite, thermally activated bauxite, and acid-treated thermally activated bauxite (ATAB). We first determine the energy intensity and resource efficiency of these three new adsorbents throughout their (future, anticipated) manufacturing processes and compare their defluoridation performance in the laboratory. Then, we quantify the carbon footprints of the three adsorbents via the product life-cycle approach, from their manufacturing to their applications in defluoridation. The results reveal that these three adsorbents exhibit less energy intensity and higher resource efficiency, thereby lowering their carbon footprints by 2-20×, relative to an equivalent amount of AA. We also estimate the operating costs of manufacturing and potential revenues from carbon offsets for each of the three adsorbents. Replacement of about 33 000 tonnes per year of AA currently used for wastewater treatment with equivalent ATAB could annually reduce annual manufacturing costs by 4.7 million USD and additionally generate 79 200 tonnes CO 2 offsets. Finally, this study supports decision-making on selecting a greener and more sustainable approach for wastewater defluoridation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Assessing the Reliability Benefits of Energy Storage as a Transmission Asset

Utilizing energy storage solutions to reduce the need for traditional transmission investments has been recognized by system planners and supported by federal policies in recent years. This work demonstrates the need for detailed reliability assessment for quantitative comparison of the reliability benefits of energy storage and traditional transmission investments. First, a mixed-integer linear programming expansion planning model considering candidate transmission lines and storage technologies is solved to find the least-cost investment decisions. Next, operations under the resulting system configuration are simulated in a probabilistic reliability assessment which accounts for weather-dependent forced outages. The outcome of this work, when applied to TPPs, is to further equalize the consideration of energy storage compared to traditional transmission assets by capturing the value of storage for system reliability.

co-optimization↗

Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure; (4) Vulnerability assessments can be connected to efforts to improve facility resilience to motivate participation; and (5) Efficient, scalable methods for vulnerability assessment can be developed, but additional case studies and evaluation are required.

54 ENVIRONMENTAL SCIENCES↗

Decision Support Tools Evaluation Report for FAS/PECAD, Version 2.0

Global agricultral intelligence is a key element of decision support eithin the U.S. Department of Agriculture (USDA). Estimeates of production and yield issued by the USDA for both foreign and domestic agriculture are primary sources of information for policy and management decision making. The USDA monitors the major global agricultural commodities through the Production Estimates and Crop Assessment Division (PECAD) of its Foreign Agricultural Service (FAS). Specifically, PECAD iintelligence focuses on global agricultural production and on conditions that affect food security. In conjunction with the USDA, NASA is evaluating the potential for products from NASA's Earth Science Enterprise (ESE) missions to add value to PECAD's decision support tools. NASA is usig a systems engineering approach to evaluate the potential enhancement of PECAD's decision support system (DSS)-first by understanding the components of the system and its input requirements, then by recommending NASA products that may be integrated as system inputs to improve the accuracy, quality, or efficiency of the DSS output. This report documents the evaluation phase of the systems engineering process and includes an examination of the system architecture, operations, and input requirements, as well as an initial assessment of specific ESE measurement systems and products that should be considered for their potential to enhance the PECAD DSS.

Ross, Kenton↗

J-2X Abort System Development

The J-2X is an expendable liquid hydrogen (LH2)/liquid oxygen (LOX) gas generator cycle rocket engine that is currently being designed as the primary upper stage propulsion element for the new NASA Ares vehicle family. The J-2X engine will contain abort logic that functions as an integral component of the Ares vehicle abort system. This system is responsible for detecting and responding to conditions indicative of impending Loss of Mission (LOM), Loss of Vehicle (LOV), and/or catastrophic Loss of Crew (LOC) failure events. As an earth orbit ascent phase engine, the J-2X is a high power density propulsion element with non-negligible risk of fast propagation rate failures that can quickly lead to LOM, LOV, and/or LOC events. Aggressive reliability requirements for manned Ares missions and the risk of fast propagating J-2X failures dictate the need for on-engine abort condition monitoring and autonomous response capability as well as traditional abort agents such as the vehicle computer, flight crew, and ground control not located on the engine. This paper describes the baseline J-2X abort subsystem concept of operations, as well as the development process for this subsystem. A strategy that leverages heritage system experience and responds to an evolving engine design as well as J-2X specific test data to support abort system development is described. The utilization of performance and failure simulation models to support abort system sensor selection, failure detectability and discrimination studies, decision threshold definition, and abort system performance verification and validation is outlined. The basis for abort false positive and false negative performance constraints is described. Development challenges associated with information shortfalls in the design cycle, abort condition coverage and response assessment, engine-vehicle interface definition, and abort system performance verification and validation are also discussed.

Santi, Louis M.↗

Visual Analysis of Air Traffic Data

In this paper, we present visual analysis tools to help study the impact of policy changes on air traffic congestion. The tools support visualization of time-varying air traffic density over an area of interest using different time granularity. We use this visual analysis platform to investigate how changing the aircraft separation volume can reduce congestion while maintaining key safety requirements. The same platform can also be used as a decision aid for processing requests for unmanned aerial vehicle operations.

Albrecht, George Hans↗

SLS Test Stand Site Selection

Test site selection is a critical element of the design, development and production of a new system. With the advent of the new Space Launch System (SLS), the National Aeronautics and Space Administration (NASA) had a number of test site selection decisions that needed to be made early enough in the Program to support the planned Launch Readiness Date (LRD). This case study focuses on decisions that needed to be made in 2011 and 2012 in preparation for the April 2013 DPMC decision about where to execute the Main Propulsion Test that is commonly referred to as "Green Run." Those decisions relied upon cooperative analysis between the Program, the Test Lab and Center Operations. The SLS is a human spaceflight vehicle designed to carry a crew farther into space than humans have previously flown. The vehicle consists of four parts: the crew capsule, the upper stage, the core stage, and the first stage solid rocket boosters. The crew capsule carries the astronauts, while the upper stage, the core stage, and solid rocket boosters provide thrust for the vehicle. In other words, the stages provide the "lift" part of the lift vehicle. In conjunction with the solid rocket boosters, the core stage provides the initial "get-off-the-ground" thrust to the vehicle. The ignition of the four core stage engines and two solid rocket boosters is the first step in the launch portion of the mission. The solid rocket boosters burn out after about 2 minutes of flight, and are then jettisoned. The core stage provides thrust until the vehicle reaches a specific altitude and speed, at which point the core stage is shut off and jettisoned, and the upper stage provides vehicle thrust for subsequent mission trajectories. The integrated core stage primarily consists of a liquid oxygen tank, a liquid hydrogen tank, and the four core stage engines. For the SLS program, four RS-25 engines were selected as the four core stage engines. The RS-25 engine is the same engine that was used for Space Shuttle. The test plan for the integrated core stage was broken down into several segments: Component testing, system level testing, and element level testing. In this context, components are items such as valves, controllers, sensors, etc. Systems are items such as an entire engine, a tank, or the outer stage body. The core stage itself is considered to be an element. The rocket engines are also considered an element. At the program level, it was decided to perform a single green run test on the integrated core stage prior to shipment of it to Kennedy Space Center (KSC) for use in the EM-1 test flight of the SLS vehicle. A green run test is the first live fire of the new integrated core stage and engine elements - without boosters of course. The SLS Program had to decide where to perform SLS green run testing.

Crowe, Kathryn↗

BBN-Based Portfolio Risk Assessment for NASA Technology R&D Outcome

The NASA Aeronautics Research Mission Directorate (ARMD) vision falls into six strategic thrusts that are aimed to support the challenges of the Next Generation Air Transportation System (NextGen). In order to achieve the goals of the ARMD vision, the Airspace Operations and Safety Program (AOSP) is committed to developing and delivering new technologies. To meet the dual challenges of constrained resources and timely technology delivery, program portfolio risk assessment is critical for communication and decision-making. This paper describes how Bayesian Belief Network (BBN) is applied to assess the probability of a technology meeting the expected outcome. The network takes into account the different risk factors of technology development and implementation phases. The use of BBNs allows for all technologies of projects in a program portfolio to be separately examined and compared. In addition, the technology interaction effects are modeled through the application of object-oriented BBNs. The paper discusses the development of simplified project risk BBNs and presents various risk results. The results presented include the probability of project risks not meeting success criteria, the risk drivers under uncertainty via sensitivity analysis, and what-if analysis. Finally, the paper shows how program portfolio risk can be assessed using risk results from BBNs of projects in the portfolio.

Geuther, Steven C.↗

Moving Beyond Data Paralysis to Effective use of Building Analytics

As digital controls and smart meters become commonplace in commercial buildings, facilities teams have access to overwhelming amounts of data. This data does not typically lead to insights and corrective actions unless it is analyzed and prioritized in automated ways. Analytic software has been commercially available for over 20 years, but only recently have these tools seen increased adoption. This monitoring infrastructure helps uncover hidden operational opportunities, which is enticing for decision makers looking for short paybacks. Rather than single project savings, monitoring-based commissioning (MBCx) provides tools and processes to implement persistent, continuous improvement. What was formerly a data onslaught is now becoming a controlled resource for improved energy management. In 2016, a Research and Industry Partnership program was launched to support the use of analytics and diagnostics technologies and MBCx practices. This program couples technical assistance to owners to help increase adoption with a data collection effort to inform industry. It includes the most comprehensive data available nationally on analytics installation and use. The first-year results are in, with data from 46 organizations representing over 185 million square feet and 2,300 buildings. These organizations have achieved a median year-over-year energy savings of $0.20/sq ft with a median first year technology implementation cost of $0.12/sq ft. The paper summarizes attributes of successful analytics and MBCx installations, and cost-effectiveness results. The research provides insight for utilities considering adopting analytics technologies into incentive programs, for analytics developers to improve the performance of their solutions, and for commercial building facility staff considering these technologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗