Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Gateway Autonomy for Enabling Deep Space Exploration

The Gateway spacecraft is an important stepping-stone to exploration of the solar system, integrating commercial and international partners into a tightly coupled system, enabling cislunar activities, and implementing key technologies for missions to Mars. Autonomy is a capability area necessary to handle long communication outages where intervention from Earth is impossible, to prepare to operate with long communication delays that will be common in interplanetary travel, and to make spaceflight more affordable and accessible by reducing sustaining operations costs. The Gateway Concept of Operations states that one of Gateway’s goals is to “focus on infrastructure and systems that will allow autonomous operations aboard the Gateway with robotics, automated systems, advanced communications, and distributed computing.” Gateway’s Vehicle Systems Manager (VSM) and associated Autonomous Spacecraft Management Architecture (ASMA) are key products towards delivering autonomous capability. The primary functions of the control architecture are Mission Management and Timeline Execution, Resource Management, Fault Management, and Vehicle Control and Operation (VCO). In each of these areas, there is an initial level of capability to be delivered at launch, with plans to continue development and grow to greater capability. The initial deployment of VSM will focus on maintaining vehicle safety by focusing on full fault management capabilities and deploying only enough resource and timeline planning functionality to support that. The final deployment of VSM will add significant planning and control optimization functionality to support nominal operations for up to 21 days without ground support, even accommodating fault and failure conditions. While the VSM is the vehicle-level representation of autonomous reasoning, distributed automation is essential to provide the right scope and abstraction of information to process. Module and system support of automation and simplicity of interfaces are two important design paradigms that Gateway is focusing on to garner a systems approach to autonomy. Distribution of reasoning can increase complexity, so Gateway is also taking a strict hierarchical approach to information flow and decision making. VSM is not the only capability necessary to achieve an autonomous spacecraft. Robotics support for maintenance of the spacecraft will be essential to provide continued vehicle functionality even when crew is not present. Technical and programmatic challenges exist when implementing autonomous robotics operations. These challenges include sufficient network flexibility to support data transfer to the rest of the vehicle to coordinate module-to-module robotic walk-offs and finding the proper interfaces to allow sufficient dexterity. Communication system upgrades planned for Gateway include Delay Tolerant Networking to best utilize the complex network of relays that will be part of mature cislunar operations. Distributed computing and management will provide failure tolerance, robustness, and growth of capabilities while still allowing significant reuse of heritage software on heritage systems as well as reuse of common applications across a spacecraft to minimize new development, but this requires adherence to key standards and interfaces. The Gateway program has demonstrated significant progress towards these capabilities and has identified challenges other spacecraft developers should be aware of from the start.

Molly Anderson↗

The Use of Standards on the LADEE Mission

The Lunar Atmosphere Dust Environment Explorer (LADEE) was a small explorer class mission that launched Sept 7, 2013 and successfully de-orbited and impacted the moon's surface on April 17, 2014. The spacecraft was the first to launch from a Minotaur 5 and was the first deep space mission to launch from the Wallops flight facility. Figure 1 shows the famous image of a frog unlucky enough to be launched from the facility at the same time as LADEE. The science mission for the spacecraft was to determine the density, composition and variability of the lunar exosphere. In addition, it performed a first-of-a-kind demonstration of laser-based communications from deep space that exhibited a record downlink rate of 622 megabits per second from the moon. In order to perform the lunar dust surveys, the spacecraft was placed in a retrograde equatorial orbit with periapsis between 20 and 60 kilometers. The mission was granted an extension in which final science surveys were performed at altitudes as low as 2 kilometers over the moon's surface. The cadence for spacecraft operations was demanding: the moon's highly inhomogeneous gravity field distorted the orbit, the regular maneuvers were subject to strict payload-induced pointing requirements, and there were periodic attitude changes to keep the spacecraft thermally safe. This led to a need for high reliability in the operation of the spacecraft while obeying strict budget and schedule guidelines.

Standards↗

In-Situ Resource Utilization Modeling of a Lunar Water Processing System

A key element of achieving a sustained surface presence, such as defined in NASA’s Artemis plan, is In-Situ Resource Utilization (ISRU). ISRU is the practice of using local resources to provide mission consumables that reduce system launch mass requirements, and regenerate resources (chiefly, water and oxygen) for propulsion and life support supporting both Lunar and Martian missions. ISRU systems require multiple complex processes, such as excavation, chemical reactors, and electrolysis subsystems that must operate in harmony to optimize the overall system process from beginning to end. The Mission Analysis and Integration Tool (MAIT) was previously developed with MATLAB in FY22 to connect individual subsystem models into a customized, flexible framework for the purpose of technology downselect, optimization, and end-to-end process planning. Beginning in FY24, MAIT was updated and became the capital program in the Systems Engineering and Integration (SE&I) ISRU Modeling and Analysis (SIMA) project. Prior work was leveraged and evolved using MATLAB/Simulink due to its ability to communicate with a vast number of other programming languages and makes up the backbone of data flow between inputs and outputs to the subsystem models. MAIT initially evaluated a suite of ISRU-related technologies, including the water processing Lunar Auger Dryer for ISRU (LADI) system with integrated upstream excavation and downstream electrolysis subsystems. With individual models consolidated, the MAIT tool generated over 5,000 cases during its first round of parametric sweeps on the water processing architecture at multiple production targets; the system analysis produced valuable insight into the optimal LADI geometry that minimized energy demands, estimated effects to cold trap size and radiator requirements, and calculated the power dynamics of the electrolysis unit and liquid oxygen storage volume. Additional efforts are being made to demonstrate the ability to scale ISRU technologies supporting the Space Technology Mission Directorate’s (STMD) commercialization strategy and increase the MAIT software capability. Work is ongoing to handle a wide array of ISRU system models beyond the Lunar environment, e.g. production of propellant for a Martian lander.

Avery Carlson↗

In-Situ Resource Utilization Modeling of a Lunar Water Processing System

A key element of achieving a sustained surface presence, such as defined in NASA’s Artemis plan, is In-Situ Resource Utilization (ISRU). ISRU is the practice of using local resources to provide mission consumables that reduce system launch mass requirements, and regenerate resources (chiefly, water and oxygen) for propulsion and life support supporting both Lunar and Martian missions. ISRU systems require multiple complex processes, such as excavation, chemical reactors, and electrolysis subsystems that must operate in harmony to optimize the overall system process from beginning to end. The Mission Analysis and Integration Tool (MAIT) was previously developed with MATLAB in FY22 to connect individual subsystem models into a customized, flexible framework for the purpose of technology downselect, optimization, and end-to-end process planning. Beginning in FY24, MAIT was updated and became the capital program in the Systems Engineering and Integration (SE&I) ISRU Modeling and Analysis (SIMA) project. Prior work was leveraged and evolved using MATLAB/Simulink due to its ability to communicate with a vast number of other programming languages and makes up the backbone of data flow between inputs and outputs to the subsystem models. MAIT initially evaluated a suite of ISRU-related technologies, including the water processing Lunar Auger Dryer for ISRU (LADI) system with integrated upstream excavation and downstream electrolysis subsystems. With individual models consolidated, the MAIT tool generated over 5,000 cases during its first round of parametric sweeps on the water processing architecture at multiple production targets; the system analysis produced valuable insight into the optimal LADI geometry that minimized energy demands, estimated effects to cold trap size and radiator requirements, and calculated the power dynamics of the electrolysis unit and liquid oxygen storage volume. Additional efforts are being made to demonstrate the ability to scale ISRU technologies supporting the Space Technology Mission Directorate’s (STMD) commercialization strategy and increase the MAIT software capability. Work is ongoing to handle a wide array of ISRU system models beyond the Lunar environment, e.g. production of propellant for a Martian lander.

Avery Carlson↗

LADEE Preparations for Contingency Operations for the Lunar Orbit Insertion Maneuver

The Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft was launched on September 6, 2013, and completed its mission on April 17, 2014 with a directed impact to the Lunar Surface. Its primary goals were to examine the lunar atmosphere, measure lunar dust, and to demonstrate high rate laser communications. The LADEE mission was a resounding success, achieving all mission objectives, much of which can be attributed to careful planning and preparation. This paper discusses the specific preparations for fault conditions that could occur during a highly-critical phase of the mission. To get to the Moon, the spacecraft traversed multiple phasing loops around the Earth, and then executed a breaking maneuver to achieve lunar orbit. This Lunar Orbit Insertion (LOI) maneuver was perhaps the most time-critical phase of the entire mission. The LOI maneuver had to occur within a twenty minute window in order to achieve lunar orbit with an acceptable amount of propellant remaining. Missing this window would have likely resulted in a loss of the entire mission. An additional challenge of the maneuver was that spacecraft was out of view for approximately one hour prior to the main thruster burn, with the burn needing to occur within five minutes after coming into view. These conditions resulted in unique challenges for ground operations and the fault management system. Early in the planning stages of the mission, the criticality and challenges of this maneuver were evident to the system designers. The major concern was that any triggering of the on-board fault management system, whether it is in response to a true fault or a false positive, would result in an unacceptable delay to the burn. Therefore the flight software was designed with a flexible fault management system, such that any or all of the fault management responses could be disabled for the lead up and execution of the maneuver. Later, a triage was conducted to develop a list of fault responses, mapped to various parts of the timeline of the maneuver. Some of these contingency responses were solely ground-based if the time to detect, diagnose, and respond were adequate. Other responses were automated on-board if the response time from the ground would have been inadequate. For instance, in order to recover from a system reboot, on-board automation would have automatically reconfigured the spacecraft for the burn and reoriented the spacecraft to the burn attitude.These contingency responses were practiced, over and over, during numerous rehearsals. Although the LOI maneuver was executed without having to use any of these contingencies, the LADEE team was adequately prepared for this highly critical phase of the mission.

Cannon, Howard↗

Aerospace Safety Advisory Panel

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for calendar year 1998-a year of sharp contrasts and significant successes at NASA. The year opened with the announcement of large workforce cutbacks. The slip in the schedule for launching the International Space Station (ISS) created a five-month hiatus in Space Shuttle launches. This slack period ended with the successful and highly publicized launch of the STS-95 mission. As the year closed, ISS assembly began with the successful orbiting and joining of the Functional Cargo Block (FGB), Zarya, from Russia and the Unity Node from the United States. Throughout the year, the Panel maintained its scrutiny of NASA's safety processes. Of particular interest were the potential effects on safety of workforce reductions and the continued transition of functions to the Space Flight Operations Contractor. Attention was also given to the risk management plans of the Aero-Space Technology programs, including the X-33, X-34, and X-38. Overall, the Panel concluded that safety is well served for the present. The picture is not as clear for the future. Cutbacks have limited the depth of talent available. In many cases, technical specialties are 'one deep.' The extended hiring freeze has resulted in an older workforce that will inevitably suffer significant departures from retirements in the near future. The resulting 'brain drain' could represent a future safety risk unless appropriate succession planning is started expeditiously. This and other topics are covered in the section addressing workforce. The major NASA programs are also limited in their ability to plan property for the future. This is of particular concern for the Space Shuttle and ISS because these programs are scheduled to operate well into the next century. In the case of the Space Shuttle, beneficial and mandatory safety and operational upgrades are being delayed because of a lack of sufficient present funding. Likewise, the ISS has little flexibility to begin long lead-time items for upgrades or contingency planning. For example, the section on computer hardware and software contains specific findings related to required longer range safety-related actions. NASA can be proud of its accomplishments this past year, but must remain ever vigilant, particularly as ISS assembly begins to accelerate. The Panel will continue to focus on both the short- and long-term aspects of risk management and safety planning. This task continues to be made manageable and productive by the excellent cooperation the Panel receives from both NASA and its contractors. Particular emphasis will continue to be directed to longer term workforce and program planning issues as well as the immediate risks associated with ISS assembly and the initial flights of the X-33 and X-34. Section 2 of this report presents specific findings and recommendations generated by ASAP activities during 1998. Section 3 contains more detailed information in support of these findings and recommendations. Appendix A is a current roster of Panel members, consultants, and staff. Appendix B contains NASA's response to the findings and recommendations from the 1997 ASAP Annual Report. Appendix C details the fact-finding activities of the Panel in 1998. During the year, Mr. Richard D. Blomberg was elected chair of the Panel and Vice Admiral (VADM) Robert F Dunn was elected deputy chair. VADM Bernard M. Kauderer moved from consultant to member. Mr. Charles J. Donlan retired from the Panel after many years of meritorious service. Ms. Shirley C. McCarty and Mr. Robert L. ('Hoot') Gibson joined the Panel as consultants.

Source record↗

Manufacturing Process Simulation of Large-Scale Cryotanks

NASA's Space Launch Initiative (SLI) is an effort to research and develop the technologies needed to build a second-generation reusable launch vehicle. It is required that this new launch vehicle be 100 times safer and 10 times cheaper to operate than current launch vehicles. Part of the SLI includes the development of reusable composite and metallic cryotanks. The size of these reusable tanks is far greater than anything ever developed and exceeds the design limits of current manufacturing tools. Several design and manufacturing approaches have been formulated, but many factors must be weighed during the selection process. Among these factors are tooling reachability, cycle times, feasibility, and facility impacts. The manufacturing process simulation capabilities available at NASA.s Marshall Space Flight Center have played a key role in down selecting between the various manufacturing approaches. By creating 3-D manufacturing process simulations, the varying approaches can be analyzed in a virtual world before any hardware or infrastructure is built. This analysis can detect and eliminate costly flaws in the various manufacturing approaches. The simulations check for collisions between devices, verify that design limits on joints are not exceeded, and provide cycle times which aide in the development of an optimized process flow. In addition, new ideas and concerns are often raised after seeing the visual representation of a manufacturing process flow. The output of the manufacturing process simulations allows for cost and safety comparisons to be performed between the various manufacturing approaches. This output helps determine which manufacturing process options reach the safety and cost goals of the SLI. As part of the SLI, The Boeing Company was awarded a basic period contract to research and propose options for both a metallic and a composite cryotank. Boeing then entered into a task agreement with the Marshall Space Flight Center to provide manufacturing simulation support. This paper highlights the accomplishments of this task agreement, while also introducing the capabilities of simulation software.

Babai, Majid↗

Optical and Microphysical Retrievals of Marine Stratocumulus Clouds off the Coast of Namibia from Satellite and Aircraft

Though the emphasis of the Southern Africa Regional Science Initiative 2000 (SAFARI-2000) dry season campaign was largely on emission sources and transport, the assemblage of aircraft (including the high altitude NASA ER-2 remote sensing platform and the University of Washington CV-580, UK MRF C-130, and South African Weather Bureau JRA in situ aircrafts) provided a unique opportunity for cloud studies. Therefore, as part of the SAFARI initiative, investigations were undertaken to assess regional aerosol-cloud interactions and cloud remote sensing algorithms. In particular, the latter part of the experiment concentrated on marine boundary layer stratocumulus clouds off the southwest coast of Africa. Associated with cold water upwelling along the Benguela current, the Namibian stratocumulus regime has received limited attention but appears to be unique for several reasons. During the dry season, outflow of continental fires and industrial pollution over this area can be extreme. From below, upwelling provides a rich nutrient source for phytoplankton (a source of atmospheric sulfur through DMS production as well as from decay processes). The impact of these natural and anthropogenic sources on the microphysical and optical properties of the stratocumulus is unknown. Continental and Indian Ocean cloud systems of opportunity were also studied during the campaign. SAFARI 2000 aircraft flights off the coast of Namibia were coordinated with NASA Terra Satellite overpasses for synergy with the Moderate Resolution Imaging Spectroradiometer (MODIS) and other Terra instruments. MODIS was developed by NASA and launched onboard the Terra spacecraft on December 18, 1999 (and Aqua spacecraft on May 4, 2002). Among the remote sensing algorithms developed and applied to this sensor are cloud optical and microphysical properties that include cloud thermodynamic phase, optical thickness, and effective particle radius of both liquid water and ice clouds. The archived products from these algorithms have applications in climate change studies, climate modeling, numerical weather prediction, and fundamental atmospheric research. The archived MODIS Collection 5 cloud products processing stream will be used to analyze low water cloud scenes off the Namibian and Angolan coasts during SAFARI 2000 time period, as well as other years. Pixel-level Terra and Aqua MODIS retrievals (l. km spatial resolution at nadir) and gridded (1' uniform grid) statistics of cloud optical thickness and effective particle radius will be presented, including joint probability distributions between the two quantities. In addition, perspectives from the MODIS Airborne Simulator, which flew on the ER-2 during SAFARI 2000 providing high spatial resolution retrievals (50 m at nadir), will be presented as appropriate. The H-SAF Program requires an experimental operational European-centric Satellite Precipitation Algorithm System (E-SPAS) that produces medium spatial resolution and high temporal resolution surface rainfall and snowfall estimates over the Greater European Region including the Greater Mediterranean Basin. Currently, there are various types of experimental operational algorithm methods of differing spatiotemporal resolutions that generate global precipitation estimates. This address will first assess the current status of these methods and then recommend a methodology for the H-SAF Program that deviates somewhat from the current approach under development but one that takes advantage of existing techniques and existing software developed for the TRMM Project and available through the public domain.

Platnick, Steven E.↗

ECS Artemis II Upgrades

The National Aeronautics and Space Administration (NASA) actively works to further the expectations of space exploration and research. NASA has been able to develop innovative technology and methods that has allowed for continued discovery and innovation. NASA is in the midst of work for the Artemis mission, which is to return to the moon in an effort to prepare for future Mars exploration. After the successful launch of Artemis I last November, our sights have shifted to Artemis II, which is set to launch next year and bring humans into the lunar orbit for the first time in over fifty years. Artemis II will be the first crewed mission for the program and will represent another step forward in our mission to advance our knowledge of the universe around us. From there, the Artemis program will move onto building a permanent site on the moon that will allow us to eventually reach Mars. During my time at NASA, I was able to work with the NE-XF Branch, also known as the Environmental and Life Support Systems Branch. I specifically worked with the Environmental Control Systems (ECS) team. During my time here, construction on the system in the Vehicle Assembly Building (VAB) and at Launchpad 39B have been progressing at full force. ECS is used to provide processed and purged air at specific temperatures, pressures, and humidity’s to fulfill requirements necessary to support Orion and the SLS. While the Pad has been undergoing upgrades from the original Artemis I configuration, the VAB has a completely new ECS very similar to it. While both systems have been undergoing upgrades, we have been able to transition into testing the systems as we prepare for stacking in the VAB early next year. My role has allowed me to learn about how the systems work and function through walkdowns and visits out to both the Pad and the VAB. I’ve been able to see firsthand how the system operates and have learned how the system affects the vehicle. I’ve been able to shadow my mentor, my coworkers, and COMET operators to oversee the construction efforts of the system along with the testing of the software and the system itself. I even was able to aid in testing at the console myself at Pad 39B. Additionally, I am also revising and reviewing displays for Artemis IV that will be used to remotely control parts of the system. Eventually these displays will be used to support the future of Artemis.

Monique Toon↗

An Agile-Like Approach to Hardware Development: The Ejectable Data Recorder (EDR) for Orion's Ascent Abort 2 (AA-2) Test Flight

On July 2, 2019, the Ascent Abort 2 (AA-2) Flight Test Vehicle was launched from Cape Canaveral, with the goal of demonstrating the performance of Orion’s Launch Abort System (LAS) and collecting data from hundreds of sensors throughout the vehicle. The data collected during this test flight is of paramount importance, as it will be used to certify the Orion vehicle for human spaceflight. Originally, the data was to be downlinked via a single string network of antennas on the LAS, with the associated risk of potential data dropouts, as well as loss of data once the LAS was jettisoned. Thus, additional antennas were added onto the crew module (CM) to support data downlink post-LAS jettison, a buffer rebroadcast capability was added to fill in any gaps in data downlink transmissions, and an ejectable data recorder (EDR) subsystem was added to the CM as a redundant measure to collect all the instrumentation data. The EDR subsystem was added to the project about one year after the project commenced, which significantly reduced the available development time when compared with the other subsystems of the AA-2 Test Flight. The project was further accelerated by six months, around the critical design review gate. Due to the schedule compression challenge and the fact that the EDR subsystem was a backup system and not flight critical, the EDR subsystem was further challenged to find a new and more efficient way to develop hardware. Thus, the EDR subsystem experimented with different management and systems engineering processes, team sizes, communication methods, and tools. Some examples are novel uses of SharePoint as a Data-centric Project Management & Systems Engineering environment, a continuous testing approach through the lifecycle, and a Skunkworks approach to managing the team. The EDR subsystem blended Commercial Off The Shelf (COTS) hardware with in-house developed hardware and software to create a novel data retrieval capability. The capability evolved rapidly through a hardware in the loop simulation environment that enabled incremental component updates for not only the EDR subsystem but across the entire Crew Module. This paper will present an overview of how the EDR subsystem was managed and compare it to an Agile approach to managing projects. The paper will further provide a recommended approach to future Agile-like hardware development that incorporates lessons learned from the EDR experience.

Agile↗

Evolving Design Criteria for Very Large Aperture Space Based Telescopes and Their Influence on the Need for Integrated Tools in the Optimization Process

NASA's Advanced Mirror Technology Development (AMTD) program has been developing the means to design and build the future generations of space based telescopes. With the nearing completion of the James Webb Space Telescope (JWST), the astrophysics community is already starting to define the requirements for follow-on observatories. The restrictions of available launch vehicles and the possibilities of planned future vehicles have fueled the competition between monolithic primaries (with better optical quality) and segmented primaries (with larger apertures, but with diffraction, costs and figure control issues). Regardless of the current shroud sizes and lift capacities, these competing architectures share the need for rapid design tools. As part of the AMTD program a number of tools have been developed and tested to speed up the design process. Starting with the Arnold Mirror Modeler (which creates Finite Element Models (FEM) for structural analysis) and now also feeds these models into thermal stability analyses. They share common file formats and interchangeable results. During the development of the program, numerous trade studies were created for 4-meter and 8-meter monolithic primaries, complete with support systems. Evaluation of these results has led to a better understanding of how the specification drives the results. This paper will show some of the early trade studies for typical specification requirements such as lowest mirror bending frequency and suspension system lowest frequency. The results use representative allowable stress values for each mirror substrate material and construction method and generic material properties. These studies lead to some interesting relationships between feasible designs and the realities of actually trying to build these mirrors. Much of the traditional specifications were developed for much smaller systems, where the mass and volume of the primary where a small portion of the overall satellite. JWST shows us that as the aperture grows, the primary takes up the majority of the mass and volume and the established rules need to be adjusted. For example, a small change in lowest frequency requirement can change the cost by millions of dollars. The paper uses numerous trade studies created during the software development phase of the Arnold Mirror Modeler to illustrate the influences of system specifications on the design space. The future telescopes will require better performance, stability and documented feasibility to meet the hurdles of today's budget and schedules realities. AMTD is developing the tools, but the basic system planning mentality also has to adopt to the requirements of these very large and complex physical structures.

Arnold, William R., Sr.↗

Fault Detection and Correction for the Solar Dynamics Observatory Attitude Control System

The Solar Dynamics Observatory is an Explorer-class mission that will launch in early 2009. The spacecraft will operate in a geosynchronous orbit, sending data 24 hours a day to a devoted ground station in White Sands, New Mexico. It will carry a suite of instruments designed to observe the Sun in multiple wavelengths at unprecedented resolution. The Atmospheric Imaging Assembly includes four telescopes with focal plane CCDs that can image the full solar disk in four different visible wavelengths. The Extreme-ultraviolet Variability Experiment will collect time-correlated data on the activity of the Sun's corona. The Helioseismic and Magnetic Imager will enable study of pressure waves moving through the body of the Sun. The attitude control system on Solar Dynamics Observatory is responsible for four main phases of activity. The physical safety of the spacecraft after separation must be guaranteed. Fine attitude determination and control must be sufficient for instrument calibration maneuvers. The mission science mode requires 2-arcsecond control according to error signals provided by guide telescopes on the Atmospheric Imaging Assembly, one of the three instruments to be carried. Lastly, accurate execution of linear and angular momentum changes to the spacecraft must be provided for momentum management and orbit maintenance. In th~sp aper, single-fault tolerant fault detection and correction of the Solar Dynamics Observatory attitude control system is described. The attitude control hardware suite for the mission is catalogued, with special attention to redundancy at the hardware level. Four reaction wheels are used where any three are satisfactory. Four pairs of redundant thrusters are employed for orbit change maneuvers and momentum management. Three two-axis gyroscopes provide full redundancy for rate sensing. A digital Sun sensor and two autonomous star trackers provide two-out-of-three redundancy for fine attitude determination. The use of software to maximize chances of recovery from any hardware or software fault is detailed. A generic fault detection and correction software structure is used, allowing additions, deletions, and adjustments to fault detection and correction rules. This software structure is fed by in-line fault tests that are also able to take appropriate actions to avoid corruption of the data stream.

Starin, Scott R.↗

X-Ray Spectroscopy of Optically Bright Planets using the Chandra Observatory

Since its launch in July 1999, Chandra's Advanced CCD Imaging Spectrometer (ACIS) has observed several planets (Venus, Mars, Jupiter and Saturn) and 6 comets. At 0.5 arc-second spatial resolution, ACIS detects individual x-ray photons with good quantum efficiency (25% at 0.6 KeV) and energy resolution (20% FWHM at 0.6 KeV). However, the ACIS CCDs are also sensitive to optical and near-infrared light, which is absorbed by optical blocking filters (OBFs) that eliminate optical contamination from all but the brightest extended sources, e.g., planets. .Jupiter at opposition subseconds approx.45 arc-seconds (90 CCD pixels.) Since Chandra is incapable of tracking a moving target, the planet takes 10 - 20 kiloseconds to move across the most sensitive ACIS CCD, after which the observatory must be re-pointed. Meanwhile, the OBF covering that CCD adds an opt,ical signal equivalent to approx.110 eV to each pixel that lies within thc outline of the Jovian disk. This has three consequences: (1) the observatory must be pointed away from Jupiter while CCD bias maps are constructed; (2) most x-rays from within the optical image will be misidentified as charged-particle background and ignored; and (3) those x-rays that are reported will bc assigned anomalously high energies. The same also applies to thc other planets, but is less serious since they are either dimmer at optical wavelengths, or they show less apparent motion across the sky, permitting reduced CCD exposure times: the optical contamination from Saturn acids approx.15 eV per pixel, and from Mars and Venus approx.31 eV. After analyzing a series of short .Jupiter observations in December 2000, ACIS parameters were optimized for the February 2003 opposition. CCD bias maps were constructed while Chandra pointed away from Jupiter, and the subsequent observations employed on-board software to ignore any pixel that contained less charge than that expected from optical leakage. In addition, ACIS was commanded to report 5 x 5 arrays of pixel values surrounding each x-ray event, and the outlying values were employed during ground processing to correct for the optical contamination.

Ford, P. G.↗

Using Simulation to Analyze Acoustic Environments

One of the main projects that was worked on this semester was creating an acoustic model for the Advanced Space Suit in Comsol Multiphysics. The geometry tools built into the software were used to create an accurate model of the helmet and upper torso of the suit. After running the simulation, plots of the sound pressure level within the suit were produced, as seen below in Figure 1. These plots show significant nulls which should be avoided when placing microphones inside the suit. In the future, this model can be easily adapted to changes in the suit design to determine optimal microphone placements and other acoustic properties. Another major project was creating an acoustic diverter that will potentially be used to route audio into the Space Station's Node 1. The concept of the project was to create geometry to divert sound from a neighboring module, the US Lab, into Node 1. By doing this, no new audio equipment would need to be installed in Node 1. After creating an initial design for the diverter, analysis was performed in Comsol in order to determine how changes in geometry would affect acoustic performance, as shown in Figure 2. These results were used to produce a physical prototype diverter on a 3D printer. With the physical prototype, testing was conducted in an anechoic chamber to determine the true effectiveness of the design, as seen in Figure 3. The results from this testing have been compared to the Comsol simulation results to analyze how closely the Comsol results are to real-world performance. While the Comsol results do not seem to closely resemble the real world performance, this testing has provided valuable insight into how much trust can be placed in the results of Comsol simulations. A final project that was worked on during this tour was the Audio Interface Unit (AIU) design for the Orion program. The AIU is a small device that will be used for as an audio communication device both during launch and on-orbit. The unit will have functions including push-to-talk buttons and volume control. With this project, an existing design was modified based on prior feedback that had been received. With the modified design, I created a 3D printed prototype, shown in Figure 4, which was then used in suited evaluations performed by crew members. The feedback received from those evaluations will be utilized to help create the best possible Orion AIU. As a whole, a number of different interesting engineering projects were worked on over the course of this semester. For many of these projects, acoustic simulations provided valuable insight into how different environments would respond to sound. While work is still underway to verify the results of these simulations, the results are fascinating because of the interesting ways that sound waves interact with the environment. Going forward, it will be interesting to see how closely these results can be matched by real-world test data.

Wood, Eric J.↗

Ultrasail

Ultrasail is a complete sail system for the launch, deployment, stabilization and control of very large solar sails enabling reduced mission times for interplanetary and deep space spacecraft. Ultrasail is an innovative, non-traditional approach to propulsion technology achieved by combining propulsion and control systems developed for formation-flying microsatellites with an innovative solar sail architecture to achieve sq km-class controllable sail areas, sail subsystem area densities of 1 gm per sq m, and thrust levels equivalent to 400 kW ion thruster systems used for comparable deep space missions. Ultrasail can conceivably even achieve outer planetary rendezvous, a deep space capability now reserved for high-mass nuclear and chemical systems. Ultrasail is a Delta IV-launched multi-blade spin-stabilized system with blade lengths as long as 50 km, reminiscent of the MacNeal Heliogyro. The primary innovation is the near-elimination of sail supporting structures by attaching the sail tip to a rigid formation-flying microsatellite truss which deploys the sail blade, and which then articulates the blade to provide attitude control, including spin stabilization and precession of the spin axis. These tip microsatellites are controlled by a solar-powered 3-axis microthruster system (electric or cold gas) to maintain proper sail film tension during deployment and spin-up. The satellite mass also provides a stabilizing centrifugal force on the blade while in rotation. Understanding the dynamics of individual blades is key to the overall dynamics of Ultrasail. Forces and torques that must be modeled include those due to solar pressure, those generated by the microsatellite at the blade tip and by torques applied at the blade root. Centrifugal forces also play a significant role in the deployment and maintenance of the sail configuration. To capture the dynamics of the overall system, the equations of motion for the blades have been derived. Using these differential equations, a control law will be derived to maneuver Ultrasail. This law involves the pitching of the individual blades thereby moving the distribution of the radiation pressure on each individual blade and inducing a resultant torque on the system. The direction of the angular momentum vector and its rate of precession can be controlled through the pitch angle of the blades. The Ultrasail trajectory is also being studied. Optimal or near-optimal trajectories are being generated to showcase Ultrasail performance. Various missions, e.g. outer planet and solar polar missions for observation of the Sun, are currently being investigated to demonstrate the performance enhancements generated by Ultrasail technology. Calculus-of-variations-based optimization software is used to produce optimal Ultrasail trajectories. The performance of these trajectories is being compared to optimal results generated with other propulsion models, including chemical propulsion, ion propulsion, and competing solar sail concepts. Results of these studies will quantify the performance of Ultrasail compared to existing solar sail concepts for high energy missions.

Burton, R.↗

Supporting Hydrometeorological Research and Applications with Global Precipitation Measurement (GPM) Products and Services

Precipitation is an important dataset in hydrometeorological research and applications such as flood modeling, drought monitoring, etc. On February 27, 2014, the NASA Global Precipitation Measurement (GPM) mission was launched to provide the next-generation global observations of rain and snow (http:pmm.nasa.govGPM). The GPM mission consists of an international network of satellites in which a GPM Core Observatory satellite carries both active and passive microwave instruments to measure precipitation and serve as a reference standard, to unify precipitation measurements from a constellation of other research and operational satellites. The NASA Goddard Earth Sciences (GES) Data and Information Services Center (DISC) hosts and distributes GPM data. The GES DISC is home to the data archive for the GPM predecessor, the Tropical Rainfall Measuring Mission (TRMM). GPM products currently available include the following:1. Level-1 GPM Microwave Imager (GMI) and partner radiometer products2. Goddard Profiling Algorithm (GPROF) GMI and partner products (Level-2 and Level-3)3. GPM dual-frequency precipitation radar and their combined products (Level-2 and Level-3)4. Integrated Multi-satellitE Retrievals for GPM (IMERG) products (early, late, and final run)GPM data can be accessed through a number of data services (e.g., Simple Subset Wizard, OPeNDAP, WMS, WCS, ftp, etc.). A newly released Unified User Interface or UUI is a single interface to provide users seamless access to data, information and services. For example, a search for precipitation products will not only return TRMM and GPM products, but also other global precipitation products such as MERRA (Modern Era Retrospective-Analysis for Research and Applications), GLDAS (Global Land Data Assimilation Systems), etc.New features and capabilities have been recently added in GIOVANNI to allow exploring and inter-comparing GPM IMERG (Integrated Multi-satelliE Retrievals for GPM) half-hourly and monthly precipitation products as well as other precipitation products such as TRMM, MERRA, NLDAS, GLDAS, etc. GIOVANNI is a web-based tool developed by the GES DISC, to visualize and analyze Earth science data without having to download data and software. During the GPM era, the GES DISC will continue to develop and provide data services for supporting applications. We will update and enhance existing TRMM applications (Current Conditions, the USDA Crop Explorer, etc.) with higher spatial resolution IMERG products. In this presentation, we will present GPM data products and services with examples.

GPM↗

Lessons Learned from OSIRIS-Rex Autonomous Navigation Using Natural Feature Tracking

The Origins, Spectral Interpretation, Resource Identification, Security-Regolith Explorer (Osiris-REx) spacecraft is scheduled to launch in September, 2016 to embark on an asteroid sample return mission. It is expected to rendezvous with the asteroid, Bennu, navigate to the surface, collect a sample (July 20), and return the sample to Earth (September 23). The original mission design called for using one of two Flash Lidar units to provide autonomous navigation to the surface. Following Preliminary design and initial development of the Lidars, reliability issues with the hardware and test program prompted the project to begin development of an alternative navigation technique to be used as a backup to the Lidar. At the critical design review, Natural Feature Tracking (NFT) was added to the mission. NFT is an onboard optical navigation system that compares observed images to a set of asteroid terrain models which are rendered in real-time from a catalog stored in memory on the flight computer. Onboard knowledge of the spacecraft state is then updated by a Kalman filter using the measured residuals between the rendered reference images and the actual observed images. The asteroid terrain models used by NFT are built from a shape model generated from observations collected during earlier phases of the mission and include both terrain shape and albedo information about the asteroid surface. As a result, the success of NFT is highly dependent on selecting a set of topographic features that can be both identified during descent as well as reliably rendered using the shape model data available. During development, the OSIRIS-REx team faced significant challenges in developing a process conducive to robust operation. This was especially true for terrain models to be used as the spacecraft gets close to the asteroid and higher fidelity models are required for reliable image correlation. This paper will present some of the challenges and lessons learned from the development of the NFT system which includes not just the flight hardware and software but the development of the terrain models used to generate the onboard rendered images.

Navigation↗

Fast Paced, Low Cost Projects at MSFC

What does an orbiting microsatellite, a robotic lander and a ruggedized camera and telescope have in common? They are all fast paced, low cost projects managed by Marshall Space Flight Center (MSFC) teamed with successful industry partners. MSFC has long been synonymous with human space flight large propulsion programs, engineering acumen and risk intolerance. However, there is a growing portfolio/product line within MSFC that focuses on these smaller, fast paced projects. While launching anything into space is expensive, using a managed risk posture, holding to schedule and keeping costs low by stopping at egood enough f were key elements to their success. Risk is defined as the possibility of loss or failure per Merriam Webster. The National Aeronautics and Space Administration (NASA) defines risk using procedural requirement 8705.4 and establishes eclasses f to discern the acceptable risk per a project. It states a Class D risk has a medium to significant risk of not achieving mission success. MSFC, along with industry partners, has created a niche in Class D efforts. How did the big, cautious MSFC succeed on these projects that embodied the antithesis of its heritage in human space flight? A key factor toward these successful projects was innovative industry partners such as Dynetics Corporation, University of Alabama in Huntsville (UAHuntsville), Johns Hopkins Applied Physics Laboratory (JHU APL), Teledyne Brown Engineering (TBE), Von Braun Center for Science and Innovation (VCSI), SAIC, and Jacobs. Fast Affordable Satellite Technology (FastSat HSV01) is a low earth orbit microsatellite that houses six instruments with the primary scientific objective of earth observation and technology demonstration. The team was comprised of Dynetics, UAHuntsvile, SAIC, Goddard Space Flight Center (GSFC) and VCSI with the United States Air Force Space Test Program as the customer. The team completed design, development, manufacturing, environmental test and integration in one year. FastSat HSV01 also deployed a Poly Picosatellite Orbital Deployer (PPOD) for a separate nano ]satellite class spacecraft (Cubesat: Nano Sail Demonstration) in partnership with Ames Research Center. The Robotic lunar lander is a MSFC JHU APL partnership that led to the development of a flexible architecture for landers to support robotic missions to a wide range of lunar and asteroid destinations. The team started with the goal of meeting NASA agency directives that led to the creation of a test bed focusing on GN&C and software to demonstrate the descent and landing on any airless body for the final 30 to 60 meters. The team created a complex technology demonstration as well as Guidance Control and Navigation (GN&C) algorithms providing autonomous control of the lander. The team uses a green propellant of 90% hydrogen peroxide and has completed 18 successful test flights. The International Space Station (ISS) SERVIR Environmental Research and Visualization System (ISERV) is a technology demonstration payload to assist the SERVIR project with environmental monitoring for disaster relief and humanitarian efforts. The ISERV project was a partnership with TBE. The ISERV payload consists of a commercial off the shelf camera, telescope, and MSFC developed power distribution box and interfaces on ISS with the Window Observational Research Facility in the US Lab. MSFC has identified three key areas that enabled the low cost mission success to include culture, partnering, and cost/schedule control. This paper will briefly discuss these three Class D efforts, FastSat HSV-01, the Robotic Lunar Lander and the ISERV camera system, the lessons learned, their successes and challenges.

Watson-Morgan, Lisa↗