Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Packet utilisation definitions for the ESA XMM mission

XMM, ESA's X-Ray Multi-Mirror satellite, due for launch at the end of 1999 will be the first ESA scientific spacecraft to implement the ESA packet telecommand and telemetry standards and will be the first ESOC-controlled science mission to take advantage of the new flight control system infrastructure development (based on object-oriented design and distributed-system architecture) due for deployment in 1995. The implementation of the packet standards is well defined at packet transport level. However, the standard relevant to the application level (the ESA Packet Utilization Standard) covers a wide range of on-board 'services' applicable in varying degrees to the needs of XMM. In defining which parts of the ESA PUS to implement, the XMM project first considered the mission objectives and the derived operations concept and went on to identify a minimum set of packet definitions compatible with these aspects. This paper sets the scene as above and then describes the services needed for XMM and the telecommand and telemetry packet types necessary to support each service.

Nye, H. R.↗

Multidisciplinary Optimization Branch Experience Using iSIGHT Software

The Multidisciplinary Optimization (MDO) Branch at NASA Langley Research Center is investigating frameworks for supporting multidisciplinary analysis and optimization research. An optimization framework call improve the design process while reducing time and costs. A framework provides software and system services to integrate computational tasks and allows the researcher to concentrate more on the application and less on the programming details. A framework also provides a common working environment and a full range of optimization tools, and so increases the productivity of multidisciplinary research teams. Finally, a framework enables staff members to develop applications for use by disciplinary experts in other organizations. Since the release of version 4.0, the MDO Branch has gained experience with the iSIGHT framework developed by Engineous Software, Inc. This paper describes experiences with four aerospace applications: (1) reusable launch vehicle sizing, (2) aerospike nozzle design, (3) low-noise rotorcraft trajectories, and (4) acoustic liner design. All applications have been successfully tested using the iSIGHT framework, except for the aerospike nozzle problem, which is in progress. Brief overviews of each problem are provided. The problem descriptions include the number and type of disciplinary codes, as well as all estimate of the multidisciplinary analysis execution time. In addition, the optimization methods, objective functions, design variables, and design constraints are described for each problem. Discussions on the experience gained and lessons learned are provided for each problem. These discussions include the advantages and disadvantages of using the iSIGHT framework for each case as well as the ease of use of various advanced features. Potential areas of improvement are identified.

Padula, S. L.↗

STS-106 Crew Activity Report / Flight Day Highlights Day 2

STS-106 was launched on Sept 8, 2000 at 8:45 a.m. The crew was commanded by Terrence W. Wilcutt, the pilot was Scott D. Altman. The mission specialists were Daniel C. Burbank, Edward T. Lu, Richard A. Mastracchio, Yuri Ivanovich Malenchenko, and Boris V. Morukov. During the 11-day mission, the crew spent a week inside the International Space Station (ISS) unloading supplies from both a double SPACEHAB cargo module in the rear of the Atlantis cargo bay and from a Russian Progress M-1 resupply craft docked to the aft end of the Zvezda Service Module. The videotape shows the activities of the second day of the flight and the preparations for docking with the ISS. Shown on the video are shots of the flight deck on the shuttle, the shuttle payload arm, and shots of the crew eating lunch.

Source record↗

The SHADOZ Data Base: History, Archive Web Guide, and Sample Climatologies

SHADOZ (Southern Hemisphere Additional Ozonesonde) is a project to augment and archive ozonesonde data from ten tropical and subtropical ozone stations. Started in 1998 by NASA's Goddard Space Flight Center and other US and international co-investigators, SHADOZ is an important tool for tropospheric ozone research in the equatorial region. The rationale for SHADOZ is to: (1) validate and improve remote sensing techniques (e.g., the Total Ozone Mapping Spectrometer (TOMS) satellite) for estimating tropical ozone, (2) contribute to climatology and trend analyses of tropical ozone and (3) provide research topics to scientists and educate students, especially in participating countries. SHADOZ is envisioned as a data service to the global scientific community by providing a central public archive location via the internet: http://code9l6.gsfc.nasa.gov/Data_services/shadoz. While the SHADOZ website maintains a standard data format for the archive, it also informs the data users on the differing stations' preparation techniques and data treatment. The presentation navigates through the SHADOZ website to access each station's sounding data and summarize each station's characteristics. Since the start of the project in 1998, the SHADOZ archive has accumulated over 600 ozonesonde profiles and received over 30,000 outside data requests. Data also includes launches from various SHADOZ supported field campaigns, such as, the Indian Ocean Experiment (INDOEX), Sounding of Ozone and Water in the Equatorial Region (SOWER) and Aerosols99 Atlantic Cruise. Using data from the archive, sample climatologies and profiles from selected stations and campaigns will be shown.

White, J. C.↗

ATLAST-9.2: A Deployable Large Aperture UVOIR Space Telescope

We present the results of a study of a deployable version of the Advanced Technology Large Aperture Space Telescope (ATLAST) that could be launched on an Evolved Expendable Launch Vehicle (EELV). ATLAST is a concept for a next-generation UVOIR observatory to follow HST and JWST. The observatory retains significant heritage from JWST, thereby taking advantage of technologies and engineering already developed for that mission. At the same time, we have identified several design changes to the JWST architecture, some of which are required due to the demanding wavefront error requirements at visible wavelengths. The optical telescope assembly has a segmented 9.2-meter aperture and consists of 36 hexagonal glass mirrors, each of which is I.3l5m in size (flat-to-flat). The telescope can be folded to fit in the 6.5m fairing on the planned upgrade to the Delta-IV heavy launch vehicle. Near-real time wavefront sensing and control is performed on-board the telescope using stars in the field of view to deliver diffraction limited imaging performance at 500nm wavelength. The optical design of the telescope provides an 8x20 arcmin FOV in which 4-5 instruments can be accommodated, plus fine guidance and wavefront sensors. Unlike JWST, the OTA sits at the end of a multi-gimbaled arm, allowing pitch and roll motion, and is isolated from the sunshield and spacecraft bus by an active isolation system. Our design permits servicing in order to extend the life of the observatory.

Oegerle, William R.↗

Accelerating Nuclear-Integrated Data Centers in the USA: SWOT Analysis, Power-Thermal Management Strategies, and Industrial-Scale Demonstration and Potential Deployment

Driven by the growth in digital services, cloud computing, AI, and manufacturing, data centers face rising energy demands that challenge traditional power sources and cooling efficiency. This study explores using nuclear power to meet these demands, focusing on accelerated reactor technology deployment and highlighting needs such as N+1/N+2 power supplies and integrated power-thermal management. A SWOT analysis addresses grid connectivity, reactors, and site selection, particularly DOE sites. Reactor technology demonstration and deployment could be accelerated by leveraging test facilities such as MARVEL, MAGNET, TED, FAS, DOME, LOTUS, ATR, Energy System Proving Grounds, and upcoming Energy Launch Pads, along with modeling and simulation tools such as RELAP5, MOOSE, VERA, RAVEN, and FORCE. The potential power and thermal management options, including various cooling technologies, waste-heat utilization, and an industrial-scale demonstration plan, aim to accelerate the integration of nuclear power and data centers in the USA, while emphasizing community and stakeholder engagement and synergistic efforts.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

STS-109 Flight Day 6 Highlights

On the sixth flight day of the STS-109 mission, the crewmembers of the Columbia Orbiter (Commander Scott Altman, Pilot Duane Carey, Payload Commander John Grunsfeld, and Mission Specialists Nancy Currie, James Newman, Richard Linnehan, and Michael Massimino) are shown in selected footage of their servicing mission to the Hubble Space Telescope (HST). The third of five extravehicular activities (EVA) is performed in which Linnehan and Grunsfeld replaced the HST's Power Control Unit (PCU). The astronauts' egress from the Orbiter was delayed after water was found in Grunsfeld's suit. The removal of the old unit was particularly difficult, given the difficulty of demating the PCU's 36 connectors encumbered by the heavy gloves of the astronaut's suit. During this space walk, the HST was powered down to a completely dormant state for the first time since its launch in 1990. Following the successful installation of the new PCU, the HST's power was restarted by engineers at the Goddard Space Flight Center (GSFC). There had been some concern about the telescope's possible failure to restart, but everything went smoothly.

Source record↗

Dissemination and Use of NPOESS Data in AWIPS II

Real-time satellite information provides one of many data sources used by NWS forecast offices to diagnose current weather conditions and to assist in short-term forecast preparation. While GOES satellite data provides relatively coarse spatial resolution coverage of the continental U.S. on a 10-15 minute repeat cycle, polar orbiting data has the potential to provide snapshots of weather conditions at high-resolution in many spectral channels. The multispectral polar orbiting satellite capabilities allow for the derivation of image and sounding products not available from geostationary orbit. The utility of these polar orbiting measurements to forecasters has been demonstrated with NASA EOS observations as part of the Short-term Prediction and Research Transition (SPORT) program at Marshall Space Flight Center. SPORT scientists have been providing real-time MODIS data to NWS forecasters on an experimental basis to address a variety of short-term weather forecasting problems since 2003. The launch of the NPOESS Preparatory Project (NPP) satellite in 2009 will extend the continuity of high-resolution data provided by the NASA EOS satellites into future operational weather systems. The NPP data will be available in a timeframe consistent with the early installation of the next generation Advanced Weather Information Processing System (AWIPS) under development by Raytheon for the NWS. The AWIPS II system will be a JAVA-based decision support system which preserves the functionality of the existing systems and offers unique development opportunities for new data sources and applications in the Service Orientated Architecture (SOA) environment. The poster will highlight some of the advanced observing and display- capabilities of these new systems such as plug-ins for NASA and NPP datasets, and the development of local applications which are not well handled in the current AWIPS (e.g., 3D displays of LMA data, generation and display of 3-channel color composites, etc.).

Jedlovec, Gary↗

Cumulative Distribution Overlap Technique for Artemis Mission Public Entry Risk Assessment

The Artemis missions use a skip-entry profile to accomplish a recovery near the western US coastline, however, the service module debris must still be disposed of safely. For certain contingency return scenarios, the expected dispersed entry profile is biased from the well-analyzed corridor. A novel method is presented for assessing the Cumulative Distribution Function (CDF) of these biased results to ensure they do not contribute additional probabilistic risk to the public. More specifically, the weight of the flight path angle dispersion "tail" of the CDF needs to remain below the well-assessed region. The details of how this method was actually used to screen and plan entry profiles for specific launch windows during the Artemis I mission are shown. This method has potential applicability in other problems where a biased distribution needs to be assessed against a well-defined "core" region.

Reentry↗

Cumulative Distribution Overlap Technique for Artemis Mission Public Entry Risk Assessment

The Artemis missions use a skip-entry profile to accomplish a recovery near the western US coastline, however, the service module debris must still be disposed of safely. For certain contingency return scenarios, the expected dispersed entry profile is biased from the well-analyzed corridor. A novel method is presented for assessing the Cumulative Distribution Function (CDF) of these biased results to ensure they do not contribute additional probabilistic risk to the public. More specifically, the weight of the flight path angle dispersion "tail" of the CDF needs to remain below the well-assessed region. The details of how this method was actually used to screen and plan entry profiles for specific launch windows during the Artemis I mission are shown. This method has potential applicability in other problems where a biased distribution needs to be assessed against a well-defined "core" region.

Reentry↗

Annual survey of spaceflight safety systems: 11th supplement. Survey period - July 1980-June 1981

Reports in the field of space flight safety applicable to current and future operational space activities which appeared between July 1980 and June 1981 are surveyed. Subjects in the area of flight rescue and safety during launch, on-orbit, reentry and landing phases include the major activities and findings of the first Shuttle test flight, a slidewire system for emergency egress from the Space Shuttle on the launch pad, and the testing of the Spacelab engineering model. In the area of human capabilities and crew roles, attention is given to reports of repairs to the Salyut 6 space station made by a Soyuz crew, and an assessment of weightlessness effects on space worker health and safety. Safety requirements for STS payloads including pressure vessels, and the Orbiter window system and for spacecraft testing are also presented, along with those for a television system to aid in monitoring astronaut extravehicular activities. For the operation of large space structures, reports include EVA equipment for satellite servicing and the safety aspects of connectors used in construction. Finally, attention is given to safety-related criteria in a study of Shuttle interactions with the proposed Space Operations Center.

Brown, N. E.↗

Integration by parts

This paper describes the unique integration and verification challenges associated with the Space Station Freedom and an approach to solve these problems using Data Management Systems (DMS) Kits. These DMS Kits will help alleviate the complex integration problems inherent in building, assembling and testing the Space Station. Particular emphasis has been placed on utilizing the capabilities and services of the on-board DMS to provide the integration and verification tools, not only for the DMS but for the other on-board distributed systems as well. DMS Kits are provided to system/software developers across the program. These DMS Kits provide a common set of integration and verification tools and hardware. Each system developer can then utilize, through the kits, a simulation of the complete data processing environment which will be available on orbit. The paper describes the evolution of the integration process from the system level to the final integration of multiple launch packages. DMS Kits are used throughout this process, which addresses both the ground and on-orbit aspects of the problem.

Barry, Thomas↗

A proposed time transfer experiment between the USA and the South Pacific

This paper describes the concept, architecture and preliminary details of an experiment directc<l towards providing continuous Ultra High Precision (UHP) time transfer between Washington, DC; Salisbury, SA Australia; Orroral Valley, ACT Australia; arid Lower Hutt, New Zealand. It further describes a proposed method of distributing UTC(USNO) at a high level of precision to passive users over a broad area of the South Pacific. The concept is based on active two-way satellite time transfer from the United States Naval Observatory (USNO) to the proposed USNO Master Clock West (MCW) in Wahiwa, HI USA at the 1 nanosecond level using active satellite two-way time transfer augmented by Precise Positioning Service (PPS) of the Global Positioning System (GPS). MCW would act as an intermediate transfer/reference station, again linked to Salisbury at the 1 nanosecond level using active satellite two-way time transfer augmented by PPS GPS. From this point, time would bc distributed within the region by two methods. The first is an existing TV line sync system using an Australian communications satellite (AUSSAT K1) which is useful to the 20 nanosecond level. The second approach is RF ranging and multilateration between Salisbury, Orroral Observatory, Lower Hutt and the AUSSAT B1 and B2 to be launched in 1992. Orroral Observatory will provide precise laser ranging to the AUSSAT B1/B2 retro reflectors which will reduce ephemeris related time transfer errors to below 1 nanosecond. The corrected position will be transmitted by both the time transfer modem and the existing TV line sync dissemination process. Multilateration has the advantage of being an all weather approach and when used with the laser ranging technique will provide a precise measurement of the propagation path delays. This will result in time transfer performance levels on the order of 10 nanoseconds to passive users in both Australia and New Zealand.

John Luck↗

Preparations for Integrating Space-Based Total Lightning Observations into Forecast Operations

NASA's Short-term Prediction Research and Transition (SPoRT) Center has been a leader in collaborating with the United States National Weather Service (NWS) offices to integrate ground-based total lightning (intra-cloud and cloud-to-ground) observations into the real-time operational environment. For much of these collaborations, the emphasis has been on training, dissemination of data to the NWS AWIPS system, and focusing on the utility of these data in the warning decision support process. A shift away from this paradigm has occurred more recently for several reasons. For one, SPoRT's collaborations have expanded to new partners, including emergency managers and the aviation community. Additionally, and most importantly, is the impending launch of the GOES-R Geostationary Lightning Mapper (GLM). This has led to collaborative efforts to focus on additional forecast needs, new data displays, develop training for GLM uses based on the lessons learned from ground-based lightning mapping arrays, and ways to better relate total lightning data to other meteorological parameters. This presentation will focus on these efforts to prepare the operational end user community for GLM with an eye towards sharing lessons learned as EUMETSAT prepares for the Meteosat Third Generation Lightning Imager. This will focus on both software and training needs. In particular, SPoRT has worked closely with the Meteorological Development Laboratory to create the total lightning tracking tool. This software allows for NWS forecasters to manually track storms of interest and display a time series trend of observations. This tool also has been expanded to work on any gridded data set allowing for easy visual comparisons of multiple parameters in addition to total lightning. A new web display has been developed for the ground-based observations that can be easily extended to satellite observations. This paves the way for new collaborations outside of the NWS, both domestically and internationally, as the web display will be functional on PCs and mobile devices. Furthermore, SPoRT has helped developed the software plug-in to visualize GLM data. Examples using the official GLM proxy product will be used to provide a glimpse as to what real-time GLM and likely MTG-LI data will be in the near future.

GLM↗

A Concept for Civil Space Traffic Management

As technology has improved, operators have sought to use cubesats, as well as smallsats more generally, to perform increasingly more ambitious and sophisticated functions. Despite this, practical concerns associated with cubesat infant mortality, conjunctions, limited maneuverability, and debris generation have been relatively muted because most cubesats have been launched to lower orbits that limit both their orbital lifetime and consequences should a collision occur. NASA ARC has developed a concept for a highly-automated and distributed space traffic management (STM) architecture, drawing on similar work done to provide traffic management for small unmanned aerial systems (UAS) operating at low altitudes. The system proposes a strategy to accommodate growing space traffic volume safely, as well as pave the way for a transition of civil STM authority to a civilian governmental entity. The architecture envisions an open-access software platform architecture of data and service suppliers, consumers, and regulators, connected via a set of application programming interfaces (APIs). The platform would build on, rather than replicate existing integration and coordination efforts within the space situational awareness ecosystem, using existing standards for data message formats from organizations like the Consultative Committee for Space Data Systems and wrapping, rather than replacing existing integrations. We will present an initial STM architecture in this presentation, with a few examples showing how stakeholders can interact structurally, but flexibly, within this architecture.

Space Situational Awareness↗

Statistical and Prediction modeling of the Ka Band Using Experimental Results from ACTS Propagation Terminals at 20.185 and 27.505 GHZ

With the increase in demand for wireless communication services, most of the operating frequency bands have become very congested. The increase of wireless costumers is only fractional contribution to this phenomenon. The demand for more services such as video streams and internet explorer which require a lot of band width has been a more significant contributor to the congestion in a communication system. One way to increase the amount of information or data per unit of time transmitted with in a wireless communication system is to use a higher radio frequency. However in spite the advantage available in the using higher frequency bands such as, the Ka-band, higher frequencies also implies short wavelengths. And shorter wavelengths are more susceptible to rain attenuation. Until the Advanced Communication Technology Satellite (ACTS) was launched, the Ka- band frequency was virtually unused - the majority of communication satellites operated in lower frequency bands called the C- and Ku- bands. Ka-band is desirable because its higher frequency allows wide bandwidth applications, smaller spacecraft and ground terminal components, and stronger signal strength. Since the Ka-band is a high frequency band, the millimeter wavelengths of the signals are easily degraded by rain. This problem known as rain fade or rain attenuation The Advanced Communication Technology Satellite (ACTS) propagation experiment has collected 5 years of Radio Frequency (RF) attenuation data from December 1993 to November 1997. The objective of my summer work is to help develop the statistics and prediction techniques that will help to better characterize the Ka Frequency band. The statistical analysis consists of seasonal and cumulative five-year attenuation statistics for the 20.2 and 27.5 GHz. The cumulative five-year results give the link outage that occurs for a given link margin. The experiment has seven ground station terminals that can be attributed to a unique rain zone climate. The locations are White Sands, NM, Tampa, Fly Clarksburg, MD, Norman, OK, Ft. Collins, COY Vancouver, BC, and Fairbanks, AK. The analysis will help us to develop and define specific parameters that will help system engineers develop the appropriated instrumentation and structure for a Ka-band wireless communication systems and networks.

Ogunwuyi, Oluwatosin O.↗

Human Space Exploration: The Moon, Mars, and Beyond

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed, to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. Why the Moon? Many questions about the Moon's potential resources and how its history is linked to that of Earth were spurred by the brief Apollo explorations of the 1960s and 1970s. This new venture will carry more explorers to more diverse landing sites with more capable tools and equipment for extended expeditions. The Moon also will serve as a training ground before embarking on the longer, more difficult trip to Mars. NASA plans to build a lunar outpost at one of the lunar poles, learn to live off the land, and reduce dePendence on Earth for longer missions. America needs to extend its ability to survive in hostile environments close to our home planet before astronauts will reach Mars, a planet very much like Earth. NASA has worked with scientists to define lunar exploration goals and is addressing the opportunities for a range of scientific study on Mars. In order to reach the Moon and Mars within a lifetime and within budget, NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-l, scheduled for spring 2009. The U.S. Vision for Space Exploration lays out a roadmap for a long-term venture of discovery. This endeavor will inspire and attract the best and brightest students to power this nation successfully to the Moon, Mars, and beyond. If one equates the value proposition for space with simple dollars and cents, the potential of the new space economy is tremendous, from orbital space delivery services for the International Space Station to mining and solar energy collection on the Moon and asteroids. The Vision for Space Exploration is fundamentally about bringing the resources of the solar system within the economic sphere of humaind. Given the immense size of our solar system, the amount of available material and energy within it present an enormous economic opportunity.

Sexton, Jeffrey D.↗

Developing a Logistics Data Process for Support Equipment for NASA Ground Operations

The United States NASA Space Shuttle has long been considered an extremely capable yet relatively expensive rocket. A great part of the roughly US $500 million per launch expense was the support footprint: refurbishment and maintenance of the space shuttle system, together with the long list of resources required to support it, including personnel, tools, facilities, transport and support equipment. NASA determined to make its next rocket system with a smaller logistics footprint, and thereby more cost-effective and quicker turnaround. The logical solution was to adopt a standard Logistics Support Analysis (LSA) process based on GEIA-STD-0007 http://www.logisticsengineers.org/may09pres/GEIASTD0007DEXShortIntro.pdf which is the successor of MIL-STD-1388-2B widely used by U.S., NATO, and other world military services and industries. This approach is unprecedented at NASA: it is the first time a major program of programs, Project Constellation, is factoring logistics and supportability into design at many levels. This paper will focus on one of those levels NASA ground support equipment for the next generation of NASA rockets and on building a Logistics Support Analysis Record (LSAR) for developing and documenting a support solution and inventory of resources for. This LSAR is actually a standards-based database, containing analyses of the time and tools, personnel, facilities and support equipment required to assemble and integrate the stages and umbilicals of a rocket. This paper will cover building this database from scratch: including creating and importing a hierarchical bill of materials (BOM) from legacy data; identifying line-replaceable units (LRUs) of a given piece of equipment; analyzing reliability and maintainability of said LRUs; and therefore making an assessment back to design whether the support solution for a piece of equipment is too much work, i.e., too resource-intensive. If one must replace or inspect an LRU too much, perhaps a modification of the design of the equipment can make such operational effort unnecessary. Finally, this paper addresses processes of tying resources to a timeline of tasks performed in ground operations: this enables various overarching analyses, e.g., a summarization of all resources used for a given piece of equipment. Quality Control of data will also be discussed: importing and exporting data from product teams, including spreadsheets-todatabase or data exchange between databases.

Chakrabarti, Suman↗