Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “environmental requirements program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Understanding Contaminant Transport Pathways at Rocky Flats - A Basis for the Remediation Strategy

The Rocky Flats Environmental Technology Site (RFETS) is a Department of Energy facility located approximately 16 miles northwest of Denver, Colorado. Processing and fabrication of nuclear weapons components occurred at Rocky Flats from 1952 through 1989. Operations at the Site included the use of several radionuclides, including plutonium-239/240 (Pu), americium-241 (Am), and various uranium (U) isotopes, as well as several types of chlorinated solvents. The historic operations resulted in legacy contamination, including contaminated facilities, process waste lines, buried wastes and surface soil contamination. Decontamination and removal of buildings at the site was completed in late 2005, culminating more than ten years of active environmental remediation work. The Corrective Action Decision/Record of Decision was subsequently approved in 2006, signifying regulatory approval and closure of the site. The use of RFETS as a National Wildlife Refuge is scheduled to be in full operation by 2012. To develop a plan for remediating different types of radionuclide contaminants present in the RFETS environment required understanding the different environmental transport pathways for the various actinides. Developing this understanding was the primary objective of the Actinide Migration Evaluation (AME) project. Findings from the AME studies were used in the development of RFETS remediation strategies. The AME project focused on issues of actinide behavior and mobility in surface water, groundwater, air, soil and biota at RFETS. For the purposes of the AME studies, actinide elements addressed included Pu, Am, and U. The AME program, funded by DOE, brought together personnel with a broad range of relevant expertise in technical investigations. The AME advisory panel identified research investigations and approaches that could be used to solve issues related to actinide migration at the Site. An initial step of the AME was to develop a conceptual model to provide a qualitative description of the relationships among potential actinide sources and transport pathways at RFETS. One conceptual model was developed specifically for plutonium and americium, because of their similar geochemical and transport properties. A separate model was developed for uranium because of its different properties and mobility in the environment. These conceptual models were guidelines for quantitative analyses described in the RFETS Pathway Analysis Report, which used existing data from the literature as well as site-specific analyses, including field, laboratory and modeling studies to provide quantitative estimates of actinide migration in the RFETS environment. For pathways where more than one method was used to estimate offsite loads for a specific pathway, the method yielding the highest estimated off-site was used for comparison purposes. For all actinides studied, for pre-remediation conditions, air and surface water were identified to be the dominant transport mechanisms. The estimated annual airborne plutonium-239/240 load transported off site exceeded the surface water load by roughly a factor of 40. However, despite being the largest transport pathway, airborne radionuclide concentrations at the monitoring location with the highest measurements during the period studied were less than two percent of the allowable 10 milli-rem standard governing DOE facilities. Estimated actinide loads for other pathways were much less. Shallow groundwater was approximately two orders of magnitude lower, or 1/100 of the load conveyed in surface water. The estimated biological pathway load for plutonium was approximately five orders of magnitude less, or 1/100,000, of the load estimated for surface-water. The pathway analysis results were taken into consideration during subsequent remediation activities that occurred at the site. For example, when the 903 Pad area was remediated to address elevated concentrations of Pu and Am in the surface soil, portable tent structures were constructed to prevent wind and water erosion from occurring while remediation activities took place. Following remediation of the 903 Pad and surrounding area, coconut erosion blankets were installed to mitigate erosion effects while vegetation was reestablished [2]. These measures were effective tools to address the primary transport mechanisms identified, coupling the scientific understanding of the site with the remediation strategy.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada (CY2021)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment, CAU 91, Area 3 U-3fi Injection Well, CAU 92, Area 6 Decon Pond Facility, CAU 110, Area 3 WMD U-3ax/bl Crater, CAU 111, Area 5 WMD Retired Mixed Waste Pits, and CAU 112, Area 23 Hazardous Waste Trenches. This report covers calendar year 2021. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. This report will address all monitoring requirements noted in the RCRA Permit NEV HW0101, except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2020 (Rev. 2)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): 1) CAU 90, Area 2 Bitcutter Containment; 2) CAU 91, Area 3 U-3fi Injection Well; 3) CAU 92, Area 6 Decon Pond Facility; 4) CAU 110, Area 3 WMD U-3ax/bl Crater; 5) CAU 111, Area 5 WMD Retired Mixed Waste Pits; 6) CAU 112, Area 23 Hazardous Waste Trenches The locations of the sites are shown in Figure ES-1. This report covers calendar year 2020. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110; and quarterly at CAU 111. Additional inspections are conducted at CAUs 92 and 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAUs 110 and 111, soil moisture monitoring and subsidence surveys are conducted in addition to the visual inspections. At CAU 110, the site fence, gate, lock, and use restriction signs are evaluated. At CAU 111, an ecological survey, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are also conducted. This report will address all monitoring item notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

Crosscut report: Exascale Requirements Reviews, March 9–10, 2017 – Tysons Corner, Virginia. An Office of Science review sponsored by: Advanced Scientific Computing Research, Basic Energy Sciences, Biological and Environmental Research, Fusion Energy Sciences, High Energy Physics, Nuclear Physics

The mission of the U.S. Department of Energy Office of Science (DOE SC) is the delivery of scientific discoveries and major scientific tools to transform our understanding of nature and to advance the energy, economic, and national security missions of the United States. To achieve these goals in today’s world requires investments in not only the traditional scientific endeavors of theory and experiment, but also in computational science and the facilities that support large-scale simulation and data analysis. The Advanced Scientific Computing Research (ASCR) program addresses these challenges in the Office of Science. ASCR’s mission is to discover, develop, and deploy computational and networking capabilities to analyze, model, simulate, and predict complex phenomena important to DOE. ASCR supports research in computational science, three high-performance computing (HPC) facilities — the National Energy Research Scientific Computing Center (NERSC) at Lawrence Berkeley National Laboratory and Leadership Computing Facilities at Argonne (ALCF) and Oak Ridge (OLCF) National Laboratories — and the Energy Sciences Network (ESnet) at Berkeley Lab. ASCR is guided by science needs as it develops research programs, computers, and networks at the leading edge of technologies. As we approach the era of exascale computing, technology changes are creating challenges for science programs in SC for those who need to use high performance computing and data systems effectively. Numerous significant modifications to today’s tools and techniques will be needed to realize the full potential of emerging computing systems and other novel computing architectures. To assess these needs and challenges, ASCR held a series of Exascale Requirements Reviews in 2015–2017, one with each of the six SC program offices,1 and a subsequent Crosscut Review that sought to integrate the findings from each. Participants at the reviews were drawn from the communities of leading domain scientists, experts in computer science and applied mathematics, ASCR facility staff, and DOE program managers in ASCR and the respective program offices. The purpose of these reviews was to identify mission-critical scientific problems within the DOE Office of Science (including experimental facilities) and determine the requirements for the exascale ecosystem that would be needed to address those challenges. The exascale ecosystem includes exascale computing systems, high-end data capabilities, efficient software at scale, libraries, tools, and other capabilities. This effort will contribute to the development of a strategic roadmap for ASCR compute and data facility investments and will help the ASCR Facility Division establish partnerships with Office of Science stakeholders. It will also inform the Office of Science research needs and agenda. The results of the six reviews have been published in reports available on the web at http://exascaleage.org/. This report presents a summary of the individual reports and of common and crosscutting findings, and it identifies opportunities for productive collaborations among the DOE SC program offices.

97 MATHEMATICS AND COMPUTING↗

2010 Ecological Survey of the Pacific Northwest National Laboratory Site

The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL Site comply with applicable laws, policies, and DOE orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL Site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL Site is described in Larson and Downs (2009). There are currently two facilities on the PNNL Site: the William R. Wiley Environmental Molecular Sciences Laboratory (EMSL), and the recently completed Physical Sciences Facility (PSF). This report describes the results of the annual survey of the biological resources found on the undeveloped portions of the PNNL Site in 2010. A brief description of the methods PNNL ecologists used to conduct the surveys and the results of the surveys are presented. Actions taken to fully delineate noxious weed populations discovered in 2009 and efforts in 2010 to control those weeds also are described. Appendix A provides a list of plant and animal species identified on the PNNL Site.

54 ENVIRONMENTAL SCIENCES↗

2011 Annual Ecological Survey: Pacific Northwest National Laboratory Site

The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL site comply with applicable laws, policies, and DOE Orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL site is described in Larson and Downs (2009). There are currently two facilities on the PNNL site: the William R. Wiley Environmental Molecular Sciences Laboratory and the Physical Sciences Facility. This report describes the annual survey of biological resources found on the undeveloped upland portions of the PNNL site. The annual survey is comprised of a series of individual field surveys conducted on various days in late May and throughout June 2011. A brief description of the methods PNNL ecologists used to conduct the baseline surveys and a summary of the results of the surveys are presented. Appendix A provides a list of plant and animal species identified in the upland areas of the PNNL site in 2011. Efforts in 2011 to control noxious weed populations (comprising plant species designated as Class B noxious weeds by the Washington State Noxious Weed Control Board) discovered in 2009 and initially treated with herbicides in 2010 are described in Appendix B.

54 ENVIRONMENTAL SCIENCES↗

Laboratory Directed Research and Development Program (FY 2019 Annual Summary of Completed Projects)

Oak Ridge National Laboratory (ORNL) is the US Department of Energy’s (DOE’s) largest multiprogram science, technology, and energy laboratory with distinctive capabilities in neutron science, computing, advanced materials, and nuclear science and technology. Using these capabilities, ORNL conducts basic and applied research and development (R&D) to support DOE’s overarching mission to “ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions.” As a national resource, ORNL also applies its capabilities and skills to specific needs of other federal agencies and customers through the DOE Strategic Partnership Projects (SPP) program. Information about the laboratory and its programs is available at the ORNL website. The Laboratory Directed Research and Development (LDRD) program at ORNL operates under the authority of the DOE Order 413.2C, “Laboratory Directed Research and Development,” which establishes DOE’s requirements for the program while providing the laboratory director broad flexibility for program implementation. The LDRD program funds are obtained through a charge to all laboratory programs. ORNL reports on the program status to DOE each year.

99 GENERAL AND MISCELLANEOUS↗

Evaluation of Apex Alpha with LabWare-LIMS Data Reduction for Alpha Analyses

Savannah River Site's Environmental Bioassay Laboratory is migrating its laboratory information management system (LIMS) from SQL-LIMS to Oracle Labware-LIMS (LW-LIMS) systems to align with the Department of Energy's cyber security policies. Concurrently with the LIMS upgrade, the current VMS based Alpha Measurement System (AMS) software is being replaced with Apex Alpha software to reduce other cyber vulnerabilities, streamline procedural production aspects of data handling, and improve outdated reduction processes to align the program with requirements outlined in ANSI N13.30. The primary technical changes which are being implemented are: - Reagent contributions are added in data reduction, - Moving average background equivalent activity are used for gross signal corrections, - Measured uncertainty of both are included in the decision level and propagated uncertainty, - Tracer levels are increased for precision and accuracy improvements, and - Reports are modified for compliance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Laboratory Directed Research and Development Program: FY 2025 Completed Projects

Oak Ridge National Laboratory (ORNL) is the US Department of Energy’s (DOE’s) largest multiprogram science, technology, and energy laboratory. It possesses distinctive capabilities in a variety of fields, such as neutron science, computing, advanced materials, and nuclear science and technology. Using these capabilities, ORNL conducts basic and applied research and development (R&D) to support DOE’s overarching mission “to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions.” As a national resource, ORNL also applies its capabilities and skills to the specific needs of other federal agencies and customers through the DOE Strategic Partnership Projects (SPP) Program. Information about the laboratory and its programs is available on the ORNL website. The Laboratory Directed Research and Development (LDRD) Program at ORNL operates under the authority of DOE Order 413.2C, Laboratory Directed Research and Development, which establishes DOE’s requirements for the program while providing the laboratory director broad flexibility for program implementation. The LDRD Program funds are obtained through a charge to all laboratory programs. Although it represents a relatively small portion of the overall research budget, the LDRD Program plays an essential role in maintaining the laboratory’s ability to respond to national needs. The program allows ORNL to improve its distinctive capabilities and enhance its ability to conduct cutting-edge R&D. In accordance with the DOE order, R&D projects funded through the LDRD Program at ORNL support the goals of • maintaining the scientific and technical vitality of the laboratory, • enhancing the laboratory’s ability to address future DOE missions, • fostering creativity and stimulating exploration of forefront areas of science and technology, • serving as a proving ground for new concepts in R&D, and • supporting high-risk, potentially high-value R&D. This report provides an overview of the LDRD Program at ORNL in FY 2025 and contains summaries of all the LDRD research projects that concluded between October 1, 2024, and September 30, 2025.

99 GENERAL AND MISCELLANEOUS↗

Computer aided system engineering for space construction

This viewgraph presentation covers the following topics. Construction activities envisioned for the assembly of large platforms in space (as well as interplanetary spacecraft and bases on extraterrestrial surfaces) require computational tools that exceed the capability of conventional construction management programs. The Center for Space Construction is investigating the requirements for new computational tools and, at the same time, suggesting the expansion of graduate and undergraduate curricula to include proficiency in Computer Aided Engineering (CAE) though design courses and individual or team projects in advanced space systems design. In the center's research, special emphasis is placed on problems of constructability and of the interruptability of planned activity sequences to be carried out by crews operating under hostile environmental conditions. The departure point for the planned work is the acquisition of the MCAE I-DEAS software, developed by the Structural Dynamics Research Corporation (SDRC), and its expansion to the level of capability denoted by the acronym IDEAS**2 currently used for configuration maintenance on Space Station Freedom. In addition to improving proficiency in the use of I-DEAS and IDEAS**2, it is contemplated that new software modules will be developed to expand the architecture of IDEAS**2. Such modules will deal with those analyses that require the integration of a space platform's configuration with a breakdown of planned construction activities and with a failure modes analysis to support computer aided system engineering (CASE) applied to space construction.

Racheli, Ugo↗

Integrated Global Observation Strategy - Ozone and Atmospheric Chemistry Project

The "Long Term Continuity of Stratospheric Ozone Measurements and Atmospheric Chemistry" project was one of six established by the Committee on Earth Observing Satellites (CEOS) in response to the Integrated Global Observing Strategy (IGOS) initiative. IGOS links satellite and ground based systems for global environmental observations. The strategy of this project is to develop a consensus of user requirements including the scientific (SPARC, IGAC, WCRP) and the applications community (WMO, UNEP) and to develop a long-term international plan for ozone and atmospheric chemistry measurements. The major components of the observing system include operational and research (meeting certain criteria) satellite platforms planned by the space faring nations which are integrated with a well supported and sustained ground, aircraft, and balloon measurements program for directed observations as well satellite validation. Highly integrated and continuous measurements of ozone, validation, and reanalysis efforts are essential to meet the international scientific and applications goals. In order to understand ozone trends, climate change, and air quality, it is essential to conduct long term measurements of certain other atmospheric species. These species include key source, radical, and reservoir constituents.

Hilsenrath, Ernest↗

Recent Progress in Materials Selection and Characterizations for Ultra Long Duration Balloon (ULDB) Missions

The development and characterization of materials suitable for ultra long duration balloon flights has recently been the focus of the materials R&D efforts for the NASA balloon program. Although basic materials selection criteria is similar to those used for conventional balloon missions, additional considerations related to balloon design, fabrication, durability, environmental effects, and cost must also be considered. Among these, the highest impact on material selection is, related to the design shape of the balloon. Work done by independent researchers indicate that for pumpkin type balloons, the load-carrying member is the tendon rather than the structural envelope. This in turn lowers the strength requirements on the envelope material to a large extent. Several materials and material combinations were explored for both design systems. This paper will present the progress made to date in the selection and characterization of these materials and the technical challenges remaining to be overcome,

Said, Magdi A.↗

Fortifying Environmental Compliance Strategies at Hanford - 19541

At the Hanford Site, located near Richland, Washington, the Department of Energy is cleaning up legacy radioactive and mixed-waste generated from the Manhattan Project in the 1940's. A major component of cleaning up the waste is maintaining compliance with federal and state environmental regulations. Environmental compliance is also determined through permits, agreements, and consent orders issued by regulating agencies such as the Washington State Department of Health: Office of Radiation Protection, Washington State Department of Ecology Nuclear Waste Program, and the Environmental Protection Agency. Maintaining compliance at Hanford reduces environmental impacts and addresses violations, or non-compliances. The following strategies improve compliance and support the avoidance of enforcement actions. At Hanford, regulatory agency environmental enforcement actions, and their corrective actions, are tracked to completion using databases maintained by inspection subject matter experts. The databases are used to provide the Department of Energy and contractor management with up-to-date status of regulatory agency activity and the required corrective actions. Trending enforcement actions helps target compliance vulnerabilities. Findings and corrective actions that are entered into the databases are then trended by date, location, responsible contractor, agency, and type of compliance issue. The ability to review previous non-compliances in certain locations of the Site, or by general alleged violation, provides the project's environmental contacts with information on what types of issues to look for on pre-inspection walk downs. Finding non-compliances during pre-inspection walk downs allows the contractor to correct the issue and avoid potential fines from regulating agencies. The walk downs are conducted by environmental specialists and project personnel looking for issues that may be viewed as a compliance problem. Using agency checklists and previous inspection correspondence can help to provide valuable information during pre-inspection activities. Training regulatory agency inspectors on Site security requirements, cultural and ecological standards, and inspection protocols allows for increased efficiency and reduces potential miscommunication between regulatory agencies and the regulated contractors. The training also allows the contractors to give the regulating agencies the up-to-date policies and procedures that will be addressed during the inspection. Hanford has pre-identified inspection coordinators within each contractor to assist in coordinating with Department of Energy personnel, projects, and management prior to the inspections. These inspection coordinators notify affected management, accommodate and escort the regulators to locations they ask to inspect, set up requested interviews, and gather requested information that will need to be cleared for public release. These practices make for positive experiences and interactions with the regulating agency personnel and help reduce and eliminate environmental non-compliances, findings, violations, and fines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

USACE FUSRAP Records Management Challenges in the Digital Age - 20242

In late 2016, the U.S. Army Corps of Engineers (USACE) implemented a Headquarters-supported nationwide records management initiative managed by the USACE-New England District to address the digitization and organization of Formerly Utilized Sites Remedial Action Program (FUSRAP) project files. This initiative will prepare USACE FUSRAP for moving toward a fully electronic system of records management. Additionally, the records management initiative streamlines the process and prepares the Administrative Record (AR) and Permanent Record (PR) file for transfer from USACE to the U.S. Department of Energy (DOE)-Office of Legacy Management (LM) following project closeout. Over the past couple of years, USACE and DOE-LM have been working to finalize a joint guidance document to assist in the FUSRAP records transition process. However, there remain key records management topics that require further discussion and development. Specifically, these topics include the implementation, process, and procedure for the capture of social media records and compliance with Section 508 of the Rehabilitation Act of 1973 (29 USC 794d), as amended. Due to advances in technology and the ease of communication it provides, USACE is using social media more often to interface with the public than 5, 10 or 15 years ago. The identification and capture of these records are challenging because it requires each USACE district or producer of a record to track what has been released through social media so that it can be captured as part of the AR or PR. USACE is currently evaluating processes and procedures for social media records capture. This paper explores how social media is being used by USACE across FUSRAP projects and best practices for the capture of social media records. Public accessibility to the project AR is required under the Comprehensive Environmental Response, Compensation, and Liability Act, which USACE FUSRAP must follow. As USACE FUSRAP ARs are converted to a digital format, greater accessibility to the files can be provided through web sites or other electronic media. However, Section 508 of the Rehabilitation Act must be considered when releasing electronic files to the public. Under Section 508, government agencies must ensure that information is made available to the public in a format that provides equal access to persons with disabilities. This paper discusses the electronic records requirements under Section 508 and addresses broad implementation of compliance across large digital records sets. Records management challenges are presented in the context of the FUSRAP records management program; however, these records management considerations and best practices are applicable across all Federal agency records management programs. Examples presented will further aid in understanding electronic records requirements that may be included on new USACE FUSRAP contracts as well as upcoming National Archives Records Administration requirements that will move us toward an electronic government. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geospatial Data from the Alpine Treeline Warming Experiment (ATWE) on Niwot Ridge, Colorado, USA

This is a collection of all GPS- and computer-generated geospatial data specific to the Alpine Treeline Warming Experiment (ATWE), located on Niwot Ridge, Colorado, USA. The experiment ran between 2008 and 2016, and consisted of three sites spread across an elevation gradient. Geospatial data for all three experimental sites and cone/seed collection locations are included in this package. –––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––Geospatial files include cone collection, experimental site, seed trap, and other GPS location/terrain data. File types include ESRI shapefiles, ESRI grid files or Arc/Info binary grids, TIFFs (.tif), and keyhole markup language (.kml) files. Trimble-imported data include plain text files (.txt), Trimble COR (CorelDRAW) files, and Trimble SSF (Standard Storage Format) files. Microsoft Excel (.xlsx) and comma-separated values (.csv) files corresponding to the attribute tables of many files within this package are also included. A complete list of files can be found in this document in the “Data File Organization” section in the included Data User's Guide. Maps are also included in this data package for reference and use. These maps are separated into two categories, 2021 maps and legacy maps, which were made in 2010. Each 2021 map has one copy in portable network graphics (.png) format, and the other in .pdf format. All legacy maps are in .pdf format. .png image files can be opened with any compatible programs, such as Preview (Mac OS) and Photos (Windows). All GIS files were imported into geopackages (.gpkg) using QGIS, and double-checked for compatibility and data/attribute integrity using ESRI ArcGIS Pro. Note that files packaged within geopackages will open in ArcGIS Pro with “main.” preceding each file name, and an extra column named “geom” defining geometry type in the attribute table. The contents of each geospatial file remain intact, unless otherwise stated in “niwot_geospatial_data_list_07012021.pdf/.xlsx”. This list of files can be found as an .xlsx and a .pdf in this archive.As an open-source file format, files within gpkgs (TIFF, shapefiles, ESRI grid or “Arc/Info Binary”) can be read using both QGIS and ArcGIS Pro, and any other geospatial softwares. Text and .csv files can be read using TextEdit/Notepad/any simple text-editing software; .csv’s can also be opened using Microsoft Excel and R. .kml files can be opened using Google Maps or Google Earth, and Trimble files are most compatible with Trimble’s GPS Pathfinder Office software. .xlsx files can be opened using Microsoft Excel. PDFs can be opened using Adobe Acrobat Reader, and any other compatible programs. A selection of original shapefiles within this archive were generated using ArcMap with associated FGDC-standardized metadata (xml file format). We are including these original files because they contain metadata only accessible using ESRI programs at this time, and so that the relationship between shapefiles and xml files is maintained. Individual xml files can be opened (without a GIS-specific program) using TextEdit or Notepad. Since ESRI’s compatibility with FGDC metadata has changed since the generation of these files, many shapefiles will require upgrading to be compatible with ESRI’s latest versions of geospatial software. These details are also noted in the “niwot_geospatial_data_list_07012021” file.

54 ENVIRONMENTAL SCIENCES↗

Progress in Monitoring Strategies for Risk Reduction in Geologic CO2 Storage

Abstract: This geophysical monitoring review is intended to lay the ground work for an approach to integrating monitoring strategies with risk assessment and risk reduction and to summarize work conducted by U.S. Department of Energy's National Risk Assessment Partnership (NRAP) participants that addresses key questions related to monitoring strategies. Commercial, demonstration and pilot geologic CO2 storage (GCS) projects have provided a wealth of practical experience in monitoring technologies. In this manuscript we review a few key projects, specific geophysical methods, well-based methods, geophysical workflows and some suggested best practices. These practices are often driven and governed by regulatory requirements (e.g. U.S. Environmental Protection Agency [US-EPA] Class VI underground injection regulation) and the need for effective reservoir management of pressures and volumes as well as the site-specific risks to containment, plume migration, and underground sources of drinking water. Reducing uncertainty in monitoring is likely to lead to reducing uncertainty in risk. One of our conclusions is the need for field experiment testing that is risk-driven. It is notable that GCS pilot projects have been designed for safe storage, and to date they have been successful. Technical challenges at all geologic CO2 storage sites include assuring injectivity and capacity predictions are reliable, the fate and subsurface topology of the CO2 plume is acceptable, regulatory permitting and compliance are accomplished in a timely manner, needed business assurances are supported by quantitative technical data, and the storage operation is acceptable to stakeholders. There is risk associated with all of these challenges necessitating a monitoring program utilizing both direct and indirect monitoring methods. Because of the direct association of risk and monitoring in GCS, geophysical monitoring is viewed as a key component in approaching risk assessment. To address monitoring in the context of risk assessment the U.S. Department of Energy's National Risk Assessment Partnership (NRAP) has undertaken a review of work related to monitoring storage sites. In this review we provide a framework for monitoring and then present some specific monitoring tools that may be useful for regulatory compliance, as well as technologies that are applicable to leakage detection.

Harbert, William↗

Progress on Footprint Reduction at the Hanford Site - 12406

The Department of Energy (DOE) Office of Environmental Management (EM) continues to reduce the footprint of legacy sites throughout the EM complex. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess contaminated facilities, soil and groundwater remediation, and solid waste disposition. All of these initiatives are being accomplished with established technologies in proven regulatory frameworks. Ultimately, completion of these environmental cleanup activities will reduce the monitoring and maintenance costs associated with managing large federal facilities, allowing EM to place more focus on other high priority cleanup efforts and facilitate a successful transition to land-term stewardship of these sites. Through the American Recovery and Reinvestment Act (ARRA) investment, the Department's cleanup footprint has been reduced by 45 percent to date, from 2411 km{sup 2} (931 mi{sup 2}) to 1336 km{sup 2} (516 mi{sup 2}s). With this significant progress on footprint reduction, the Department is on track towards their goal to reduce its overall footprint by approximately 90 percent by 2015. In addition, some areas cleaned up may become available for alternate uses (i.e. recreation, conservation, preservation, industrialization or development). Much of the work to reduce the complex's footprint occurred at the Savannah River Site in South Carolina and the Hanford Site in Washington, but cleanup continues across the complex. Footprint reduction is progressing well at the Hanford Site, supported predominantly through ARRA investment. To date, 994 km{sup 2} (384 mi{sup 2}) (65%) of footprint reduction have been achieved at Hanford, with a goal to achieve a 90% reduction by Fiscal Year 2015. The DOE EM and DOE Richland Operations Office, continue to make great progress to reduce the legacy footprint of the Hanford Site. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess facilities, both contaminated and uncontaminated, waste site cleanup activities, and debris pile removal. All of these activities can be accomplished with proven technologies and within established regulatory frameworks. Footprint reduction goals for Fiscal Year 2011 were exceeded, largely with the help of ARRA funding. As cleanup projects are completed and the total area requiring cleanup shrinks, overall costs for surveillance and maintenance operations and infrastructure services decrease. This work completion and decrease in funding requirements to maintain waste sites and antiquated facilities allows more focus on high priority site missions (i.e. groundwater remediation, tank waste disposition, etc.) and moves Site areas closer to transition from EM to the Legacy Management program. The progress in the Hanford footprint reduction effort will help achieve success in these other important mission areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗