Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electrical distribution system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Development of a Multi-Robot System for Autonomous Inspection of Nuclear Waste Tank Pits

This paper introduces the overall design plan, development timeline, and preliminary progress of the Autonomous Pit Exploration System project. This project aims to develop an advanced multi-robot system for the efficient inspection of nuclear waste-storage tank pits. The project is structured into three phases: Phase 1 involves data collection and interface definition in collaboration with Hanford Site experts and university partners, focusing on tank riser geometry and hardware solutions. Phase 2 includes the selection of sensors and robot components, detailed mechanical design, and prototyping. Phase 3 integrates all components into a cohesive system managed by a master control package which also incorporates digital twin and surrogate models, and culminates in comprehensive testing and validation at a simulated tank pit at the Idaho National Laboratory. Additionally, the system’s communication design ensures coordinated operation through shared data, power, and control signals. For transportation and deployment, an electric vehicle (EV) is chosen to support the system for a full 10 h shift with better regulatory compliance for field deployment. A telescopic arm design is selected for its simple configuration and superior reach capability and controllability. Preliminary testing utilizes an educational robot to demonstrate the feasibility of splitting computational tasks between edge and cloud computers. Successful simultaneous localization and mapping (SLAM) tasks validate our distributed computing approach. More design considerations are also discussed, including radiation hardness assurance, SLAM performance, software transferability, and digital twinning strategies.

Nuclear waste management↗

High-Power and Flexible Low-Frequency AC Transmission for Renewable Integration

This project develops a steady-state, dynamic, and production cost models of a multi-terminal, high-power, flexible low-frequency ac (LF-HVac) transmission system with grid-forming converters. Through both numerical analysis and EMTP simulation, the project goal is to demonstrate the feasibility of such an innovative and transformative LF-HVac system to support bulk integration of large-scale, cheap, and steady renewable resources from remote locations such as offshore wind farms to meet recent clean energy goals from DOE. The proposed adoption of low-frequency ac transmission aims to improve power transfer capability for remote large-scale renewable integration. In addition, the control for power electronics converters provides grid-support functions to improve the flexibility and resilience the existing 60-Hz HVac system. Future projects on this topic can be supported by both Energy Efficiency and Renewable Energy (DOEEE) and Office of Electricity Delivery & Energy Reliability (DOEOE) offices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Examples of State and Utility Actions on Proactive Planning and Investments

As states across the U.S. confront rising electricity demand, clean energy deployment, grid modernization imperatives, and the integration of large new loads, some regulators and utilities are shifting away from reactive, “just-in-time” investment approaches toward more proactive planning and investment frameworks. This report compiles examples of jurisdictional and utility actions that reshape planning processes, cost recovery mechanisms, and performance oversight to anticipate—rather than simply respond to—future grid needs. Several themes emerge from state actions examined in this report. First, legislatures and commissions are increasingly directing utilities to proactively upgrade their distribution and transmission systems, reflecting a shift toward a forward-looking system that aligns planning with state policy goals. Second, states are establishing long-term, iterative planning frameworks that often feature multi-year horizons, biannual or annual compliance reporting, structured opportunities for stakeholder engagement, and emphasis on collaboration among utilities, regulators, and stakeholders. Third, states are actively investigating innovative cost recovery mechanisms designed to support accelerated electrification and grid modernization, while balancing consumer advocates’ concerns regarding the ratepayer financial risks of premature investments. Fourth, performance metrics and reporting requirements are being developed to ensure transparency and accountability for proactive investments. Fifth, methodological improvements in planning—such as aligning load forecasting assumptions, incorporating sensitivities, and considering load management potential across building, vehicles, storage, and demand response—are recurring areas of stakeholder focus across jurisdictions. Overall, these developments signify a growing recognition among state regulators, utilities, and stakeholders that proactive planning—supported by clear definitions, consistent and transparent methodologies, robust performance metrics, and innovative cost recovery mechanisms—is a tool that can be used to address the scale and urgency of contemporary grid needs.

electricity market↗

Alternating-bias assisted annealing of amorphous oxide tunnel junctions

Superconducting quantum bits (qubits) rely on ultra-thin, amorphous oxide tunneling barriers that can have significant inhomogeneities and defects as grown. This can result in relatively large uncertainties and deleterious effects in the circuits, limiting the scalability. Finding a robust solution to the junction reproducibility problem has been a long-standing goal in the field. Here, we demonstrate a transformational technique for controllably tuning the electrical properties of aluminum-oxide tunnel junctions. This is accomplished using a low-voltage, alternating-bias applied individually to the tunnel junctions, with which resistance tuning by more than 70% can be achieved. The data indicates an improvement of coherence and reduction of two-level system defects. Transmission electron microscopy shows that the treated junctions are predominantly amorphous, albeit with a more uniform distribution of alumina coordination across the barrier. This technique is expected to be useful for other devices based on ionic amorphous materials.

36 MATERIALS SCIENCE↗

Study of eVTOL Charging Impact on Airport Electrical Grids

Growth in commercial air traffic has increased the aviation industry's contribution to global emissions. Aircraft electrification can reduce greenhouse gas emissions along with being efficient and reliable. Advanced air mobility introduces the idea of an advanced and more efficient air transportation system. Electric and hybrid aircraft designs, such as electric vertical takeoff and landing (eVTOL), are being considered for a number of applications, such as urban air mobility, cargo delivery, and medical emergencies. Although the electrification of aircraft provides environmental benefits, their charging needs will place significant demand on the electrical grid. This work presents a grid impact study and infrastructure upgrade requirements analysis of eVTOL charging on a realistic distribution grid through power flow simulation analysis. The case study results show that the eVTOL charging can lead to power quality issues, such as undervoltage and equipment capacity overloading. Grid infrastructure, such as lines and transformers, would need to be upgraded, and voltage management strategies would need to be deployed to accommodate eVTOL charging at an existing airport.

advanced air mobility (AAM)↗

GridDS: Data Science Toolkit for Energy Grid Data

According to the U.S. Energy Information Administration (EIA), the demand for energy is expected to increase 50% by the year 20501. While energy standards, such as the Institute of Electrical and Electronics Engineers (IEEE) Standard 1547, (Basso 2015) and monitoring with wide area management systems (WAMS) (Liu 2017, Zhou 2016) have enabled large scale data collection and storage, the application of this data in mitigating costs associated with increased consumer demand is an ongoing focus for energy research. This ubiquitous data collection presents a promising opportunity for machine learning and data science to improve efficiency of distributed energy resources (DERs). The GridDS software toolkit is designed to leverage advanced metering infrastructure (AMI), outage management systems data (OMS), Supervisory control Data Acquisition (SCADA), and geographic information systems (GIS) to forecast future energy demands and detect incipient grid failures. GridDS is a python software library designed to be modular and generalizable to data recorded by DERs. In adapting to disparate datasets recorded by various WAMS, GridDS provides a range of unique functionality not presently implemented in current WAMS which have highly specific software infrastructure by design. GridDS functionality ranges from data specification and preparation, to training and validation for state of the art machine learning, to interactive data visualization. For data intake, GridDS combines: Pandera: a library for creating data specifications. TimeScaleDB: a postgresSQL database infrastructure for efficient storage of timeseries data. Dataset class: A custom dataset class / interface that ensures modularity between a range of synthetic and live recorded datasets. Is

Ladd, Alexander↗

Integrated Distribution Planning

The contemporary distribution planning landscape is comprised of an increasing number of factors that require integration into the engineering of the modern electric grid. Expectations for electric utilities to accommodate heightened awareness of stakeholders' interest in things like decarbonization, resilience and equity are growing. As these interests are formed into objectives, many jurisdictions will experience increasing levels of load modifying technologies like DER, building and industrial electrification and electric vehicles which prove not only to challenge the capabilities of the grid; but the processes by which planning for it is traditionally done. Other related factors that strain the conventional distribution planning mold are the swelling amount and sources of data associated with these technologies and the need it creates for improved capabilities in the processes and tools that manage it. As the complexity of the distribution system expands, so will the distribution system's effects on the transmission and generation systems that it is a part of. Forecasting distribution system load and DER are examples of areas where this complexity will manifest, and harmonizing distribution forecasting with transmission and generation forecasting requires higher amounts of intentionality as these typically separate processes become a solitary one. Of course, core activities do not cease as a utility begins to integrate these other factors, and in this webinar we explore specifics of how distribution planning can be expected to evolve as progress towards Integrated Distribution System Planning is made.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Recommended Functionalities for Improving Cybersecurity of Distributed Energy Resources: Preprint

The legacy electric grid is transitioning into a 'present' modern grid due to increasing penetration of intermittent renewable generation at the distribution side, also known as distributed energy resources (DERs). Monitoring and control of such DERs requires extensive data-exchange and bidirectional communication networks. This bidirectional communication paves the way to cyber vulnerabilities and risks for new kinds of cyber-attacks that may have destructive impacts on power system operations. Since IEEE Std. 1547-2018 does not discuss cybersecurity measures for DERs, cybersecurity controls should be developed for securing DER systems at all three levels: device level, communications level, and applications level. This paper discusses the current industry's best practices related to DER cybersecurity and proposes recommended functionalities for improving the cybersecurity posture of DERs. These practical recommended functionalities have been discussed and verified with the industry through a DER cybersecurity working group and are meant to improve the device level security of DERs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Participation Factor-Based Approach for Defining the EMT Model Boundary for Power System Simulations with Inverter-Based Resources

The increasing penetration of inverter-based resources (IBRs) introduces new challenges to power system simulations, particularly with the emergence of fast electromagnetic transient (EMT) dynamics and sub-synchronous oscillations (SSO) that require time-consuming EMT simulations. To reduce the time cost for simulating a large-scale power grid with IBRs, this paper proposes a novel participation factor-based approach for defining a critical zone for detailed EMT modeling and simulations, which includes the IBRs, synchronous generators, and the network components participating significantly in simulated contingencies. Both model-based and response-based methods are introduced for the estimation of participation factors (PFs). The case study on the 240-bus Western Electricity Coordinating Council (WECC) system demonstrates that the EMT zone determined by the proposed approach can effectively capture power system dynamics involving IBRs.

EMT simulation↗

10 MWE CDCL Large Pilot Plant – pre-FEED Study

Coal Direct Chemical Looping (CDCL) is an advanced oxy-combustion technology that has the potential to substantially reduce the energy penalty and the cost of electricity (COE) for coal-fired power generation with CO₂ capture. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been collaborating on the development of an iron oxide oxygen-carrier based chemical looping technology for clean power generation with inherent carbon capture. In this process, coal is dried and pulverized prior to being transported into a moving-bed reducer. In the reducer, coal reacts with the oxygen-carrier particles, forming combustion byproducts, predominantly CO₂ and H₂O, while reducing the iron oxide oxidation state from Fe₂O₃ to a mixture of FeO and Fe. The reduced state particles are then transported to a combustor reactor and re-oxidized with air. Following the oxidation, the oxygen-carrier particles are regenerated, and a large amount of heat is released for steam production. The produced steam is sent to a turbine for electricity generation. Meanwhile, the CO₂–rich stream leaving the reducer is cooled, cleaned, and compressed for subsequent pipeline transportation and sequestration. By combining air separation and fuel conversion into a single system, the CDCL technology enables the intensification of oxy-combustion processes by eliminating the energy and cost intensive cryogenic air separation unit and thereby results in higher overall plant efficiencies and lower COE’s. The use of a moving-bed reducer results in high conversions of volatile hydrocarbons and high CO₂ purity, which reduces the cost of downstream CO₂ purification for sequestration or utilization. The Babcock & Wilcox Company in collaboration with The Ohio State University, Johnson & Matthey, The Electric Power Research Institute, and Dover Light & Power completed a Preliminary Front-End Engineering and Design (Pre-FEED) study of a 10 MWe coal-direct chemical looping (CDCL) pilot plant. The planned system is a modular 10 MWe CDCL large pilot facility consisting in 4 modules of 2.5 MWe each, working in parallel and to be hosted within the current structure at the City of Dover’s Municipal Power Plant. The CDCL system can achieve auto-thermal operation and includes a sub-critical steam cycle for power generation. The pilot system was designed to demonstrate full commercial operation at a reduced scale. The coal distribution per plan area is a representative slice of larger commercial arrangements. The system includes a CO₂ recycle system, but it does not include a compression system. The large pilot includes all the environmental control equipment and oxygen carrier and ash handling systems. As part of the project, the Team performed laboratory testing and carried out multiple pilot test campaigns to obtain design and performance information at the 250 kWth CDCL pilot facility at the Babcock & Wilcox Company’s Research Center. The Team demonstrated sustained operations at designed coal inputs, high coal conversion, high CO₂ purity, heat generation on the combustor, low carbon carryover between reactors and low particle attrition. Emissions generated in the reducer reactor were identified as SO₂ and NO x . The commercial manufacturing cost of oxygen carrier particle was evaluated by JM. A particle manufacturing report was generated and submitted to the DOE. Based on the results from the pilot tests and the pre-FEED design efforts, a techno-economic analysis was performed. The study shows that the CDCL process is a promising carbon-friendly technology capable of producing electricity with high efficiency. The estimated COE of the supercritical CDCL plant is $83.3 / MWh, which meets DOE’s target of less than 30% increase in COE when compared to a supercritical PC plant without CO₂ capture. This is the lowest among the existing carbon capture technologies (post-combustion and oxy-combustion) for fossil fuel power plant. CDCL is evaluated to be the most promising technology for carbon capture from the economic aspect.

01 COAL, LIGNITE, AND PEAT↗

Electroenzymatic Nitrogen Fixation Using a MoFe Protein System Immobilized in an Organic Redox Polymer

Abstract We report an organic redox‐polymer‐based electroenzymatic nitrogen fixation system using a metal‐free redox polymer, namely neutral‐red‐modified poly(glycidyl methacrylate‐ co ‐methylmethacrylate‐ co‐ poly(ethyleneglycol)methacrylate) with a low redox potential of −0.58 V vs. SCE. The stable and efficient electric wiring of nitrogenase within the redox polymer matrix enables mediated bioelectrocatalysis of N 3 − , NO 2 − and N 2 to NH 3 catalyzed by the MoFe protein via the polymer‐bound redox moieties distributed in the polymer matrix in the absence of the Fe protein. Bulk bioelectrosynthetic experiments produced 209±30 nmol NH 3 nmol MoFe −1 h −1 from N 2 reduction. 15 N 2 labeling experiments and NMR analysis were performed to confirm biosynthetic N 2 reduction to NH 3 .

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Impact of FERC Order 2222 on DER Participation Rules in US Electricity Markets

Electricity markets in the bulk grid are beginning to implement market mechanisms that support the procurement of flexible capabilities from wide range of technologies, including distributed energy resources (DERs). The flexibility of these resources will help counterbalance supply uncertainties from large-scale integration of variable renewable generation. To encourage development of distributed and aggregated market participants, FERC Order 2222 was issued in September 2020 to require each Independent System Operator (ISO) in the US to implement rules that enable broader participation from aggregations of DERs in the bulk market. The following paper first describes the generic design of ISO markets before introducing the new market participation rules that ISOs have proposed for compliance with Order 2222. The paper then describes how software performance issues may continue to affect the eligibility requirements and offer structures for DER aggregations participating in ISOs, noting that continued research on computational methods may help reduce burdens for DER integration. The prospects for transmission and distribution system coordination is second major issue discussed, which will require minor changes to existing processes in the short term. In the longer term, there is more opportunity for more wide-ranging reforms, such as the development of a Distribution System Operator (DSO) framework. Newly proposed market rules may affect how Transactive Energy Systems (TES) will help facilitate efficient formation of DER aggregations and operation of the individual DERs within an aggregation. Within the TES context, the challenge is to fully understand how resource eligibility and operational and planning coordination methods will affect the design and implementation of TES.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sizing battery energy storage and PV system in an extreme fast charging station considering uncertainties and battery degradation

In this paper, we present mixed integer linear programming (MILP) formulations to obtain optimal sizing for a battery energy storage system (BESS) and solar generation system in an extreme fast charging station (XFCS) to reduce the annualized total cost. The proposed model characterizes a typical year with eight representative scenarios and obtains the optimal energy management for the station and BESS operation to exploit the energy arbitrage for each scenario. Contrasting extant literature, this paper proposes a constant power constant voltage (CPCV) based improved probabilistic approach to model the XFCS charging demand for weekdays and weekends. This paper also accounts for the monthly and annual demand charges based on realistic utility tariffs. Furthermore, BESS life degradation is considered in the model to ensure no replacement is needed during the considered planning horizon. Different from the literature, this paper offers pragmatic MILP formulations to tally BESS charge/discharge cycles using the cumulative charge/discharge energy concept. McCormick relaxations and the Big-M method are utilized to relax the bi-linear terms in the BESS operational constraints. Finally, a robust optimization-based MILP model is proposed and leveraged to account for uncertainties in electricity price, solar generation, and XFCS demand. Case studies were performed to signify the efficacy of the proposed formulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Thermal Hydraulic Experimental Test Article (FY2020 Status Report)

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA will be installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2. The design work for the facility has been completed. Since the FY19 THETA status report, the THETA primary system components have been assembled and tested using de-ionized water. Some results of this testing at select Richardson and Reynolds numbers are included herein. The custom THETA sodium flowmeter (permanent magnet submersible sodium flowmeter) has been built and calibrated using sodium in an auxiliary facility against a NIST traceable vortex shedder type flowmeter. The permanent magnet flowmeter showed excellent performance, following the theoretical equation for measured voltage quite well, with an error < 3.5% at flow rates ranging from 3-24 GPM at temperatures up to 400 °C. The secondary sodium system for heat rejection from intermediate heat exchanger has been analyzed according to ASME code. All secondary side piping, fittings and a U-stamped air-to-sodium heat exchanger have been procured.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Thermal Hydraulic Experimental Test Article - Report of THETA Commissioning for METL Testing

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA has been installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2 and Figure 3. Since the FY20 THETA status report, [1], further water shakedown testing was performed, some final welding modifications were performed, all system components were sanitized, dry assembled, and commissioned before installing into METL test vessel #4. The THETA submersible electromagnetic flowmeter was welded closed to hermetically seal internal components from sodium followed by a helium leak check for the final time

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Thermal Hydraulic Experimental Test Article (FY21 Final Report)

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA has been installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2 and Figure 3. Since the FY20 THETA status report, further water shakedown testing was performed, some final welding modifications were performed, all system components were sanitized, dry assembled, and commissioned. The THETA submersible electromagnetic flowmeter was welded closed to hermetically seal internal components from sodium followed by a helium leak check for the final time. Following installation of THETA into vessel #4, all data acquisition and control systems were brought online and commissioned at room temperature in the argon gas space of the empty vessel. The vessel zone 1 heaters were reinstalled and the flange was then insulated. The vessel 4 heaters were brought to a temperature of 100 °C and the THETA pump was jogged at 600 RPM to ensure it was functioning correctly. The secondary, AC Conduction based electromagnetic pump from CMI Novacast (product number CA-15) was ordered and will be delivered in late calendar year 2021. The custom designed permanent magnet based secondary flowmeter was designed, a drawing package and manufacturing specification created and quote requested from a machine shop. The intermediate heat exchanger design was completed and a drawing package is currently in progress. During the middle of calendar year 2021 the Building 308 sodium scrubber system was shut down in order to replaced some corroded piping and facilitate improvements on the system, thus requiring the sodium in METL to remain frozen. This has imposed a delay in filling vessel 4 with sodium to begin THETA testing. Sodium testing is expected to begin in early fiscal year 2022 as all THETA primary systems are operational.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Thermal Hydraulic Experimental Test Article - Status Report FY20 Q2

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (like a redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA will be installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2. The design work for the facility has been completed, most primary component have been fabricated, primary components are being assembled in preparation for initial testing, and procurement is continuing with the secondary system components. Since the FY19 THETA status report, The THETA primary system components are at Argonne National Laboratory (ANL) and have been dry assembled. The secondary sodium system for heat rejection from intermediate heat exchanger has all been analyzed according to ASME code. All secondary side piping, fittings and a U-stamped air-to-sodium heat exchanger has been procured.

42 ENGINEERING↗