Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “control simulation testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Sub-Doppler Cooling of a Trapped Ion in a Phase-Stable Polarization Gradient

Trapped ions provide a highly controlled platform for quantum sensors, clocks, simulators, and computers, all of which depend on cooling ions close to their motional ground state. Existing methods like Doppler, resolved sideband, and dark resonance cooling balance trade-offs between the final temperature and cooling rate. A traveling polarization gradient has been shown to cool multiple modes quickly and in parallel, but utilizing a stable polarization gradient can achieve lower ion energies, while also allowing tailorable light-matter interactions in the sub-wavelength regime. In this Letter, we demonstrate cooling of a trapped ion below the Doppler limit using a phase-stable polarization gradient created using trap-integrated photonic devices. At an axial frequency of 2⁢𝜋×1.45 MHz we achieve ⟨𝑛⟩=1.56±0.07 in 150 μ⁢s and cooling rates of ∼0.3 quanta/μ⁢s. Here, we examine ion dynamics under different polarization gradient phases, detunings, and intensities, showing reasonable agreement between experimental results and a multilevel model. Cooling is fast and power efficient, with lower average motional Fock state occupation when compared to simulated operation under the corresponding running wave configuration. Our results demonstrate a well-controlled test bed for studying the dynamics of multilevel atomic systems in a phase-stable polarization gradient.

Atom & ion cooling↗

Optimal Droop Setting for Congestion Reduction in a 100% Grid-Forming Inverter-based Power System

he high penetration of inverter-based resources (IBRs) introduces new challenges to power systems due to the complex inverter control. However, IBRs can be configured to maximize their benefits to improve system resilience and reliability. This paper proposes a steady-state optimization model that aims to mitigate transmission congestion in a 100% grid- forming (GFM) IBR-based power system. This goal is achieved by determining the optimal droop settings for the GFM IBRs under different congestion conditions due to renewable energy and load variations. The numerical solution is rigorously verified by a high-fidelity model of the IEEE 39-bus test system with detailed GFM IBR control in the time-domain electromagnetic transient (EMT) simulation tool PSCAD. The numerical solution and simulation results show a significant congestion reduction while meeting all other operating requirements. It is also observed that the numerical solving time is substantially less compared to the EMT simulation time.

Nguyen, Quan H.↗

Incentive-Based Control and Coordination of Distributed Energy Resources

Higher penetration of renewable generation will increase the demand for adequate (and cost-effective) controllable resources on the grid that can mitigate and contain contingencies locally before they cause a network-wide collapse. This report details a scalable hierarchical control strategy for coordinating a vast number of heterogeneous distributed energy resources (DERs) in order to provide three ancillary grid services: frequency response, regulation, and ramping reserve. The control architecture consists of 1) a Distribution Reliability Coordinator (DRC), which allocates resource responses based on their declared flexibility, 2) aggregator controllers, which control a collection of DERs, and finally, 3) DER controllers at the individual devices. Test results are provided showing scalable performance on thousands of simulated residential DERs (air conditioners and water heaters) as well as results of a hardware-in-the-loop demonstration of commercial HVAC and microgrid equipment providing real responses in coordination with a grid simulation. Technology commercialization barriers and strategy is also discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Mass Wood Walls on Building Energy Use, Peak Demand, and Thermal Comfort

Thermal mass moderates indoor temperatures, allowing the heating, ventilation, and air conditioning (HVAC) system to operate more efficiently during peak hours. Cross-Laminated Timber (CLT) and other mass wood products provide thermal mass to the building envelope in a lighter and more environmentally friendly form than concrete. However, the influence of CLTs on heating and cooling energy, peak energy demand, and the indoor climate is not well-known. This project was formed to find the energy efficiency benefits of mass timber structures. The objectives were to (1) test the thermal performance of insulated mass wall structures in controlled laboratory conditions, (2) validate simulation models to expand performance to natural climatic conditions, (3) isolate the impact of the thermal properties of wood (thermal mass, thermal conductivity, moisture storage) on heating and cooling energy use and peak energy demand, and to optimize the performance. Currently, the designs used for CLT buildings have focused on structural and fire issues, and they do not consider the thermal mass benefits. Therefore, the thermal performance is not necessarily optimized.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A simplified fuel control approach for low cost aircraft gas turbines

Reduction in the complexity of gas turbine fuel controls without loss of control accuracy, reliability, or effectiveness as a method for reducing engine costs is discussed. A description and analysis of hydromechanical approach are presented. A computer simulation of the control mechanism is given and performance of a physical model in engine test is reported.

Gold, H.↗

An integrated PCM data system for full scale aeronautics testing

An integrated PCM data system is being developed at Ames Research Center to gather test data on advanced STOL propulsive lift, VTOL, rotary wing, and V/STOL control systems concepts as they pass through wind-tunnel, test-stand, flight-simulator and flight-test phases. Identical airborne signal conditioning and PCM encoding is used on test aircraft and wind tunnel models. An 80,000 word/second PCM installation will be the first all PCM-instrumented rotary wing development project. The system uses both dedicated and time-shared computers for fast data analysis with maximum use of resources. This system development shows one way to bring separate data user groups together over a common data base, while sharing computing resources for minimum cost.-

Reynolds, D. R.↗

The 3-axis Dynamic Motion Simulator (DMS) system

A three-axis dynamic motion simulator (DMS) consisting of a test table with three degrees of freedom and an electronics control system was designed, constructed, delivered, and tested. Documentation, as required in the Data Requirements List (DRL), was also provided.

Source record↗

Development of systems and techniques for landing an aircraft using onboard television

A flight program was conducted to develop a landing technique with which a pilot could consistently and safely land a remotely piloted research vehicle (RPRV) without outside visual reference except through television. Otherwise, instrumentation was standard. Such factors as the selection of video parameters, the pilot's understanding of the television presentation, the pilot's ground cockpit environment, and the operational procedures for landing were considered. About 30 landings were necessary for a pilot to become sufficiently familiar and competent with the test aircraft to make powered approaches and landings with outside visual references only through television. When steep approaches and landings were made by remote control, the pilot's workload was extremely high. The test aircraft was used as a simulator for the F-15 RPRV, and as such was considered to be essential to the success of landing the F-15 RPRV.

Gee, S. W.↗

Berthing simulator for space station and orbiter

The development of a real-time man-in-the-loop berthing simulator is in progress at NASA Lyndon B. Johnson Space Center (JSC) to conduct a parametric study and to measure forces during contact conditions of the actual docking mechanisms for the Space Station Freedom and the orbiter. In berthing, the docking ports of the Space Station and the orbiter are brought together using the orbiter robotic arm to control the relative motion of the vehicles. The berthing simulator consists of a dynamics docking test system (DDTS), computer system, simulator software, and workstations. In the DDTS, the Space Station, and the orbiter docking mechanisms are mounted on a six-degree-of-freedom (6 DOF) table and a fixed platform above the table. Six load cells are used on the fixed platform to measure forces during contact conditions of the docking mechanisms. Two Encore Concept 32/9780 computers are used to simulate the orbiter robotic arm and to operate the berthing simulator. A systematic procedure for a real-time dynamic initialization is being developed to synchronize the Space Station docking port trajectory with the 6 DOF table movement. The berthing test can be conducted manually or automatically and can be extended for any two orbiting vehicles using a simulated robotic arm. The real-time operation of the berthing simulator is briefly described.

Veerasamy, Sam↗

Application of fuzzy logic-neural network based reinforcement learning to proximity and docking operations: Translational controller results

The reinforcement learning techniques developed at Ames Research Center are being applied to proximity and docking operations using the Shuttle and Solar Maximum Mission (SMM) satellite simulation. In utilizing these fuzzy learning techniques, we also use the Approximate Reasoning based Intelligent Control (ARIC) architecture, and so we use two terms interchangeable to imply the same. This activity is carried out in the Software Technology Laboratory utilizing the Orbital Operations Simulator (OOS). This report is the deliverable D3 in our project activity and provides the test results of the fuzzy learning translational controller. This report is organized in six sections. Based on our experience and analysis with the attitude controller, we have modified the basic configuration of the reinforcement learning algorithm in ARIC as described in section 2. The shuttle translational controller and its implementation in fuzzy learning architecture is described in section 3. Two test cases that we have performed are described in section 4. Our results and conclusions are discussed in section 5, and section 6 provides future plans and summary for the project.

Jani, Yashvant↗

Nonlinear Observers for Gyro Calibration Coupled with a Nonlinear Control Algorithm

Nonlinear observers for gyro calibration are presented. The first observer estimates a constant gyro bias. The second observer estimates scale factor errors. The third observer estimates the gyro alignment for three orthogonal gyros. The observers are then combined. The convergence properties of all three observers, and the combined observers, are discussed. Additionally, all three observers are coupled with a nonlinear control algorithm. The stability of each of the resulting closed loop systems is analyzed. Simulated test results are presented for each system.

Thienel, Julie↗

Nonlinear Observers for Gyro Calibration

Nonlinear observers for gyro calibration are presented. The first observer estimates a constant gyro bias. The second observer estimates scale factor errors. The third observer estimates the gyro alignment for three orthogonal gyros. The convergence properties of all three observers are discussed. Additionally, all three observers are coupled with a nonlinear control algorithm. The stability of each of the resulting closed loop systems is analyzed. Simulated test results are presented for each system.

Thienel, Julie↗

Evaluation of an Outer Loop Retrofit Architecture for Intelligent Turbofan Engine Thrust Control

The thrust control capability of a retrofit architecture for intelligent turbofan engine control and diagnostics is evaluated. The focus of the study is on the portion of the hierarchical architecture that performs thrust estimation and outer loop thrust control. The inner loop controls fan speed so the outer loop automatically adjusts the engine's fan speed command to maintain thrust at the desired level, based on pilot input, even as the engine deteriorates with use. The thrust estimation accuracy is assessed under nominal and deteriorated conditions at multiple operating points, and the closed loop thrust control performance is studied, all in a complex real-time nonlinear turbofan engine simulation test bed. The estimation capability, thrust response, and robustness to uncertainty in the form of engine degradation are evaluated.

Litt, Jonathan S.↗

Ares I-X: First Step in a New Era of Exploration

Since 2005, NASA's Constellation Program has been designing, building, and testing the next generation of launch and space vehicles to carry humans beyond low-Earth orbit (LEO). On October 28, 2009, the Ares Projects successfully launched the first suborbital development flight test of the Ares I crew launch vehicle, Ares I-X, from Kennedy Space Center (KSC). Although the final Constellation Program architecture is under review, data and lessons obtained from Ares I-X can be applied to any launch vehicle. This presentation will discuss the mission background and future impacts of the flight. Ares I is designed to carry up to four astronauts to the International Space Station (ISS). It also can be used with the Ares V cargo launch vehicle for a variety of missions beyond LEO. The Ares I-X development flight test was conceived in 2006 to acquire early engineering, operations, and environment data during liftoff, ascent, and first stage recovery. Engineers are using the test flight data to improve the Ares I design before its critical design review the final review before manufacturing of the flight vehicle begins. The Ares I-X flight test vehicle incorporated a mix of flight and mockup hardware, reflecting a similar length and mass to the operational vehicle. It was powered by a four-segment SRB from the Space Shuttle inventory, and was modified to include a fifth, spacer segment that made the booster approximately the same size as the five-segment SRB. The Ares I-X flight closely approximated flight conditions the Ares I will experience through Mach 4.5, performing a first stage separation at an altitude of 125,000 feet and reaching a maximum dynamic pressure ("Max Q") of approximately 850 pounds per square foot. The Ares I-X Mission Management Office (MMO) was organized functionally to address all the major test elements, including: first stage, avionics, and roll control (Marshall Space Flight Center); upper stage simulator (Glenn Research Center); crew module/launch abort system simulator (Langley Research Center); and ground systems and operations (KSC). Interfaces between vehicle elements and vehicle-ground elements, as well as environment analyses were performed by a systems engineering and integration team at Langley. Experience and lessons learned from these integrated product teams area are already being integrated into the Ares Projects to support the next generation of exploration launch vehicles.

Davis, Stephan R.↗