Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “capital”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Long-run Marginal Emission Rates for Electricity - Workbooks for 2021 Cambium Data

These workbooks contain modeled estimates of long-run marginal emission rates (LRMER) for the contiguous United States. The LRMER is an estimate of the rate of emissions that would be either induced or avoided by a long-term (i.e., more than several years) change in electrical demand. It incorporates both the projected changes to the electric grid, as well as the potential for an incremental change in electrical demand to influence the structural evolution of the grid (i.e., the building and retiring of capital assets, such as generators and transmission lines). It is therefore distinct from the more-commonly-known short-run marginal, which treats grid assets as fixed. The Levelized LRMER worksheet within each workbook is set up to produce a levelized long-run marginal emission rate based on user-provided inputs. These levelized LRMER values are intended for analysts to use when estimating the emissions induced (or avoided) by a long-term change in end-use electricity demand. There are two workbooks that supply the data at two different geographic resolutions: states and GEA regions (20 regions that are similar to, but not exactly the same as, the US EPA's eGRID regions). For more data underlying these emissions factors, see the Cambium 2021 project at https://cambium.nrel.gov/. For more details on the inputs into the scenarios available in the workbooks, see the Standard Scenarios 2021 Report (https://www.nrel.gov/docs/fy22osti/80641.pdf). This data was produced as part of the Cambium project. For more details about the methodology, see the Cambium Documentation: Version 2021 (https://www.nrel.gov/docs/fy22osti/81611.pdf). This data is planned to be updated annually. Information on the latest versions can be found at https://www.nrel.gov/analysis/cambium.html.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Long-run Marginal Emission Rates for Electricity - Workbooks for 2022 Cambium Data

These workbooks contain modeled estimates of long-run marginal emission rates (LRMER) for the contiguous United States. A LRMER is an estimate of the rate of emissions that would be either induced or avoided by a change in electric demand, taking into account how the change could influence both the operation as well as the structure of the grid (i.e., the building and retiring of capital assets, such as generators and transmission lines). It is therefore distinct from the more-commonly-known short-run marginal, which treat grid assets as fixed. Long-run marginal emissions rates are generally appropriate to use when trying to comprehensively estimate the impact of a long-lived (i.e., more than several years) intervention. There are two workbooks that supply the data at two different geographic resolutions: states and GEA regions (20 regions that are similar to, but not exactly the same as, the US EPA's eGRID regions). For more data underlying these emissions factors, see the Cambium 2022 project at https://scenarioviewer.nrel.gov/. For more details on input assumptions and methodology see the associated report (Cambium 2022 Scenario Descriptions and Documentation, https://www.nrel.gov/docs/fy23osti/84916.pdf). This data is planned to be updated annually. Information on the latest versions can be found at https://www.nrel.gov/analysis/cambium.html.

01 COAL, LIGNITE, AND PEAT↗

Long-run Marginal Emission Rates for Electricity - Workbooks for 2023 Cambium Data

These workbooks contain modeled estimates of long-run marginal emission rates (LRMER) for the contiguous United States' electric sector. A LRMER is an estimate of the rate of emissions that would be either induced or avoided by a change in electric demand, taking into account how the change could influence both the operation as well as the structure of the grid (i.e., the building and retiring of capital assets, such as generators and transmission lines). These workbooks provide data for 18 GEA regions covering the contiguous United States. Mappings of these regions to ZIP codes and counties is given in this workbook in the corresponding tabs. For more data underlying these emissions factors, see the Cambium 2023 project at https://scenarioviewer.nrel.gov/. For more details on input assumptions and methodology see the associated report (Cambium 2023 Scenario Descriptions and Documentation, https://www.nrel.gov/docs/fy24osti/88507.pdf). Users are advised to review section 4 of the report, which discusses limitations and caveats of the data. This data is planned to be updated annually. Information on the latest versions can be found at https://www.nrel.gov/analysis/cambium.html.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Q1-2024 Solar Cost Benchmarks

Each year, the U.S. Department of Energy’s (DOE) Solar Energy Technologies Office (SETO) and its national laboratory partners develop cost benchmarks for U.S. solar photovoltaic (PV) systems. These benchmarks track progress toward reducing solar costs and guide R&D priorities. Unlike typical studies that report only $/W, SETO uses intrinsic units (e.g., $/m² for mounting structures) to better capture how technology improvements such as module efficiency would impact system costs. This allows flexible modeling where inputs can vary significantly to assess cost sensitivity. Costs are reported in two ways: Minimum Sustainable Price (MSP): Long term, financially viable price under stable market conditions. Modeled Market Price (MMP): Actual market price, influenced by short term distortions such as tariffs or subsidies. Three national labs collect cost data from industry stakeholders, ensuring no duplication in outreach to stakeholders. Data reflects real transactions (primarily from Q1) and is weighted based on the number of sources per cost element. The PV System Cost Model (PVSCM) divides total installed system cost into eight categories: 1. Module (PV) 2. Inverter 3. Energy Storage System (ESS) 4. Structural BOS (SBOS) 5. Electrical BOS (EBOS) 6. Fieldwork 7. Office work 8. Other (developer/EPC costs) The first five are hardware costs, while the last three are soft costs. Each category includes fixed and variable cost components, where “size” depends on context (e.g., manufacturing capacity for modules vs. system capacity for installation costs). Variable costs are expressed using appropriate intrinsic units. The model reflects the owner’s upfront overnight capital cost, excluding tax credits. Tariffs and subsidies are treated as temporary market distortions affecting MMP but not MSP. PVSCM is implemented in Excel, where cost elements are aggregated into total system cost. Additional sheets handle unit conversions and operation & maintenance (O&M), with O&M costs levelized over the system’s lifetime.

14 SOLAR ENERGY↗

Concept for a multifunctional oscilloscope probe

Multifunctional oscilloscope probe incorporates required electronic components so that any one of three desired functions /direct, demodulation, or low capitance/ can be switched into the oscilloscope. The probe obviates the need for the three seperate oscilloscope probes previously used in checking electronic equipment.

Stringer, E. J.↗

Fuel element concept for long life high power nuclear reactors

Nuclear reactor fuel elements have burnups that are an order of magnitude higher than can currently be achieved by conventional design practice. Elements have greater time integrated power producing capacity per unit volume. Element design concept capitalizes on known design principles and observed behavior of nuclear fuel.

Mcdonald, G. E.↗

Large-scale terrestrial solar cell power generation cost: A preliminary assessment

A cost study was made to assess the potential of the large-scale use of solar cell power for terrestrial applications. The incentive is the attraction of a zero-pollution source of power for wide-scale use. Unlike many other concepts for low-pollution power generation, even thermal pollution is avoided since only the incident solar flux is utilized. To provide a basis for comparison and a perspective for evaluation, the pertinent technology was treated in two categories: current and optimistic. Factors considered were solar cells, array assembly, power conditioning, site preparation, buildings, maintenance, and operation. The capital investment was assumed to be amortized over 30 years. The useful life of the solar cell array was assumed to be 10 years, and the cases of zero and 50-percent performance deg-radation were considered. Land costs, taxes, and profits were not included in this study because it was found too difficult to provide good generalized estimates of these items. On the basis of the factors considered, it is shown that even for optimistic projections of technology, electric power from large-sclae terrestrial use of solar cells is approximately two to three orders of magnitude more costly than current electric power generation from either fossil or nuclear fuel powerplants. For solar cell power generation to be a viable competitor on a cost basis, technological breakthroughs would be required in both solar cell and array fabrication and in site preparation.

Spakowski, A. E.↗

What can nuclear energy do for society.

Nuclear fuel is a compact and abundant source of energy. Its cost per unit of energy is less than that of fossil fuel. Disadvantages of nuclear fuel are connected with the high cost of capital equipment required for releasing nuclear energy and the heavy weight of the necessary shielding. In the case of commercial electric power production and marine propulsion the advantages have outweighed the disadvantages. It is pointed out that nuclear commercial submarines have certain advantages compared to surface ships. Nuclear powerplants might make air-cushion vehicles for transoceanic ranges feasible. The problems and advantages of a nuclear aircraft are discussed together with nuclear propulsion for interplanetary space voyages.

Rom, F. E.↗

What can nuclear energy do for society.

It is pointed out that the earth's crust holds 30,000 times as much energy in the form of fissionable atoms as fossil fuel. Moreover, nuclear fuel costs less per unit of energy than fossil fuel. Capital equipment used to release nuclear energy, on the other hand, is expensive. For commercial electric-power production and marine propulsion, advantages of nuclear power have outweighed disadvantages. As to nuclear submarines, applications other than military may prove feasible. The industry has proposed cargo submarines to haul oil from the Alaskan North Slope beneath the Arctic ice. Other possible applications for nuclear power are in air-cushion-vehicles, aircraft, and rockets.-

Rom, F. E.↗

An experiment with interactive planning models

Experiments on decision making in planning problems are described. Executives were tested in dealing with capital investments and competitive pricing decisions under conditions of uncertainty. A software package, the interactive risk analysis model system, was developed, and two controlled experiments were conducted. It is concluded that planning models can aid management, and predicted uses of the models are as a central tool, as an educational tool, to improve consistency in decision making, to improve communications, and as a tool for consensus decision making.

Beville, J.↗

Northwest passage: Trade route for large air cushion vehicles

A conceptual vehicle and powerplant (10,000-ton) nuclear-powered air-cushion vehicle (ACV) that could open the Northwest Passage and other Arctic passages to commercial traffic is identified. The report contains a description of the conceptual vehicle, including the powerplant and operations, an assessment of technical feasibility, estimates of capital and operating costs, and identification of eligible cargo and markets. A comparison of the nuclear ACV freighter with nuclear container ships shows that for containerized or roll-on/roll-off cargo the ACV would provide greatly reduced transit time between North Atlantic and North Pacific ports at a competitive cost.

Anderson, J. L.↗

Air-cushion tankers for Alaskan North Slope oil

A concept is described for transporting oil from the Arctic to southern markets in 10,000-ton, chemically fueled air-cushion vehicles (ACV's) configured as tankers. Based on preliminary cost estimates the conceptual ACV tanker system as tailored to the transportation of Alaskan North Slope oil could deliver the oil for about the same price per barrel as the proposed trans-Alaska pipeline with only one-third of the capital investment. The report includes the description of the conceptual system and its operation; preliminary cost estimates; an appraisal of ACV tanker development; and a comparison of system costs, versatility, vulnerability, and ecological effect with those of the trans-Alaska pipeline.

Anderson, J. L.↗

Study of V/STOL aircraft implementation. Volume 1: Summary

A high density short haul air market which by 1980 is large enough to support the introduction of an independent short haul air transportation system is discussed. This system will complement the existing air transportation system and will provide relief of noise and congestion problems at conventional airports. The study has found that new aircraft, exploiting V/STOL and quiet engine technology, can be available for implementing these new services, and they can operate from existing reliever and general aviation airports. The study has also found that the major funding requirements for implementing new short haul services could be borne by private capital, and that the government funding requirement would be minimal and/or recovered through the airline ticket tax. In addition, a suitable new short haul aircraft would have a market potential for $3.5 billion in foreign sales. The long lead times needed for aircraft and engine technology development will require timely actions by federal agencies.

Portenier, W. J.↗

Astronomical photography. Part A: Gum nebula, galactic cluster, and zodiacal light photography

It is reported that the Apollo 16 command module astronomical photography was performed with the specific objective of capitalizing on the uniqueness of the double umbra as a vantage point to collect astronomical data that are obtainable only near our Moon. For this reason, these data will be compared directly to analogous photography performed from Earth orbit during Project Mercury and the Gemini Program as well as to the Apollo-duplicated photography taken from sites on the Earth surface. Comparison with Earth-based photography should yield direct information on the Earth airglow layer and on atmospheric scattering and extinction.

Mercer, R. D.↗

Financing the Air Transportation Industry

The basic characteristics of the air transportation industry are outlined and it is shown how they affect financing requirements and patterns of production. The choice of financial timing is imperative in order to get the best interest rates available and to insure a fair return to investors. The fact that the industry cannot store its products has a fairly major effect on the amount of equipment to purchase, the amount of capital investment required, and the amount of return required to offset industry depriciation.

Lloyd-Jones, D. J.↗