Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Validation of Fault-Tolerant Plans for Europa Clipper

The Europa Clipper mission will explore that icy moon in a series of brief flybys through the Jovian radiation belts. A single event upset in the spacecraft flight computer during these critical scientific periods could jeopardize the success of the mission. Rather than safing and awaiting operator intervention, the Clipper mission envisions limited onboard autonomy that can restore spacecraft state sufficiently to resume the encounter observation plan as rapidly as possible. The contingency plan is contained in an Activity Restart Timeline (ART) that is transmitted in parallel with the nominal plan, which must be co-validated jointly against all spacecraft state and resource constraints amid unpredictable fault timing. A prototype validation tool was built that leverages declarative spacecraft models and automated search techniques to find such potential inconsistencies in the unified contingent mission plan. Early validation results within motivating scenarios are presented.

Ferguson, Eric↗

Mirror Design Study for a Segmented HabEx System

NASA is exploring telescope and mirror technology options to meet the demanding science goals of the proposed HabEx space telescope. A key priority for the HabEx mission concept would be to leverage affordable telescope solutions that can meet challenging telescope performance requirements with a demanding program timeline. The baseline approach for HabEx is to use an unobscured, monolithic primary mirror with a coronagraph to optimize system performance. NASA is performing an initial study to investigate the feasibility of a HabEx Lite concept which would not leverage a coronagraph and would therefore, have lower exoEarth yield as a consequence, but could provide system mass, cost, and schedule advantages. The HabEx Lite concept leverages replicated, ULE® mirror segments to provide an attractive, alternative telescope architecture to meet the HabEx threshold mission needs. We present the initial mirror design and performance assessment for the HabEx Lite concept.

Schulz, Kevin↗

Mars Sample Return Conceptual Mission Overview

This talk will provide an overview of an overall Mars Sample Return campaign architecture, and the current concepts and options for the architecture and design of a Mars Sample Retrieval Lander (called Sample Retrieval Lander, SRL). The overall SRL mission concept and key mission objectives will be described, including the mission’s concept of operations and a notional timeline from launch to entry, through surface operations, to delivery of the samples to Mars orbit. The overall lander vehicle concept will be described, including current options being evaluated. Key lander element options will be discussed, including a Mars Ascent Vehicle (MAV), Fetch Rover, Orbiting Sample container (OS), and tube transfer robotics systems. Details of the notional Fetch Rover functions, constraints and operations will be discussed. Specific challenges and approaches for addressing those challenges will be discussed, including key technical margins and planetary protection. Major trade studies and implementation approaches and a proposed schedule will also be discussed. The information provided about possible Mars sample return architectures and concepts is for planning and discussion purposes only. NASA and ESA have made no official decisions to implement Mars Sample Return.

Beyer, Friederike↗

Hybrid chemical-electric trajectories for a Mars Sample Return orbiter

The Earth return orbiter component of a Mars sample return campaign is a high total impulse mission with challenging timeline constraints. These competing demands mean a hybrid chemical-electric propulsion architecture may be needed for a feasible design, with chemical propulsion providing timely impulse and electric propulsion providing high volume impulse. We describe an approach to map out the hybrid trajectory design space and create a database to use in conjunction with a spacecraft design tool, enabling co-optimization of trajectory and spacecraft. This method is applied to both the outbound and inbound legs of a Mars sample return mission concept.

Lock, Rob↗

Mission analysis for a potential Mars Sample Return campaign in the 2020's

The Mars 2020 mission, currently under development by NASA, plans to acquire and cache carefully-selected rock and regolith samples from the surface of Mars for potential future return. NASA and ESA are jointly studying options for returning those samples to Earth with missions launching in the 2020s. This paper demonstrates a method for modeling the various campaign elements, synthesizing coordinated campaign timelines, and assuring trajectory feasibility in the presence of many constraints, and finally optimizing towards mission success. Options for complete sample return campaigns in multiple launch and arrival opportunities are explored and compared.

Huesing, Jakob↗

Mars Sample Return Lander mission concepts

This paper will provide an overview of current concepts and options for the architecture and design of a Mars Sample Return Lander (called Sample Return Lander, SRL). Key mission objectives and the overall baseline mission design will be described, including the constraints and a notional timeline from launch to entry, through surface operations, to delivery of the samples to Mars orbit. The overall lander vehicle concepts will be described, including current options being evaluated.

Karp, Ashley↗

HAT m:N Cognitive Task Analysis (CTA)

This Cognitive Task Analysis (CTA) study was designed to understand the capability of the m:N Tactical Operator (TO) interfaces developed by the Human-Autonomy Teaming Laboratory at NASA Ames to support operators responsible for simplified pilot operations of 100 independently operated small UAS (sUAS) in a constrained geographic area. The m:N sUAS TO interface includes a central Tactical Situation Display (TSD) digital map with moving icons reflecting the sUAS location and planned flight route. The interface also has two side panels. The left panel includes a tabular list of UAS assets and mission tasking, a list of recently viewed assets, and a list of events and alerts. The right panel includes a tabular list of UAS assets and their associated telemetry, text-based chat communication window, and a tabbed checklist window. This CTA was adapted from the incident-based applied cognitive task analysis (Militello & Hutton, 1998) and included demographics questions, scenario-based simulations, a task diagram and knowledge audit methods. In addition to examining the support provided by this m:N sUAS TO interface, this CTA study, conducted with aviation subject matter experts in analogous roles to the future tactical operator, was designed to illuminate and project likely cognitive requirements of the tactical operator. Interviewees participated in two scenario-based simulations using the m:N sUAS TO interfaces. In the first simulation, the interviewees supervised 12 sUAS operating in downtown San Diego, California transiting to and from a central sUAS Hive, restaurant locations, and customer drop off locations. Interviewees were asked to react to a UAS Volume Reservation (UVR) event with a two-phase impact on food delivery operations. In the second scenario, the interviewees supervised 100 sUAS operating in the same airspace and with the same mission. Interviewees used the interfaces to recognize and react to two sUAS air vehicle problems. After each scenario, we asked the interviewees a semi-structured list of questions to elicit their reflections about using the interfaces. Interviewees were confident in their ability to respond to two off-nominal situations in each simulation. Interviewees felt that, given high levels of automation on the sUAS, they would be able to manage the events without requiring additional support or handing off the sUAS to a colleague or supervisor in both the n=12 or n=100 sUAS settings. In the n=12 sUAS condition, interviewees used the center map to understand the asset location and progress along with mission tasking. An additional display window, Asset Telemetry, helped interviewees understand battery state and sUAS altitude. When the number of sUAS increased, interviewees altered their behavior. Rather than maintaining awareness of individual assets, interviewees appeared to become more reactive, managing exceptions. Interviewees reported that they spent less time looking at the nominal aircraft, and focused their attention primarily on the off-nominal aircraft. In addition, in the second simulation with n=100 sUAS, interviewees reported that they relied more on the side panels (Mission Timeline and Asset Telemetry) to gather information.

human-autonomy teaming↗

An Approach for Defining IASMS Services, Functions, and Capabilities

Assuring safety in the NAS with the inclusion of new entrants, such as Advanced Air Mobility (AAM), will require overcoming unique safety challenges that result from combining innovative technologies with novel airspace concepts for moving people and cargo using autonomous vehicles. The focus of the In-time Aviation Safety Management System (IASMS) is to overcome AAM’s safety assurance challenges. The IASMS Concept of Operations (ConOps) describes an interconnected set of services, functions, and capabilities (SFCs) designed to manage operational risks, identify unknown risks, and inform system designs. This paper describes an approach for defining SFCs based on technology trends in research, assessment of known and unknown risks in voluntary safety reports, and causal and contributing factors in aviation accidents and incidents. This approach would identify potential SFCs that further expand the Monitor, Assess, and Mitigate (M-A-M) functionality that represents the enabling framework of the IASMS. Safety implications that will result from integration of AAM in the transformation of the National Airspace System (NAS) were addressed in National Academies committees reports on AAM and IASMS. Development of a ConOps for IASMS was a top recommendation and can be represented as a reframing of safety assurance that builds on real-time alerting such as the Traffic Alert and Collision Avoidance System, and adds the more encompassing in-time temporal parameter in recognition of the different timelines for collecting and assessing safety data for risk mitigations. For example, mining for safety trends from data sources such as the Aviation Safety Information Analysis and Sharing system occurs over a longer time period. Research on AAM operations poses that SFCs can be designed to monitor the safety margin appropriate for AAM including with regards to the distance between current flight parameters and nominal ideal conditions. These in-time comparisons will become more complex as the density of operations increases at least in certain areas and can include planned and actual 4D trajectory, and in-time comparisons having implications on conflict modeling and prediction including expected and actual departure time, fix/waypoint crossing times, and arrival time. These comparisons would be integrated as part of SFCs that redefine and inform new safety margin. An increased safety margin improves management of operational risks while reducing the potential for anomalies. An increased safety margin also has implications for operator confidence in the certainty of its operations and trust in automation. Technology trends in research could be used to refine existing SFCs and define needs for additional SFCs that provide safety improvements to the design and operation of vehicles, airspace design, and operator performance requirements. NASA is developing innovative approaches to safeguard against major accidents and incidents that have occurred in the NAS and those anticipated with the inclusion of envisioned AAM operations. The innovations use operational performance data to monitor, detect, and predict flight variations exceeding safe nominal patterns, such as would be caused by navigational error, severe weather complications, or hijacking of UAS controls. These innovative approaches have high potential to prevent accidents and incidents in the new AAM era. It is anticipated that elements of the innovations will evolve into SFCs for the IASMS. Voluntary safety reports can be monitored to identify anomalies related to design or operational performance risks. Reports could be periodically monitored and assessed for specific topics. Reports might serve as weak signals or precursors indicative of emergent risk such as when combined with other safety information. The architecture could include SFCs that are based on voluntary safety reports recognizing the periodic temporal nature of data analysis. As previously mentioned, aviation accidents with their causal and contributing precursors can inform the need for SFCs in the IASMS. Accidents and incidents at San Francisco International Airport such as Asiana 214 and Air Canada 759 illustrate how combinations of different factors lead to increased risk. These types of precursors and different factors have implications on the types of SFCs that could be needed to monitor and manage different sources and types of design and operational risk. Continuing to assure the safety of AAM as designs and operations gain in complexity can be accompanied by defining SFCs that also increase in complexity. These SFCs can leverage information from findings and recommendations synthesized across on-going research, voluntary safety reports, and accident and incident reports. These SFCs can serve to refine accuracy of algorithms and resolve limitations with current practices. The IASMS architecture represents the framework for the SFCs and their critical role in safety assurance.

In-Time Aviation Safety Management System↗

Maintenance Human Factors and Flight Safety

This chapter will chronicle the journey of the community of operators, regulators, and researchers who embarked upon the task of identifying critical human factors of maintenance and inspection, establishing a database and research tools, developing practical strategies for reducing the risks of maintenance and inspection errors, and understanding its critical role in preserving flight safety. We will take a historical perspective, developing a timeline that is largely driven by key events such as accidents and regulatory/government actions and initiatives. Part 1 focuses on how the field of maintenance human factors was built, beginning in the late 1980’s. Part 2 describes the development of methods and tools for meeting the maintenance human factors challenges identified. Finally, Part 3 updates the original chapter by focusing on issues that have persisted or emerged since 2010.

maintenance↗

Quantifying the Effect of Cosmic Ray Showers on the X-IFU Energy Resolution

The X-ray Integral Field Unit (X-IFU) will operate an array of more than 3000 Transition Edge Sensor pixels at 90 mK with an unprecedented energy resolution of 2.5 eV at 7 keV. In space, primary cosmic rays and secondary particles produced in the instrument structure will continuously deposit energy on the detector wafer and induce fluctuations on the pixels’ thermal bath. We have investigated through simulations of the X-IFU readout chain how these fluctuations eventually influence the energy measurement of X-ray photons. Realistic timelines of thermal bath fluctuations at different positions in the array are generated as a function of a thermal model and the expected distribution of the deposited energy of the charged particles. These are then used to model the TES response to these thermal perturbations and their influence on the onboard energy reconstruction process. Overall, we show that with adequate heatsinking, the main energy resolution degradation effect remains minimal and within the associated resolution allocation of 0.2 eV. We further study how a dedicated triggering algorithm could be put in place to flag the rarer large thermal events.

P. Peille↗

NASA Extreme Environment Mission Operations (NEEMO)

Introduction: NASA is preparing to land the first woman and first person of color on the Moon within the next decade, and ensuring the success of these missions will depend on our preparation on the ground in multiple ground-based lunar environment analogs. To achieve this, NASA has used full mission class analogs, of which NASA Extreme Environment Mission Operations (NEEMO) is the longest continuously running example. Discussion: NEEMO is NASA’s long-standing undersea high-fidelity spaceflight mission analog. It focuses on exploration science, EVA techniques and tools, and maturing ISS IVA flight hardware and operations concepts. NEEMO crews are composed of groups of US and International Partner (IP) astronauts, engineers and scientists who live, work and explore in a challenging environment analogous to the environment experienced currently on ISS and what is expected for future deep space exploration destinations. NEEMO missions are conducted at Aquarius Reef Base (ARB), which includes a shore base in Tavernier, FL, and the world's only undersea research station, the Aquarius habitat, which is located 5.4 miles (9 kilometers) off Key Largo in the Florida Keys National Marine Sanctuary. ARB is owned and operated by Florida International University (FIU). Aquarius was selected due to its remote and extreme location and its ability to provide the unique isolation and risk factors that spaceflight presents. NEEMO missions allow for evaluations of end-to-end EVA and Science exploration concepts of operations with a crew that is in situ in a true extreme environment. They also allow for evaluations of flight hardware and ops tools that are either pondered or destined for ISS or Gateway in the near future. NEEMO missions feature flight-like interactions between the crew and a Mission Control Center (MCC )and Science Team, which in turn allows evaluation of mission and science operations decision making and communications techniques. One reason NEEMO missions are of such high fidelity is that so many of the participants are experienced human space flight end operators. The majority of crewmembers are trained astronauts, and many of the MCC operators have credentials as current or former certified ISS MCC operators (e.g., CapCom, EVA Officer, etc.). Mission products are generated daily by the ground team and are modeled on ISS products (but modified as needed). A planning team manages the constantly evolving mission timelines in response to the ever-changing constraints and opportunities. During NEEMO missions, suited EVA crewmembers (using diving helmets) have clear voice communications with each other, the habitat, and the MCC and Science Team back on shore. Each EVA crewmember also sends helmet cam video to the habitat and MCC and Science Teams. Appropriate communications latencies are inserted for the destination being simulated as well. NEEMO missions are made possible by a broad collaboration of participants. Astronauts from all of the ISS partner agencies are eligible for crew assignment. Often the crew includes a NASA scientist, doctor or engineer with a particular skill to contribute. Sometimes crewmembers come from external entities–generally institutes or universities. Objectives come from a wide variety of sources as well, from within NASA, IPs, government agencies, academia, commercial companies and research institutes. A typical NEEMO mission is a collaboration between at least 5 NASA centers. To date, 23 NEEMO missions have been conducted since 2001, and NEEMO 24 is planned for 2022. Conclusion: NEEMO is a high-fidelity mission analog conducted in an extreme subsea environment. It features experienced end-operators in human spaceflight, from the astronaut crewmembers to key personnel staffing Mission Control. Acknowledgments: The authors wish to thank FIU and NASA’s HEO SEI/Strategic Analysis and Exploration Integration and Science Directorate organizations for the continued support that makes the NEEMO Project possible.

M L Reagan↗

Mars Sample Return mission concept status

This paper will provide an overview of current options and specific concepts for a potential Mars Sample Return (MSR) architecture being jointly studied by NASA and ESA. Overall objectives and mission options will be described, including the architecture’s constraints and notional timelines. The paper will highlight architecture-level trade studies, including specific elements and their status. The overall Sample Retrieval Lander (SRL) mission concept, including vehicle options will be described, including the Mars Ascent Vehicle (MAV), Sample Fetch Rover (being studied by ESA), Orbiting Sample container (OS), and tube transfer robotics systems. The concept and status of the Earth Return Orbiter (ERO) mission, being studied by ESA, and the Capture/Containment and Return System (CCRS) which would be the payload on the ERO, will be discussed.

Vijendran, Sanjay↗

A Lunar Water ISRU System Study for Human-Scale Propellant Production

NASA’s plans to return to the moon in the Artemis campaign include intentions for sustainable surface operations. In-Situ Resource Utilization (ISRU) is key to enabling sustainability. The use of water, which has been identified in the lunar polar regions [1-4], could be pivotal to a sustainable architecture. While water has been identified, there is limited information regarding its form and distribution. The Lunar Water ISRU Measurement Study (LWIMS) [5] outlined the current state of knowledge regarding water resources on the moon, what information is lacking, and how to approach a measurement campaign to close those knowledge gaps. However the NASA timeline necessitates that lunar surface water prospecting, or reconnaissance, efforts and ISRU system design to occur in parallel. ISRU hardware and systems development must proceed without key resource knowledge. Yet, engineering design requires come constraints and targets to work to. The goal of this study was to define a set of lunar water reference cases, based on the cur-rent lunar water information, to help focus ISRU de-sign and planning. This approach is similar to an study focused on Mars resources called Mars Water ISRU Planning (MWIP) [6].

Lunar Water↗

The Current State and Future of the Former Central Nervous System Risk Managed by Space Radiation Element Part of NASA’s Human Research Program

Historically, the Space Radiation Element, as part of the NASA Human Research Program, was responsible for the scientific strategy and funding of research focused on characterizing and mitigating the effects of space radiation exposure on the central nervous system (CNS). During the past few of years, there have been two major changes that have affected the management of the science associated with the CNS risk. The first major change was the integration of several related risks: CNS (C), Behavioral medicine (B), and sensorimotor (S) to be managed as an integrated effort called CBS. CBS was formed to accelerate research on combined spaceflight stressors, specifically space radiation, microgravity, isolation, and confinement. CBS was managed by Human Factors and Behavioral Performance (HFBP) with support and inputs from Space Radiation as well as Human Health Countermeasures. Secondly, and more recently, the CNS risk was absorbed by the behavioral medicine risk currently also held by HFPB. As a result, the gaps associated with CNS were removed and aspects of them are represented in the BMED gaps (link). However, due to recent changes in element leadership, budget, and timeline, extensive restructuring of CBS is in progress. In addition, in an effort to harmonize datasets to be used in modelling efforts, an Animal Standardization TIM was held in June 2021 to standardize the type of behavioral and cognitive tasks as well as experimental set-ups. This presentation is an effort to communicate with the radiation research community concerning the strategy, management, and future of the former central nervous system risk and the role of the Space Radiation Element.

central nervous system↗

Updated Human Mars Ascent Vehicle Concept in Support of NASA’s Strategic Analysis Cycle 2021

The NASA Artemis program has brought significant change to the agency’s human exploration strategy over the last several years. The human exploration of Mars remains an ultimate objective of the overall human exploration strategy. However, how the agency intends to execute initial human exploration of Mars has shifted to better align with current policy. These changes find their way into the design of key architecture elements, such as the Mars Ascent Vehicle (MAV). Of the numerous changes in the conceptual human Mars architecture, two in particular have had significant impact on the design of the human MAV: the desire for minimal surface infrastructure for initial human Mars missions, and technology investment timelines in support of initial human missions to Mars. The first leads to a surface mission architecture targeting a 30-day surface duration with two crewmembers. The second drives out in-situ resource utilization (ISRU) from the initial sortie. As a result, the reference MAV design for initial human Mars missions in the Human Exploration and Operations Mission Directorate’s Strategic Analysis Cycle 2021 (SAC21) is based around supporting the return of 2 crew from the surface of Mars, without surface ISRU. This has led to several design changes since 2019, when details of a reference human MAV were last published. The MAV concept for SAC21 consists of a two-stage vehicle capable of supporting two crew for 84 hours. This duration is derived from a baseline ascent trajectory targeting an apoapsis rendezvous with the habitation element in a nominal 5-sol Mars aggregation orbit. With the goal of minimizing technology investments for the initial surface sortie removing ISRU from the trade space, the MAV must now be landed either fully loaded with propellant, or with some portion of the propellant off-loaded. Landing a partially-fueled MAV will require additional surface assets to perform robotic propellant transfer on the surface of Mars from a pre-emplaced propellant depot. Furthermore, cryogenic fluid management and storage for extended duration with no losses represents additional technology investment that would have to be made to support cryogenic-based propellant concepts that have been the baseline in past architectures. As a result, the SAC21 architecture utilizes a storable propellant-based MAV propulsion system to minimize these potential technology investments incurred by cryogenic-based propulsion systems. Recent efforts also focused on evaluating the sensitivity of key design parameters, such as landing site latitude, elevation, and local atmospheric conditions. All play a large role in determining the predicted propellant requirements of the MAV. Understanding their potential impacts is important because of the rippling effects of changes to the MAV design on other architecture elements, such as entry, descent, landing, and transportation systems. Results indicate up to +2% to -4% wet mass variation due to landing site latitude, with higher latitudes greater than 70 degrees North resulting in greater than 6% wet mass increases. The MAV saw reduced impact due to atmospheric design parameters, which only accounting for -0.6% to +0.4% wet mass variation.

Douglas J. Trent↗

Risk-Reduction Autonomy Implementation to Enable NASA Artemis Missions

To achieve NASA’s Artemis program mission objectives a high level of autonomy and ubiquitous autonomy throughout the systems that are being developed will be necessary. The autonomous systems of Artemis will require a distributed autonomy capability, with autonomous systems organized functionally in a hierarchical architecture, where systems at higher levels of the hierarchy have authority over systems at lower levels. The challenge of developing autonomy technologies and concepts of operations for Artemis has been undertaken by the NASA Gateway Working Group. This group has developed requirements, architectures, concepts of operations, and interface control documents, in the context of a hierarchical distributed architecture that includes the following: a Vehicle System Manager (VSM) that autonomously manages the entire Gateway; Module System Managers (MSMs) that autonomously manage each module; and System Managers (SMs) that autonomously manage systems within a module(i.e. ECLSS).A substantially high level of autonomy needs to be achieved by each element of the hierarchy (VSM, MSM, SM)to meet requirements for uncrewed operations; this includes conditions that will have minimal and/or delayed ground intervention (i.e. requirements for sustainability for months of operation without crew or ground support). To advance an implementation of this autonomy design (Gateway Autonomy Design –GAD), a collaboration was established between the Autonomous Systems Laboratory (ASL) at NASA Stennis Space Center and Lockheed Martin. The objectives of this partnership were the following: (1)to implement autonomy at the VSM, MSM, and SM levels;(2) to implement communications among a VSM, 2 MSMs, ORION (a visiting vehicle somewhat equivalent to a module) and 1 SM (a power system), and (3) test autonomous operations with representative use cases. A SM backed by a high-fidelity simulation was created to facilitate demonstrations of use cases that originated in a system of a module. Communication between the VSM and MSMs was implemented according to Concepts of Operations and Interface Control Documents (ICDs). Demonstrations were conducted to address nominal and off-nominal operations and multi-module interactions with VSM. Additionally, user interfaces were created to provide awareness about ongoing processes and results while enhancing the demonstration. Demonstrations included the following use cases: (1)Orion as visiting vehicle registers with VSM;(2) VSM reschedules a module’s timelines when another module’s MSM task fails; and (3) a module’s Power System Manager (PSM) standalone demonstration that included component failure diagnostics, tracing component failure to effected components, which in turn, reports failure information up to the VSM for acknowledgement and display. This paper will describe the detailed technology and autonomous systems developed, and the integrated multi-module demonstrations conducted. Also, challenges that must be met to fully implement the GAD defined by Gateway will be addressed.

Autonomous Systems↗

Down-Selection of Four Common Habitat Variants

The Common Habitat is a large habitat developed as an alternative architecture study, not part of the current NASA baseline, that uses the SLS core stage liquid oxygen tank as its primary structure. It has a gravity-independent internal architecture, such that identical units can be used on the lunar surface, Mars surface, and in microgravity. In developing the habitat, two key architectural questions emerged. Should the internal layout use a vertical or horizontal orientation of the tank? Should the crew size be four or eight? This led to the design of four variants: a four-crew horizontal, four-crew vertical, eight-crew horizontal, and eight-crew vertical. The four-crew variants use a shortened version of the tank while the eight-crew variants use the entire tank. The primary consideration applied for down-selection is the crew experience living and working in the habitat, inclusive of crew productivity, well-being, and survivability. Based on this consideration, a series of seven assessments were performed to compare the variants. This analysis was performed as an unfunded, volunteer activity leveraging civil servants across multiple field centers, most with expertise working in various Artemis teams. Additionally, the evaluation was limited to the use of CAD models, images, and spreadsheet data, with no resources available for mockups or Virtual Reality. A logistics analysis developed a standard logistics module and then estimated how much stowage could be carried onboard each Common Habitat and how many logistics modules are required by each variant for a given mission duration. It also considered the amounts of water to be stored in each variant. A functional analysis identified and compared the living and working functions across the habitats, ranking them relative to each other. A crew time assessment first estimated the total crew time, building a weekly crew timeline for both four and eight-person crews. It then allocated time to activities linked to living and working functions, comparing how much time was available for each function in each variant. A science productivity assessment developed a relative metric using crew time, science stowage, and assumed rates of experiment consumables use to analytically compare the four variants. It also comparatively ranked the habitats with respect to a number of subjective parameters and a workstation acceptability rating. A maintenance capacity assessment identified and compared eleven generic maintenance capabilities across the variants and also ranked them for their predicted ability to complete twelve fabrication, maintenance, and repair scenarios. A contingency responsiveness analysis examined twelve serious in-flight contingencies. For each scenario, the number of crew needed to respond were predicted and acceptability of various aspects of contingency response were evaluated, comparing the variants against each other. Finally, in a habitability assessment, 120 habitability characteristics reflecting 13 major categories were evaluated for each habitat. These results were compared to identify the most acceptable habitat in each category. Ultimately, the data favored the horizontal orientation over the vertical and an eight-person crew over four. Implications of selecting this variant are discussed, including specific architectural challenges that result from the use of the full tank.

Habitability↗

Bion-M2

Bion-M2, scheduled to launch in April 2023, continues the 30+ year collaboration between the Institute of Biomedical Problems of the Russian Academy of Sciences (IBMP RAS) and the National Aeronautics and Space Administration (NASA). Bion-M2 is the second biosatellite in the Bion-M series and its goal is to investigate how the space environment affects living organisms, with emphasis on physiological changes in rodents, gravitational biology using a wide variety of specimens, and radiation biology. The Bion-M2 biosatellite will complete a 30-day low earth orbit (LEO) flight to study the combined effects of microgravity and ionizing radiation (IR) on multiple organisms, where the payload may be exposed to IR at 20-30 times thedose rate seen on the International Space Station. Following return, nine U.S. collaborators selected through the NASA Space Biology Research Announcement will conduct post-flight rodent experiments using male C57BL/6 mice. The post-flight experiments will investigate the effects of the space environment on bone and skeletal muscle health, cardiac function, reproductive system function, neurovascular systems, protein composition in plasma, and thermoregulation in the mice. Currently, the Bion-M2 mission is in the development phase of theproject lifecycle. The mission objectives, constraints, requirements, and timeline have been defined in the project plan and contracts. Technology for the mission is under development and science procedures will be finalized by FY22. The aim of this presentation is to highlight the importance of the Bion-M2 mission and provide insight into the mission development process, including an overview of the project plan and the tissue sharing plan that will be utilized during the post-flight dissection procedures.

Bion-M2↗