Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SPACE LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,236 records · Page 69

Development of a Ground Test and Analysis Protocol for NASA's NextSTEP Phase 2 Habitation Concepts

The NASA Next Space Technologies for Exploration Partnerships (NextSTEP) program is a public-private partnership model that seeks commercial development of deep space exploration capabilities to support human spaceflight missions around and beyond cislunar space. NASA first issued the Phase 1 NextSTEP Broad Agency Announcement to U.S. industries in 2014, which called for innovative cislunar habitation concepts that leveraged commercialization plans for low-Earth orbit. These habitats will be part of the Deep Space Gateway (DSG), the cislunar space station planned by NASA for construction in the 2020s. In 2016, Phase 2 of the NextSTEP program selected five commercial partners to develop ground prototypes. A team of NASA research engineers and subject matter experts (SMEs) have been tasked with developing the ground-test protocol that will serve as the primary means by which these Phase 2 prototypes will be evaluated. Since 2008, this core test team has successfully conducted multiple spaceflight analog mission evaluations utilizing a consistent set of operational tools, methods, and metrics to enable the iterative development, testing, analysis, and validation of evolving exploration architectures, operations concepts, and vehicle designs. The purpose of implementing a similar evaluation process for the Phase 2 Habitation Concepts is to consistently evaluate different commercial partner ground prototypes to provide data-driven, actionable recommendations for Phase 3. This paper describes the process by which the ground test protocol was developed and the objectives, methods, and metrics by which the NextSTEP Phase 2 Habitation Concepts will be rigorously and systematically evaluated. The protocol has been developed using both a top-down and bottom-up approach. Top-down development began with the Human Exploration and Operations Mission Directorate (HEOMD) exploration objectives and ISS Exploration Capability Study Team (IECST) candidate flight objectives. Strategic questions and associated rationales, derived from these candidate architectural objectives, provide the framework by which the ground-test protocol will address the DSG stack elements and configurations, systems and subsystems, and habitation, science, and EVA functions. From these strategic questions, high-level functional requirements for the DSG were drafted and associated ground-test objectives and analysis protocols were established. Bottom-up development incorporated objectives from NASA SMEs in autonomy, avionics and software, communication, environmental control and life support systems, exercise, extravehicular activity, exploration medical operations, guidance navigation and control, human factors and behavioral performance, human factors and habitability, logistics, Mission Control Center operations, power, radiation, robotics, safety and mission assurance, science, simulation, structures, thermal, trash management, and vehicle health. Top-down and bottom-up objectives were integrated to form overall functional requirements - ground-test objectives and analysis mapping. From this mapping, ground-test objectives were organized into those that will be evaluated through inspection, demonstration, analysis, subsystem standalone testing, and human-in-the-loop (HITL) testing. For the HITL tests, mission-like timelines, procedures, and flight rules have been developed to directly meet ground test objectives and evaluate specific functional requirements. Data collected from these assessments will be analyzed to determine the acceptability of habitation element configurations and the combinations of capabilities that will result in the best habitation platform to be recommended by the test team for Phase 3.

Gernhardt, Michael L.↗

A Flight Research Overview of WSPR, a Pilot Project for Sonic Boom Community Response

In support of the ongoing effort by the National Aeronautics and Space Administration (NASA) to bring supersonic commercial travel to the public, the NASA Armstrong Flight Research Center and the NASA Langley Research Center, in cooperation with other industry organizations, conducted a flight research experiment to identify the methods, tools, and best practices for a large-scale quiet (or low) sonic boom community human response test. The name of the effort was Waveforms and Sonic boom Perception and Response (WSPR). Such tests will be applied to building a dataset that governing agencies such as the Federal Aviation Administration and the International Civil Aviation Organization will use to establish regulations for acceptable sound levels of overland sonic booms. The WSPR test was the first such effort that studied responses to non-traditional low sonic booms while the subject persons were in their own homes and performing daily activities.The WSPR test was a NASA collaborative effort with several industry partners, in response to a NASA Aeronautics Research Mission Directorate Research Opportunities in Aeronautics. The primary contractor was Wyle (El Segundo, California). Other partners included Gulfstream Aerospace Corporation (Savannah, Georgia); Pennsylvania State University (University Park, Pennsylvania); Tetra Tech, Inc. (Pasadena, California); and Fidell Associates, Inc. (Woodland Hills, California).A major objective of the effort included exposing a community to the sonic boom magnitudes and occurrences that would be expected to occur in high-air traffic regions having a network of supersonic commercial aircraft in place. Low-level sonic booms designed to simulate those produced by the next generation of commercial supersonic aircraft were generated over a small residential community. The sonic boom footprint was recorded with an autonomous wireless microphone array that spanned the entire community. Human response data were collected using multiple survey methods. The research focused on essential elements of community response testing including subject recruitment, survey methods, instrumentation systems, flight planning and operations, and data analysis methods.This paper focuses on the NASA role in the logistics and operations of the effort, including human response subject recruitment, the operational processes involved in implementing the surveys throughout the community, instrumentation systems, logistics, flight planning, and flight operations. Findings discussed in this paper include critical lessons learned in all of the above-mentioned areas, as well as flight operations results. Analysis of the accuracy and repeatability of planning and executing the unique aircraft maneuver used to generate low sonic booms concluded that the sonic booms had overpressures within 0.15 lbft2 of the planned values for 76 percent of the attempts. Similarly, 90 percent of the attempts to generate low sonic booms within the community were successful.

community response↗

Viper Rover: Flight Build and Environmental Test Status

The NASA Artemis Program plans to return humans to the Moon to stay. Extended human stays on the Moon will require substantial resources to sustain human presence, requiring continuous supplies delivered from the Earth. However, if some of the resources were indigenously available, Earth logistical requirements could be substantially reduced by “living off the land” with in-situ lunar resources. Local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. LCROSS, LRO and other missions have confirmed the presence of lunar volatiles resources in polar regions, so the next step is to understand the physical distribution of those resources, as well as the scientific basis for how water got there, and why it is still there. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss VIPER’s completion of the flight rover build, as well as current progress in environmental testing, preparedness for mission operations, and overall readying for launch integration with our CLPS partner. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) lunar delivery model.

rover↗

VIPER Rover Flight Build and Environmental Test Status

The NASA Artemis Program plans to return humans to the Moon to stay. Extended human stays on the Moon will require substantial resources to sustain human presence, requiring continuous supplies delivered from the Earth. However, if some of the resources were indigenously available, Earth logistical requirements could be substantially reduced by “living off the land” with in-situ lunar resources. Local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. LCROSS, LRO and other missions have confirmed the presence of lunar volatiles resources in polar regions, so the next step is to understand the physical distribution of those resources, as well as the scientific basis for how water got there, and why it is still there. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss VIPER’s completion of the flight rover build, as well as current progress in environmental testing, preparedness for mission operations, and overall readying for launch integration with our CLPS partner. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) lunar delivery model.

rover↗

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

Current Environmental Control and Life Support System (ECLSS) development and test activities are not generating data fast enough to provide statistically-supportable precise Orbital Replacement Unit (ORU) failure rate estimates for future missions. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches – namely regular resupply and rapid abort capabilities – will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of operations on board the International Space Station (ISS), a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass for future missions. A Bayesian failure rate estimation approach, such as the one currently implemented by the ISS Program, can help reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior failure rate estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, these subjective (and often inaccurate) prior estimates currently have a strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Supportability↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

How I Love My 80 Percenters

Don't ever take your support staff for granted. By support staff, I mean the people in personnel, logistics, and finance; the ones who can make things happen with a phone call or a signature, or by the same token frustrate you to no end by their inaction; these are people you must depend on. I've spent a lot of time thinking about how to cultivate relationships with my support staff that work to the advantage of both of us. The most important thing that have learned working with people, any people--and I will tell you how I learned this in a minute--is there are some folks you just can't motivate, so forget it, don't try; others you certainly can with a little psychology and some effort; and the best of the bunch, what I call the 80 percenters, you don't need to motivate because they're already on the team and performing beautifully. The ones you can't change are rocks. Face up to it, and just kick them out of your way. I have a reputation with the people who don't want to perform or be part of the team. They don't come near me. If someone's a rock, I pick up on it right away, and I will walk around him or her to find someone better. The ones who can be motivated I take time to nurture. I consider them my projects. A lot of times these wannabes are people who want to help but don't know how. Listen, you can work with them. Lots of people in organizations have the mindset that all that matters are the regulations. God forbid if you ever work outside those regulations. They've got one foot on that regulation and they're holding it tight like a baby holds a blanket. What you're looking for is that first sign that their minds are opening. Usually you hear it in their vocabulary. What used to sound like "We can't do that ... the regulations won't allow it ... we have never done this before," well, suddenly that changes to "We have options ... let's take a look at the options ... let me research this and get back to you." The 80 percenters you want to nurture too, but they're already on the team. The 80 percenters know the regulation, but if there is a problem because of a regulation, they will still tell you, "Don't worry about it, I've got it under control." These people don't see themselves as guardians of the regulations. Instead, they see themselves as customer service representatives. Two 80 percenters on my team are Hettie Courtney at Goddard Space Flight Center and Debbie Randall at NASA Headquarters in Code B. Thank you, ladies, very much. You are the best.

Maturo, Anthony J.↗

Down-Selection of Four Common Habitat Variants

The Common Habitat is a large habitat developed as an alternative architecture study, not part of the current NASA baseline, that uses the SLS core stage liquid oxygen tank as its primary structure. It has a gravity-independent internal architecture, such that identical units can be used on the lunar surface, Mars surface, and in microgravity. In developing the habitat, two key architectural questions emerged. Should the internal layout use a vertical or horizontal orientation of the tank? Should the crew size be four or eight? This led to the design of four variants: a four-crew horizontal, four-crew vertical, eight-crew horizontal, and eight-crew vertical. The four-crew variants use a shortened version of the tank while the eight-crew variants use the entire tank. The primary consideration applied for down-selection is the crew experience living and working in the habitat, inclusive of crew productivity, well-being, and survivability. Based on this consideration, a series of seven assessments were performed to compare the variants. This analysis was performed as an unfunded, volunteer activity leveraging civil servants across multiple field centers, most with expertise working in various Artemis teams. Additionally, the evaluation was limited to the use of CAD models, images, and spreadsheet data, with no resources available for mockups or Virtual Reality. A logistics analysis developed a standard logistics module and then estimated how much stowage could be carried onboard each Common Habitat and how many logistics modules are required by each variant for a given mission duration. It also considered the amounts of water to be stored in each variant. A functional analysis identified and compared the living and working functions across the habitats, ranking them relative to each other. A crew time assessment first estimated the total crew time, building a weekly crew timeline for both four and eight-person crews. It then allocated time to activities linked to living and working functions, comparing how much time was available for each function in each variant. A science productivity assessment developed a relative metric using crew time, science stowage, and assumed rates of experiment consumables use to analytically compare the four variants. It also comparatively ranked the habitats with respect to a number of subjective parameters and a workstation acceptability rating. A maintenance capacity assessment identified and compared eleven generic maintenance capabilities across the variants and also ranked them for their predicted ability to complete twelve fabrication, maintenance, and repair scenarios. A contingency responsiveness analysis examined twelve serious in-flight contingencies. For each scenario, the number of crew needed to respond were predicted and acceptability of various aspects of contingency response were evaluated, comparing the variants against each other. Finally, in a habitability assessment, 120 habitability characteristics reflecting 13 major categories were evaluated for each habitat. These results were compared to identify the most acceptable habitat in each category. Ultimately, the data favored the horizontal orientation over the vertical and an eight-person crew over four. Implications of selecting this variant are discussed, including specific architectural challenges that result from the use of the full tank.

Habitability↗

Moon Base Transportation - Deliveries to the Lunar Surface

Development of the Moon Base will enable a home away from home for astronauts who will live and work at humanity’s first lunar outpost. In this effort, NASA’s Moon Transportation Office is responsible for enabling the transformational missions required to deliver habitats, supplies, science payloads, and all other elements needed to cultivate a permanent presence on the Lunar Surface. The Mission Concept (MC) is characterized through evaluation of an end-to-end architecture that can successfully deliver a generalized heavy large-volume payload, in excess of 4000 kg, to a precision landing and touchdown on the lunar surface. The mission architecture utilizes a single launch configuration of a Lunar Lander (LL) with a unique propellant system. The LL has an integral orbital transfer capability and features jettisonable elements. The design circumvents the need for prop transfer on orbit and multiple launch configurations. The launch vehicle (LV) for this work will assume the capability to deliver a payload in excess of 40,000 kg to orbit, affording multiple LV solutions. Considerations for the LL and payload deployment from the fairing are assumed to be handled through compliance with a launch providers’ Interface Requirements Document (IRD). The MC will span from launch at Kennedy Space Center (KSC) to terminal descent and touchdown on the lunar surface, requiring a total ΔV on the order of 6 km/s beyond what is required to get the vehicle stack to a 200 km circular Low Earth Orbit (LEO). Major mission phases include: launch and launch vehicle separation, transfer operations, pre-landing navigation, and lunar descent and touchdown. A Concept of Operations (ConOps) is used as the primary design driver for defining architecture of the vehicles necessary to achieve final payload delivery. Numerous ground rules and assumptions will be provided for each phase of the mission. Concept designs for the LL is presented. An emphasis of the design maximizes a feasible path for maturation, manufacturing, and operation. A self-imposed practical consideration for this effort is the incorporation of legacy designed hardware to minimize expensive, time-intensive, and high-risk hardware development cycles. The propulsion system of the LL adopts a conventional storable bipropellant configuration of monomethyl hydrazine (MMH) and mixed oxides of nitrogen (MON3). This effort will showcase a unique propellant delivery system to minimize the reliance on propellant management devices (PMDs) during descent. Numerous key constraints have been considered, across the multiple segments of the mission. These include the unique aspects of center of gravity (CG) management, thruster plume effects including self-impingement, propulsion system hardware limitations, navigation during multiple mission phases, and landing gear geometry for uneven terrain. These constraints shape the trades necessary for precision landing of heavy cargo and ensure compatibility with broader Moon Base Transportation concepts. The resulting insights inform future transportation strategies for the Moon and beyond; directly contributing to the development of cargo‑delivery standards that will support the long‑term buildup of a sustainable, continuously inhabited Moon Base.

Lunar Habitat↗

A dedicated cone-beam CT system for musculoskeletal extremities imaging: Design, optimization, and initial performance characterization

Purpose: This paper reports on the design and initial imaging performance of a dedicated cone-beam CT (CBCT) system for musculoskeletal (MSK) extremities. The system complements conventional CT and MR and offers a variety of potential clinical and logistical advantages that are likely to be of benefit to diagnosis, treatment planning, and assessment of therapy response in MSK radiology, orthopaedic surgery, and rheumatology. Methods: The scanner design incorporated a host of clinical requirements (e.g., ability to scan the weight-bearing knee in a natural stance) and was guided by theoretical and experimental analysis of image quality and dose. Such criteria identified the following basic scanner components and system configuration: a flat-panel detector (FPD, Varian 3030+, 0.194 mm pixels); and a low-power, fixed anode x-ray source with 0.5 mm focal spot (SourceRay XRS-125-7K-P, 0.875 kW) mounted on a retractable C-arm allowing for two scanning orientations with the capability for side entry, viz. a standing configuration for imaging of weight-bearing lower extremities and a sitting configuration for imaging of tensioned upper extremity and unloaded lower extremity. Theoretical modeling employed cascaded systems analysis of modulation transfer function (MTF) and detective quantum efficiency (DQE) computed as a function of system geometry, kVp and filtration, dose, source power, etc. Physical experimentation utilized an imaging bench simulating the scanner geometry for verification of theoretical results and investigation of other factors, such as antiscatter grid selection and 3D image quality in phantom and cadaver, including qualitative comparison to conventional CT. Results: Theoretical modeling and benchtop experimentation confirmed the basic suitability of the FPD and x-ray source mentioned above. Clinical requirements combined with analysis of MTF and DQE yielded the following system geometry: a {approx}55 cm source-to-detector distance; 1.3 magnification; a 20 cm diameter bore (20 x 20 x 20 cm{sup 3} field of view); total acquisition arc of {approx}240 deg. The system MTF declines to 50% at {approx}1.3 mm{sup -1} and to 10% at {approx}2.7 mm{sup -1}, consistent with sub-millimeter spatial resolution. Analysis of DQE suggested a nominal technique of 90 kVp (+0.3 mm Cu added filtration) to provide high imaging performance from {approx}500 projections at less than {approx}0.5 kW power, implying {approx}6.4 mGy (0.064 mSv) for low-dose protocols and {approx}15 mGy (0.15 mSv) for high-quality protocols. The experimental studies show improved image uniformity and contrast-to-noise ratio (without increase in dose) through incorporation of a custom 10:1 GR antiscatter grid. Cadaver images demonstrate exquisite bone detail, visualization of articular morphology, and soft-tissue visibility comparable to diagnostic CT (10-20 HU contrast resolution). Conclusions: The results indicate that the proposed system will deliver volumetric images of the extremities with soft-tissue contrast resolution comparable to diagnostic CT and improved spatial resolution at potentially reduced dose. Cascaded systems analysis provided a useful basis for system design and optimization without costly repeated experimentation. A combined process of design specification, image quality analysis, clinical feedback, and revision yielded a prototype that is now awaiting clinical pilot studies. Potential advantages of the proposed system include reduced space and cost, imaging of load-bearing extremities, and combined volumetric imaging with real-time fluoroscopy and digital radiography.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Tool for Forecasting Cool-Season Peak Winds Across Kennedy Space Center and Cape Canaveral Air Force Station

The expected peak wind speed for the day is an important element in the daily morning forecast for ground and space launch operations at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS). The 45th Weather Squadron (45 WS) must issue forecast advisories for KSC/CCAFS when they expect peak gusts for >= 25, >= 35, and >= 50 kt thresholds at any level from the surface to 300 ft. In Phase I of this task, the 45 WS tasked the Applied Meteorology Unit (AMU) to develop a cool-season (October - April) tool to help forecast the non-convective peak wind from the surface to 300 ft at KSC/CCAFS. During the warm season, these wind speeds are rarely exceeded except during convective winds or under the influence of tropical cyclones, for which other techniques are already in use. The tool used single and multiple linear regression equations to predict the peak wind from the morning sounding. The forecaster manually entered several observed sounding parameters into a Microsoft Excel graphical user interface (GUI), and then the tool displayed the forecast peak wind speed, average wind speed at the time of the peak wind, the timing of the peak wind and the probability the peak wind will meet or exceed 35, 50 and 60 kt. The 45 WS customers later dropped the requirement for >= 60 kt wind warnings. During Phase II of this task, the AMU expanded the period of record (POR) by six years to increase the number of observations used to create the forecast equations. A large number of possible predictors were evaluated from archived soundings, including inversion depth and strength, low-level wind shear, mixing height, temperature lapse rate and winds from the surface to 3000 ft. Each day in the POR was stratified in a number of ways, such as by low-level wind direction, synoptic weather pattern, precipitation and Bulk Richardson number. The most accurate Phase II equations were then selected for an independent verification. The Phase I and II forecast methods were compared using an independent verification data set. The two methods were compared to climatology, wind warnings and advisories issued by the 45 WS, and North American Mesoscale (NAM) model (MesoNAM) forecast winds. The performance of the Phase I and II methods were similar with respect to mean absolute error. Since the Phase I data were not stratified by precipitation, this method's peak wind forecasts had a large negative bias on days with precipitation and a small positive bias on days with no precipitation. Overall, the climatology methods performed the worst while the MesoNAM performed the best. Since the MesoNAM winds were the most accurate in the comparison, the final version of the tool was based on the MesoNAM winds. The probability the peak wind will meet or exceed the warning thresholds were based on the one standard deviation error bars from the linear regression. For example, the linear regression might forecast the most likely peak speed to be 35 kt and the error bars used to calculate that the probability of >= 25 kt = 76%, the probability of >= 35 kt = 50%, and the probability of >= 50 kt = 19%. The authors have not seen this application of linear regression error bars in any other meteorological applications. Although probability forecast tools should usually be developed with logistic regression, this technique could be easily generalized to any linear regression forecast tool to estimate the probability of exceeding any desired threshold . This could be useful for previously developed linear regression forecast tools or new forecast applications where statistical analysis software to perform logistic regression is not available. The tool was delivered in two formats - a Microsoft Excel GUI and a Tool Command Language/Tool Kit (Tcl/Tk) GUI in the Meteorological Interactive Data Display System (MIDDS). The Microsoft Excel GUI reads a MesoNAM text file containing hourly forecasts from 0 to 84 hours, from one model run (00 or 12 UTC). The GUI then displays e peak wind speed, average wind speed, and the probability the peak wind will meet or exceed the 25-, 35- and 50-kt thresholds. The user can display the Day-1 through Day-3 peak wind forecasts, and separate forecasts are made for precipitation and non-precipitation days. The MIDDS GUI uses data from the NAM and Global Forecast System (GFS), instead of the MesoNAM. It can display Day-1 and Day-2 forecasts using NAM data, and Day-1 through Day-5 forecasts using GFS data. The timing of the peak wind is not displayed, since the independent verification showed that none of the forecast methods performed significantly better than climatology. The forecaster should use the climatological timing of the peak wind (2248 UTC) as a first guess and then adjust it based on the movement of weather features.

Barrett, Joe H., III↗

Evaluating the Effectiveness of an Ultrasonic Acoustic Deterrent in Reducing Bat Fatalities at Wind Energy Facilities

This project was designed to use thermal video cameras and fatality monitoring to evaluate the effectiveness of an ultrasonic acoustic deterrent (UAD) on bat activity and mortality, respectively. Our goals were to redesign the UAD device and installation infrastructure, determine the placement on wind turbines to optimize safety, compatibility and functionality, and to compare the mortality among the following conditions: Control (deterrents off and turbines feathered up to the manufacturer’s cut-in speed of 3.5 m/s), Deterrent (deterrents on and turbines feathered up to the manufacturer’s cut-in speed of 3.5 m/s), Curtailment (deterrents off and turbines feathered up to 5/ m/s), and combination (deterrents on and turbines feathered up to 5 m/s). The project was divided into a Feasibility Study and Comparative Study. The objectives for the Feasibility Study were to develop an installation strategy, redesign a previous iteration of a UAD to improve performance and weatherization, and test the effectiveness of the deterrents on bat activity. The Feasibility Study was intended to work out potential issues using a relatively small number of devices prior to manufacturing and installing numerous devices for a larger-scale comparative study. The division of the project into these separate studies was based on previous experience and the challenges of assessing the capabilities of an untested UAD. During the initial development and manufacturing of the UAD, NRG Systems decided to use a piezoelectric transducer rather than an electrostatic transducer, which was used by a previous device (i.e. Deaton UAD). NRG Systems conducted lab testing (i.e., IP67 or Ingress Protection) to ensure no water or dust ingress. In addition, shock/drop trials and variations in temperature exposure were conducted as part of the reliability testing. NRG Systems also developed a communications system to allow for continuous performance monitoring of the UADs. For the Feasibility Study, we installed 6 UADs on each of 2 Gamesa G90 2-MW wind turbines (Turbine 14 and 8) at the South Chestnut Wind Energy Facility, Pennsylvania and monitored activity under control and treatment (i.e. Deterrent) conditions using thermal video monitoring. There are two major sources of variation in bat activity (beyond the anticipated treatment effect): 1) environment around the turbines might inherently favor more activity at one than the other; 2) weather conditions on any given night or within season difference (e.g., migration later during the study period) might favor more activity on some nights than on other nights. Because we could only monitor two turbines on any night, we sought to control the potential influences of these two sources by alternating the turbine on which deterrents were activated each night. If there were no loss of data due to technical failures, this design would result in an equal number of deterrent and control nights at each turbine through the monitoring period, balancing the effects of both sources of variation. We compared the time bats spent and the number of events that occurred in overlapping cameras FOV as an indicator of risk, since 80% of the overlapping FOV of the cameras was in the RSA. Equipment failures, majority due to lightning, resulted in only 17 nights with useable data, with unbalanced treatment assignment within turbines and uneven distribution of treatment assignment throughout the observational period. This resulted in a confounding of treatment assignment and seasonal change. Deterrent treatment was measured at Turbine 14 on only 2 of the first 8 usable nights (spanning the period from 8/18-9/17), whereas 6 times on Turbine 8. From 9/18-927, deterrent was on at Turbine 14 on 6 of the remaining 10 nights, and 4 on Turbine 8. We recorded a total of 1,057 bats and observed a reduction in number of events and duration of events at the UAD-activated turbine when it was Turbine 14. When Turbine 8 had the UAD activated, we observed no difference in number or duration of events. Variation between turbines is not unusual and can cause issues when study designs have no true replication, i.e., multiple turbines per treatment. Within-turbine differences suggested a trend for reduced activity when UADs were activated, particularly for Turbine 14. These results may be caused by the overall higher bat activity at Turbine 8 and confounding of treatment assignment and seasonal trends. We mapped 58 bat events in 3-dimensional space (3D), 30 and 28 events during control and treatment conditions, respectively. We observed bats crossing the rotor plane under both control and treatment conditions and observed a total of 40 confirmed or near-collisions (i.e., target close to blade but no visual confirmation of a strike) out of a total of 1,491 medium and high confidence bat observations (880 control, 611 at treatment). Twice as many collisions/possible collisions were observed during control conditions. Given the challenges with the equipment and potential confounding of the data (i.e., different activity levels at the two wind turbines), we were unable to determine whether this initial turbine placement and orientation was optimal. Given no new information on how best to install the devices, we elected to use the same placement and orientation for the comparative study. For the Comparative Study, the objectives were to investigate the relative mortality rates among 4 treatments. We searched the area within 90 m of each turbine daily to recover the highest number of fresh fatalities possible. We were unable to detect a clear reduction in mortality from deterrents alone for any individual species. Surprisingly, mortality rate of the eastern red bat (Lasiurus borealis) was estimated to be 1.3–4.2 times as much when turbines were operating normally and UADs were on than when UADs were off. Reduction in mortality of all bat species combined due to curtailment of turbines was estimated to be between 0%–38%. This effect was nullified when, in addition to curtailment, UADs were on, with 95% confidence interval ranging from a 45% reduction to a 36% increase in mortality. This was likely due to the large proportion of eastern red bats in the total carcass population. Mortality of all low-frequency echolocating bats combined (i.e. hoary bat [L. cinereus], big brown bat [Eptesicus fuscus], silver-haired bat [Lasionycteris noctivagans]) relative to control was lower when curtailed (95% CI: 0%–74%), but the addition of UADs had no detectable effect (95%CI: 13%–79%). The combined treatment reduced mortality in silver-haired bats relative to control by 11%–99%, compared to curtailment (81% reduction–67% increase) or deterrent (82% reduction–67% increase) alone. Because silver-haired bats comprised a large proportion of low-frequency calling bats found during this study, a similar effect was seen for that group. The higher mortality observed for eastern red bats at UAD compared to control could have been caused by several factors, such as the effective range of the UAD, particularly at higher frequencies, behavior, positioning of the devices on the nacelle, or a combination of these. We used 3D thermal videography to compare control and UAD bat behavior from two turbines using a total of 203 3D bat-tracks across 34 nights. We recorded a similar number of bat-tracks between treatment groups, with 51% and 49% for control and UAD, respectively. Due to potential differences in bat behavior around spinning vs stationary turbine blades, we examined UAD effectiveness separately for non-operating turbines (feathered below cut-in speed of 3.5 m/s) and operating (normal operation above wind speed of 3.5 m/s). We found a higher proportion of bat-tracks at operating turbines (82%) compared to non-operating turbines (18%), although this does not account for overall time turbines were operating versus not. At non-operating turbines the UAD appears to be effective at reducing the amount of time, flight length, and number of passes through the rotor plane, compared to control. In addition, we found bats approached turbines similarly between control and treatment turbines, with 61% of control and 63% of UAD bat-tracks originating leeward of the hub. In contrast, at operating turbines, we saw little change in bat behavior in response to UADs. For example, we found an increase in the average duration of bat-tracks between non-operating and operating turbines for UAD but at control turbines we found average duration decreased once turbines became operational. Both control and UAD had a high proportion of bat-tracks that crossed the rotor plane (i.e., collision risk) originate from the windward side when turbines were operational 65% to 92%, respectively. Given that the UAD devices closest to the blades were orientated parallel to the blades, its possible bats were not exposed to the signal until they were close to the turbine blades, as suggested by the slightly higher mean duration within 5 meters of the blades for UAD turbines. Future research should consider concentrating UAD intensity on the areas of risk (i.e. blades) with enough buffer to allow bats to react to the sound before entering the rotor-swept area (RSA). In addition, investigating the potential of installing UAD units windward of the turbine blades (e.g. a hub-mounted UAD), particularly since even under control conditions, a relatively high proportion (65%) of crosses through the blade plane originated windward. 3D thermal videography provided valuable information on future testing strategies (e.g. device placement, UAD orientation) to improve UAD effectiveness when bats are at risk (i.e., operating wind turbines). Across the entire project we experienced issues with the operation and communication with the UADs. Most of the issues occurred during the Feasibility Study and were resolved prior to the Comparability Study. Additional challenges surfaced during the Comparability Study but were remedied immediately and are thought to have little impact on the results. We had logistical constraints at the project that limited our ability use traditional methods in our camera calibration. Several calibrations showed inaccurate scales, which may have been related to inadequate spatial coverage of “points” in the camera calibration volume. Because we were using actual video recordings of bats at a wind turbine, the behavior of bats could have concentrated “points” in specific areas of the turbine (i.e. leeward of nacelle), and limited “points” in other areas, resulting in camera calibration issues. We have plans to address these inconsistencies and improving the software and related methodologies by early 2020.

17 WIND ENERGY↗