Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SERVICE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

An Analysis of Failure Handling in Chameleon, A Framework for Supporting Cost-Effective Fault Tolerant Services

The desire for low-cost reliable computing is increasing. Most current fault tolerant computing solutions are not very flexible, i.e., they cannot adapt to reliability requirements of newly emerging applications in business, commerce, and manufacturing. It is important that users have a flexible, reliable platform to support both critical and noncritical applications. Chameleon, under development at the Center for Reliable and High-Performance Computing at the University of Illinois, is a software framework. for supporting cost-effective adaptable networked fault tolerant service. This thesis details a simulation of fault injection, detection, and recovery in Chameleon. The simulation was written in C++ using the DEPEND simulation library. The results obtained from the simulation included the amount of overhead incurred by the fault detection and recovery mechanisms supported by Chameleon. In addition, information about fault scenarios from which Chameleon cannot recover was gained. The results of the simulation showed that both critical and noncritical applications can be executed in the Chameleon environment with a fairly small amount of overhead. No single point of failure from which Chameleon could not recover was found. Chameleon was also found to be capable of recovering from several multiple failure scenarios.

Haakensen, Erik Edward↗

Astronomical Software Directory Service

This is the final report on the development of the Astronomical Software Directory Service (ASDS), a distributable, searchable, WWW-based database of software packages and their related documentation. ASDS provides integrated access to 56 astronomical software packages, with more than 16,000 URL's indexed for full-text searching.

Hanisch, R. J.↗

Satellite/Terrestrial Networks: End-to-End Communication Interoperability Quality of Service Experiments

Various issues associated with satellite/terrestrial end-to-end communication interoperability are presented in viewgraph form. Specific topics include: 1) Quality of service; 2) ATM performance characteristics; 3) MPEG-2 transport stream mapping to AAL-5; 4) Observation and discussion of compressed video tests over ATM; 5) Digital video over satellites status; 6) Satellite link configurations; 7) MPEG-2 over ATM with binomial errors; 8) MPEG-2 over ATM channel characteristics; 8) MPEG-2 over ATM over emulated satellites; 9) MPEG-2 transport stream with errors; and a 10) Dual decoder test.

Ivancic, William D.↗

Measurement of the Errors of Service Altimeter Installations During Landing-Approach and Take-Off Operations

The overall errors of the service altimeter installations of a variety of civil transport, military, and general-aviation airplanes have been experimentally determined during normal landing-approach and take-off operations. The average height above the runway at which the data were obtained was about 280 feet for the landings and about 440 feet for the take-offs. An analysis of the data obtained from 196 airplanes during 415 landing approaches and from 70 airplanes during 152 take-offs showed that: 1. The overall error of the altimeter installations in the landing- approach condition had a probable value (50 percent probability) of +/- 36 feet and a maximum probable value (99.7 percent probability) of +/- 159 feet with a bias of +10 feet. 2. The overall error in the take-off condition had a probable value of +/- 47 feet and a maximum probable value of +/- 207 feet with a bias of -33 feet. 3. The overall errors of the military airplanes were generally larger than those of the civil transports in both the landing-approach and take-off conditions. In the landing-approach condition the probable error and the maximum probable error of the military airplanes were +/- 43 and +/- 189 feet, respectively, with a bias of +15 feet, whereas those for the civil transports were +/- 22 and +/- 96 feet, respectively, with a bias of +1 foot. 4. The bias values of the error distributions (+10 feet for the landings and -33 feet for the take-offs) appear to represent a measure of the hysteresis characteristics (after effect and recovery) and friction of the instrument and the pressure lag of the tubing-instrument system.

Gracey, William↗

Roll Utilization of an F-100A Airplane During Service Operational Flying

As a means of evaluating the roll utilization of a fighter airplane capable of supersonic speeds, an instrumented North American F-100A fighter airplane was flown by U.S. Air Force pilots at Nellis Air Force Base, NV, during 20 hours of service operational flying. Mach numbers up to 1.22 and altitudes up to 50,000 feet were realized in this investigation. Results of the study showed that except for high g barrel rolls performed as evasive maneuvers and rolls performed in acrobatic flying, rolling was utilized primarily as a means of changing heading. Acrobatic and air combat maneuvering produced the largest bank angles (1,200 deg), roll velocities (3.3 radians/sec), rolling accelerations (8 radians/sq sec) and sideslip angles (10.8 deg). Full aileron deflections were utilized on numerous occasions. Although high rolling velocities and accelerations also were experienced during several air-to-air gunnery missions, generally, air-to-air gunnery and air-to-ground gunnery and bombing required only two-thirds of maximum aileron deflection. The air-to-air gunnery and air combat maneuvers initiated from supersonic speeds utilized up to two-thirds aileron deflection and bank angles of less than 18 deg and resulted in rolling velocities and accelerations of 2 radians per second and 4.6 radians/sq sec, respectively. Rolling maneuvers were often initiated from high levels of normal acceleration, but from levels of negative normal acceleration only once.

Matranga, Gene J.↗

MPEG-2 Over Asynchronous Transfer Mode (ATM) Over Satellite Quality of Service (QoS) Experiments: Laboratory Tests

Asynchronous transfer mode (ATM) quality of service (QoS) experiments were performed using MPEG-2 (ATM application layer 5, AAL5) over ATM over an emulated satellite link. The purpose of these experiments was to determine the free-space link quality necessary to transmit high-quality multimedia information by using the ATM protocol. The detailed test plan and test configuration are described herein as are the test results. MPEG-2 transport streams were baselined in an errored environment, followed by a series of tests using, MPEG-2 over ATM. Errors were created both digitally as well as in an IF link by using a satellite modem and commercial gaussian noise test set for two different MPEG-2 decoder implementations. The results show that ITU-T Recommendation 1.356 Class 1, stringent ATM applications will require better link quality than currently specified; in particular, cell loss ratios of better than 1.0 x 10(exp -8) and cell error ratios of better than 1.0 x 10(exp -7) are needed. These tests were conducted at the NASA Lewis Research Center in support of satellite-ATM interoperability research.

Ivancic, William D.↗

PI Microgravity Services Role for International Space Station Operations

During the ISS era, the NASA Lewis Research Center's Principal Investigator Microgravity Services (PIMS) project will provide to principal investigators (PIs) microgravity environment information and characterization of the accelerations to which their experiments were exposed during on orbit operations. PIMS supports PIs by providing them with microgravity environment information for experiment vehicles, carriers, and locations within the vehicle. This is done to assist the PI with their effort to evaluate the effect of acceleration on their experiments. Furthermore, PIMS responsibilities are to support the investigators in the area of acceleration data analysis and interpretation, and provide the Microgravity science community with a microgravity environment characterization of selected experiment carriers and vehicles. Also, PIMS provides expertise in the areas of microgravity experiment requirements, vibration isolation, and the implementation of requirements for different spacecraft to the microgravity community and other NASA programs.

DeLombard, Richard↗

Carrier Estimation Using Classic Spectral Estimation Techniques for the Proposed Demand Assignment Multiple Access Service

In any satellite communication, the Doppler shift associated with the satellite's position and velocity must be calculated in order to determine the carrier frequency. If the satellite state vector is unknown then some estimate must be formed of the Doppler-shifted carrier frequency. One elementary technique is to examine the signal spectrum and base the estimate on the dominant spectral component. If, however, the carrier is spread (as in most satellite communications) this technique may fail unless the chip rate-to-data rate ratio (processing gain) associated with the carrier is small. In this case, there may be enough spectral energy to allow peak detection against a noise background. In this thesis, we present a method to estimate the frequency (without knowledge of the Doppler shift) of a spread-spectrum carrier assuming a small processing gain and binary-phase shift keying (BPSK) modulation. Our method relies on an averaged discrete Fourier transform along with peak detection on spectral match filtered data. We provide theory and simulation results indicating the accuracy of this method. In addition, we will describe an all-digital hardware design based around a Motorola DSP56303 and high-speed A/D which implements this technique in real-time. The hardware design is to be used in NMSU's implementation of NASA's demand assignment, multiple access (DAMA) service.

Scaife, Bradley James↗

Galileo-NMS Field Services

Final Technical Report for NAS5-29344 entitled "Galileo Mass Spectrometer System Field Services."

Carignan, George R.↗

International VLBI Service for Geodesy and Astrometry: 2000 General Meeting Proceedings

This volume is the proceedings of the first General Meeting of the International Very Long Base Interferometry (VLBI) Service for Geodesy and Astrometry (IVS), held in Koetzting, Germany, February 21-24, 2000. The content of this volume also appears on the IVS web site at: http://ivscc.gsfc.nasa.gov/publications/gm2000. The goal of the program committee for the General Meeting was to provide an interesting and informative program for a wide cross section of IVS members, including station operators, program managers, and analysts. The program included reports, tutorials, invited and contributed papers, and poster presentations. The tutorial papers should be particularly useful references because each one provides an overview and introduction to a topic relevant to VLBI.

Nancy R. Vandenberg↗

Breadth of Scientific Activities and Network Station Specifications in the International GPS Service (IGS)

A strong multipurpose aspect of the International GPS Service (IGS) is revealed by a glance at the titles of current projects and working groups within the IGS: IGS/BIPM Time Transfer Project; Ionosphere Working Group; Troposphere Working Group; International GLONASS Experiment; Working Group on Low-Earth Orbiter Missions; and Tide Gauges, CGPS, and the IGS. The IGS network infrastructure, in large part originally commissioned for geodynamical investigations, has proved to be a valuable asset in developing application-oriented subnetworks whose requirements overlap the characteristics of existing IGS stations and future station upgrades. Issues encountered thus far in the development of multipurpose or multitechnique IGS projects as well as future possibilities will be reviewed.

Moore, A. W.↗

ATM Quality of Service Parameters at 45 Mbps Using a Satellite Emulator: Laboratory Measurements

Results of 45-Mbps DS3 intermediate-frequency loopback measurements of asynchronous transfer mode (ATM) quality of service parameters (cell error ratio and cell loss ratio) are presented. These tests, which were conducted at the NASA Lewis Research Center in support of satellite-ATM interoperability research, represent initial efforts to quantify the minimum parameters for stringent ATM applications, such as MPEG-1 and MPEG-2 video transmission. Portions of these results were originally presented to the International Telecommunications Union's ITU-R Working Party 4B in February 1996 in support of their Draft Preliminary Recommendation on the Transmission of ATM Traffic via Satellite.

Ivancic, William D.↗

Quality of Service for Real-Time Applications Over Next Generation Data Networks

This project, which started on January 1, 2000, was funded by the NASA Glenn Research Center for duration of one year. The deliverables of the project included the following tasks: (1) Study of QoS mapping between the edge and core networks envisioned in the Next Generation networks will provide us with the QoS guarantees that can be obtained from next generation networks; (2) Buffer management techniques to provide strict guarantees to real-time end-to-end applications through preferential treatment to packets belonging to real-time applications. In particular, use of ECN to help reduce the loss on high bandwidth-delay product satellite networks needs to be studied; (3) Effect of Prioritized Packet Discard to increase goodput of the network and reduce the buffering requirements in the ATM switches; (4) Provision of new IP circuit emulation services over Satellite IP backbones using MPLS will be studied; and (5) Determine the architecture and requirements for internetworking ATN and the Next Generation Internet for real-time applications. The project has been completed on time. All the objectives and deliverables of the project have been completed. Research results obtained from this project have been published in a number of papers in journals, conferences, and technical reports, included in this document.

Atiquzzaman, Mohammed↗

Hubble Space Telescope Servicing Mission 3A Rendezvous Operations

The Hubble Space Telescope (HST) hardware complement includes six gas bearing, pulse rebalanced rate integrating gyros, any three of which are sufficient to conduct the science mission. After the loss of three gyros between April 1997 and April 1999 due to a known corrosion mechanism, NASA decided to split the third HST servicing mission into SM3A, accelerated to October 1999, and SM3B, scheduled for November 2001. SM3A was developed as a quick turnaround 'Launch on Need' mission to replace all six gyros. Loss of a fourth gyro in November 1999 caused HST to enter Zero Gyro Sunpoint (ZGSP) safemode, which uses sun sensors and magnetometers for attitude determination and momentum bias to maintain attitude stability during orbit night. Several instances of large attitude excursions during orbit night were observed, but ZGSP performance was adequate to provide power-positive sun pointing and to support low gain antenna communications. Body rates in ZGSP were estimated to exceed the nominal 0.1 deg/sec rendezvous limit, so rendezvous operations were restructured to utilize coarse, limited life, Retrieval Mode Gyros (RMGs) under Hardware Sunpoint (HWSP) safemode. Contingency procedures were developed to conduct the rendezvous in ZGSP in the event of RMGA or HWSP computer failure. Space Shuttle Mission STS-103 launched on December 19, 1999 after a series of weather and Shuttle-related delays. After successful rendezvous and grapple under HWSP/RMGA, the crew changed out all six gyros. Following deploy and systems checkout, HST returned to full science operations.

Lee, S.↗

International VLBI Service for Geodesy and Astrometry

This volume of reports is the 2000 Annual Report of the International Very Long Base Interferometry (VLBI) Service for Geodesy and Astrometry (IVS). The individual reports were contributed by VLBI groups in the international geodetic and astrometric community who constitute the components of IVS. The 2000 Annual Report documents the work of these IVS components over the period March 1, 1999, through December 31, 2000. The reports document changes, activities, and progress of the IVS. The entire contents of this Annual Report also appear on the IVS web site at http://ivscc.gsfc.nasa.gov/publications/ar2000.

Vandenberg, Nancy R.↗

International VLBI Service for Geodesy and Astrometry: General Meeting Proceedings

This volume contains the proceedings of the second General Meeting of the International VLBI Service for Geodesy and Astrometry (IVS), held in Tsukuba, Japan, February 4-7, 2002. The contents of this volume also appear on the IVS Web site at http://ivscc.gsfc.nasa.gov/publications/gm2002. The key-note of the second GM was prospectives for the future, in keeping with the re-organization of the IAG around the motivation of geodesy as 'an old science with a dynamic future' and noting that providing reference frames for Earth system science that are consistent over decades on the highest accuracy level will provide a challenging role for IVS. The goal of the meeting was to provide an interesting and informative program for a wide cross section of IVS members, including station operators, program managers, and analysts. This volume contains 72 papers and five abstracts of papers presented at the GM. The volume also includes reports about three splinter meetings held in conjunction with the GM: a mini-TOW (Technical Operations Workshop), the third IVS Analysis Workshop and a meeting of the analysis working group on geophysical modeling.

Vandenberg, Nancy R.↗