Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Earth Observatory Satellite system definition study. Report no. 5: System design and specifications. Part 1: Observatory system element specifications

The performance, design, and quality assurance requirements for the Earth Observatory Satellite (EOS) Observatory and Ground System program elements required to perform the Land Resources Management (LRM) A-type mission are presented. The requirements for the Observatory element with the exception of the instruments specifications are contained in the first part.

Source record↗

Communications among elements of a space construction ensemble

Space construction projects will require careful coordination between managers, designers, manufacturers, operators, astronauts, and robots with large volumes of information of varying resolution, timeliness, and accuracy flowing between the distributed participants over computer communications networks. Within the CSC Operations Branch, we are researching the requirements and options for such communications. Based on our work to date, we feel that communications standards being developed by the International Standards Organization, the CCITT, and other groups can be applied to space construction. We are currently studying in depth how such standards can be used to communicate with robots and automated construction equipment used in a space project. Specifically, we are looking at how the Manufacturing Automation Protocol (MAP) and the Manufacturing Message Specification (MMS), which tie together computers and machines in automated factories, might be applied to space construction projects. Together with our CSC industrial partner Computer Technology Associates, we are developing a MAP/MMS companion standard for space construction and we will produce software to allow the MAP/MMS protocol to be used in our CSC operations testbed.

Davis, Randal L.↗

Biologically-Inspired Concepts for Self-Management of Complexity

Inherent complexity in large-scale applications may be impossible to eliminate or even ameliorate despite a number of promising advances. In such cases, the complexity must be tolerated and managed. Such management may be beyond the abilities of humans, or require such overhead as to make management by humans unrealistic. A number of initiatives inspired by concepts in biology have arisen for self-management of complex systems. We present some ideas and techniques we have been experimenting with, inspired by lesser-known concepts in biology that show promise in protecting complex systems and represent a step towards self-management of complexity.

Sterritt, Roy↗

Unified Communications for Space Inventory Management

To help assure mission success for long-duration exploration activities, NASA is actively pursuing wireless technologies that promote situational awareness and autonomy. Wireless technologies are typically extensible, offer freedom from wire tethers, readily support redundancy, offer potential for decreased wire weight, and can represent dissimilar implementation for increased reliability. In addition, wireless technologies can enable additional situational awareness that otherwise would be infeasible. For example, addition of wired sensors, the need for which might not have been apparent at the outset of a program, night be extremely costly due in part to the necessary routing of cables through the vehicle. RFID, or radio frequency identification, is a wireless technology with the potential for significant savings and increased reliability and safety in space operations. Perhaps the most obvious savings relate to the application of inventory management. A fully automated inventory management system is highly desirable for long-term sustaining operations in space environments. This assertion is evidenced by inventory activities on the International Space Station, which represents the most extensive inventory tracking experience base in the history of space operations. In the short tern, handheld RFID readers offer substantial savings owing to reduced crew time for inventory audits. Over the long term, a combination of improved RFID technology and operational concepts modified to fully utilize the technology should result in space based inventory management that is highly reliable and requires very little crew time. In addition to inventory management, RFID is likely to find space applications in real-time location and tracking systems. These could vary from coarse-resolution RFID portals to the high resolution afforded by ultra-wideband (UWB) RFID. Longer range RFID technologies that leverage passive surface acoustic wave (SAW) devices are being investigated to track assets on a lunar or planetary surface.

Gifford, Kevin K.↗

The Future of Evapotranspiration: Global Requirements for Ecosystem Functioning, Carbon and Climate Feedbacks, Agricultural Management, and Water Resources

The fate of the terrestrial biosphere is highly uncertain given recent and projected changes in climate. This is especially acute for impacts associated with changes in drought frequency and intensity on the distribution and timing of water availability. The development of effective adaptation strategies for these emerging threats to food and water security are compromised by limitations in our understanding of how natural and managed ecosystems are responding to changing hydrological and climatological regimes. This information gap is exacerbated by insufficient monitoring capabilities from local to global scales. Here, we describe how evapotranspiration (ET) represents the key variable in linking ecosystem functioning, carbon and climate feedbacks, agricultural management, and water resources, and highlight both the outstanding science and applications questions and the actions, especially from a space-based perspective, necessary to advance them.

Fisher, Joshua B.↗

Developing IVHM Requirements for Aerospace Systems

The term Integrated Vehicle Health Management (IVHM) describes a set of capabilities that enable sustainable and safe operation of components and subsystems within aerospace platforms. However, very little guidance exists for the systems engineering aspects of design with IVHM in mind. It is probably because of this that designers have to use knowledge picked up exclusively by experience rather than by established process. This motivated a group of leading IVHM practitioners within the aerospace industry under the aegis of SAE's HM-1 technical committee to author a document that hopes to give working engineers and program managers clear guidance on all the elements of IVHM that they need to consider before designing a system. This proposed recommended practice (ARP6883 [1]) will describe all the steps of requirements generation and management as it applies to IVHM systems, and demonstrate these with a "real-world" example related to designing a landing gear system. The team hopes that this paper and presentation will help start a dialog with the larger aerospace community and that the feedback can be used to improve the ARP and subsequently the practice of IVHM from a systems engineering point-of-view.

IVHM↗

Towards an Indian Land Data Assimilation System (ILDAS): A Coupled Hydrologic-Hydraulic System for Water Balance Assessments

Effective management of water resources requires reliable estimates of land surface states and fluxes, including water balance components. But most land surface models run in uncoupled mode and do not produce river discharge at catchment scales to be useful for water resources management applications. Such integrated systems are also rare over India where hydrometeorological extremes have wreaked havoc on the economy and people. So, an Indian Land Data Assimilation System (ILDAS) with a coupled land surface and a hydrodynamic model has been developed and driven by multiple meteorological forcings (0.1°, daily) to estimate land surface states, channel discharge, and floodplain inundation. ILDAS benefits from an integrated framework as well as the largest suite of observation records collected over India and has been used to produce a reanalysis product for 1981–2021 using four forcing datasets, namely, Modern-Era Retrospective Analysis for Research and Applications, Version 2 (MERRA-2), Climate Hazards Group InfraRed Precipitation with Station data (CHIRPS), ECMWF’s ERA-5, and Indian Meteorological Department (IMD) gridded precipitation. We assessed the uncertainty and bias in these precipitation datasets and validated all major components of the terrestrial water balance, i.e., surface runoff, soil moisture, terrestrial water storage anomalies, evapotranspiration, and streamflow, against a combination of satellite and in situ observation datasets. Our assessment shows that ILDAS can represent the hydrological processes reasonably well over the Indian landmass with IMD precipitation showing the best relative performance. Evaluation against ESA-CCI soil moisture shows that MERRA-2 based estimates outperform the others, whereas ERA-5 performs best in simulating evapotranspiration when evaluated against MODIS ET. Evaluations against observed records show that CHIRPS-based estimates have the highest performance in reconstructing surface runoff and streamflow. Once operational, this system will be useful for supporting transboundary water management decision making in the region.

Indian Land Data Assimilation System (ILDAS)↗

HP upgrade operational streamlining

New computer technology and resources must be successfully integrated into CDSLR station operations to manage new complex operational tracking requirements, support the on site production of new data products, support ongoing station performance improvements, and to support new station communication requirements. The NASA CDSLR Network is in the process of upgrading station computer resources with HP UNIX workstations, designed to automate a wide range of operational station requirements. The primary HP upgrade objective was to relocate computer intensive data system tasks from the controller computer to a new advanced computer environment designed to meet the new data system requirements. The HP UNIX environment supports fully automated real time data communications, data management, data processing, and data quality control. Automated data compression procedures are used to improve the efficiency of station data communications. In addition, the UNIX environment supports a number of semi-automated technical and administrative operational station tasks. The x window user interface generates multiple simultaneous color graphics displays, providing direct operator visibility and control over a wide range of operational station functions.

Edge, David R.↗

The evolution of power management architecture for missions to the outer planets

Outer planet spacecraft have unique requirements that differentiate them from inner planet and Earth orbiter spacecraft. To meet these requirements, the Voyager and Galileo Power Management And Distribution (PMAD) architectures employed shunt regulation and carried on the Mariner tradition of AC power distribution to many of the user loads. Also, autonomous fault recovery was achieved by automatic responses in hardware and software recovery routines. Finally, power distribution switching was expanded to allow for removal of the most trivial load element as the nuclear source depleted itself. The design cycle has begun for a third generation spacecraft set named Comet Rendezvous Asteroid Flyby (CRAF) and Cassini (a saturn orbiter). In their power systems, AC power distribution, relay/fuse load switching, and fault protection will give way to the advantages of DC power and solid state load switches.

Detwiler, R. C.↗

The OSS-1 mission - Lessons learned in developing and integrating experiments

Experience gained in the development and integration of experiments for the OSS-1 payload to be carried on board the Space Shuttle for the characterization of the effects of the STS environment on future scientific missions is related. Following a review of mission objectives, including the demonstration of Shuttle research capabilities and the evaluation of new technology, the experiments and mission operations to be performed are outlined, and mission support requirements are indicated. The conduct of mission management by the Goddard Space Flight Center, which required interfacing with a large number of other agencies, centers, and investigators and contractors and an enormous amount of formal documentation, is then examined, with consideration given to the management of mechanical, electrical, and thermal systems development mock-up construction, EMI/EMC and acoustic testing, the formation of an integration and test team, and trade-offs between cost, schedule and performance. It is concluded that although work still remains to be done, significant progress has been made in ensuring that the STS is a viable system for space exploration.

Kissin, K.↗

Oracle accrual plans from requirements to implementation

Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

97 MATHEMATICS AND COMPUTING↗

Advanced licensing and safety engineering method - ADLAS{sup TM} - 377

Complex nuclear projects, with long supply chains require detailed understanding and management to succeed. One of the most important success factors is licensing, which has been very challenging in past years in many nuclear projects (both new build projects and modernization projects). To better understand the licensing aspects and the safety features that are behind the licensing requirements, the high level safety engineering method has been developed in Finnish energy company Fortum. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Assessment of NDE for Key Indicators of Aging Cables in Nuclear Power Plants – Interim Status

Degradation of the cable jacket, electrical insulation, and other cable components of installed cables within nuclear power plants (NPPs) is known to occur as a function of age, temperature, radiation, and other environmental factors. System tests verify cable function under normal loads; however, the concern is over cable performance under exceptional loads associated with design-basis events (DBEs). The cable’s ability to perform safely over the initial 40 year planned and licensed life has generally been demonstrated and there have been very few age-related cable failures. With greater than 1000 km of power, control, instrumentation, and other cables typically found in an NPP, replacing all the cables would be a severe cost burden. Justification for life extension to 60 and 80 years requires a cable aging management program to justify cable performance under normal operation as well as accident conditions. Currently the gold standard for determining cable insulation degradation is the elongation-at-break (EAB). This, however, is an ex-situ measurement and requires removal of a sample for laboratory investigation. A reliable nondestructive examination (NDE) in-situ approach is desirable to objectively determine the suitability of the cable for service. A variety of tests are available to assess various aspects of electrical and mechanical cable performance, but none of these tests are suitable for all cable configurations nor does any single test confirm all features of interest. Nevertheless, the complete collection of test possibilities offers a powerful range of tools to assure the integrity of critical cables. Licensees and regulators have settled on a practical program to justify continued operation based on condition monitoring of a lead sample set of cables where test data is tracked in a database and the required test data are continually adjusted based on plant and fleet-wide experience. As part of the Light Water Reactor Sustainability program sponsored by the U.S. Nuclear Regulatory Commission, the U.S. Department of Energy, and industry (represented by the Electric Power Research Institute), an assessment of cable NDE methods was commissioned. Technologies include both bulk electrical measurements (Tan d, time domain reflectometry, frequency domain reflectometry (FDR), partial discharge, and other techniques) and local insulation measurement (indenter, dynamic mechanical analysis interdigital capacitance, infrared spectral measurement, etc.). This aging cable NDE program update reviews the full range of techniques but focuses on the most interesting test approaches that have a chance to be deployed in-situ, particularly including Tan d, FDR, and ultrasound methods that have been reviewed most completely in this progress period.

cable aging inspection↗

Open Circuit Switch Fault Management Method of a Multi-Phase Synchronous Buck Converter for EV Charging Application

Multi-phase synchronous buck converter (MSBC) is becoming popular for the electric vehicle (EV) charging application because of its higher efficiency, smaller passive component sizes, bidirectional power flow, and output current ripple reduction through interleaving. This converter also provides higher reliability than the traditional single phase converter since its modular structure enables fault tolerant operation. Fault management in the converter requires the detection of switch fault, shut down of the faulty phase, and reconfiguration of the PWM signals for the healthy phases to avoid circulating current and high output current ripple. In addition, it is desirable that the fault management method can be implemented using the micro-controller unit (MCU) or digital signal processor (DSP), which are widely used to control power converters. This paper presents a fault management method for detecting switch faults and reconfiguring healthy phases using a DSP. The method is validated through simulations and experiments using a commercial off-the-shelf power stack.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Transition to Online Cable Insulation Condition Monitoring

Nuclear power plant cables were originally qualified for 40 year life and generally have not required specific test verification to assure service availability through the initial plant qualification period. However, license renewals to 60 and 80 years of operation require a cable aging management program that depends on some form of test and verification to assure fitness for service. Environmental stress (temperature, radiation, chemicals, water, and mechanical) varies dramatically within a nuclear power plant and, in some cases, cables have degraded and required repair or replacement before their qualified end-of-life period. In other cases, cable conditions have been mild and dependable cable performance confirmed to extend well beyond the initial qualified life. Most offline performance-based testing requires cables to be de-coupled and de-energized for specially trained technicians to perform testing. These offline tests constitute an expensive operational burden that limits the economic viability of nuclear power plants. Although initial investment may be higher, new online test practices are emerging as options or complements to offline testing that avoid or minimize the regularly scheduled offline test burden. These online methods include electrical and fiber-optic partial discharge measurement, spread spectrum time or frequency domain reflectometry, distributed temperature profile measurements, and local interdigital capacitance measurement of insulation characteristics. Introduction of these methods must be supported by research to confirm efficacy plus either publicly financed or market driven investment to support the start-up expense of cost-effective instrumentation to monitor cable condition and assure reliable operation. This work summarizes various online cable assessment technologies plus introduces a new cable motor test bed to assess some of these technologies in a controlled test environment.

Glass, Samuel W.↗

Integrated Human-Robotic Missions to the Moon and Mars: Mission Operations Design Implications

For most of the history of space exploration, human and robotic programs have been independent, and have responded to distinct requirements. The NASA Vision for Space Exploration calls for the return of humans to the Moon, and the eventual human exploration of Mars; the complexity of this range of missions will require an unprecedented use of automation and robotics in support of human crews. The challenges of human Mars missions, including roundtrip communications time delays of 6 to 40 minutes, interplanetary transit times of many months, and the need to manage lifecycle costs, will require the evolution of a new mission operations paradigm far less dependent on real-time monitoring and response by an Earthbound operations team. Robotic systems and automation will augment human capability, increase human safety by providing means to perform many tasks without requiring immediate human presence, and enable the transfer of traditional mission control tasks from the ground to crews. Developing and validating the new paradigm and its associated infrastructure may place requirements on operations design for nearer-term lunar missions. The authors, representing both the human and robotic mission operations communities, assess human lunar and Mars mission challenges, and consider how human-robot operations may be integrated to enable efficient joint operations, with the eventual emergence of a unified exploration operations culture.

Korth, David↗

Integrated Human-Robotic Missions to the Moon and Mars: Mission Operations Design Implications

For most of the history of space exploration, human and robotic programs have been independent, and have responded to distinct requirements. The NASA Vision for Space Exploration calls for the return of humans to the Moon, and the eventual human exploration of Mars; the complexity of this range of missions will require an unprecedented use of automation and robotics in support of human crews. The challenges of human Mars missions, including roundtrip communications time delays of 6 to 40 minutes, interplanetary transit times of many months, and the need to manage lifecycle costs, will require the evolution of a new mission operations paradigm far less dependent on real-time monitoring and response by an Earthbound operations team. Robotic systems and automation will augment human capability, increase human safety by providing means to perform many tasks without requiring immediate human presence, and enable the transfer of traditional mission control tasks from the ground to crews. Developing and validating the new paradigm and its associated infrastructure may place requirements on operations design for nearer-term lunar missions. The authors, representing both the human and robotic mission operations communities, assess human lunar and Mars mission challenges, and consider how human-robot operations may be integrated to enable efficient joint operations, with the eventual emergence of a unified exploration operations culture.

human robotic missions↗