Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Quantifying Contaminant Mass for the Feasibility Study of the DuPont Chambers Works FUSRAP Site - 13510

The U.S. Army Corps of Engineers (USACE) - Philadelphia District is conducting an environmental restoration at the DuPont Chambers Works in Deepwater, New Jersey under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Discrete locations are contaminated with natural uranium, thorium-230 and radium-226. The USACE is proposing a preferred remedial alternative consisting of excavation and offsite disposal to address soil contamination followed by monitored natural attenuation to address residual groundwater contamination. Methods were developed to quantify the error associated with contaminant volume estimates and use mass balance calculations of the uranium plume to estimate the removal efficiency of the proposed alternative. During the remedial investigation, the USACE collected approximately 500 soil samples at various depths. As the first step of contaminant mass estimation, soil analytical data was segmented into several depth intervals. Second, using contouring software, analytical data for each depth interval was contoured to determine lateral extent of contamination. Six different contouring algorithms were used to generate alternative interpretations of the lateral extent of the soil contamination. Finally, geographical information system software was used to produce a three dimensional model in order to present both lateral and vertical extent of the soil contamination and to estimate the volume of impacted soil for each depth interval. The average soil volume from all six contouring methods was used to determine the estimated volume of impacted soil. This method also allowed an estimate of a standard deviation of the waste volume estimate. It was determined that the margin of error for the method was plus or minus 17% of the waste volume, which is within the acceptable construction contingency for cost estimation. USACE collected approximately 190 groundwater samples from 40 monitor wells. It is expected that excavation and disposal of contaminated soil will remove the contaminant source zone and significantly reduce contaminant concentrations in groundwater. To test this assumption, a mass balance evaluation was performed to estimate the amount of dissolved uranium that would remain in the groundwater after completion of soil excavation. As part of this evaluation, average groundwater concentrations for the pre-excavation and post-excavation aquifer plume area were calculated to determine the percentage of plume removed during excavation activities. In addition, the volume of the plume removed during excavation dewatering was estimated. The results of the evaluation show that approximately 98% of the aqueous uranium would be removed during the excavation phase. The USACE expects that residual levels of contamination will remain in groundwater after excavation of soil but at levels well suited for the selection of excavation combined with monitored natural attenuation as a preferred alternative. (authors)

54 ENVIRONMENTAL SCIENCES↗

Comparison of Statistically Modeled Contaminated Soil Volume Estimates and Actual Excavation Volumes at the Maywood FUSRAP Site - 13555

As part of the ongoing remediation process at the Maywood Formerly Utilized Sites Remedial Action Program (FUSRAP) properties, Argonne National Laboratory (Argonne) assisted the U.S. Army Corps of Engineers (USACE) New York District by providing contaminated soil volume estimates for the main site area, much of which is fully or partially remediated. As part of the volume estimation process, an initial conceptual site model (ICSM) was prepared for the entire site that captured existing information (with the exception of soil sampling results) pertinent to the possible location of surface and subsurface contamination above cleanup requirements. This ICSM was based on historical anecdotal information, aerial photographs, and the logs from several hundred soil cores that identified the depth of fill material and the depth to bedrock under the site. Specialized geostatistical software developed by Argonne was used to update the ICSM with historical sampling results and down-hole gamma survey information for hundreds of soil core locations. The updating process yielded both a best guess estimate of contamination volumes and a conservative upper bound on the volume estimate that reflected the estimate's uncertainty. Comparison of model results to actual removed soil volumes was conducted on a parcel-by-parcel basis. Where sampling data density was adequate, the actual volume matched the model's average or best guess results. Where contamination was un-characterized and unknown to the model, the actual volume exceeded the model's conservative estimate. Factors affecting volume estimation were identified to assist in planning further excavations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from a Complex FUSRAP Site - Sylvania Corning FUSRAP Site - 12269

Since its addition to the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 2005, the Sylvania Corning FUSRAP Site (the Site) in Hicksville, New York, has provided challenges and opportunities from which to gain lessons learned for conducting investigation work at a complex multi-contaminant FUSRAP Site. The United States Army Corps of Engineers (USACE) and its contractors conducted a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation (RI) and are currently in the Feasibility Study (FS) phase at the Site. This paper presents the planning, execution, and reporting lessons learned by USACE during the RI/FS. The Site, operated from 1952 to 1967 for the research, development, and fabrication of nuclear elements under the Atomic Energy Commission, and other government and commercial contracts. Previous investigations performed by the New York State Department of Environmental Conservation (NYSDEC) and the current property owner have identified uranium, thorium, nickel, and chlorinated solvents, as Site contaminants [1]. The property owner is currently under two separate voluntary agreements with NYSDEC to investigate and remediate the Site. USACE's work at the site has been independent of this voluntary agreement and has moved on a parallel path with any work the property owner has completed. The project at the Site is complex because of the radiological and chemical concerns in both soils and groundwater, high hydraulically conductive soils, lack of a shallow aquiclude/aquitard, and a principal water table aquifer underlying the site. Contaminants are migrating from the Site and may potentially impact local drinking water supplies (municipal wells). During the RI/FS process the project team has encountered many issues and has thus developed many resolutions. The issues are organized into three categories: Planning and Contracting, Execution, and Reporting. Planning and Contracting lessons learned include: how to incorporate an overwhelming volume of historical data; how to manage a complex team of three prime contractors innovatively, and how to implement a project under an Award Fee task order. Execution lessons learned include: characterization of investigation derived wastes, and proper approach to radiological scanning of direct-push borings and soil cores. Reporting lessons learned include: coordinating multiple phase (iterative) reporting, large dataset presentation, and the National Priorities List (NPL) designation. The goal of this paper is to provide a resource for other project delivery teams that encounter similar situations on their projects to optimize cost savings, realization of efficiency, shorten schedules, or simply ensure higher quality deliverables. Each FUSRAP project is unique but there are many lessons we can apply to each site to gain efficiency and work more effectively. The Sylvania Corning FUSRAP site is a complex site with both soils and groundwater contamination, contamination to depths of 182 meters, and a highly politically charged environment of PRP involvement. Many of the lessons the project team has learned during the life of the project to date are being shared with others as well as being applied back to this project for future work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview and History of DOE's Hanford Site - 12502

Hanford's DOE offices are responsible for one of the largest nuclear cleanup efforts in the world, cleaning up the legacy of nearly five decades of nuclear weapons production. Nowhere in the DOE Complex is cleanup more challenging than at the Hanford Site in southeastern Washington. Hanford cleanup entails remediation of hundreds of large complex hazardous waste sites; disposition of nine production reactors and the preservation of one as a National Historic Landmark; demolition of hundreds of contaminated facilities including five enormous process canyons; remediation of billions of gallons of contaminated groundwater; disposition of millions of tons of low-level, mixed low-level, and transuranic waste; disposition of significant quantities of special nuclear material; storage and ultimate disposition of irradiated nuclear fuel; remediation of contamination deep in the soil that could impact groundwater; decontamination and decommissioning of hundreds of buildings and structures; and treatment of 56 million gallons of radioactive waste in 177 large underground tanks through the construction of a first-of-its-kind Waste Treatment Plant. Cleanup of the Hanford Site is a complex and challenging undertaking. The DOE Richland Operations Office has a vision and a strategy for completing Hanford's cleanup including the transition to post-cleanup activities. Information on the strategy is outlined in the Hanford Site Completion Framework. The framework describes three major components of cleanup - River Corridor, Central Plateau, and Tank Waste. It provides the context for individual cleanup actions by describing the key challenges and approaches for the decisions needed to complete cleanup. The U.S. Department of Energy (DOE), as regulated by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology), is implementing a strategy to achieve final cleanup decisions for the River Corridor portion of the Hanford Site. The DOE Richland Operations Office (RL) and DOE Office of River Protection (ORP) have prepared this document to describe the strategy and to begin developing the approach for making cleanup decisions for the remainder of the Hanford Site. DOE's intent is that the Completion Framework document will facilitate dialogue among the Tri-Parties and with Hanford's diverse interest groups, including Tribal Nations, State of Oregon, Hanford Advisory Board, Natural Resource Trustees, and the public. Future cleanup decisions will be enhanced by an improved understanding of the challenges facing cleanup and a common understanding of the goals and approaches for cleanup completion. The overarching goals for cleanup are sevenfold. - Goal 1: Protect the Columbia River. - Goal 2: Restore groundwater to its beneficial use to protect human health, the environment, and the Columbia River. - Goal 3: Clean up River Corridor waste sites and facilities to: Protect groundwater and the Columbia River. Shrink the active cleanup footprint to the Central Plateau, and support anticipated future uses of the land. - Goal 4: Clean up Central Plateau waste sites, tank farms, and facilities to: Protect groundwater. Minimize the footprint of areas requiring long-term waste management activities. Support anticipated future uses of the land. - Goal 5: Safely manage and transfer legacy materials scheduled for off-site disposition including special nuclear material (including plutonium), spent nuclear fuel, transuranic waste, and immobilized high-level waste. - Goal 6: Consolidate waste treatment, storage, and disposal operations on the Central Plateau. - Goal 7: Develop and implement institutional controls and long-term stewardship activities that protect human health, the environment, and Hanford's unique cultural, historical and ecological resources after cleanup activities are completed. These goals embody more than 20 years of dialogue among the Tri-Party Agencies, Tribal Nations, State of Oregon, stakeholders, and the public. They carry forward key values captured in forums such as the Hanford Future Site Uses Working Group, Tank Waste Task Force, Hanford Summits, and Hanford Advisory Board Exposure Scenario Workshops, as well as more than 200 advice letters issued by the Hanford Advisory Board (http://www.hanford.gov/page.cfm/hab). These goals help guide all aspects of Hanford Site cleanup. Cleanup activities at various areas of the site support the achievement of one or more of these goals. These goals help set priorities to apply resources and sequence cleanup efforts for the greatest benefit. These goals reflect DOE's recognition that the Columbia River is a critical resource for the people and ecology of the Pacific Northwest. The 50-mile stretch of the river known as the Hanford Reach is home to the last free-flowing section of the river in the U.S. As one of the largest rivers in North America, its waters support a multitude of uses that are vital to the economic and environmental well being of the region and it is particularly important in sustaining the culture of Native Americans. Cleanup actions must protect this river. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Impact of Soil Vapor Extraction at Material Disposal Area L, Los Alamos National Laboratory - 17155

Material Disposal Area L (MDA L) is an inactive liquid-waste disposal site located within the Los Alamos National Laboratory property. A subsurface vapor plume of volatile organic compounds (VOCs) is present in the unsaturated zone and site remediation is recommended so that the plume will not impact groundwater in the future. Soil vapor extraction using two extraction wells was recently conducted at the site for 10 months as an interim remediation measure. We analyzed plume size, concentrations vs. time and depth in monitoring wells, predicted vs. measured extraction concentrations, and plume rebound to understand the impact of the interim measure and to obtain effective feedback on how to continue remediating the site. We also re-calibrated an existing model used to predict plume behavior with field data collected during extraction. The vapor plume size decreased by 60%. This paper presents the results for the removal of VOC mass from the subsurface and the spatially-dependent reduction of VOC concentrations in the plume; these reductions, as well as maintaining the plume in the upper unsaturated zone, are desired for reducing possible future impacts to groundwater. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

URS/WTP's Future Leader Program and AECOM's Early Career Professional Technology Exchange - 17239

URS Energy and Construction, Inc. (URS), a subsidiary of AECOM, is the Bechtel National, Inc. (BNI) teaming subcontractor on the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Project. Recently, the WTP Project has begun a transition toward facility turnover and commissioning. With that transition came the hiring of staff for the startup and commissioning workforce. With many of these individuals being Early Career Professionals (ECPs), URS recognized a need to create and implement a workforce development program to give these professionals the skills to thrive in a professional environment and provide a sense of community to improve talent retention. The result of this recognition of need was the creation of URS/WTP Future Leaders. This paper will share the successes and lessons learned related to founding the URS/WTP Future Leaders. This includes establishing programs such as the Continuous Learning Workshops, Rotational Program, and implementing a mentor program. In addition, establishing a budget and obtaining support from Human Resources will be discussed. By March 2017, the ECP program will have been in effect for approximately two years. As a separate effort, many of AECOM's major waste remediation contractors have started having Early Career Professional Technology Exchanges (ECP TE) in an effort to create collaboration between sites and to establish industry contacts that will continue to be a resource for years to come. Washington River Protection Solutions, LLC; URS/WTP; Savannah River Remediation, LLC; and Nuclear Waste Partnership, LLC have conducted ECP TE, with each site hosting an event. For these events, each participant prepares a presentation and answers questions on the presentation topic. This allows ECPs to practice presentation skills, develop skills in answering questions from their peers and management, and be the expert in the room on a particular topic. Tours of the onsite facilities also are given as a way for ECPs to gain a broader understanding of the waste remediation industry and the challenges that other sites are facing. Accomplishments, lessons learned, and future plans for ECP TE will be discussed. The ECP TE events allow AECOM, as the parent company, to provide a unique learning opportunity to the next generation of engineers within the DOE nuclear field and to ensure the safe operations of these nuclear sites for years to come. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Groundwater Flow, Solute Transport, and Geochemical Modeling To Evaluate Long-Term Nitrate Plume Concentrations Following Phreatophyte Source Control - 17262

The Monument Valley, Arizona, Processing Site is a former uranium mill site within the Navajo Nation in northeastern Arizona. Milling activities between 1955 and 1968 resulted in contamination of groundwater in the shallow alluvium at the site. Remedial action was completed under Title I of the Uranium Mill Tailings Radiation Control Act of 1978. Site remediation activities between 1992 and 1994 removed surficial source material and other site-related contamination, but contamination of deeper soil, primarily by nitrate, remained between the excavation depth and the water table. Residual nitrate in these soils, from uranium ore processing at the mill, has continued to be a source of groundwater contamination. To evaluate the potential for native phreatophytes to control remaining source material, four-wing salt-bush and black grease-wood were planted in 2000 and 2005 within the footprints of the former tailings piles. The objectives of the plantings were to increase nitrate removal from soil water through root uptake and, because phreatophyte water usage is expected to equal or exceed annual precipitation, to halt nitrate loading to groundwater. Recent evaluation showed more than an 80% decrease in soil nitrate concentrations and no effective groundwater recharge in the planting area. Numerical groundwater flow, solute transport, and geochemical modeling were performed to evaluate the long-term response of the existing nitrate plume to the phreatophyte source control measures. This modeling will help determine if 100-year natural flushing is a viable compliance strategy for the nitrate plume. Results showed that nitrate concentrations in the alluvial aquifer are expected to drop below the standard of 10 mg/L as N in approximately 70 years as a result of the phreatophyte planting. Companion sensitivity analysis was also performed to better understand how uncertainty in groundwater flow model and solute transport model inputs would impact cleanup times. Even considering input uncertainty, nitrate concentrations are expected to reach the standard in the alluvial aquifer within 100 years. Recognizing that model predictions are not absolute, but represent the general potential for an event to occur, the model was used to identify key sampling locations to verify that the nitrate plume will attenuate as predicted. This evaluation identified locations that can be used to assess the viability of the modeling predictions within the next 50 years. If the source diminishes or no longer exists, modeling predicts that concentrations of nitrate and ammonium in these wells should show significant declines over the next 10-55 years. If downward concentration trends do not occur as predicted, other remedial strategies may need to be evaluated to meet groundwater standards within the specified 100-year duration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Iron Behavior in Microcosms Simulating Bioreduction in Savannah River Site Sediments - 17389

An estimated 1.8 billion gallons of acidic low-activity waste solutions originating from the processing of uranium slugs and irradiated fuel at separation facilities at the Savannah River Site (SRS) were discharged to the unlined seepage basins located in the F/H-area. The acidic solutions of the basin influent (pH from 3.2 to 5.5) contaminated with a variety of radionuclides and dissolved metals caused groundwater contamination. In 2010, DOE funded a demonstration of the Enhanced Anaerobic Reductive Precipitation (EARP) process at the SRS F-Area that consisted of in-situ injections of a carbohydrate substrate to establish anaerobic reactive zones for metal and radionuclide remediation. The addition of the molasses substrate solution to groundwater was done to produce anaerobic conditions conducive to uranium reduction and then precipitation as uranium (IV). The SRS soil is highly weathered and features very low natural alkalinity. A microcosm study, prepared with sieved SRS sediments and augmented with a solution mixture containing molasses and sulfate, was designed to provide evidence of the capabilities of this remediation technology under SRS environmental conditions. The objective of these microcosm experiments was to replicate the anaerobic conditions created as a result of injections of molasses combined with sulfate ions, similar to the EARP process that was performed at SRS, and investigate if any mineralogical changes could occur in the soil due to the addition of molasses. Specifically, the study aimed to determine if solid phases of reduced iron such as siderite and pyrite would be formed, as this would indicate the potential to form a long-lasting bioreductive zone. An understanding of this technology will be useful in determining if it is a viable option for remediation. In the experiments, the media solution was amended with molasses and sulfate to stimulate sulfate-reducing bacteria. Sulfate reduction occurs extensively under the redox conditions occurring after iron reduction and before methanogenic conditions. These conditions are considered the second most reducing condition in natural groundwater systems. Microcosm tubes prepared in triplicate were kept inside an anaerobic glove box, which was continuously monitored to ensure that conditions remained anaerobic. The initial X-ray diffraction (XRD) analyses on the background sediment samples indicated the presence of quartz, kaolinite, montmorillonite, and goethite. In the molasses-treated samples there were no visible peaks for reduced forms of iron such as siderite and pyrite. The pH measurements suggest that all samples in either batch, including those that were brought to a neutral pH before the addition of the sediments, have followed a similar trend with a decline in the pH value to between 4 and 4.7. This can be attributed to the fermentation of molasses and the natural acidity of the SRS sediments used for the microcosm study. In the acidic iron-rich sediment, the microbial reduction of Fe (III) was the predominant electron-accepting process for oxidation of the organic substrate. The maximum iron concentration detected during the experiments was 13 mg/L. Analytical results showed that there was no sulfate reduction in any of the samples augmented with sulfate and the concentration remained level at 500 ppm as originally added to the initial solutions (518 - 542 mg/L). This is consistent with the absence of any indication of iron sulfide formation. Under the experimental conditions in these microcosms, the abundance of biologically available Fe (III) allows Fe (III)-reducers to out-compete sulfate-reducing bacteria using molasses as an electron donor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations and Lessons Learned from the Use of Gamma Spectroscopy Systems at FUSRAP Project Sites - 17459

This paper will discuss the application of gamma spectroscopy systems for analysis of environmental media samples for parents and daughter progeny of the Natural Uranium and Thorium Decay Series radionuclides. The concentrations and relative ratios of naturally occurring isotopes are used to confirm the presence of FUSRAP-related wastes and for understanding the associated potential dose and health risks. Focus will be given to lessons learned from the set-up and operation of onsite gamma spectroscopy laboratories used to provide stakeholders with defensible and timely results to support FUSRAP site investigations and remediation including adaptive survey design implementation, physical remediation and waste transport, and confirmatory final status survey activities. This paper focuses on the potential impacts to gamma spectroscopy measurement accuracy from the following: - Bias caused by sample matrix effects as well as use of different library reference values between performance evaluation study providers and testing laboratories; - Use of calibration sources with limited energy ranges, and; - Selection of available alternative isotopic decay reference data for the input of line energies and their intensities. These lessons learned include discussing how inter-laboratory measurement differences from blind performance evaluation samples are affected by the manufacturer's measurement method, including equilibrium assumptions; the isotope decay information source library used by the study provider and participating laboratories; and calibration source geometry/density variances from actual sample conditions. Any of these factors can significantly impact the accuracy of reported results data. Deepening the reader's understanding of the various factors that impact the accuracy, interpretation, and overall usability of gamma spectroscopy results data from laboratories will help ensure defensible decision-making and cost-effective mission implementation within FUSRAP and similar remediation programs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The U.S. DOE-EM international program - 15026

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) conducts international collaboration activities in support of U.S. policies and objectives regarding the accelerated risk reduction and remediation of the environmental cleanup legacy resulting from the nations' nuclear weapons program and government sponsored nuclear energy research. The EM International Program, supported out of the EM Office of the Associate Principal Deputy Assistant Secretary pursues collaborations with foreign government organizations, educational institutions and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. The primary objective of the International Program is to work closely with the various technical program offices within EM (e.g., tank waste and nuclear materials management, groundwater and soil remediation, deactivation and decommissioning) to identify collaborative opportunities related to innovative technologies, as well as best management practices, that support successful completion of the EM mission. This objective is directly aligned with the current DOE Strategic Plan 2014 - 2018, issued in April 2014. In mid-fiscal year (FY) 2014, the International Program awarded several collaborative projects for work scope spanning waste management, tank waste management, groundwater and soil remediation, deactivation and decommissioning (D and D), disposal operations, and nuclear materials disposition initiatives to nine foreign organizations. These projects include both technical and non-technical activities, with opportunities for continuation into FY 2015 and beyond. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhanced chemical CRUD decontamination combined with electrokinetic process - 15242

This study has tested about the deposition and dissolution of Chalk River Unidentified Deposit (CRUD), and investigated the remediation of CRUD. CRUD is an accumulated corrosion product on external fuel rod cladding surfaces and composed of either dissolved ions or solid particles such as Ni and Co. As nuclear power plants are getting older, decontaminating process has been concerned due to increased contamination. Corrosion product can be activated through nuclear reaction to form radionuclide such as Co-60. Because the CRUD is formed at cladding surface and radionuclides can be contained in CRUD, it can affect to human health and environment. Therefore CRUD needs to be removed safely during NPP's decontaminating process by efficient. In order to decontaminate the CRUD, first thing it has to be dissolved and removed. Deposition behavior of corrosion products has been well studied, but the study about behavior of CRUD dissolution is required in various environments. In this study, the CRUD synthesis, the dissolution method of CRUD, and the CRUD decontamination method was investigated. There are three major approaches the remediation of CRUD. First one is well synthesized the CRUD, second one is finding the optimum condition for CRUD dissolution, and last one is applying the Electro-Kinetic (EK) process to CRUD remediation. Synthesis of simulated CRUD for the decontamination experiments was successful. The combination of EK process with chemical decontamination of CRUD proved to be a more economical method for removing CRUD; it can be directly applied to the NPP decommissioning and decontamination process, and it can decrease the volume of secondary radioactive waste as well. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of defense-related uranium mines in the United States and other US DOE office of legacy management domestic and international uranium initiatives - 15335

US DOE's Office of Legacy Management (LM) has taken several initiatives to improve domestic uranium mining and milling operations in the United States and to contribute to the management of legacy uranium mining and milling sites around the world. Initiatives include completing the 2014 Report to Congress on Defense-Related Uranium Mines, managing the Title X Uranium and Thorium Program with the Office of Environmental Management, and assisting IAEA with uranium issues in member state countries. The 2014 Report to Congress identified abandoned uranium mines (AUMs) in the United States that provided uranium ore to the US Atomic Energy Commission (AEC) between 1947 and 1970. The report identified AUM locations, reclamation/remediation status, radiological risks and other hazards, costs for reclamation and remediation, and potential prioritization schemes for mine cleanup. To develop reclamation and remediation cleanup cost estimates and assess risks, AUMs were grouped into six categories by tons of uranium ore produced, ranging from Small (less than 91 metric tons [100 tons]) to Very Large (greater than 453,900 metric tons [500,000 tons]). Radiological risk was calculated using the RESRAD computer code for five exposure scenarios: offsite resident, onsite resident, occasional visitor, recreational visitor, and mine reclamation worker. Results indicate that 69 percent of the AUMs are in Colorado and Utah and 23 percent are in Arizona, Wyoming, and New Mexico; and that the majority of the AUMs (68 percent) were considered Small or Small/Medium production mines, producing less than 908 metric tons (1,000 tons) of uranium ore. Although New Mexico has fewer AUMs (247) than the other states in the Colorado Plateau region, AUMs in that state (primarily those in the Grants Mineral Belt) produced 45 percent of the 79.5 million tons of AEC-purchased uranium ore. About 50 percent of the AUMs are on public land managed by the US Bureau of Land Management; 435 AUMs are on the Navajo Nation. Risk estimates for the onsite resident scenario (plausible on tribal and non-federal land) could result in an incremental cancer risk greater than 10{sup -4}. Radon inhalation was the dominant contributor to radiological risk for the five exposure scenarios evaluated. Different state and federal agencies are conducting cleanup of some AUMs under various remedial and legal authorities. Activities constituting mine 'reclamation' may reduce radiological risks to humans to acceptable levels for many mines on federal public lands if the occasional visitor and recreational visitor exposure scenarios are assumed. Addressing physical hazards (e.g., open shafts) at mines where conditions could cause serious injuries is typically a priority of public land management agencies. At locations where mine-related groundwater contamination occurs, it is a significant contributor to cleanup costs. However, most Small and Small/Medium AUMs were likely developed above the water table, and some wet mines are located in areas where groundwater has high, naturally occurring levels of the same constituents (including radioactive elements) that are typically associated with uranium mines. LM is also administering, with the US DOE Office of Environmental Management, the Title X program, which was developed by Congress to reimburse private companies (i.e., those that held active operating licenses prior to 1978) for a portion of their reclamation costs for mill sites that processed ore sold to AEC. LM recently updated the program guidance document and established internal protocols for annually auditing companies. LM is assisting IAEA on two different initiatives: assisting developing countries with training on the basic steps to take to perform reclamation of uranium mines, and developing technical guidance and case studies related to safety and environmental assessments and post-closure management of uranium legacy sites as part of the IAEA Regulatory Supervision of Legacy Sites initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilization of GIS technology to support development of flow and contaminant fate and transport models at US DOE sites - 15457

U.S. Department of Energy (DOE) sites have accumulated years of data and millions of spatial and temporal records related to the hydrological cycle, contaminant transport, and parameters of remediation technologies. In addition, numerical models which use field monitoring data to help understand flow and transport produce gigabytes of computed spatial and temporal data for each computation node. There is a need therefore for an advanced spatial data structure that can be used to address the management, processing, and analysis of spatial and temporal numerical modeling data derived from multiple sources. This can be accomplished using a geo-database. The development of an ArcSDE geo-database facilitates the centralized storage, backup, accessibility, organization, and management of model configuration and computed simulation data, putting it into a structured, coherent, and logical computer-supported system. GIS data processing and automation would enable faster and hence more complex analyses of field test data. The Applied Research Center (ARC) at Florida International University (FIU) has provided analysis of flow and transport for several watersheds at DOE's Oak Ridge Reservation (ORR), including East Fork Poplar Creek (EFPC), Upper EFPC in the Y-12 National Security Complex area (Y-12 NSC) and White Oak Creek (WOC). Integrated surface and subsurface flow, fate and transport models were developed to provide analysis of contaminant patterns within each watershed. In addition, digital monitoring data available from the Oak Ridge Environmental Information System (OREIS) related to mercury (Hg) contamination and remediation within these watersheds was used for calibration and verification of the model. Experimental studies were also carried out which provided kinetic and equilibrium data about important parameters related to Hg transport, speciation and methylation/demethylation kinetics within the watershed. Geographic Information Systems (GIS) technology was employed to support the modeling work through storage and geo-processing of spatial and temporal data required by the models and to produce hydrogeological maps for visualization. An ArcGIS geo-database was developed for centralized storage and management of experimental and computed model data and its capabilities were extended over the years using tools such as ModelBuilder combined with Python scripting to automate repetitive tasks, perform statistical analyses and generate maps and reports. The hydrologic geo-database model developed possesses a structure that enables linkage with scalable hydrologic modeling tools/applications to model hydrologic systems, and in this case, enables the testing of the potential impacts of various remediation scenarios on the ORR watersheds. The ArcSDE geo-database can also be used to automate and simplify the process of calling stored GIS and time series data. This geo-database can serve as a tool for contaminant flow and transport analyses which require large amounts of high-quality spatial and temporal data in order to ensure reliability and validity of modeling results. The existing geo-database structure developed for the hydrological modeling at ORR was designed to be replicable for application at other DOE sites. An investigation of downloadable free/open source GIS software along with required security protocols to facilitate online querying of the database was also conducted to determine methods by which project-derived data can be more easily shared with other project stakeholders such as DOE personnel and site contractors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Diversity and the citizens' advisory board: aligning disparate views for better results - 15469

The Northern New Mexico Citizens' Advisory Board (NNMCAB) is a group of -citizen experts,- i.e., experts on being citizens who take the time and focus their attention to grow more informed about nuclear science, nuclear waste remediation, and environmental monitoring issues. The Board digests complex information associated with these topics in light of the Los Alamos National Laboratory's (LANL) and Department of Energy's (DOE) activities in Northern New Mexico and discusses and conveys this information clearly to a diverse regional stakeholder population that includes a 400+ year old Hispanic culture, a 1,000+ year old Native American pueblo culture, a highly educated scientific and technical community of federal workers and their families, rural agricultural communities, creative/artistic communities, and political and peace activists. Our Board has either representation from each of these diverse New Mexican sectors or enjoys public comment from these sectors. Projects that involve such stakeholder-expert exchanges include remediation of an underground chromium plume, continued investigation and remediation associated with a radiation leak at the Waste Isolation Pilot Plant (WIPP) in Carlsbad, the transport of Transuranic Waste off the Los Alamos 'Hill,- the ultimate disposition of -33 Shafts,- currently in place at Los Alamos National Laboratory, and the distilled voice of the citizen for continued and sufficient federal funding each year for responsible clean-up and monitoring of nuclear activities. Through the NNMCAB's communication venue of regular public meetings, mis-characterization is prevented, public input is incorporated into the official record, and recommendations to the DOE are promulgated. Scientific and technical experts join the bi-monthly NNMCAB meetings and monthly committee meetings to present and discuss current topics. The availability of these experts and their deeper reference materials is key to the interchange, as is the respectful and patient dialogue that exists between board members and the subject matter experts, both in the public forums and between meetings. Meetings are professionally organized and orchestrated to maximize the value of the experts' and board members' participation time. The professional format of the meetings ensures maximum learning and relationship-building which fosters effective channels for public dialogue. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Development of an Automated Instrument for Measuring Radioactivity in an Excavator Bucket - 16246

Increasing interest and emphasis is being given to the presence of radioactive contamination in the environment and the methods by which this contamination can be remediated. Radioactive contamination may arise from industrial process including the operation of nuclear facilities. It may also arise from the enhancement of naturally occurring radioactive material by industrial processes. An area of particular concern is the remediation of soil and rubble with radioactive contamination. Traditional methods of soil remediation involve sampling followed by the excavation of areas where contamination is found. The soil removal process is normally very inefficient and can involve multiple handling of excessive quantities of soil and ultimately an over estimate of the quantity of soil with radioactive contamination. In order to both minimize material handling and to reduce the final volume of contaminated material, which must be handled for disposal, a sensitive instrument has been developed and tested which is designed to measure the radioactive content of an excavator bucket. The instrument detector is positioned automatically just above the open top of the bucket and the measurement employs a high efficiency sodium iodide crystal which has a graded shadow shield to reduce the effect of background radioactivity. The measurement efficiency is enhanced as the detector is located in close proximity to the soil in the bucket and the thick steel shell of the bucket acts as a shield to further reduce the effect of background from the ground below. The method has obvious advantages over methods, which attempt to measure the potentially radioactive soil through the shielding provided by the thick steel bucket shell. As the first stage of the bucket measurement the excavator operator fills the bucket and locates it in a designated position with the open top of the bucket facing upwards, close to the operator cab. A measurement technician, located outside the danger area of the excavator boom, begins the measurement using a tablet computer with a wireless connection to the instrument. The shielded detector is moved from a storage position above the operator cab to the measurement position close to the open surface of the excavator bucket. Once the measurement is completed in typically one to two minutes, the detector is repositioned in its storage location and the measurement data is transmitted to the tablet computer. At this point the measurement technician makes the decision based on the measurement results as to how to disposition the bucket contents. Typically contaminated material will be transferred to a vehicle for off-site disposal. Alternatively, and this is the great advantage of this technique, uncontaminated material may be returned directly to the site of the excavation without the need for further handling. The development, detailed design and preliminary testing of the instrument are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maintenance of Maywood Laboratory Operations Support During Contractor Transition and Replacement of the Project Databases - 16329

In December 2013, Cabrera Services (Cabrera) executed transition of the FUSRAP Maywood Superfund Site remediation project operations, including an on-site accredited environmental lab, from a large business that had established technology infrastructure in place for over a decade which required updating to support the expected remediation scope and client needs. As of November 2015, Cabrera has shipped over 116,000 yd{sup 3} of contaminated soil to disposal facilities. During the transition, the USACE FUSRAP Maywood Laboratory (UFML) continued to support project operations, providing the expected timely and reliable results and maintaining their New Jersey Department of Environmental Protection certification for all parameters of concern, while having to cope with new challenges and additional tasks having the potential to disrupt the laboratory's ability to support project operations. This case study examines the challenges with maintaining a certified radiochemistry laboratory and an aggressive remediation schedule during a period of prime contractor transition which included a complete IT infrastructure overhaul, and conversion of the existing Microsoft Access laboratory database and project Electronic Data Management System (EDMS) to a customized commercial solution. Challenges: I. Procurement of a new database subcontractor and working closely with them to achieve the following: a. Migration of all environmental (including radiological, chemical, and quality control), health and safety, and spatial data as well as reports, queries, and analytical instrument software processes from a MS Access data management system to a SQL server system; and b. Verification that the functionality and data integrity of the databases remained intact. II. The onsite laboratory was changed over to a new onsite network and the following tasks were completed with little or no interruption to site operations by January 10, 2014: i. Installation of new instrument personal computers (PCs) and making them fully operational; ii. Configuration of the lab domain and server to host the LIMS (replaced all servers/domain/workstations with Windows 7 and Server 2012 machines). iii. Networking of the laboratory building into the rest of the project site via fiber optic cabling across the site. iv. Upgrade of the wide area network (WAN) data connection to high-speed Fiber Optic service; v. Upgrade of the telephones into voice over internet protocol (VOIP) phones. vi. Splitting of the database into front ends and a centralized back-end hosted on the new server to allow simultaneous access for fixes and improvements. III. Phone service interruption; phone systems were operational by January 10, 2014. Additional Tasks: I. Revision of the USACE FUSRAP Maywood Laboratory (UFML) Quality Systems Manual Rev. 1 Submitted 01/16/14; II. Writing of the Uniform Federal Policy Quality Assurance Project Plan Rev. 1 (UFP-QAPP) submitted 1/21/14. This document replaced the prior project data quality plan, the Chemical Data Quality Management Plan. III. Support of USACE communications to the New Jersey Department of Environmental Protection (NJDEP) on lab management and personnel transition to Cabrera. This work was important since it ensured a smooth transition and shows how critical project records infrastructure such as databases, can be upgraded with minimal interruption of project support. Such work may provide benefit to other similar projects, especially long term projects where database infrastructure upgrades may be beneficial in terms of improved efficiencies in data recording and transfer, and improved security in data storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of High Performance Computing on the Detailed Simulation of Subsurface Flow and Contaminant Transport Using eSTOMP - 16341

The ability to model subsurface processes at the field-scale is essential to site closure and remedial action decisions. Field-scale models often require high-performance computing to meet the computational demands associated with complex systems, model calibration, and uncertainty quantification. eSTOMP, a parallel version of STOMP, is an analytical tool that meets the need for investigating coupled processes in the subsurface involving regional multi-fluid flow and biogeochemistry. The scalability of eSTOMP makes it ideal for simulating contaminant and geochemical reactive transport when long run times result from execution of a serial code. To demonstrate the impact of high-performance computation on subsurface analyses, the application of eSTOMP is presented for two sites. The first site involves uranium surface complexation within a highly dynamic, variably saturated flow field. The use of this model in conjunction with continued field monitoring is expected to provide a rigorous basis for developing operational strategies for field remediation and for defining defensible remediation endpoints. The second site involves the long-term dissolution of low-level radioactive glass emplaced within a near-surface repository. The waste form release rate is evaluated by modeling the basic physical and chemical processes that are known to control the waste form dissolution behavior, including pH and composition of the fluid contacting the glass. Simulations demonstrate that glass dissolution rates vary both in time and as a function of position within the disposal system, and that a 'leach rate' or radionuclide release rate parameter can only be estimated after identifying these impacts in a dynamic system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Colonie FUSRAP Site - Radioactive Dust Sampling of Residential and Commercial Properties - 16384

The Colonie Formerly Utilized Sites Remedial Action Program (FUSRAP) Site is located in the Town of Colonie, Albany County, New York. The U.S. Army Corps of Engineers (USACE) is currently addressing environmental contamination associated with the Site. The area surrounding the Site consists of residential and commercial properties, known as vicinity properties (VPs). Cleanup activities have been completed on many of these VPs under the FUSRAP to address depleted uranium contamination. Soil remediation activities have been substantially completed at the Colonie FUSRAP Site and its VPs under the FUSRAP. Recent studies performed by an independent party and under FUSRAP identified uranium within indoor dust in residencies and businesses in the immediate vicinity of the Site. The studies were limited to non-living areas such as basement window sills, garages, and attics. This paper discusses the indoor dust sampling and analysis, in support of the Remedial Investigation (RI) for the VPs, and presents sampling results. The indoor dust sample media presented many technical challenges regarding sampling design, data reduction, and data interpretation. In addition, because the RI is focused on numerous resident-owned, rental, and commercial properties, challenges where presented regarding right-of-entry to sample. Isotopic uranium ratios observed in the majority of the samples are indicative of the depleted uranium contaminant, even at trace levels. While the sampling and analysis methods were effective at identifying depleted uranium in the majority of the samples, preliminary property-specific risk assessment results do not indicate the presence of depleted uranium in sufficient concentrations to pose unacceptable risk to VP inhabitants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗