Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Uncertainty”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

PRIME: A bottom-up approach to probabilistic rule development

PRIME is a system to be used by an intelligent machine to allow it to operate in an abstract but uncertain (or stochastic) environment. It maintains a model of the effects of the machine's actions in the form of a rule base, which is induced from experience. This bottom-up approach to rule development allows the model to adapt to changes in the environment. Each rule consists of a condition under which the rule is active, an action, the effect of the action on the environment, and an estimate of the probability of this effect occurring. The effect probabilities are used to model the uncertainty in the environment, permitting multiple possible effects for a single action under a particular set of conditions. The objective of the intelligent machine is to satisfy user-specified goals with maximum probability of success. PRIME fulfills this requirement in two ways: it continuously updates the rule base with the most recent information, to ensure the validity of the model; and it generates plans which have the maximum probability of achieving the goals, based on the probability estimates in the rule base. PRIME is composed of three main processes: exploration, generalization, and planning. In exploration, the machine executes various randomly chosen actions, observes the effects on the environment, and updates the rule base accordingly. This process is used to develop the rule base in simulation, as well as to supplement the current knowledge during normal operation. Generalization is the procedure used to induce general rules from experience, which is encoded in the form of specific rules. These general rules extend the machine's knowledge to situations which have not been encountered yet, thereby increasing the capability of the machine to plan effectively. Planning is the process of constructing an optimal sequence of actions to satisfy a goal, using the rule base to predict the effects of these actions and to determine the probability of success of the plan. The rule representation and many other data structures were specifically chosen to maximize the efficiency of these processes. A simulated environment was designed to test the performance of PRIME. The results of experimentation were largely negative. The main problem was that the domain coverage of the rules was inadequate for the number of rules stored in the rule base, due to redundancies in general rules and numerous rules covering ineffective actions. It was determined that a more efficient generalization, and some form of goal-directed exploration, are necessary in order to solve most of the current deficiencies in PRIME.

Miller, Scott A.↗

Benchmarking Exercises To Validate The Updated ELLWF GoldSim Slit Trench Model

The Savannah River National Laboratory (SRNL) results of the 2008 Performance Assessment (PA) (WSRC, 2008) sensitivity/uncertainty analyses conducted for the trenches located in the EArea LowLevel Waste Facility (ELLWF) were subject to review by the United States Department of Energy (U.S. DOE) Low-Level Waste Disposal Facility Federal Review Group (LFRG) (LFRG, 2008). LFRG comments were generally approving of the use of probabilistic modeling in GoldSim to support the quantitative sensitivity analysis. A recommendation was made, however, that the probabilistic models be revised and updated to bolster their defensibility. SRS committed to addressing those comments and, in response, contracted with Neptune and Company to rewrite the three GoldSim models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Sensitivity-informed, Process Model Abstraction Implementation in GoldSim - 19276

System-level Performance Assessment (PA) models rely on specific process-level models for some inputs, such as infiltration. For probabilistic PA, the value of the process model output depends on the values of input parameters that also vary in the PA model. The simplest conceptual solution is to draw values of the input parameters from their distributions, run the process level model at these values, and then use the output where it is needed in the PA model. However, this solution is unsatisfactory for multiple reasons: (1) the PA Model should be set up such that new runs can be made and distributions can change without having to go back and run the process-level model; (2) calling the process model from the system model is possible, but technical difficulties remain in coupling the two; and (3) there is no uncertainty in the process-level model results incorporated into the PA model. Therefore, it is desirable to develop a method that maps the values of PA Model inputs to process level model outputs, in real time within the PA Model set up and using as simple of a map as possible without losing key features of the relationship. This has been termed 'model abstraction' because information about process model runs is 'abstracted' to be used with the PA model. A simple 'nearest neighbor' abstraction approach is presented to overcome these problems, in which a sensitivity-informed distance metric is used to map a system-level model realization to the most appropriate process-level model realization. (authors)

97 MATHEMATICS AND COMPUTING↗

Learning from crowds with variational Gaussian processes

Solving a supervised learning problem requires to label a training set. This task is traditionally performed by an expert, who provides a label for each sample. The proliferation of social web services (e.g., Amazon Mechanical Turk) has introduced an alternative crowdsourcing approach. Anybody with a computer can register in one of these services and label, either partially or completely, a dataset. The effort of labeling is then shared between a great number of annotators. However, this approach introduces scientifically challenging problems such as combining the unknown expertise of the annotators, handling disagreements on the annotated samples, or detecting the existence of spammer and adversarial annotators. All these problems require probabilistic sound solutions which go beyond the naive use of majority voting plus classical classification methods. In this work we introduce a new crowdsourcing model and inference procedure which trains a Gaussian Process classifier using the noisy labels provided by the annotators. Variational Bayes inference is used to estimate all unknowns. The proposed model can predict the class of new samples and assess the expertise of the involved annotators. Moreover, the Bayesian treatment allows for a solid uncertainty quantification. Since when predicting the class of a new sample we might have access to some annotations for it, we also show how our method can naturally incorporate this additional information. Furthermore, a comprehensive experimental section evaluates the proposed method with synthetic and real experiments, showing that it consistently outperforms other state-of-the-art crowdsourcing approaches.

97 MATHEMATICS AND COMPUTING↗

Technical Maturity Assessment of Risk-Informed Safety Analysis Tools

Ensuring maximum safety while enhancing economic benefit is one of most important goal of In the of US Light Water Reactor Sustainability (LWRS) program. Optimization of the safety margins will provide best practice to achieve this goal which can also lead to cost reduction. Under the LWRS framework, the Risk-Informed Systems Analysis (RISA) Pathway has been focusing on the optimization of safety margin and minimization of uncertainties to ensure both safety and economics at the highest level. One of the important activities of the pathway is to deploy risk-informed analysis tools to related nuclear industry to support precise representation of safety margins and factors that contribute to cost and safety. The tools therefore need highest technical maturity so that industry can use immediately with strong credibility. The tools should have a capability to support risk-informed decision making for both probabilistic and deterministic elements of safety. The RISA Pathway, therefore, have been performing a comprehensive assessment of technical maturity and verification and validation (V&V) status of selected tools to improve adaptability to the industry. The technical maturity assessment includes three work scope: (a) define requirements based on risk-informed concept; (b) investigate and review development and V&V status for technical maturity assessment; and (c) identify technical gap and propose improvement to meet RISA toolkit requirements. The Requirement Traceability Matrix (RTM) concept was used to capture the requirements from user and developer of the project and/or software. The importance of each requirements was evaluated by Phenomena Identification and Ranking Technology (PIRT) which systematically gathers information and ranks the importance of the information. Finally, degree of the maturity was measured by Technology Readiness Level (TRL) for estimating the maturity of the technologies during the development and acquisition phase of certain technology. This paper summarizes development of assessment method and technical maturity evaluation of multi-purpose probabilistic risk analysis tool RAVEN.

, PIRT↗

An improved approach for flight readiness certification: Methodology for failure risk assessment and application examples, volume 1

An improved methodology for quantitatively evaluating failure risk of spaceflight systems to assess flight readiness and identify risk control measures is presented. This methodology, called Probabilistic Failure Assessment (PFA), combines operating experience from tests and flights with engineering analysis to estimate failure risk. The PFA methodology is of particular value when information on which to base an assessment of failure risk, including test experience and knowledge of parameters used in engineering analyses of failure phenomena, is expensive or difficult to acquire. The PFA methodology is a prescribed statistical structure in which engineering analysis models that characterize failure phenomena are used conjointly with uncertainties about analysis parameters and/or modeling accuracy to estimate failure probability distributions for specific failure modes. These distributions can then be modified, by means of statistical procedures of the PFA methodology, to reflect any test or flight experience. Conventional engineering analysis models currently employed for design of failure prediction are used in this methodology. The PFA methodology is described and examples of its application are presented. Conventional approaches to failure risk evaluation for spaceflight systems are discussed, and the rationale for the approach taken in the PFA methodology is presented. The statistical methods, engineering models, and computer software used in fatigue failure mode applications are thoroughly documented.

Moore, N. R.↗

An improved approach for flight readiness certification: Methodology for failure risk assessment and application examples. Volume 2: Software documentation

An improved methodology for quantitatively evaluating failure risk of spaceflight systems to assess flight readiness and identify risk control measures is presented. This methodology, called Probabilistic Failure Assessment (PFA), combines operating experience from tests and flights with engineering analysis to estimate failure risk. The PFA methodology is of particular value when information on which to base an assessment of failure risk, including test experience and knowledge of parameters used in engineering analyses of failure phenomena, is expensive or difficult to acquire. The PFA methodology is a prescribed statistical structure in which engineering analysis models that characterize failure phenomena are used conjointly with uncertainties about analysis parameters and/or modeling accuracy to estimate failure probability distributions for specific failure modes, These distributions can then be modified, by means of statistical procedures of the PFA methodology, to reflect any test or flight experience. Conventional engineering analysis models currently employed for design of failure prediction are used in this methodology. The PFA methodology is described and examples of its application are presented. Conventional approaches to failure risk evaluation for spaceflight systems are discussed, and the rationale for the approach taken in the PFA methodology is presented. The statistical methods, engineering models, and computer software used in fatigue failure mode applications are thoroughly documented.

Moore, N. R.↗

An improved approach for flight readiness certification: Methodology for failure risk assessment and application examples. Volume 3: Structure and listing of programs

An improved methodology for quantitatively evaluating failure risk of spaceflight systems to assess flight readiness and identify risk control measures is presented. This methodology, called Probabilistic Failure Assessment (PFA), combines operating experience from tests and flights with engineering analysis to estimate failure risk. The PFA methodology is of particular value when information on which to base an assessment of failure risk, including test experience and knowledge of parameters used in engineering analyses of failure phenomena, is expensive or difficult to acquire. The PFA methodology is a prescribed statistical structure in which engineering analysis models that characterize failure phenomena are used conjointly with uncertainties about analysis parameters and/or modeling accuracy to estimate failure probability distributions for specific failure modes. These distributions can then be modified, by means of statistical procedures of the PFA methodology, to reflect any test or flight experience. Conventional engineering analysis models currently employed for design of failure prediction are used in this methodology. The PFA methodology is described and examples of its application are presented. Conventional approaches to failure risk evaluation for spaceflight systems are discussed, and the rationale for the approach taken in the PFA methodology is presented. The statistical methods, engineering models, and computer software used in fatigue failure mode applications are thoroughly documented.

Moore, N. R.↗

Reducing the Risk of Human Space Missions with INTEGRITY

The INTEGRITY Program will design and operate a test bed facility to help prepare for future beyond-LEO missions. The purpose of INTEGRITY is to enable future missions by developing, testing, and demonstrating advanced human space systems. INTEGRITY will also implement and validate advanced management techniques including risk analysis and mitigation. One important way INTEGRITY will help enable future missions is by reducing their risk. A risk analysis of human space missions is important in defining the steps that INTEGRITY should take to mitigate risk. This paper describes how a Probabilistic Risk Assessment (PRA) of human space missions will help support the planning and development of INTEGRITY to maximize its benefits to future missions. PRA is a systematic methodology to decompose the system into subsystems and components, to quantify the failure risk as a function of the design elements and their corresponding probability of failure. PRA provides a quantitative estimate of the probability of failure of the system, including an assessment and display of the degree of uncertainty surrounding the probability. PRA provides a basis for understanding the impacts of decisions that affect safety, reliability, performance, and cost. Risks with both high probability and high impact are identified as top priority. The PRA of human missions beyond Earth orbit will help indicate how the risk of future human space missions can be reduced by integrating and testing systems in INTEGRITY.

Jones, Harry W.↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data free inference with processed data products

Here, we consider the context of probabilistic inference of model parameters given error bars or confidence intervals on model output values, when the data is unavailable. We introduce a class of algorithms in a Bayesian framework, relying on maximum entropy arguments and approximate Bayesian computation methods, to generate consistent data with the given summary statistics. Once we obtain consistent data sets, we pool the respective posteriors, to arrive at a single, averaged density on the parameters. This approach allows us to perform accurate forward uncertainty propagation consistent with the reported statistics.

97 MATHEMATICS AND COMPUTING↗

Creep-rupture reliability analysis

A probabilistic approach to the correlation and extrapolation of creep-rupture data is presented. Time temperature parameters (TTP) are used to correlate the data, and an analytical expression for the master curve is developed. The expression provides a simple model for the statistical distribution of strength and fits neatly into a probabilistic design format. The analysis focuses on the Larson-Miller and on the Manson-Haferd parameters, but it can be applied to any of the TTP's. A method is developed for evaluating material dependent constants for TTP's. It is shown that optimized constants can provide a significant improvement in the correlation of the data, thereby reducing modelling error. Attempts were made to quantify the performance of the proposed method in predicting long term behavior. Uncertainty in predicting long term behavior from short term tests was derived for several sets of data. Examples are presented which illustrate the theory and demonstrate the application of state of the art reliability methods to the design of components under creep.

Peralta-Duran, A.↗

Creep-rupture reliability analysis

A probabilistic approach to the correlation and extrapolation of creep-rupture data is presented. Time temperature parameters (TTP) are used to correlate the data, and an analytical expression for the master curve is developed. The expression provides a simple model for the statistical distribution of strength and fits neatly into a probabilistic design format. The analysis focuses on the Larson-Miller and on the Manson-Haferd parameters, but it can be applied to any of the TTP's. A method is developed for evaluating material dependent constants for TTP's. It is shown that optimized constants can provide a significant improvement in the correlation of the data, thereby reducing modelling error. Attempts were made to quantify the performance of the proposed method in predicting long term behavior. Uncertainty in predicting long term behavior from short term tests was derived for several sets of data. Examples are presented which illustrate the theory and demonstrate the application of state of the art reliability methods to the design of components under creep.

Peralta-Duran, A.↗

Probabilistic Risk-Based Approach to Aeropropulsion System Assessment Developed

In an era of shrinking development budgets and resources, where there is also an emphasis on reducing the product development cycle, the role of system assessment, performed in the early stages of an engine development program, becomes very critical to the successful development of new aeropropulsion systems. A reliable system assessment not only helps to identify the best propulsion system concept among several candidates, it can also identify which technologies are worth pursuing. This is particularly important for advanced aeropropulsion technology development programs, which require an enormous amount of resources. In the current practice of deterministic, or point-design, approaches, the uncertainties of design variables are either unaccounted for or accounted for by safety factors. This could often result in an assessment with unknown and unquantifiable reliability. Consequently, it would fail to provide additional insight into the risks associated with the new technologies, which are often needed by decisionmakers to determine the feasibility and return-on-investment of a new aircraft engine.

Tong, Michael T.↗

Induced seismicity potential based on probabilistic geomechanics for the San Juan Basin CarbonSAFE project

Although geologic carbon sequestration projects have yet to induce — or may never induce — a damaging earthquake, experiences from other deep injection industries such as hydraulic fracturing, enhanced geothermal systems, and saltwater disposal suggest that effective quantitative seismic risk assessment is necessary for deep saline carbon capture and sequestration (CCS) projects. One such imminent CCS project is the San Juan Basin CarbonSAFE Phase III program. We use Monte Carlo probabilistic geomechanical analyses combined with observations of the geologic and operational parameters of the San Juan Basin site and suggest that this project is of low-induced seismic risk. The primary analysis is split into four sections. First, we assess the literature for faults and past seismicity, and at least five faulting scenarios are directly relevant. Second, we develop and calibrate an integrated earth model for the project site. Third, we perform Monte Carlo simulations that consider reasonable uncertainties of the geomechanical parameters. Of five tested faulting scenarios, only one presents high Coulomb failure functions, but fourth, we determine the risk to be low based on the combined lack of historical seismicity, the geologic framework of the faulting scenario, and the presence of saltwater injection at the same depth as the proposed supercritical carbon dioxide injection. The most sensitive parameters in the geomechanical calculations are the fault dip and the coefficient of friction. The least sensitive are the fault strike and the orientation of the maximum horizontal principal stress.

58 GEOSCIENCES↗

A comparison of material flow strength models using Bayesian cross-validation

Predicting material flow strength over a range of conditions, such as temperature and strain rate, is necessary for many engineering applications. In this paper, we consider how to compare the predictiveness of several different strength models using a statistical technique called Bayesian cross-validation. Given a dataset of flow strength measurements obtained from mechanictesting experiments, the procedure consists of performing a Bayesian calibration of each strength model on a subset of the data and evaluating how well the trained models predict the remaining data. The predictiveness of a calibrated strength model is quantifiable probabilistically, which provides an interpretable metric for comparing the different models. As an illustrative example, we compare the Johnson-Cook (JC), Zerilli-Armstrong (ZA), Preston-Tonks-Wallace (PTW), and Mechanical Threshold Stress (MTS) flow strength models for the tantalum stress-strain curve data from Chen and Gray (1996). We show that prediction intervals for the four strength models cover the held-out data at most experimental conditions, but also that prediction interval coverage and prediction uncertainty varies by model and experimental condition. Finally, the analysis further allows us to identify experimental regimes for which one of the strength models predicts better than the other three.

36 MATERIALS SCIENCE↗

Application of machine learning for the estimation of electron energy distribution from optical emission spectra

Abstract This paper discusses the use of probabilistic deep neural networks for the prediction of the electron energy probability function in low-temperature non-thermal plasmas. The neural networks are trained using optical emission spectroscopy and Langmuir probe measurements, with the goal of providing a reliable estimate of the electron energy probability function solely from optical emission data. The performance of both non-Bayesian and Bayesian networks is evaluated. It is found that Bayesian models are preferable as they assign a higher level of uncertainty to their prediction especially when the dataset used to train them is small. This work describes one of the many potential applications of machine learning in plasma science and technology.

Physics↗

An Initial Examination for Verifying Separation Algorithms by Simulation

An open question in algorithms for aircraft is what can be validated by simulation where the simulation shows that the probability of undesirable events is below some given level at some confidence level. The problem is including enough realism to be convincing while retaining enough efficiency to run the large number of trials needed for high confidence. The paper first proposes a goal based on the number of flights per year in several regions. The paper examines the probabilistic interpretation of this goal and computes the number of trials needed to establish it at an equivalent confidence level. Since any simulation is likely to consider the algorithms for only one type of event and there are several types of events, the paper examines under what conditions this separate consideration is valid. This paper is an initial effort, and as such, it considers separation maneuvers, which are elementary but include numerous aspects of aircraft behavior. The scenario includes decisions under uncertainty since the position of each aircraft is only known to the other by broadcasting where GPS believes each aircraft to be (ADS-B). Each aircraft operates under feedback control with perturbations. It is shown that a scenario three or four orders of magnitude more complex is feasible. The question of what can be validated by simulation remains open, but there is reason to be optimistic.

White, Allan L.↗