Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Path Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Interference Path Loss Prediction in A319/320 Airplanes Using Modulated Fuzzy Logic and Neural Networks

In this paper, neural network (NN) modeling is combined with fuzzy logic to estimate Interference Path Loss measurements on Airbus 319 and 320 airplanes. Interference patterns inside the aircraft are classified and predicted based on the locations of the doors, windows, aircraft structures and the communication/navigation system-of-concern. Modeled results are compared with measured data. Combining fuzzy logic and NN modeling is shown to improve estimates of measured data over estimates obtained with NN alone. A plan is proposed to enhance the modeling for better prediction of electromagnetic coupling problems inside aircraft.

Jafri, Madiha J.↗

Ground Processing Affordability for Space Vehicles

Launch vehicles and most of their payloads spend the majority of their time on the ground. The cost of ground operations is very high. So, why so often is so little attention given to ground processing during development? The current global space industry and economic environment are driving more need for efficiencies to save time and money. Affordability and sustainability are more important now than ever. We can not continue to treat space vehicles as mere science projects. More RLV's (Reusable Launch Vehicles) are being developed for the gains of reusability which are not available for ELV's (Expendable Launch Vehicles). More human-rated vehicles are being developed, with the retirement of the Space Shuttles, and for a new global space race, yet these cost more than the many unmanned vehicles of today. We can learn many lessons on affordability from RLV's. DFO (Design for Operations) considers ground operations during design, development, and manufacturing-before the first flight. This is often minimized for space vehicles, but is very important. Vehicles are designed for launch and mission operations. You will not be able to do it again if it is too slow or costly to get there. Many times, technology changes faster than space products such that what is launched includes outdated features, thus reducing competitiveness. Ground operations must be considered for the full product Lifecycle, from concept to retirement. Once manufactured, launch vehicles along with their payloads and launch systems require a long path of processing before launch. Initial assembly and testing always discover problems to address. A solid integration program is essential to minimize these impacts, as was seen in the Constellation Ares I-X test rocket. For RLV's, landing/recovery and post-flight turnaround activities are performed. Multi-use vehicles require reconfiguration. MRO (Maintenance, Repair, and Overhaul) must be well-planned--- even for the unplanned problems. Defect limits and standard repairs need to be in-place as well as easily added. Many routine inspections and maintenance can be like an aircraft overhaul. Modifications and technology upgrades should be expected. Another factor affecting ground operations efficiency is trending. It is essential for RLV's, and also useful for ELV's which fly the same or similar models again. Good data analysis of technical and processing performance will determine fixes and improvements needed for safety, design, and future processing. Collecting such data on new or low-frequency vehicles is a challenge. Lessons can be learned from the Space Shuttle, or even the Concorde aircraft. For all of the above topics, efficient business systems must be established for comprehensive program management and good throughput. Drawings, specifications, and manuals for an entire launch vehicle are often in different formats from multiple vendors, plus they have proprietary constraints. Nonetheless, the integration team must ensure that all data needed is compatible and visible to each appropriate team member. Ground processing systems for scheduling, tracking, problem resolution, etc. must be well laid-out. The balance between COTS (commercial off the shelf) and custom software is difficult. Multiple customers, vendors, launch sites, and landing sites add to the complexity of efficient IT (Information Technology) tools.

Ingalls, John↗

Launch Vehicle Demonstrator Using Shuttle Assets

The Marshall Space Flight Center Advanced Concepts Office (ACO) has the leading role for NASA s preliminary conceptual launch vehicle design and performance analysis. Over the past several years the ACO Earth-to-Orbit Team has evaluated thousands of launch vehicle concept variations for a multitude of studies including agency-wide efforts such as the Exploration Systems Architecture Study (ESAS), Constellation, Heavy Lift Launch Vehicle (HLLV), Heavy Lift Propulsion Technology (HLPT), Human Exploration Framework Team (HEFT), and Space Launch System (SLS). NASA plans to continue human space exploration and space station utilization. Launch vehicles used for heavy lift cargo and crew will be needed. One of the current leading concepts for future heavy lift capability is an inline one and a half stage concept using solid rocket boosters (SRB) and based on current Shuttle technology and elements. Potentially, the quickest and most cost-effective path towards an operational vehicle of this configuration is to make use of a demonstrator vehicle fabricated from existing shuttle assets and relying upon the existing STS launch infrastructure. Such a demonstrator would yield valuable proof-of-concept data and would provide a working test platform allowing for validated systems integration. Using shuttle hardware such as existing RS-25D engines and partial MPS, propellant tanks derived from the External Tank (ET) design and tooling, and four-segment SRB s could reduce the associated upfront development costs and schedule when compared to a concept that would rely on new propulsion technology and engine designs. There are potentially several other additional benefits to this demonstrator concept. Since a concept of this type would be based on man-rated flight proven hardware components, this demonstrator has the potential to evolve into the first iteration of heavy lift crew or cargo and serve as a baseline for block upgrades. This vehicle could also serve as a demonstration and test platform for the Orion Program. Critical spacecraft systems, re-entry and recovery systems, and launch abort systems of Orion could also be demonstrated in early test flights of the launch vehicle demo. Furthermore, an early demonstrator of this type would provide a stop-gap for retaining critical human capital and infrastructure while affording the current emerging generation of young engineers opportunity to work with and capture lessons learned from existing STS program offices and personnel, who were integral in the design and development of the Space Shuttle before these resources are no longer available. The objective of this study is to define candidate launch vehicle demonstration concepts that are based on Space Shuttle assets and determine their performance capabilities and how these demonstration vehicles could evolve to a heavy lift capability to low earth orbit.

Threet, Grady E., Jr.↗

An Examination of Selected Datacom Options for the Near-Term Implementation of Trajectory Based Operations

A primary feature of the Next Generation Air Transportation System (NextGen) is trajectory based operations (TBO). Under TBO, aircraft flight plans are known to computer systems on the ground that aid in scheduling and separation. The Future Air Navigation System (FANS) was developed to support TBO, but relatively few aircraft in the US are FANSequipped. Thus, any near-term implementation must provide TBO procedures for non-FANS aircraft. Previous research has explored controller clearances, but any implementation must also provide procedures for aircraft requests. The work presented here aims to surface issues surrounding TBO communication procedures for non-FANS aircraft and for aircraft requesting deviations around weather. Three types of communication were explored: Voice, FANS, and ACARS,(Aircraft Communications Addressing and Reporting System). ACARS and FANS are datacom systems that differ in that FANS allows uplinked flight plans to be loaded into the Flight Management System (FMS), while ACARS delivers flight plans as text that must be entered manually via the Control Display Unit (CDU). Sixteen pilots (eight two-person flight decks) and four controllers participated in 32 20-minute scenarios that required the flight decks to navigate through convective weather as they approached their top of descents (TODs). Findings: The rate of non-conformance was higher than anticipated, with aircraft off path more than 20% of the time. Controllers did not differentiate between the ACARS and FANS datacom, and were mixed in their preference for Voice vs. datacom (ACARS and FANS). Pilots uniformly preferred Voice to datacom, particularly ACARS. Much of their dislike appears to result from the slow response times in the datacom conditions. As a result, participants frequently resorted to voice communication. These results imply that, before implementing TBO in environments where pilots make weather deviation requests, further research is needed to develop communication procedures that integrate voice and datacom.

trajectory based operations↗

Building an Economical and Sustainable Lunar Infrastructure to Enable Lunar Industrialization

A new concept study was initiated to examine the architecture needed to gradually develop an economical, evolvable and sustainable lunar infrastructure using a public/private partnerships approach. This approach would establish partnership agreements between NASA and industry teams to develop a lunar infrastructure system that would be mutually beneficial. This approach would also require NASA and its industry partners to share costs in the development phase and then transfer operation of these infrastructure services back to its industry owners in the execution phase. These infrastructure services may include but are not limited to the following: lunar cargo transportation, power stations, communication towers and satellites, autonomous rover operations, landing pads and resource extraction operations. The public/private partnerships approach used in this study leveraged best practices from NASA's Commercial Orbital Transportation Services (COTS) program which introduced an innovative and economical approach for partnering with industry to develop commercial cargo services to the International Space Station. This program was planned together with the ISS Commercial Resupply Services (CRS) contracts which was responsible for initiating commercial cargo delivery services to the ISS for the first time. The public/private partnerships approach undertaken in the COTS program proved to be very successful in dramatically reducing development costs for these ISS cargo delivery services as well as substantially reducing operational costs. To continue on this successful path towards installing economical infrastructure services for LEO and beyond, this new study, named Lunar COTS (Commercial Operations and Transport Services), was conducted to examine extending the NASA COTS model to cis-lunar space and the lunar surface. The goals of the Lunar COTS concept are to: 1) develop and demonstrate affordable and commercial cis-lunar and surface capabilities, such as lunar cargo delivery and surface power generation, in partnership with industry; 2) incentivize industry to establish economical and sustainable lunar infrastructure services to support NASA missions and initiate lunar commerce; and 3) encourage creation of new space markets for economic growth and benefit. A phased-development approach was also studied to allow for incremental development and demonstration of capabilities needed to build a lunar infrastructure. This paper will describe the Lunar COTS concept goals, objectives and approach for building an economical and sustainable lunar infrastructure. It will also describe the technical challenges and advantages of developing and operating each infrastructure element. It will also describe the potential benefits and progress that can be accomplished in the initial phase of this Lunar COTS approach. Finally, the paper will also look forward to the potential of a robust lunar industrialization environment and its potential effect on the next 50 years of space exploration.

Zuniga, Allison F.↗

Commanding Curiosity from the Couch: MSL Remote Operations, Challenges, and Path Ahead

This paper describes how the Mars ScienceLaboratory (MSL) project prepared for and successfully beganCuriosity rover Mars operations from their homes in responseto the COVID-19 work-from-home orders. In a very shortperiod, the team developed procedures and executed a remoteoperations readiness test in parallel with the team's support fornominal operations. Continuing regular rover operations withan entirely remote team had not previously been consideredfeasible due to a variety of factors. These included both thehuman factors, such as multiple concurrent person-to-personinteractions of the uplink planning team, as well as technicalfactors, such as reliance on powerful workstations dedicated tographically intensive software tools used for planning. The testwas conducted on March 12th, with both the downlink anduplink teams successfully simulating a near full planning day.The JPL administration announced the transition to mandatorytelework on Monday, March 16th. MSL stood down the uplinkplanning originally scheduled for the next day while downlinkcontinued monitoring the rover. Full operations then resumedper schedule with nearly the entire operations team teleworkingon Friday, March 20th, during which the team planned roveractivities for three Martian days (sols). These activities includedthe successful drilling of the "Edinburgh" rock target, a highlycomplex contact science activity.As of October 1st, 2020, the Mars Science Laboratory missionoperations team has conducted 88 remote tactical uplink shiftsfor a total of 190 sols of planned rover activity, which accountsfor more than 6% of the mission to date. In this period the roverhas completed four drilling campaigns and driven over 1150meters towards its next major science target – a sulfate bearinggeologic unit at the foot of Mount Sharp. Success has not beenwithout its challenges. Many of these have been addressed whileothers will remain in some form until the team can safely returnto JPL, which in turn is the largest challenge for the future.

Stroupe, Ashley↗

Powering the Future: Fusion & Plasmas

This report provides a decade-long vision for the field of fusion energy and plasma science and presents a path to a promising future of new scientific discoveries, industrial applications, and, ultimately, the delivery of fusion energy. We identify critical areas for research and development and prioritize investments to maximize impact. The research community worked for more than a year to develop a wealth of creative ideas designed to accelerate fusion energy and advance plasma science. The effort culminated in the consensus Community Planning Process report. Our work is based heavily on that report, and we extend our sincere gratitude to our colleagues for their efforts. Following the research community’s lead, we worked through consensus to generate this report. Many ideas were heard and were thoughtfully deliberated until a shared view on each issue emerged. This process allowed us to discuss and appreciate our different points of view and come to consensus language. Ultimately, we speak with one voice in conveying a vision for a vibrant program that will bring significant benefit to society.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Satellite lifetime prediction

Satellite lifetime predictions are critically dependent on the ability to forecast future solar and geomagnetic activity. These quantities are inputs to the atmospheric model with which values of atmospheric density are computed along a projected orbital path. Density values are combined with the predicted ballistic coefficient timeline to compute drag and predict decay histories. The major uncertainty in making predictions that pertain to the time periods that are years in the future is in the solar and geomagnetic activity projections, although the ballistic coefficient is also frequently in doubt. The study concludes that while present density models are adequate for planning, the inputs to them, particularly solar/geomagnetic activity indices, are unreliable.

Wittenstein, Gerald↗

Combat Agility Management System (CAMS)

The proper management of energy becomes a complex task in fighter aircraft which have high angle of attack (AOA) capability. Maneuvers at high AOA are accompanied by high bleed rates (velocity decrease), a characteristic that is usually undesirable in a typical combat arena. Eidetics has developed under NASA SBIR Phase 1 and NAVAIR SBIR Phase 2 contracts a system which allows a pilot to more easily and effectively manage the trade-off of energy (airspeed or altitude) for turn rate while not imposing hard limits on the high AOA nose pointing capability that can be so important in certain air combat maneuver situations. This has been accomplished by incorporating a two-stage angle of attack limiter into the flight control laws. The first stage sets a limit on AOA to achieve a limit on the maximum bleed rate (selectable) by limiting AOA to values which are dependent on the aircraft attitude and dynamic pressure (or flight path, velocity, and altitude). The second stage sets an AOA limit near the AOA for C(sub l max). One of the principal benefits of such a system is that it enables a low-experience pilot to become much more proficient at managing his energy. The Phase 2 simulation work is complete, and an exploratory flight test on the F-18 HARV is planned for the Fall of 1994 to demonstrate/validate the concept.

Skow, Andrew↗

STS-96 Crew Interview: Rick Husband

Live footage of a preflight interview with Pilot Rick D. Husband is seen. The interview addresses many different questions including why Husband became an astronaut, the events that led to his interest, and his career path as a pilot. Other interesting information that this one-on-one interview discusses is this logistics and outfitting mission, why it is important to send equipment to the International Space Station (ISS) before the astronauts, and the Integrated Cargo Carrier. Husband mentions Discovery's anticipated docking with the ISS, the space walk with Mission Specialists Tamara E. Jernigan, and Daniel T. Barry, plans for the supply and equipment transfers, and an experiment designed to evaluate the system that will transfer oxygen, nitrogen and water between the ISS and the spacecraft. A fly-around mission, and the deployment of the Student Tracked Atmospheric Research Satellite for Heuristic International Networking Equipment (STARSHINE) are also discussed.

Source record↗

STS-111 Crew Interviews: Phillippe Perrin, Mission Specialist 1

STS-111 Mission Specialist 1 Phillippe Perrin is seen during this preflight interview, where he gives a quick overview of his mission before answering questions about his inspiration to become an astronaut and his career path. Perrin outlines his role in the mission in general, and specifically during the docking and extravehicular activities (EVAs). He describes what the crew exchange will be like (transferring the Expedition 5 crew in place of the Expedition 4 crew on the International Space Station (ISS)) and the payloads (Mobile Base System (MBS) and the Leonardo Multi-Purpose Logistics Module). Perrin discusses the planned EVAs in detail and outlines what supplies will be left for the resident crew of the ISS. He also provides his thoughts about the significance of the mission to France and the value of the ISS.

Source record↗

Optimizing Mars Airplane Trajectory with the Application Navigation System

Planning complex missions requires a number of programs to be executed in concert. The Application Navigation System (ANS), developed in the NAS Division, can execute many interdependent programs in a distributed environment. We show that the ANS simplifies user effort and reduces time in optimization of the trajectory of a martian airplane. We use a software package, Cart3D, to evaluate trajectories and a shortest path algorithm to determine the optimal trajectory. ANS employs the GridScape to represent the dynamic state of the available computer resources. Then, ANS uses a scheduler to dynamically assign ready task to machine resources and the GridScape for tracking available resources and forecasting completion time of running tasks. We demonstrate system capability to schedule and run the trajectory optimization application with efficiency exceeding 60% on 64 processors.

Frumkin, Michael↗

Design and Performance of Micro-Spec, an Ultra Compact High-Sensitivity Far-Infrared Spectrometer for SPICA

Micro-Spec (u-Spec) is a high-performance spectrometer working in the 250-700-micrometer wavelength range, whose modules use low-loss superconducting microstrip transmission lines on a single 4-inch-diameter silicon wafer. Creating the required phase delays in transmission lines rather than free space allows such an instrument to have, in principle, the performance of a meter-scale grating spectrometer. Such a dramatic size reduction enables classes of instruments for space that would be impossible with conventional technologies. This technology can dramatically enhance the long-wavelength capability of the space infrared telescope for cosmology and astrophysics SPICA. u-Spec is analogous to a grating spectrometer. The phase retardation generated by the reflection from the grating grooves is instead produced by propagation through a transmission line. The power received by a broadband antenna is progressively divided by binary microstrip power dividers, and the required phase delays are generated by different lengths of microstrip transmission lines. by arranging these outputs along a circular focal surface, the analog of a Rowland spectrometer can he created. The procedure to optimize the Micro-Spec design is based on the stigmatization and minimization of the light path function in a two-dimensional hounded region, which results in an optimized geometry arrangement with three stigmatic points. In addition, in order to optimize the overall efficiency of the instrument, the emitters are directed to the center of the focal surface. The electric field amplitude and phase as well as the power transmitted and absorbed throughout the region are analyzed. Measurements are planned in late summer to validate the designs.

Cataldo, Giuseppe↗

Earth Independent Medical Operations (EIMO)

Inherent in interplanetary space travel are unprecedented challenges that could threaten mission success and negatively impact crew health and performance. Return to definitive care is essentially untenable and resources will be constrained with practically no re-supply capability. Access to ground-based medical expertise will be significantly delayed under nominal conditions with exacerbation during conjunction or prolonged dust storms. Taken together, these challenges necessitate the development of a progressively autonomous medical operational support system to assist the crew medical officer (CMO). While support from ground based medical experts will remain indispensable for pre-mission planning, the approach to management of acute/emergent medical contingencies will require a gradual transition of medical care and decision making from terrestrial to space-based assets, enabling support of astronaut health and performance and reducing overall mission risk. To progressively enable EIMO, a series of meetings were convened with subject matter experts from within NASA, academia and industry to facilitate mapping of the path to support autonomous medical operations. Topics explored in these meetings included the scope of data (storage capacity, usage, transmission rate and bandwidth, computing capacity), CMO training, supply and resource management and task load balance. Recommendations from these meetings will inform the EIMO Concept of Operations and definition of the associated requirements culminating in updates to the NASA 3001 standards. The EIMO project team will work with stakeholders to conceptualize a clinical decision support system (CDSS) to assist the CMO in response to medical contingencies when terrestrial support is delayed or otherwise unavailable. The CDSS will be a system of systems that will utilize data from numerous input vectors. Successful deployment of the CDSS will facilitate medical decision making while decreasing the cognitive load leading to an improvement in task load balancing. Additional benefits of the envisioned CDSS include assistance with inventory management, locating resources, storage/retrieval of medical records, highlighting trends in recorded data, in addition to providing a consult for diagnosis and treatment. More advanced features might include passive monitoring to identify early warning signs of behavioral or medical anomalies to possibly pre-empt onset of conditions that would compromise crew health and performance.

Benjamin Easter↗

Lessons in Commercial PACE Leadership: The Path from Legislation to Launch

Property Assessed Clean Energy (PACE) financing enables building owners to finance energy efficiency, renewable energy, and, in some states, non-energy building improvements through a voluntary special assessment on their properties. For commercial buildings, there are many benefits to using Commercial PACE (C-PACE) financing. Still, using C-PACE financing is a multi-step process and involves diverse stakeholders (see Figure ES-1 for a simplified overview), and the process may vary depending on the state and policy context. The primary audience for this report, Lessons in Commercial PACE Leadership, is state and local decision makers that seek an informed, objective perspective of what it takes to launch a C-PACE program. The report is specifically for those states with enabling legislation and program sponsors (i.e., state or local governments) that are looking to launch or join a C-PACE program. The report is a starting point for understanding what approaches have worked to establish successful C-PACE programs. It examines the experience of programs across the country and provides insights for making the process smoother, and hopefully less cost and time-intensive, for new state and local governments sponsoring C-PACE programs. The report also provides a roadmap to key decision points on the path to setting up a program — the different paths taken and program models employed by those who have blazed the trail. The report is organized into three sections describing the decision points involved, options and considerations, and experience from the field.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Identification of RESNET HERS Index Values Corresponding to Minimal Compliance with the IECC Performance Path

Pacific Northwest National Laboratory analyzed the relationship between the Residential Energy Services Network (RESNET) Home Energy Rating System (HERS) Index and the traditional simulation-based Performance Path used in the International Energy Conservation Code (IECC). The analysis evaluates, for a single-family residence with various characteristics, the ranges of HERS Index values that would imply compliance with the 2012 IECC Performance Path. Several building characteristics considered likely to result in quantifiable differences in the outcomes of the two approaches, or otherwise believed to be of interest to code developers and policy makers, are considered in the analysis.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Demand for a Domestic Offshore Wind Energy Supply Chain

In March of 2021, the Biden-Harris Administration established a National Offshore Wind Target to install 30 GW by 2030. This ambitious goal was not only intended to help reduce dependencies on fossil fuels, but also represents an opportunity to establish a new and sustainable industry in the United States. The announcement referenced the potential benefits of establishing a domestic supply chain, including the opportunity for existing suppliers to produce thousands of components while creating tens of thousands of jobs over the course of the decade. This vision by the Biden-Harris Administration aligns with the perspective of the offshore wind industry. At a Leadership 100 event hosted by the Business Network for Offshore wind in 2019, offshore wind developers and manufacturers identified the need for a roadmap outlining a pathway to a domestic supply chain as the top priority facing the industry. Building up domestic manufacturing capabilities will not only energize local industries but can potentially de-risk individual project by reducing reliance on importing resources from European or Asian markets. Although establishing a domestic supply chain will require significant investment, it has the potential to create substantial benefits throughout the industry and, by extension, on the decarbonization goals of the United States. This study characterizes the challenges and opportunities facing the growth of a domestic supply chain industry and evaluates the potential benefits that could be achieved through the creation of the supply chain. This report is the first of a two-part series which will describe the full supply chain roadmap and the associated benefits; the current report focuses on the high-level deployment, workforce, and component requirements that need to be met to achieve the National Offshore Wind Target. We will present: 1. A deployment pipeline that demonstrates the pathway to 30 GW, the associated demand for major fixed-bottom and floating offshore wind components (turbines, foundations, cables, substations), and the vessel and port requirements to support these installation activities. 2. A series of sensitivity analyses showing how the demand for components, ports, and vessels changes for different technology pathways and availability of the global supply chain. 3. An estimate of the total number of jobs that would be required to support these deployment scenarios under varying levels of assumed domestic content. 4. A comprehensive list of the Tier 1, 2, and 3 components (finished components, subassemblies, and subcomponents) required to construct fixed-bottom and floating offshore wind projects. 5. A discussion of critical path components that represent a significant challenge, bottleneck, or risk for a future domestic supply chain.

17 WIND ENERGY↗

Local Resistance Measurement for Degradation of c-Si Heterojunction with Intrinsic Thin Layer (HIT) Solar Modules

Silicon heterojunction with intrinsic thin layer (or HIT) modules typically degrade at a rate of less than 1% annually in solar fields with dominant degradation in open-circuit voltage and some degradation in series resistance. However, detailed mechanisms can differ from module to module. Here, we study increases in local series resistance that occur over long-term field deployment, indicated by cell areas where the photoluminescence intensity does not degrade but the electroluminescence degrades significantly. To directly measure the local series resistance, we have cored out the local electroluminescence-degraded area, and we measured the sheet resistance by 4-point-probe and local nm-scale resistance using scanning spreading resistance microscopy (SSRM). The results by 4-point-probe show scattered sheet resistance that can be caused, for example, by nonuniform current paths through the transparent conductive oxide layer, the a-Si:H emitter, or the near-junction c-Si inversion layer. In contrast, the SSRM results indicate a relatively uniform and non-degraded resistivity on smaller nanometer spatial scales. SSRM is an atomic force microscopy-based two-terminal resistance mapping technique that measures the local resistance in nm-volume beneath the probe. The consistent resistances measured on the control and degraded samples can exclude the degradation of transparent conductive oxide resistance.

41 EE - Solar Energy Technologies Office (EE-4S)↗