Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Modeling Single Well Injection-Withdrawal (SWIW) Tests for Characterization of Complex Fracture-Matrix Systems

The ability to reliably predict flow and transport in fractured porous rock is an essential condition for performance evaluation of geologic (underground) nuclear waste repositories. In this report, a suite of programs (TRIPOLY code) for calculating and analyzing flow and transport in two-dimensional fracture-matrix systems is used to model single-well injection-withdrawal (SWIW) tracer tests. The SWIW test, a tracer test using one well, is proposed as a useful means of collecting data for site characterization, as well as estimating parameters relevant to tracer diffusion and sorption. After some specific code adaptations, we numerically generated a complex fracture-matrix system for computation of steady-state flow and tracer advection and dispersion in the fracture network, along with solute exchange processes between the fractures and the porous matrix.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transuranic waste management at Sandia National Laboratories

This paper documents the history of the TRU program at Sandia, previous and current activities associated with TRU material and waste, interfaces with other TRU waste generator sites and the Waste Isolation Pilot Plan (WIPP), and paths forward for TRU material and waste. This document is a snapshot in time of the TRU program and should be updated as necessary, or when significant changes have occurred in the Sandia TRU program or in the TRU regulatory environment. This paper should serve as a roadmap to capture past TRU work so that efforts are not repeated and ground is not lost due to future inactivity and personnel changes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Well Plugging and Abandonment Activities for Fiscal Year 2009

The Waste Isolation Pilot Plant (WIPP) facility is a U.S. Department of Energy (DOE) facility for disposal of transuranic mixed waste under a permit issued by the New Mexico Environment Department. The WIPP facility is 26 miles southeast of Carlsbad, New Mexico, in eastern Eddy County. Disposal panels are mined in the Permian Salado Formation at a depth of 2,150 feet below ground surface (bgs). Field activities for this Basic Data Report were initiated in June 2009, and concluded in July 2009. The FY 2009 program included the plugging and abandonment (P&A) of two monitoring wells, which permanently removed them from the monitoring network. This Basic Data Report presents the summary of procedures followed for each well completion as documented by the Subcontract Technical Representative (STR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations for Implementation of MARSSIM/MARSAME Surface Radioactivity Surveys within FUSRAP - 12330

Surveys for residual surface radioactivity support the release of buildings under MARSSIM and the release of materials and equipment under MARSAME consensus guidance. There are a multitude of factors and conditions that must be assessed and addressed when developing a defensible survey design. ISO-7503 addresses the most basic survey considerations with consistent terminology and defensible calculation methodologies recommended for program-wide implementation by the authors. A key point of interest is the ISO-7503 approach to determining the total efficiency of the measurement system that is promoted by the authors for adoption throughout FUSRAP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CURRENT PROGRESS AND FUTURE PLANS FOR THE DOE OFFICE OF ENVIRONMENTAL MANAGEMENT INTERNATIONAL PROGRAM

The U.S. Department of Energy's (DOE) Office of Environmental Management (EM) has collaborated with various international institutes for many years on radioactive waste management challenges of mutual concern. Currently, DOE-EM is performing collaborative work with researchers at the Khlopin Radium Institute and the SIA Radon Institute in Russia and the Ukraine's International Radioecology Laboratory to explore issues related to high-level waste and to investigate experience and technologies that could support DOE-EM site cleanup needs. Specific initiatives include: (1) Application of the Cold Crucible Induction Heated Melter to DOE Wastes--SIA Radon and Savannah River National Laboratory; (2) Improved Solubility and Retention of Troublesome Components in SRS and Hanford Waste Glasses--Khlopin Radium Institute, Pacific Northwest National Laboratory and Savannah River National Laboratory; and (3) Long-term Impacts from Radiation/Contamination within the Chernobyl Exclusion Zone--International Radioecology Laboratory and Savannah River National Laboratory. This paper provides an overview of the status of the current International Program task activities. The paper will also provide insight into the future direction for the program. Specific ties to the current DOE-EM technology development multi-year planning effort will be highlighted as well as opportunities for future international collaborations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effective Access Monitoring at Geological Repositories

Access points at a deep, mined geological repository (GR) for the disposal of spent nuclear fuel (SNF) and other nuclear wastes present potential diversion paths for nuclear material. Because C/S measures are not likely to be used underground, access to a GR will require unprecedented reliance on C/S measures to maintain continuity of knowledge (CoK) on SNF buried underground. We develop a model GR based on common features of GR designs from national programs in order to develop and optimize C/S measures for GR access points that maximize confidence that CoK is maintained on SNF underground. Critical access points identified in this study are surface entrances to (1) the GR ramp (2) the excavation shaft, (3) the main elevator shaft, and (4) the ventilation shaft. The first three are considered critical detection points (DPs), whereas the fourth is considered a non-critical DP. The reason for the distinction is due to the different design capabilities of shaft components: the first three (ramp, excavation shaft, main elevator) are all capable of being used to move material from the underground to the surface, whereas the ventilation shaft is not. Such capabilities are verified during periodic design information verification (DIV) inspections.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NTS MC&A History

Within the past three years, the Nevada Test Site (NTS) has progressed from a Category IV to a Category I facility. In accordance with direction from the U. S. Department of Energy (DOE) Secretary and National Nuclear Security Administration (NNSA) Administrator, NTS received shipments of large quantities of special nuclear material from Los Alamos National Laboratory (LANL) and other sites in the DOE complex. September 2004 was the first occurrence of Category I material at the NTS, with the exception of two weeks of underground testing in 2001, since 1992. The Material Control and Accountability (MC&A) program was originally a joint-lab effort by LANL, Lawrence Livermore National Laboratory (LLNL), and Bechtel Nevada (BN), but in March 2006 the NNSA Nevada Site Office appointed the NTS Management and Operations contractor with sole responsibility. This paper will discuss the process and steps taken to transition the NTS MC&A program from multiple disciplines to a single entity and from a Category IV to a Category I program. This transition flourished as MC&A progressed from the 2004 Office of Assessment (OA) rating of “Significant Weakness” to the 2007 OA assessment rating of “Effective Performance.” The paper will provide timelines, funding and staffing issues, OA assessment findings and corrective actions, and future expectations. The process has been challenging, and MC&A’s innovative responses to the challenges have been very successful.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Returning HEU Fuel from the Czech Republic to Russia

In December 1999, representatives from the United States, Russian Federation, and International Atomic Energy Agency began working on a program to return Russian supplied, highly enriched, uranium fuel stored at foreign research reactors to Russia. Now, under the Global Threat Reduction Initiative’s Russian Research Reactor Fuel Return Program, this effort has repatriated over 800 kg of highly enriched uranium to Russia from over 10 countries. In May 2004, the “Agreement Between the Government of the United States of America and the Government of the Russian Federation Concerning Cooperation for the Transfer of Russian Produced Research Reactor Nuclear Fuel to the Russian Federation” was signed. This agreement provides legal authority for the Russian Research Reactor Fuel Return Program and establishes parameters whereby eligible countries may return highly enriched uranium spent and fresh fuel assemblies and other fissile materials to Russia. On December 8, 2007, one of the largest shipments of highly enriched uranium spent nuclear fuel was successfully made from a Russian-designed nuclear research reactor in the Czech Republic to the Russian Federation. This accomplishment is the culmination of years of planning, negotiations, and hard work. The United States, Russian Federation, and the International Atomic Energy Agency have been working together. In February 2003, Russian Research Reactor Fuel Return Program representatives met with the Nuclear Research Institute in Rež, Czech Republic, and discussed the return of their highly enriched uranium spent nuclear fuel to the Russian Federation for reprocessing. Nearly 5 years later, the shipment was made. This article discusses the planning, preparations, coordination, and cooperation required to make this important international shipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Tank 38H (HTF-38-21-24, -25) and Tank 43H (HTF-43-21-26, -27) Samples for Support of the Enrichment Control and Corrosion Control Programs

Feed limits have been established for the 2H-Evaporator system to ensure nuclear criticality is not possible and corrosion is minimized. These limits are protected by the Enrichment Control Program (ECP) and the Corrosion Control Program (CCP) that require periodic sampling and analysis to confirm that the waste supernate composition stays within the limits. Savannah River Remediation (SRR) obtained samples from two different heights within each of the two waste tanks supporting the 2H-Evaporator operations on March 26, 2021. The Tank 38H (evaporator drop tank) and Tank 43H (evaporator feed tank) samples were received by the Savannah River National Laboratory (SRNL) Shielded Cells on March 26, 2021. Analysis of these samples provides information necessary for determining compliance with the ECP and CCP. The sample characterization was requested via a Technical Task Request (TTR) and conducted based on a Task Technical and Quality Assurance Plan (TTQAP).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Approach for the isotopic characterization of irradiated start-up sources for disposal at WIPP - 15674

The National Nuclear Security Administration, Global Threat Reduction Initiative (GTRI)/ Off-site Source Recovery Program (OSRP) requires an approved final disposition pathway for sealed irradiated startup sources with uncertain irradiation histories. To create this path a reliable method is required to determine yields of transmutation, fission and activation products contained within the source at the time of disposal. Because of the uncertain histories of these sources, a number of likely histories are modeled with the code ORIGEN in order to establish the bounds of the radioisotope yields. The ORIGEN simulations are confirmed with gamma spectroscopy, specifically examining the activities of several fission and transmutation isotopes. These calculations, coupled with other previously established characterization techniques for transuranic neutron sources, will be used to establish a waste profile that is in compliance with Waste Isolation Pilot Plant (WIPP) waste acceptance criteria. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-term Moisture Adsorption in Packaged Plutonium Oxide

In 2018, the Department of Energy National Nuclear Security Administration (DOE-NNSA) began implementing dilute and dispose to remove 34 metric tons (MT) of surplus weapons grade plutonium from the US stockpile. Under this plan, surplus plutonium material is converted into plutonium oxide (PuO 2 ) before being stored in metal containers and sent to the DOE Waste Isolation Pilot Plant (WIPP). The dilute and dispose project was implemented as a more cost-effective method for abiding by the Plutonium Management and Disposition Agreement (PMDA) between the USA and Russia, as compared to producing mixed oxide fuel (MOX). The PMDA was originally signed in 2000 and amended in 2010.2 The disassembly of pits and conversion to PuO 2 as part of dilute and dispose is carried out through the Advanced Recovery and Integrated Extraction System (ARIES) developed at Los Alamos National Laboratory (LANL). The dilute portion of dilute and dispose is carried out at Savannah River Site (SRS). With this program in place, it is necessary to ensure the safe, long-term storage of the PuO 2 generated during this process until final disposal at WIPP is accomplished.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Path to Subsurface Closure: When Real and Predicted Data Don't Match, Central Nevada Test Area (CNTA) - 19560

The Central Nevada Test Area, Nevada, was the site of an underground nuclear test in 1968, which resulted in residual contamination at and near the detonation depth of 975 meters (3200 feet). The environmental corrective action strategy for the site was conducted in accordance with the Federal Facility Agreement and Consent Order and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. The corrective action strategy initiated in 1999 included developing a conceptual site model, preparing a numerical flow and transport model, calculating contaminant boundaries, negotiating compliance boundaries with NDEP, performing model validation, and monitoring groundwater. This strategy was executed through the Corrective Action Decision Document/Corrective Action Plan phase, when it was determined that the flow and transport model could not be validated because it failed to adequately predict groundwater elevations in the monitoring/validation (MV) wells (MV-1, MV-2, and MV-3) drilled subsequent to the modeling effort. This led to a change in the corrective action strategy that is now designed to validate the compliance boundary through monitoring and institutional controls, rather than relying predominantly on a numerical flow and transport model. This new approach included enhancements to the monitoring well network and additional monitoring to confirm that data were sufficient to proceed to closure. The corrective action activities were completed in 2015, and the Closure Report, which established the long-term postclosure monitoring program, was approved in 2016. The postclosure monitoring program is designed to (1) assess the effectiveness of the compliance boundary by monitoring for the radionuclides of interest and (2) evaluate the effectiveness of monitoring locations within the groundwater flow system by monitoring water elevations to ensure that monitoring wells are located along the potential migration pathways. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Separations and Waste Forms Research and Development FY 2013 Accomplishments Report

The Separations and Waste Form Campaign (SWFC) under the U.S. Department of Energy (DOE) Fuel Cycle Research and Development Program (FCRD) is responsible for developing advanced separation and waste form technologies to support the various fuel cycle options defined in the DOE Nuclear Energy Research and Development Roadmap, Report to Congress, April 2010. The fiscal year (FY) 2013 accomplishments report provides a highlight of the results of the research and development (R&D) efforts performed within SWFC in FY 2013. Each section contains a high-level overview of the activities, results, technical point of contact, applicable references, and documents produced during the fiscal year. This report briefly outlines campaign management and integration activities, but the intent of the report is to highlight the many technical accomplishments made during FY 2013.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Thermal and Deposition Modeling of the Canister Deposition Field Demonstration

This report provides initial thermal and deposition modeling results of the spent nuclear fuel (SNF) storage system planned for use in the Canister Deposition Field Demonstration (CDFD). The goal of the CDFD testing is to collect deposition measurements on the surface of the dry shielded canister (DSC) to aid in chloride-induced stress corrosion crack (CISCC) research. Ideally this testing will occur in a marine coastal environment but at the time of this report no official site has been selected. The CDFD will use the NUHOMS ® Advanced Horizontal Storage Module – High Seismic (AHSM-HS) with a 32PTH2 canister. The SNF assemblies will be replaced with electrical heaters. Canisters are currently being outfitted with these heaters and tested at Sandia National Laboratory (SNL). Thermal modeling was conducted to ensure the electrical heaters were representative of the temperature distribution found within a storage system with SNF. Deposition models were built to evaluate contaminant deposition on SNF canisters. The CDFD testing will help to validate these models, which will then be used to plan and inform on-site test programs and predictive models for the timing and occurrence of canister CISCC.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Groundwater Monitoring Guidance for Decommissioning Planning - 16228

The Electric Power Research Institute (EPRI) is preparing a document called Groundwater Monitoring Guidance for Decommissioning Planning. This guidance is the first part of a multi-year EPRI project which summarizes experiences with both operational and decommissioning groundwater protection programs and compares the two in order to identify data gaps. The EPRI guidance will show how to address these data gaps and provide recommended decommissioning preparatory actions. The second part of this project will addresses the long term stewardship of a groundwater protection program after the permanent shutdown of the plant during the SAFSTOR period and/or during the active decommissioning of the plant. This paper will discuss the content of the first EPRI guidance document that is focused on decommissioning planning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulation and Optimization of Large Scale Subsurface Environmental Impacts; Investigations, Remedial Design and Long Term Monitoring

The global impact to human health and the environment from large scale chemical / radionuclide releases is well documented. Examples are the wide spread release of radionuclides from the Chernobyl nuclear reactors, the mobilization of arsenic in Bangladesh, the formation of Environmental Protection Agencies in the United States, Canada and Europe, and the like. The fiscal costs of addressing and remediating these issues on a global scale are astronomical, but then so are the fiscal and human health costs of ignoring them. An integrated methodology for optimizing the response(s) to these issues is needed. This work addresses development of optimal policy design for large scale, complex, environmental issues. It discusses the development, capabilities, and application of a hybrid system of algorithms that optimizes the environmental response. It is important to note that 'optimization' does not singularly refer to cost minimization, but to the effective and efficient balance of cost, performance, risk, management, and societal priorities along with uncertainty analysis. This tool integrates all of these elements into a single decision framework. It provides a consistent approach to designing optimal solutions that are tractable, traceable, and defensible. The system is modular and scalable. It can be applied either as individual components or in total. By developing the approach in a complex systems framework, a solution methodology represents a significant improvement over the non-optimal 'trial and error' approach to environmental response(s). Subsurface environmental processes are represented by linear and non-linear, elliptic and parabolic equations. The state equations solved using numerical methods include multi-phase flow (water, soil gas, NAPL), and multicomponent transport (radionuclides, heavy metals, volatile organics, explosives, etc.). Genetic programming is used to generate the simulators either when simulation models do not exist, or to extend the accuracy of them. The uncertainty and sparse nature of information in earth science simulations necessitate stochastic representations. For discussion purposes, the solution to these site-wide challenges is divided into three sub-components; plume finding, long term monitoring, and site-wide remediation. Plume finding is the optimal estimation of the plume fringe(s) at a specified time. It is optimized by fusing geo-stochastic flow and transport simulations with the information content of data using a Kalman filter. The result is an optimal monitoring sensor network; the decision variable is location(s) of sensor in three dimensions. Long term monitoring extends this approach concept, and integrates the spatial-time correlations to optimize the decision variables of where to sample and when to sample over the project life cycle. Optimization of location and timing of samples to meet the desired accuracy of temporal plume movement is accomplished using enumeration or genetic algorithms. The remediation optimization solves the multi-component, multiphase system of equations and incorporates constraints on life-cycle costs, maximum annual costs, maximum allowable annual discharge (for assessing the monitored natural attenuation solution) and constraints on where remedial system component(s) can be located, including management overrides to force certain solutions to be chosen are incorporated for solution design. It uses a suite of optimization techniques, including the outer approximation method, Lipchitz global optimization, genetic algorithms, and the like. The automated optimal remedial design algorithm requires a stable simulator be available for the simulated process. This is commonly the case for all above specifications sans true three-dimensional multiphase flow. Much work is currently being conducted in the industry to develop stable 3D, three-phase simulators. If needed, an interim heuristic algorithm is available to get close to optimal for these conditions. This system process provides the full capability to optimize multi-source, multiphase, and multicomponent sites. The results of applying just components of these algorithms have produced predicted savings of as much as $90,000,000(US), when compared to alternative solutions. Investment in a pilot program to test the model saved 100% of the $20,000,000 predicted for the smaller test implementation. This was done without loss of effectiveness, and received an award from the Vice President - and now Nobel peace prize winner - Al Gore of the United States. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Site Beryllium Program: Past, Present, and Future - 12428

The U.S. Department of Energy (DOE) has a long history of beryllium use because of the element's broad application to many nuclear operations and processes. At the Hanford Site beryllium alloy was used to fabricate parts for reactors, including fuel rods for the N-Reactor during plutonium production. Because of continued confirmed cases of chronic beryllium disease (CBD), and data suggesting CBD occurs at exposures to low-level concentrations, the DOE decided to issue a rule to further protect federal and contractor workers from hazards associated with exposure to beryllium. When the beryllium rule was issued in 1999, each of the Hanford Site contractors developed a Chronic Beryllium Disease Prevention Program (CBDPP) and initial site wide beryllium inventories. A new site-wide CBDPP, applicable to all Hanford contractors, was issued in May, 2009. In the spring of 2010 the DOE Headquarters Office of Health, Safety, and Security (HSS) conducted an independent inspection to evaluate the status of implementation of the Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP). The report identified four Findings and 12 cross-cutting Opportunities for Improvement (OFIs). A corrective action plan (CAP) was developed to address the Findings and crosscutting OFIs. The DOE directed affected site contractors to identify dedicated resources to participate in development of the CAP, along with involving stakeholders. The CAP included general and contractor-specific recommendations. Following initiation of actions to implement the approved CAP, it became apparent that additional definition of product deliverables was necessary to assure that expectations were adequately addressed and CAP actions could be closed. Consequently, a supplement to the original CAP was prepared and transmitted to DOE-HQ for approval. Development of the supplemental CAP was an eight month effort. From the onset a core group of CAP development members were identified to develop a mechanism for assuring that consensus was achieved on products developed as part of the CAP and the closure process. The original CAP was developed based on a large number of actions developed from the HSS report. This was essentially a 'bottoms up' approach. The revised CAP development team concluded that a more holistic, process-based approach was appropriate to assure that the resulting deliverable resulted in a best-in-class product. Consequently, issues and recommendations contained in the HSS report were grouped into 11 program areas, specific product deliverables were identified within each of the program areas, and a work breakdown structure (WBS) was logically applied to number the groupings. While the revised approach to product development utilizes a more holistic, 'top down' approach, the intent was still to incorporate specific recommendations and address specific issues contained in the HSS report. Through implementation of this new approach, a collaborative team has been established that works together using a consensus process for ensuring product completion. Benefits of the new approach include building a level of trust amongst all parties, quality of the products have improved, and acceptance by all parties of what action will truly meet the intent of the deficiency and make the beryllium program stronger. Open dialogue occurs amongst the core Be CAP team members, Hanford contractors, and DOE. It has been a learning process and will continue to be one, but everyone shares the common goal of reducing worker exposure to beryllium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Further Development of an ISOCS - based Advanced In Situ Gamma Spectrometry Services Tool for Waste Measurements - 17452

Canberra's In Situ Object Counting System is an established tool used for gamma spectrometry allowing a physical representation of complex geometries and mathematical calculation of the calibration function while avoiding the need for radioisotope standards. The ISOCS Uncertainty Estimator tool can be used to calculate defensible systematic calibration uncertainties. However the uncertainties depend on knowledge of the properties of the item being measured and for poorly characterized materials these can be large, often leading to large costs for waste sentencing. An ISOCS-based advanced in-situ gamma spectrometry services tool has been developed to reduce those uncertainties. This system is based on generating and comparing a range of candidate geometry models that yield figures of merit indicative of improved consistency between modelled data and available diverse measurement data. The approach and results of initial performance testing have previously been published, demonstrating an analysis procedure and enhanced accuracy for measurement of a low density 200 litre waste drum, based on measurements with known sources placed at different positions. It was shown how the accuracy of assay of Am-241 in a light matrix can be significantly improved. Further analysis has now been performed, with reference to measurements of a second drum, containing a standard matrix of higher density, and with a multiple radionuclide line source (Ba-133, Cs-137, Eu-152 and Am-241). These measurements represent a more challenging waste assay scenario, corresponding to potentially much larger assay uncertainties. Our results show how the assay uncertainty can be reduced, by careful application of AIGS, from relative values of the order of 100% to a few 10's of %. Furthermore, we demonstrate, through extended analysis of the test drum data, how an AIGS measurement program can be optimized to reduce the number of required measurement positions substantially. This paper describes these new results with comment on their importance and potential application for real waste assay projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗