Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

The Magellan Venus mapping mission

The April 1989 Magellan (MGN) Mission to Venus will initiate a new phase in the exploration of the solar system. In addition to being the first U.S. planetary mission in 10.5 years, it will also be the first such mission to use the Space Shuttle and IUS 2-Stage as launch vehicles. Upon arrival at Venus the spacecraft will begin a systematic mapping of the surface of that planet using side-looking SAR. This paper discusses some of the interesting trade-offs in mission design for this mission in the areas of launch and injection, interplanetary cruise, Venus Orbit insertion, and mapping. The Magellan mapping strategy is discussed briefly along with a few special experiments being considered for the MGN extended mission.

Cutting, E.↗

Ulysses mission design after Challenger

The delay of the Ulysses launch from May 1986 to October 1990, because of the Challenger disaster, has altered both the constraints under which the mission must be designed and the timing of several mission critical events. Safety and launch reliability concerns from the Shuttle have increased the effective launch window to durations greater than one hour. Fortuitously high declinations of the launch asymptote (DLA), of the order of the launch site latitude, ameliorate the impact of the new constraints on the launch window. Target overlays in the first hour of the launch window provide higher departure energies that improve mission performance and avoid a science schedule conflict at second opposition near the time of closest Jupiter approach. The mission design starts with the maximum earth departure energy that the upper stage can deliver within the launch constraints. The Jupiter arrival asymptotes are chosen from the optimal point of mission performance in the mission space defined in the Jupiter B-plane by contours mapped by the science and spacecraft constraints. More than half the orbital energy of the earth-to-Jupiter transfer orbit is lost in the Jupiter flyby, and the Jupiter gravitational assist rotates the orbit plane out of the ecliptic to an inclination of about 80 degrees.

Luthey, Joe L.↗

Manned Mars mission

Terrapin Technologies proposes a Manned Mars Mission design study. The purpose of the Manned Mars Mission is to transport ten people and a habitat with all required support systems and supplies from low Earth orbit (LEO) to the surface of Mars and, after an expedition of three months to return the personnel safely to LEO. The proposed hardware design is based on systems and components of demonstrated high capability and reliability. The mission design builds on past mission experience but incorporates innovative design approaches to achieve mission priorities. These priorities, in decreasing order of importance, are safety, reliability, minimum personnel transfer time, minimum weight, and minimum cost. The design demonstrates the feasibility and flexibility of a waverider transfer module. Information is given on how the plan meets the mission requirements.

Source record↗

NASA future mission needs and benefits of controls-structures interaction technology

Two questions are addressed: (1) which future missions need Controls-Structures Interaction (CSI) technology for implementing large spacecraft in orbit; and (2) what specific benefits are to be derived if the technology is available? The answers to these questions were used to help formulate and direct the CSI technology development program. Many future NASA missions have common CSI technology needs which can best be developed in a broad-based, but focused, technology program to provide the greatest benefit to the largest number of users. Three CSI benefit studies were completed to date as part of ongoing assessment process: (1) missions requiring large antennas; (2) missions requiring large optical systems; and (3) missions requiring the use of closed-loop controlled, flexible, remote manipulator systems (RMS) for in-space assembly. The large antenna and flexible RMS mission benefits are discussed.

Grantham, William L.↗

Fusion energy for space missions in the 21st century: Executive summary

Future space missions were hypothesized and analyzed, and the energy source of their accomplishment investigated. The missions included manned Mars, scientific outposts to and robotic sample return missions from the outer planets and asteroids, as well as fly-by and rendezvous missions with the Oort Cloud and the nearest star, Alpha Centauri. Space system parametric requirements and operational features were established. The energy means for accomplishing missions where delta v requirements range from 90 km/sec to 30,000 km/sec (High Energy Space Mission) were investigated. The need to develop a power space of this magnitude is a key issue to address if the U.S. civil space program is to continue to advance as mandated by the National Space Policy. Potential energy options which could provide the propulsion and electrical power system and operational requirements were reviewed and evaluated. Fusion energy was considered to be the preferred option and was analyzed in depth. Candidate fusion fuels were evaluated based upon the energy output and neutron flux. Additionally, fusion energy can offer significant safety, environmental, economic, and operational advantages. Reactors exhibiting a highly efficient use of magnetic fields for space use while at the same time offering efficient coupling to an exhaust propellant or to a direct energy convertor for efficient electrical production were examined. Near term approaches were identified. A strategy that will produce fusion powered vehicles as part of the space transportation infrastructure was developed. Space program resources must be directed toward this issue as a matter of the top policy priority.

Schulze, Norman R.↗

Space acceleration measurement system description and operations on the First Spacelab Life Sciences Mission

The Space Acceleration Measurement System (SAMS) project and flight units are briefly described. The SAMS operations during the STS-40 mission are summarized, and a preliminary look at some of the acceleration data from that mission are provided. The background and rationale for the SAMS project is described to better illustrate its goals. The functions and capabilities of each SAMS flight unit are first explained, then the STS-40 mission, the SAMS's function for that mission, and the preparation of the SAMS are described. Observations about the SAMS operations during the first SAMS mission are then discussed. Some sample data are presented illustrating several aspects of the mission's microgravity environment.

Delombard, Richard↗

NEP mission sensitivities to system performance

Nuclear Electric Propulsion (NEP) mission performance is strongly affected by system performance. Power and propulsion system specific mass, specific impulse, and efficiency all combine to determine the performance limits for a given mission. Thruster technology determines the specific impulse and efficiency of the system. The effects of these parameters on the mission performance of NEP systems relative to other concepts was analyzed to give guidance to thruster development goals for a range of missions: Lunar Cargo, Mars Cargo, and Mars Piloted. Mission sensitivities to system parameters are discussed, and technology requirements are identified for each mission.

Gilland, James H.↗

STS-36 Space Shuttle mission report

The STS-36 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem activities on this thirty-fourth flight of the Space Shuttle and the sixth flight of the OV-104 Orbiter vehicle, Atlantis. In addition to the Atlantis vehicle, the flight vehicle consisted of an External Tank (ET) (designated as ET-33/LWT-26), three Space Shuttle main engines (SSME's) (serial numbers 2019, 2030, and 2029), and two Solid Rocket Boosters (SRB's) (designated as BI-036). The STS-36 mission was a classified Department of Defense mission, and as such, the classified portions of the mission are not discussed. The unclassified sequence of events for this mission is shown in tabular form. Summarized are the significant problems that occurred in the Orbiter subsystems during the mission. The official problem tracking list is presented. In addition, each of the Orbiter problems is cited in the subsystem discussion.

Mechelay, Joseph E.↗

STS-38 Space Shuttle mission report

The STS-38 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem activities on this thirty-seventh flight of the Space Shuttle and the seventh flight of the Orbiter vehicle Atlantis (OV-104). In addition to the Atlantis vehicle, the flight vehicle consisted of an External Tank (ET) (designated as ET-40/LWT-33), three Space Shuttle main engines (SSME's) (serial numbers 2019, 2022, 2027), and two Solid Rocket Boosters (SRB's), designated as BI-039. The STS-38 mission was a classified Department of Defense mission, and as much, the classified portions of the mission are not presented in this report. The sequence of events for this mission is shown. The significant problems that occurred in the Space Shuttle Orbiter subsystem during the mission are summarized and the official problem tracking list is presented. In addition, each Space Shuttle Orbiter problem is cited in the subsystem discussion.

Camp, David W.↗

Status of robotic mission studies for the Space Exploration Initiative - 1991

Results of studies of robotic missions to the moon and Mars planned under the U.S. Space Exploration Initiative are summarized. First, an overall strategy for small robotic missions to accomplish the information gathering required by human missions is reviewed, and the principal robotic mission requirements are discussed. The discussion covers the following studies: the Lunar Observer, the Mars Environmental Survey mission, Mars Sample Return missions using microtechnology, and payloads.

Bourke, Roger D.↗

A decision support tool for synchronizing technology advances with strategic mission objectives

Successful accomplishment of the objectives of many long-range future missions in areas such as space systems, land-use planning, and natural resource management requires significant technology developments. This paper describes the development of a decision-support data-derived tool called MisTec for helping strategic planners to determine technology development alternatives and to synchronize the technology development schedules with the performance schedules of future long-term missions. Special attention is given to the operations, concept, design, and functional capabilities of the MisTec. The MisTec was initially designed for manned Mars mission, but can be adapted to support other high-technology long-range strategic planning situations, making it possible for a mission analyst, planner, or manager to describe a mission scenario, determine the technology alternatives for making the mission achievable, and to plan the R&D activity necessary to achieve the required technology advances.

Hornstein, Rhoda S.↗

Mission options for rendezvous with the most accessible Near-Earth Asteroid - 1989 ML

The recent discovery of the Amor-class 1989 ML, the most accessible known asteroid for minimum-energy rendezvous missions, has expedited the search for frequent, low-cost Near-Earth Asteroid rendezvous and round-trip missions. This paper identifies trajectory characteristics and assesses mass performance for low Delta V ballistic rendezvous opportunities to 1989 ML during the period 1996-2010. This asteroid also offers occasional unique extended mission opportunities, such as the lowest known Delta V requirement for any asteroid sample return mission as well as pre-rendezvous asteroid flyby and post-rendezvous comet flyby opportunities requiring less than 5.25 km/sec total Delta V. This paper also briefly comments concerning mission opportunities for asteroid 1991 JW, which recently replaced other known asteroids as the most accessible Near-Earth Asteroid for fast rendezvous and round-trip missions.

Mcadams, Jim V.↗

Optimization of vehicle weight for Mars excursion missions

The excursion class mission to Mars is defined as a mission with one year durations coupled with a stay time of up to 30 days. The fuel budget for such a mission is investigated. The overall figure of merit in such an assessment is the vehicle weight ratio, the ratio between the wet vehicle weight to the dry vehicle weight. It is necessary to minimize the overall fuel budget for the mission in order to maximize the benefits that could be obtained by sending humans to Mars. Assumptions used in the analysis are: each mission will depart and terminate in low-earth-orbit (LEO) (500 km circular) and the maximum stay time at Mars is 30 days. The maximum mission duration is one year (355-375 days). The mass returned to LEO is 135,000 kg, the dropoff mass left at Mars is 168,000 kg. Three propulsive techniques for atmospheric interface are investigated: aerobraking, all-chemical propulsion, and nuclear thermal propulsion. By defining the fuel requirements, the space transfer vehicle's configuration is defined.

Ferebee, Melvin J., Jr.↗

SEDS1 mission software verification using a signal simulator

The first flight of the Small Expendable Deployer System (SEDS1) is schedule to fly as the secondary payload of a Delta 2 in March, 1993. The objective of the SEDS1 mission is to collect data to validate the concept of tethered satellite systems and to verify computer simulations used to predict their behavior. SEDS1 will deploy a 50 lb. instrumented satellite as an end mass using a 20 km tether. Langley Research Center is providing the end mass instrumentation, while the Marshall Space Flight Center is designing and building the deployer. The objective of the experiment is to test the SEDS design concept by demonstrating that the system will satisfactorily deploy the full 20 km tether without stopping prematurely, come to a smooth stop on the application of a brake, and cut the tether at the proper time after it swings to the local vertical. Also, SEDS1 will collect data which will be used to test the accuracy of tether dynamics models used to stimulate this type of deployment. The experiment will last about 1.5 hours and complete approximately 1.5 orbits. Radar tracking of the Delta II and end mass is planned. In addition, the SEDS1 on-board computer will continuously record, store, and transmit mission data over the Delta II S-band telemetry system. The Data System will count tether windings as the tether unwinds, log the times of each turn and other mission events, monitor tether tension, and record the temperature of system components. A summary of the measurements taken during the SEDS1 are shown. The Data System will also control the tether brake and cutter mechanisms. Preliminary versions of two major sections of the flight software, the data telemetry modules and the data collection modules, were developed and tested under the 1990 NASA/ASEE Summer Faculty Fellowship Program. To facilitate the debugging of these software modules, a prototype SEDS Data System was programmed to simulate turn count signals. During the 1991 summer program, the concept of simulating signals produced by the SEDS electronics systems and circuits was expanded and more precisely defined. During the 1992 summer program, the SEDS signal simulator was programmed to test the requirements of the SEDS Mission software, and this simulator will be used in the formal verification of the SEDS Mission Software. The formal test procedures specification was written which incorporates the use of the signal simulator to test the SEDS Mission Software and which incorporates procedures for testing the other major component of the SEDS software, the Monitor Software.

Pierson, William E.↗

NASA mission planning for space nuclear power

An evaluation is conducted of those aspects of the Space Exploration Initiative which stand to gain from the use of nuclear powerplants. Low-power, less than 10 kW(e) missions in question encompass the Comet Rendezvous Asteroid Flyby, the Cassini mission to Saturn, the Mars Network mission, a solar probe, the Mars Rover Sample Return mission, the Rosetta comet nucleus sample return mission, and an outer planets orbiter/probe. Reactor power yielding 10-100 kW(e) can be used by advanced rovers and initial lunar and Martian outposts, as well as Jovian and Saturnian grand tours and sample-return missions.

Bennett, Gary L.↗

Architecting a mission plan for Lunar Observer

The present status of NASA's Lunar Observer study effort at JPL is discussed in the context of an ongoing 20-year series of studies focused on defining a robotic, low-altitude, polar-orbiting mission to the moon. The primary emphasis of the discussion is a review of the various systems-level factors that drive the overall architecture of the mission plan. Selected top-level project and science requirements are summarized and the current mission and science objectives are presented. A brief description of the candidate science instrument complement is included. Several significant orbital effects caused by the lunar gravity field are explained and the variety of trajectory and maneuver options considered for both getting to the moon and orbiting there are described. Several candidate mission architectures are outlined and the mission plans chosen for future study are described. Two mission options result: a single-spacecraft, single-launch scenario, and a multiple-spacecraft, multiple-launch concept.

Ridenoure, Rex W.↗

An assessment of mission and configuration variations on multi-role fighter/attack aircraft concepts

This paper presents the results of a series of configuration studies conducted in connection with the NASA agility design study project. The purpose of these in-house studies was to develop a parametric data base of configuration concepts and resulting mission performances for a variety of notional fighter/attack missions. This data base will then be used to assess the impact of the imposition of agility requirements on these configurations. Three vehicle concepts were evaluated, and resulting vehicle sizes, weights, and mission performances were compared. Each configuration was then optimized for varying mission requirements and technology levels. It was found that small variations in mission requirements can have significant impact on the design choices. It was also found that optimization of engine cycle variables results in significant improvements in take-off gross weight and vehicle performance regardless of the concept being explored. Finally, results indicate that signature considerations such as internal vs. external weapons carriage can cause dramatic changes in vehicle size, weight, and mission performance.

Logan, Michael J.↗

Architectures for mission control at the Jet Propulsion Laboratory

JPL is currently converting to an innovative control center data system which is a distributed, open architecture for telemetry delivery and which is enabling advancement towards improved automation and operability, as well as new technology, in mission operations at JPL. The scope of mission control within mission operations is examined. The concepts of a mission control center and how operability can affect the design of a control center data system are discussed. Examples of JPL's mission control architecture, data system development, and prototype efforts at the JPL Operations Engineering Laboratory are provided. Strategies for the future of mission control architectures are outlined.

Davidson, Reger A.↗