Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mission Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Multi-mission ground data systems - breakthroughs and challenges

Given the cost-constrained nature of JPL Flight Projects, especially Discovery Class missions, there is more and more pressure to reduce the costs associated with mission operations, particularly the costs for the Ground Data System. This paper explores the successes (and failures) of using the Mission Management Office (MMO) GDS team to provide a common set of services, tools, procedures, and products to JPL Flight Projects.

GDS↗

An Operations System for a Planetary Rover Prototype

A distributed operations system, the Web Interface for Telescience (WITS), is being developed for use in future planetary lander and rover mission operations.

Ground operations manipulator control Internet pla↗

Human Health and Performance Considerations for Exploration of Near-Earth Asteroids

This presentation will describe the human health and performance issues that are anticipated for the human exploration of near-Earth asteroids (NEA). Humans are considered a system in the design of any such deep-space exploration mission, and exploration of NEA presents unique challenges for the human system. Key factors that define the mission are those that are strongly affected by distance and duration. The most critical of these is deep-space radiation exposure without even the temporary shielding of a nearby large planetary body. The current space radiation permissible exposure limits (PEL) restrict mission duration to 3-10 months depending on age and gender of crewmembers and stage of the solar cycle. Factors that affect mission architecture include medical capability; countermeasures for bone, muscle, and cardiovascular atrophy during continuous weightlessness; restricted food supplies; and limited habitable volume. The design of a habitat that can maintain the physical and psychological health of the crew and support mission operations with limited intervention from Earth will require an integrated research and development effort by NASA s Human Research Program, engineering, and human factors groups. Limited abort and return options for an NEA mission are anticipated to have important effects on crew psychology as well as influence medical supplies and training requirements of the crew. Other important factors are those related to isolation, confinement, communication delays, autonomous operations, task design, small crew size, and even the unchanging view outside the windows for most of the mission. Geological properties of the NEA will influence design of sample handling and containment, and extravehicular activity capabilities including suit ports and tools. A robotic precursor mission that collects basic information on NEA surface properties would reduce uncertainty about these aspects of the mission as well as aid in design of mission architecture and exploration tasks.

Kundrot, Craig↗

NASA Operational Simulator for Small Satellites: Tools for Software Based Validation and Verification of Small Satellites

The NASA Operational Simulator for Small Satellites (NOS3) is a suite of tools to aid in areas such as software development, integration test (IT), mission operations training, verification and validation (VV), and software systems check-out. NOS3 provides a software development environment, a multi-target build system, an operator interface-ground station, dynamics and environment simulations, and software-based hardware models. NOS3 enables the development of flight software (FSW) early in the project life cycle, when access to hardware is typically not available. For small satellites there are extensive lead times on many of the commercial-off-the-shelf (COTS) components as well as limited funding for engineering test units (ETU). Considering the difficulty of providing a hardware test-bed to each developer tester, hardware models are modeled based upon characteristic data or manufacturers data sheets for each individual component. The fidelity of each hardware models is such that FSW executes unaware that physical hardware is not present. This allows binaries to be compiled for both the simulation environment, and the flight computer, without changing the FSW source code. For hardware models that provide data dependent on the environment, such as a GPS receiver or magnetometer, an open-source tool from NASA GSFC (42 Spacecraft Simulation) is used to provide the necessary data. The underlying infrastructure used to transfer messages between FSW and the hardware models can also be used to monitor, intercept, and inject messages, which has proven to be beneficial for VV of larger missions such as James Webb Space Telescope (JWST). As hardware is procured, drivers can be added to the environment to enable hardware-in-the-loop (HWIL) testing. When strict time synchronization is not vital, any number of combinations of hardware components and software-based models can be tested. The open-source operator interface used in NOS3 is COSMOS from Ball Aerospace. For testing, plug-ins are implemented in COSMOS to control the NOS3 simulations, while the command and telemetry tools available in COSMOS are used to communicate with FSW. NOS3 is actively being used for FSW development and component testing of the Simulation-to-Flight 1 (STF-1) CubeSat. As NOS3 matures, hardware models have been added for common CubeSat components such as Novatel GPS receivers, ClydeSpace electrical power systems and batteries, ISISpace antenna systems, etc. In the future, NASA IVV plans to distribute NOS3 to other CubeSat developers and release the suite to the open-source community.

Verification↗

New Mission Old Spacecraft: EPOXI's Approach to the Comet Hartley-2

NASA's Deep Impact mission ended successfully in 2005 after an impact and close flyby of the comet 9P/Tempel-1. The Flyby spacecraft was placed in hibernation and was left to orbit the sun. In 2007, engineers at the Jet Propulsion Laboratory brought the spacecraft out of hibernation and successfully performed two additional missions. These missions were EPOCh, Extra-solar Planetary Observation and Characterization, a photometric investigation of transiting exo-planets, and DIXI, Deep Impact eXtended Investigation, which maneuvered the Flyby spacecraft towards a close encounter with the comet 103P/Hartley- 2 on 4 November 2010. The names of these two scientific investigations combine to form the overarching mission's name, EPOXI. The encounter with 103P/Hartley-2 was vastly different from the prime mission's encounter with 9P/Tempel-1. The geometry of encounter was nearly 180 ? different and 103P/Hartley-2 was approximately one-quarter the size of 9P/Tempel-1. Mission operations for the comet flyby were broken into three phases: a) Approach, b) Encounter, and c) Departure. This paper will focus on the approach phase of the comet encounter. It will discuss the strategies used to decrease both cost and risk while maximizing science return and some of the challenges experienced during operations.

science return↗

Object oriented Simulation of Maintenance and Operations for Space Systems (OSMOSSYS)

This paper describes the NASA/JSC Research Technology Opportunity Program (RTOP) activity to assess the supportability of space systems throughout their life cycles. Supportability analyses for space systems present unique attributes and problems. The OSMOSSYS (Object oriented Simulation of Maintenance and Operations for Space Systems) was developed using object-oriented design concepts to provide NASA an analysis tool which addresses the question `Will a proposed space facility be able to successfully perform the missions for which it is designed?' This model integrates the complete configuration of the system including the reliability and maintainability characteristics of each component, the logistics support, and the mission operations of the facility to assess the success rate of the planned mission(s). Two parallel design processes are being utilized; developing core modules utilizing C++, and incorporating as much code and ideas as possible from existing NASA models. The space station was used as a test case to demonstrate the applicability of the model.

Doran, Linda↗

Plasma Oscillation Characterization of NASA's HERMeS Hall Thruster via High Speed Imaging

For missions beyond low Earth orbit, spacecraft size and mass can be dominated by onboard chemical propulsion systems and propellants that may constitute more than 50 percent of the spacecraft mass. This impact can be substantially reduced through the utilization of Solar Electric Propulsion (SEP) due to its substantially higher specific impulse. Studies performed for NASA's Human Exploration and Operations Mission Directorate and Science Mission Directorate have demonstrated that a 50kW-class SEP capability can be enabling for both near term and future architectures and science missions. A high-power SEP element is integral to the Evolvable Mars Campaign, which presents an approach to establish an affordable evolutionary human exploration architecture. To enable SEP missions at the power levels required for these applications, an in-space demonstration of an operational 50kW-class SEP spacecraft has been proposed as a SEP Technology Demonstration Mission (TDM). In 2010 NASA's Space Technology Mission Directorate (STMD) began developing high-power electric propulsion technologies. The maturation of these critical technologies has made mission concepts utilizing high-power SEP viable.

Ground Tests↗

Architecture assessment of HLLV candidates

Results of an architecture study of four Heavy Lift Launch Vehicles (HLLV) families are summarized, with attention given to civil, commercial, military and Space Exploration Initiative (SEI) applications. The Mars Exploration architecture is used as the SEI model baseline, and the architecture of each vehicle family is analyzed with respect to ground processing, launch operations, on-orbit operations, mission performance, and cost. For lunar missions, a 70-t earth-to-orbit (ETO) vehicle is shown to have definite cost advantages, with only small operational disadvantages, if the lunar program is small or medium in size. For Mars, a comparison of 150-t and 250-t ETO vehicles shows that little operational advantage is gained by going to the 250-t size.

Thompson, Walter E.↗

JPL process for tailoring mission assurance to specific projects

This document identifies a processs for tailoring Mission Assurance (MA) activities to JPL flight projects. These MA activities are to be accomplished during appropriate phases of projects involved in design, development, test, fabrication, launch and mission operations. MA is the responsibility of all participants on a project; it enhances their contribution to the success of the mission.

mission assurance↗

NASA 14 Day Undersea Missions: A Short-Duration Spaceflight Analog for Immune System Dysregulation

BACKGROUND Spaceflight-associated immune dysregulation (SAID) occurs during spaceflight and may represent specific clinical risks for exploration-class missions. An appropriate ground analog for spaceflight-associated immune dysregulation would offer a platform for ground-evaluation of various potential countermeasures. This study evaluated the NASA Undersea Mission Operations ( NEEMO ), consisting of 14 day undersea deployment at the Aquarius station, as an analog for SAID. Sixteen Aquanauts from missions NEEMO-12, 13 and 14 participated in the study. RESULTS Mid-mission alterations leukocyte distribution occurred, including granulocytosis and elevations in central-memory CD8+ T-cells. General T cell function was reduced during NEEMO missions in roughly 50% of subjects. Secreted cytokines profiles were evaluated following whole blood stimulation with CD3/CD28 (T cells) or LPS (monocytes). T cell production of IFNg, IL-5, IL-10, IL-2, TNFa and IL-6 were all reduced before and during the mission. Conversely, monocyte production of TNFa, IL-10, IL-6, IL-1b and IL-8 were elevated during mission, moreso at the MD-14 timepoint. Antibodies to Epstein-Barr virus (EBV) viral capsid antigen and early antigen were increased in approximately 40% of the subjects. Changes in EBV tetramer-positive CD8+ T-cells exhibited a variable pattern. Antibodies against Cytomegalovirus (CMV) were marginally increased during the mission. Herpesvirus reactivation was determined by PCR. EBV viral load was generally elevated at L-6. Higher levels of salivary EBV were found during the NEEMO mission than before and after as well as than the healthy controls. No VZV or CMV was found in any pre, during and after NEEMO mission or control samples. Plasma cortisol was elevated at L-6. CONCLUSION Unfortunately, L-6 may be too near to mission start to be an appropriate baseline measurement. The general immune changes in leukocyte distribution, T cell function, cytokine production, virus specific immunity and viral reactivation are similar to those observed during or following spaceflight. The NEEMO platform may thus have utility for short-duration, ground-based spaceflight-immune research, such as investigations of mechanism or countermeasures validation.

Crucian, B. E.↗

Impact-Seismic Investigations of the InSight Mission

Impact investigations will be an important aspect of the InSight mission. One of the scientific goals of the mission is a measurement of the current impact rate at Mars. Impacts will additionally inform the major goal of investigating the interior structure of Mars. In this paper, we review the current state of knowledge about seismic signals from impacts on the Earth, Moon, and laboratory experiments. We describe the generalized physical models that can be used to explain these signals. A discussion of the appropriate source time function for impacts is presented, along with spectral characteristics including the cutoff frequency and its dependence on impact momentum. Estimates of the seismic efficiency (ratio between seismic and impact energies) vary widely. Our preferred value for the seismic efficiency at Mars is 5 × 10−4, which we recommend using until we can measure it during the InSight mission, when seismic moments are not used directly. Effects of the material properties at the impact point and at the seismometer location are considered. We also discuss the processes by which airbursts and acoustic waves emanate from bolides, and the feasibility of detecting such signals. We then consider the case of impacts on Mars. A review is given of the current knowledge of present-day cratering on Mars: the current impact rate, characteristics of those impactors such as velocity and directions, and the morphologies of the craters those impactors create. Several methods of scaling crater size to impact energy are presented. The Martian atmosphere, although thin, will cause fragmentation of impactors, with implications for the resulting seismic signals. We also benchmark several different seismic modeling codes to be used in analysis of impact detections, and those codes are used to explore the seismic amplitude of impactinduced signals as a function of distance from the impact site. We predict a measurement of the current impact flux will be possible within the timeframe of the prime mission (one Mars year) with the detection of ∼ a few to several tens of impacts. However, the error bars on these predictions are large. Specific to the InSight mission, we list discriminators of seismic signals from impacts that will be used to distinguish them from marsquakes. We describe the role of the InSight Impacts Science Theme Group during mission operations, including a plan for possible night-time meteor imaging. The impacts detected by these methods during the InSight mission will be used to improve interior structure models, measure the seismic efficiency, and calculate the size frequency distribution of current impacts.

Ingrid Daubar↗

XL-Calibur - a second-generation balloon-borne hard X-ray polarimetry mission

XL-Calibur is a hard X-ray (15-80 keV) polarimetry mission operating from a stabilised balloon-borne platform in the stratosphere. It builds on heritage from the X-Calibur mission, which observed the accreting neutron star GX 301−2 from Antarctica, between December 29th 2018 and January 1st 2019. The XL-Calibur design incorporates an X-ray mirror, which focusses X-rays onto a polarimeter comprising a beryllium rod surrounded by Cadmium Zinc Telluride (CZT) detectors. The polarimeter is housed in an anticoincidence shield to mitigate background from particles present in the stratosphere. The mirror and polarimeter-shield assembly are mounted at opposite ends of a12 m long lightweight truss, which is pointed with arcsecond precision by WASP – the Wallops Arc Second Pointer. TheXL-Calibur mission will achieve a substantially improved sensitivity over X-Caliburby using a larger effective area X-ray mirror, reducing background through thinner CZT detectors, and improved anticoincidence shielding. When observing a 1 Crab source for t(day) days, the Minimum Detectable Polarisation (at 99% confidence level) is∼2%·t−1/2day. The energy resolution at 40 keV is∼5.9 keV. The aim of this paper is to describe the design and performance of the XL-Calibur mission, as well as the foreseen science programme.

Q Abarr↗

Mars Relay Operations Service (MaROS): A Present Service Preparing for the Future

The Mars Relay Operations Service (MaROS) has been deployed by NASA's Mars Program Office and the Multimission Ground Systems and Services (MGSS) Project into mission operations to aid in the coordination of relay activities at Mars. This live system presents standardized interfaces and a centralized infrastructure to current and future participants in the Mars Relay Network for the purpose of reliably and securely exchanging and storing all relay-related planning and operations data. The initial development of this system leveraged over eight years of experience performing relay operations between the various spacecraft at Mars. Now, four years after its initial deployment, MaROS continues to undergo further refinement to better meet the needs of the Mars Relay Network. The most substantial, recent update was focused on providing capabilities needed by the Mars Science Laboratory project, which landed on Mars in August of 2012. This paper will describe the nature of that update and describe additional features being added to the system to better serve the needs of current and future Mars missions.

Gladden, Roy E.↗

International Space Station Multi-Element Integrated Test

The International Space Station offers a unique challenge for integrated testing since the entire station is not launched as an integrated vehicle. The ISS design evolved for over 10 years from the station Freedom program that was based on a "ship and shoot" approach. Ship and shoot assumed the program would accept the hardware for launch and integrate the vehicle on orbit without any ground element-to-element integrated testing. Element-to-Element powered-on integrated testing is needed to identify operational problems on the ground rather than once the hardware is on orbit. The industry is accustomed to testing an integrated vehicle and then verifying it is ready for its operational missions. These tests require ground element emulators to represent on-orbit elements. The ISS Multi-Element Integrated Tests (MEIT) are element-to-element integrated tests bringing together hardware representing several flights. The major purpose of these tests is: 1) Element-to-Element interface compatibility, 2) Systems end-to-end operability and functionality and 3) utilize on-orbit procedures with the crew and mission control center. Execution of these tests is critical since the hardware is available for only a limited period of time. Test configurations are defined which test specific interfaces or functionality. These tests develop operational confidence in the Element-to-Element interfaces and identify major problems on the ground to avoid on-orbit anomalies that could threaten mission success, element survivability or assembly activities. This paper addresses the MEIT process, configurations and lessons-learned from these tests.

Filler, Russell E.↗

Extravehicular Activity Testing in Analog Environments: Evaluating the Effects of Center of Gravity and Environment on Human Performance

The EVA Physiology, Systems and Performance (EPSP) Project is performing tests in different analog environments to understand human performance during Extravehicular Activity (EVA) with the aim of developing more safe and efficient systems for lunar exploration missions and the Constellation Program. The project is characterizing human EVA performance in studies using several test beds, including the underwater NASA Extreme Environment Mission Operations (NEEMO) and Neutral Buoyancy Laboratory (NBL) facilities, JSC fs Partial Gravity Simulator (POGO), and the NASA Reduced Gravity Office (RGO) parabolic flight aircraft. Using these varied testing environments, NASA can gain a more complete understanding of human performance issues related to EVA and the limitations of each testing environment. Tests are focused on identifying and understanding the EVA system factors that affect human performance such as center of gravity (CG), inertial mass, ground reaction forces (GRF), suit weight, and suit pressure. The test results will lead to the development of lunar EVA systems operations concepts and design requirements that optimize human performance and exploration capabilities. METHODS: Tests were conducted in the NBL and during NEEMO missions in the NOAA Aquarius Habitat. A reconfigurable back pack with repositionable mass was used to simulate Perfect, Low, Forward, High, Aft and NASA Baseline CG locations. Subjects performed simulated exploration tasks that included ambulation, kneel and recovery, rock pick-up, and shoveling. Testing using POGO, that simulates partial gravity via pneumatic weight offload system and a similar reconfigurable rig, is underway for a subset of the same tasks. Additionally, test trials are being performed on the RGO parabolic flight aircraft. Subject performance was assessed using a modified Cooper-Harper scale to assess operator compensation required to achieve desired performance. All CG locations are based on the assumption of a standardized 6 ft 180 lb subject. RESULTS: The modified Cooper-Harper Scale assesses desired task performance described as performance in a reduced gravity environment as compared to a 1G environment. Modified Cooper-Harper ratings of . 3 indicate no improvements are needed, ratings of 4-6 indicate improvements are desirable, and ratings . 7 indicate improvements are mandatory. DISCUSSION: Differences were noted in suited CH results based on environment at the same CG and suit pressure. Additionally, results suggest that CG location affects unsuited human performance. Subjects preferred locations near their natural CG over those that are high, aft, or a combination of high and aft. Further testing and analyses are planned to compare these unsuited results to suited performance.

Gernhardt, M.L.↗

Curiosity's Autonomous Surface Safing Behavior Design

The safing routines on all robotic deep-space vehicles are designed to put the vehicle in a power and thermally safe configuration, enabling communication with the mission operators on Earth. Achieving this goal is made a little more difficult on Curiosity because the power requirements for the core avionics and the telecommunication equipment exceed the capability of the single power source, the Multi-Mission Radioisotope Thermoelectric Generator. This drove the system design to create an operational mode, called "sleep mode", where the vehicle turns off most of the loads in order to charge the two Li-ion batteries. The system must keep the vehicle safe from over-heat and under-heat conditions, battery cell failures, under-voltage conditions, and clock failures, both while the computer is running and while the system is sleeping. The other goal of a safing routine is to communicate. On most spacecraft, this simply involves turning on the receiver and transmitter continuously. For Curiosity, Earth is above the horizon only a part of the day for direct communication to the Earth, and the orbiter overpass opportunities only occur a few times a day. The design must robustly place the Rover in a communicable condition at the correct time. This paper discusses Curiosity's autonomous safing behavior and describes how the vehicle remains power and thermally safe while sleeping, as well as a description of how the Rover communicates with the orbiters and Earth at specific times.

MSL↗

Compatibility of TOPEX/Poseidon trajectory propagation with JPL and GSFC/FDF operational software

Two independent trajectory software systems are used to perform the TOPEX/Poseidon operational orbit determination and propagation: the Goddard Trajectory Determination System (GTDS) at the GSF/FDF and the Double Precision Trajectory System (DPTRAJ) at JPL. GTDS is used for operational tracking and TDRS-based orbit determination. DPTRAJ is used for ephemeris generation necessary to conduct day-to-day mission operations. This paper describes the DPTRAJ/GTDS trajectory comparison analysis conducted jointly by JPL and GSFC to ensure the compatibility of these two independent trajectory software systems.

Salama, Ahmed↗