Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integrated Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Assessing urbanized area expansion through the integration of Landsat and conventional data /79052/

An image base information system (IBIS) is utilized to integrate Landsat and census data for the purpose of mapping urban land and updating urbanized-area outer lines. IBIS is a subset of the video image communication and retrieval digital image processing system developed at JPL. IBIS is used to analyze three urban areas: Orlando, Florida; Seattle, Washington; and Boston, Massachusetts. In all three applications the primary objective is to map the expansion of urban land cover in the urban fringe. Pertinent tabular reports are produced.

Davis, J. B.↗

Integration of Space Station propulsion and fluid systems

The benefits which would be gained by providing commonality and integration of propulsion and fluid systems associated with various elements of the Space Station are discussed and the results of the integrated propulsion system assessment are presented. The O2/H2 propulsion system with and without resistojets, the integration of O2/H2 systems across the Space Station elements, and an approach for handling waste fluids available for resistojet venting are evaluated. It is shown that major benefits can be gained through commonality and integration. Several systems are recommended, including a gaseous O2/H2 propulsion system with resistojets, a Bosch CO2 reduction process, and pumping electrolysis units.

Bicknell, B. A.↗

Baseline Assessment and Prioritization Framework for IVHM Integrity Assurance Enabling Capabilities

Fundamental to vehicle health management is the deployment of systems incorporating advanced technologies for predicting and detecting anomalous conditions in highly complex and integrated environments. Integrated structural integrity health monitoring, statistical algorithms for detection, estimation, prediction, and fusion, and diagnosis supporting adaptive control are examples of advanced technologies that present considerable verification and validation challenges. These systems necessitate interactions between physical and software-based systems that are highly networked with sensing and actuation subsystems, and incorporate technologies that are, in many respects, different from those employed in civil aviation today. A formidable barrier to deploying these advanced technologies in civil aviation is the lack of enabling verification and validation tools, methods, and technologies. The development of new verification and validation capabilities will not only enable the fielding of advanced vehicle health management systems, but will also provide new assurance capabilities for verification and validation of current generation aviation software which has been implicated in anomalous in-flight behavior. This paper describes the research focused on enabling capabilities for verification and validation underway within NASA s Integrated Vehicle Health Management project, discusses the state of the art of these capabilities, and includes a framework for prioritizing activities.

Cooper, Eric G.↗

An Assessment of Supercritical CO2 Power Cycles Integrated with Generic Heat Sources (Presentation)

Presentation for the 4th sCO2 Symposium Presentation (2014). Presented is a detailed analysis of the supercritical CO2 (sCO2) recompression Brayton cycle to better understand at a fundamental level the dependence of the cycle performance on operating conditions. The focus of this study is on cycle performance, particularly efficiency. No cost estimates were performed. However, a number of indirect measures of cycle cost were examined to provide an indication of whether the operating conditions were in a region of great cost sensitivity. In this study, a sCO2 recompression cycle is described and a set of baseline operating conditions proposed. The heat source for the study was considered generic or agnostic. No temperature value, temperature range, or heat flux was assumed to limit cycle design.

Generic heat source↗

An Assessment of Supercritical CO2 Power Cycles Integrated with Generic Heat Sources (Report)

Paper for the 4th sCO2 Symposium. (2014). This paper documents a detailed analysis of the supercritical CO2 (sCO2) recompression Brayton cycle to better understand at a fundamental level the dependence of the cycle performance on operating conditions. The focus of this study is on cycle performance, particularly efficiency. No cost estimates were performed. However, a number of indirect measures of cycle cost were examined to provide an indication of whether the operating conditions were in a region of great cost sensitivity. In this study, a sCO2 recompression cycle is described and a set of baseline operating conditions proposed. The heat source for the study was considered generic or agnostic. No temperature value, temperature range, or heat flux was assumed to limit cycle design.

Generic heat source↗

Offshore Advanced Infrastructure Integrity Model (AIIM) Dashboard

The Advanced Infrastructure Integrity Model (AIIM) is a multivariate, multi-machine learning modeling technology applied to evaluate the integrity of offshore energy infrastructure (e.g., pipelines, platforms) in the U.S Gulf Region. Offshore energy infrastructure plays an essential role in ensuring access to safe and secure energy for the United States. According to the U.S. Energy Information Administration (EIA), production in the U.S. Gulf Region accounts for 15% of total crude and 5% of total natural gas from the United States. Many of these structures have been operating for close to or past their design life, while others have the chance of attrition before return on investment. To better understand the potential for reuse or life extension opportunities, an assessment of the infrastructure integrity is critical to inform safe decision making. Assessing structural integrity, AIIM provides key insights that inform infrastructure use and reuse, as well as hazard prevention planning, in support of stakeholders including researchers and industry.

Advanced Infrastructure Integrity Model↗

PacWave South SeaRAY k2 Risk Registers

The SeaRAY is a deployable power system for maritime sensors, monitoring equipment, communications, unmanned underwater vehicles, and other similar payloads. This project is to design, deliver, and test a prototype low-power WEC that lowers the total cost of ownership and provides robust, new capabilities for customers in the maritime environment. Failure Modes, Effects, and Criticality Analysis (FMECA) is conducted to systematically identify all potential failure modes and their effects on the system, and to analyze the criticality of each risk based on the likelihood of the event and the severity of the impact. Actions may then be recommended to mitigate the criticality of a risk, either by reducing the likelihood of the risk or the severity of its impact. Risk assessment is executed iteratively as an integral part of the design process. By incorporating risk assessment early in the development cycle, mitigation of risk can be achieved cost effectively. The actions recommended to mitigate risk may be subsequently executed, and as the design progresses the risk assessment is reviewed and revised. Review of the risk assessment is integrated into structured design reviews, ensuring that critical risks are comprehended and that the Project will not progress to e.g. fabrication while intolerable risks remain. The risk assessment process results in the population and maintenance of Risk Registers (RRs). Each major system (and as needed, subsystem) will have a distinct RR. This allows each system or subsystem to be assessed individually, rendering the RRs to a manageable size for review.

16 TIDAL AND WAVE POWER↗

IMPECCABLE: Integrated Modeling Pipeline for COVID Cure by Assessing Better Leads

ABSTRACT The drug discovery process currently employed in the pharmaceutical industry typically requires about 10 years and $2-3 billion to deliver one new drug. This is both too expensive and too slow, especially in emergencies like the COVID-19 pandemic. In silico methodologies need to be improved both to select better lead compounds, so as to improve the efficiency of later stages in the drug discovery protocol, and to identify those lead compounds more quickly. No known methodological approach can deliver this combination of higher quality and speed. Here, we describe an Integrated Modeling PipEline for COVID Cure by Assessing Better LEads (IMPECCABLE) that employs multiple methodological innovations to overcome this fundamental limitation. We also describe the computational framework that we have developed to support these innovations at scale, and characterize the performance of this framework in terms of throughput, peak performance, and scientific results. We show that individual workflow components deliver 100× to 1000× improvement over traditional methods, and that the integration of methods, supported by scalable infrastructure, speeds up drug discovery by orders of magnitudes. IMPECCABLE has screened ~10 11 ligands and has been used to discover a promising drug candidate. These capabilities have been used by the US DOE National Virtual Biotechnology Laboratory and the EU Centre of Excellence in Computational Biomedicine.

97 MATHEMATICS AND COMPUTING↗