Feasibility Study for Crystal Shadowing in 8GeV Slow Extraction at Fermilab
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This presentation provides an overview of ultralow temperature.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The measurement of beam emittances by extracting the quadrupole mode signal from a 4 plate beam position monitor (BPM) was published at least 40 years ago. Unfortunately, in practice, this method suffers from poor signal to noise ratio and requires a lot of tuning to extract out the emittances. In this paper, an improved method where multiple BPMs are used together with better mathematical analysis is described. The BPM derived emittances are then compared with those measured by the Ion Profile Monitor (IPM). Surprisingly, the BPM measured emittances behave very well and are more realistic than those measured by the IPM.
The FNAL Booster is a fast cycling 15 Hz resonant circuit synchrotron accelerating proton beam from 400 MeV to 8 GeV. The linac pulse injected into the Booster is ˜32 usec long and fills the ring by multi-turn charge-exchange injection. As part of the PIP-II project, the Booster injection energy and repetition rate will be increased to 800 MeV and 20 Hz respectively. Due to much reduced average current in the new superconducting PIP-II linac, the injection time will increase to 550us. A shorter machine cycle coupled to a longer injection time make flattening the injection porch B-field during injection important requirement for successful PIP-II operation. We aim to achieve: (1) flattening of the net bending during injection using dipole correctors, and (2) using a new system based on an Altera FPGA board, reduction of the cycle-to-cycle bending field variation caused by current jitter in the Gradient Magnet Power Supply (GMPS). While the flat injection scheme is essential to future PIP-II operations, it should also noticeably improve efficiency for present HEP operations.
The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling Booster synchrotron will be doubled by raising the machine cycle frequency from 15 to 20 Hz and by increasing the injected beam intensity by a factor 1.5. This has to be accomplished without raising uncontrolled losses beyond the administrative limit of 500 W. In addition, slip-stacking efficiency in the Recycler, the next machine in the accelerator chain, sets an upper limit on the longitudinal emittance of the beam delivered by the Booster. As part of an effort to better understand potential losses and emittance blow-up in the Booster, we have been conducting full cycle 6D simulations using the code PyORBIT. The simulations include space charge, wall impedance effects and transition crossing. In this paper, we discuss our experience with the code and present representative results for possible operational scenarios.
Explore the source record for details and available documents.
CMS Progress and Commissioning * First Beam * Cosmic Runs * Computing * Remote Operations * ConclusionsCMS Upgrade for SLHC * Upgrade Plans for subcomponents * 2008/9 activities * R&D budget * ConclusionsPhysics Activities and LHC Physics Center -> Chris' talk
The Muon g-2 Experiment has achieved a significant milestone by measuring the positive muon anomalous magnetic moment to an unprecedented accuracy of 0.20 ppm, paving the way to a better understanding of particle physics, including beyond-the-Standard-Model possibilities. In the experiment, muons are circulated within a storage ring, and their anomalous precession frequency — the spin precession relative to momentum — is determined from decay positron time and energy data, captured using calorimeters. In support of accurate storage ring simulations, we performed high-order calculations of the field of the experiment's high-voltage quadrupoles. We also carried out accurate, transfer map–based calculations of the storage ring's chromaticity. These calculations are essential for understanding the beam dynamics effects in the Muon g-2 storage ring.