Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Fifty-Five Gallon Drum Standard Study

Fifty-five gallon drums are routinely used within the U.S. for the storage and eventual disposal of fissionable materials as Transuranic or low-level waste. To support these operations, criticality safety evaluations are required. A questionnaire was developed and sent to selected Endusers at Hanford, Idaho National Laboratory, Lawrence Livermore National Laboratory, Oak Ridge and the Savannah River Site to solicit current practices. This questionnaire was used to gather information on the kinds of fissionable materials packaged into drums, the models used in performing criticality safety evaluations in support of operations involving these drums, and the limits and controls established for the handling and storage of these drums. The completed questionnaires were reviewed and clarifications solicited through individual communications with each Enduser to obtain more complete and consistent responses. All five sites have similar drum operations involving thousands to tens of thousands of fissionable material waste drums. The primary sources for these drums are legacy (prior operations) and decontamination and decommissioning wastes at all sites except Lawrence Livermore National Laboratory. The results from this survey and our review are discussed in this paper.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

300 AREA URANIUM CONTAMINATION

{sm_bullet} Uranium fuel production {sm_bullet} Test reactor and separations experiments {sm_bullet} Animal and radiobiology experiments conducted at the. 331 Laboratory Complex {sm_bullet} .Deactivation, decontamination, decommissioning,. and demolition of 300 Area facilities

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Underground collocation of nuclear power plant reactors and repository to facilitate the post-renaissance expansion of nuclear power

Underground collocation of nuclear power reactors and the nuclear waste management facilities supporting those reactors, termed an underground nuclear park (UNP), appears to have several advantages compared to the conventional approach to siting reactors and waste management facilities. These advantages include the potential to lower reactor capital and operating cost, lower nuclear waste management cost, and increase margins of physical security and safety. Envirorunental impacts related to worker health, facility accidents, waste transportation, and sabotage and terrorism appear to be lower for UNPs compared to the current approach. In-place decommissioning ofUNP reactors appears to have cost, safety, envirorunental and waste disposal advantages. The UNP approach has the potential to lead to greater public acceptance for the deployment of new power reactors. Use of the UNP during the post-nuclear renaissance time frame has the potential to enable a greater expansion of U.S. nuclear power generation than might otherwise result. Technical and economic aspects of the UNP concept need more study to determine the viability of the concept.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

LCA (Life Cycle Assessment) of Parabolic Trough CSP: Materials Inventory and Embodied GHG Emissions from Two-Tank Indirect and Thermocline Thermal Storage (Presentation)

In the United States, concentrating solar power (CSP) is one of the most promising renewable energy (RE) technologies for reduction of electric sector greenhouse gas (GHG) emissions and for rapid capacity expansion. It is also one of the most price-competitive RE technologies, thanks in large measure to decades of field experience and consistent improvements in design. One of the key design features that makes CSP more attractive than many other RE technologies, like solar photovoltaics and wind, is the potential for including relatively low-cost and efficient thermal energy storage (TES), which can smooth the daily fluctuation of electricity production and extend its duration into the evening peak hours or longer. Because operational environmental burdens are typically small for RE technologies, life cycle assessment (LCA) is recognized as the most appropriate analytical approach for determining their environmental impacts of these technologies, including CSP. An LCA accounts for impacts from all stages in the development, operation, and decommissioning of a CSP plant, including such upstream stages as the extraction of raw materials used in system components, manufacturing of those components, and construction of the plant. The National Renewable Energy Laboratory (NREL) is undertaking an LCA of modern CSP plants, starting with those of parabolic trough design.

14 SOLAR ENERGY↗

Behavior-Based Assists for Telerobotic Manipulation

Teleoperated manipulation has been a critical tool in hazardous operations where the presence of humans has been precluded since the early days of nuclear material handling. Performance levels and limitations were understood and accepted. However, in the current era of decontamination and decommissioning (D&D) of facilities owned by the U.S. Department of Energy, there has been criticism that traditional remote systems are too expensive, too slow, and too difficult to use by cost-driven demolition companies. Previous research in telerobotics has attempted to alleviate some of these issues; however, it has been difficult to get capabilities generated in the research lab into the field. One major difficulty is the severely unstructured environments found in real D&D type environments. Behavior-based robotics (BBR) is based on concepts specifically designed to permit autonomous robots to function in unstructured environments. BBR schemes use sensor data to interact with the world directly rather than to generate models that are manipulated. Because the robot is immersed in its environment and since sensors are mounted on the robot, sensing and motion are inherently calibrated with respect to the robot. This paper presents a behavior-based approach and architecture for executing telerobotic D&D type tooling tasks.

42 ENGINEERING↗

SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford nuclear reservation. Workers had to pass through metal detectors when they arrived at the plant and materials leaving the plant had to be scanned for security reasons. Whereas other high-security nuclear materials were shipped from the PFP to Savannah River, S.C. as part ofa Department of Energy (DOE) program to consolidate weapons-grade plutonium, it was determined that the SIF should remain onsite pending disposition to a national repository. Nevertheless, the SIF still requires a high level of security that the PFP complex has always provided. With the 60-year PFP mission of producing and storing plutonium concluded, the environmental cleanup plans for Hanford call for the demolition of the 63-building PFP complex. Consequently, if the SIF remained at PFP it not only would have interfered with the environmental cleanup plans, but would have required $100 million in facility upgrades to meet increased national security requirements imposed after the 9/11 terrorist attacks. A new smaller and more cost-effective area was needed to store this material, which led to the SIF Project. Once the SIF project was successfully completed and the SIF was safely removed from PFP, the existing Protected Area at PFP could be removed, and demolition could proceed more quickly without being encumbered by restrictive security requirements that an active Protected Area requires. The lightened PFP security level brought by safely removing and storing the SIF would also yield lowered costs for deactivation and demolition, as well as reduce overall life-cycle costs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RADBALL TECHNOLOGY TESTING FOR HOT CELL CHARACTERIZATION

Operations at various U.S. Department of Energy sites have resulted in substantial radiological contamination of tools, equipment, and facilities. It is essential to use remote technologies for characterization and decommissioning to keep worker exposures as low as reasonably achievable in these highly contaminated environments. A significant initial step in planning and implementing D&D of contaminated facilities involves the development of an accurate assessment of the radiological, chemical, and structural conditions inside of the facilities. Collected information describing facility conditions using remote technologies could reduce the conservatism associated with planning initial worker entry (and associated cost).

42 ENGINEERING↗

The Ural Electrochemical Integrated Plant Sustainability Program of Nuclear Material Protection, Control and Accounting System Upgrades

UEIP has been working on a comprehensive sustainability program that includes establishing a site sustainability working group, information gathering, planning, organizing, developing schedule and estimated costs, trhough joint UEIP-US DOE/NNSA National Laboratory sustainability contracts. Considerable efforts have been necessary in the sustainability planning, monitoring, and control of the scope of work using tools such as Microsoft Excel, Microsoft Project and SAP R/3. While information interchanges within the sustainability program provides adequate US assurances that US funds are well spent through its quarterly reporting methodology, proper information security and protection measures are taken throughout the process. Decommissioning of outdated equipment has also become part of determining sustainability requirements and processes. The site’s sustainability program has facilitated the development of a transition plan toward eventual full Russian funding of sustaining nuclear security upgrades.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Calculating a minimum overlap period for successful intercalibration of soil moisture sensors

Abstract Long‐term in situ soil moisture monitoring inevitably requires sensors to be replaced. Ensuing discontinuities in the data record can be mitigated by intercalibration, however it is unclear how long the existing sensor needs to remain alongside the newly installed before there is enough overlapping data to generate a robust intercalibration. We used 154 pairs of established and newly installed sensors within the Marena, Oklahoma, In Situ Sensor Testbed to determine if there is a minimum overlap time that should be considered when planning upcoming replacements. Hourly observations of the existing sensor were linearly calibrated to those of the newly installed sensor with coefficients determined from overlap periods incremented by 30 days until a reference period of 2 years was reached. The resulting bias, root‐mean‐square error, and correlation coefficient for sensor pairs indicate that a minimum of 6 to 9 months of overlapping data are required to generate a successful intercalibration. Extending that to a full year before decommissioning the old sensor results in a stable intercalibration with higher confidence.

Agriculture↗

Digital Twins for Nuclear Power Plants and Facilities

The nuclear digital twin (DT) is the virtual representation of a nuclear energy system across its lifecycle. The nuclear DT uses real-time information and other data sources to improve the process of design, licensing, construction, security, O&M, decommissioning, and waste disposal. By leveraging the knowledge base and experience from the past 40 years of LWR operation, the nuclear DT is helping to accelerate the development and deployment of advanced nuclear technology in areas of passive safety, new fuel forms, instrumentation, and reactor control. For the currently operating nuclear fleet, DTs are reducing the operational risks, increasing plant availability, increasing energy capability, and reducing electricity production costs. For advanced fission and fusion reactors, DTs are being used to design for passive safety and built-in security-by-design. Rapidly deployable small modular reactor (SMR) and microreactor designs compatible with modular construction techniques and advanced manufacturing will be the new normal, reducing the need for large capital expenditures and compressing construction schedules. In addition, lower operational and maintenance costs will be realized by reducing the complexity of operations, staffing needs, and maintenance-related activities.

Kropaczek, Dave↗

TANDEM: a mutual cooperation effort for transactinide nuclear data evaluation and measurement

Here, the need for accurate nuclear reaction data of actinides is well documented and several initiatives from international organizations for improvement have been initiated in the past. This need, particularly in view of method development for non-destructive assay of nuclear waste, has generated a joint effort to use prompt and delayed neutron activation techniques to enhance nuclear capture data of some long lived actinides such as 237 Np, 242 Pu and 241 Am in the frame of a multilateral cooperation. This research initiative is targeted to lay grounds for the development of a non-destructive active neutron interrogation technique to quantify actinides in mixed waste and residues from decommissioning of nuclear installations for safe treatment and storage of such materials.

42 ENGINEERING↗

Rapid method to determine 89 Sr/ 90 Sr in large concrete samples

Here, a new rapid method has been developed that provides high quality low-level measurements of 89,90 Sr in concrete samples with an MDA (Minimum Detectable Activity) of <1 mBq g -1 . The new method is fast, meets new decommissioning regulatory limits and is robust even if refractory particles are present. The method utilizes a rapid fusion to ensure total dissolution of samples and rapid preconcentration and separation of 89,90 Sr from 5-10 g concrete samples. When, the 89 Sr/ 90 Sr ratio is high, Sr can be isolated from up to 5g concrete samples, total 89/90 Sr measured, and then 90Sr determined via 90 Y separated after a period of ingrowth. Another approach allows the immediate determination of 90 Sr in 10 g concrete aliquots without waiting for 90 Y ingrowth, in instances where the shorter lived 89 Sr is unlikely to be encountered.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Removable coatings: Thermal stability and decontamination of steel surfaces from 241 Am

This study presents a comparative analysis of several strippable materials for decontamination of steel surfaces from 241 Am. The strippable coatings were chosen to have a history of application, to be commercially available, easily handled and have different composition and formulation. Carbon steel and stainless steel surfaces (coupons) were utilized as the most representative industrial materials, and the experimental series were expanded to include the rusting treatment of these surfaces as it is common for decommissioned old nuclear facilities. The experiments followed the path of pre-screening of the strippable materials (easiness of application, peeling etc.), their characterization with Fourier-transform infrared (FTIR) spectroscopy and thermogravimetric analysis (TGA), decontamination factors (DF) or removal efficiencies for different types of steel surfaces, and enhancement of the removal efficiencies of the select strippable coatings via amendment with EDTA. As a result, DF and removal efficiencies for stainless steel (both pristine and with rusting treatment) are higher than for pristine carbon steel, and decontamination factors and removal efficiencies are higher for pristine than for rusted carbon steel across all the coatings. It is also shown that EDTA amendment can improve DF and removal efficiency for a strippable coating (i.e., CC Strip), however other factors should also be considered. Thus, the coating CC Strip exhibited easiness in handling and high DF (up to 97% when EDTA-amended), but its drying period was the longest among the rest of the materials and its thermal decomposition indicates on a risk of intense release of heat in case of a fire event.

36 MATERIALS SCIENCE↗

Isotope harvesting from a NSCL beam blocker: Isolation of 173,174 lu

A decommissioned beam blocker from the National Superconducting Cyclotron Laboratory was processed for recovery of long-lived Lu radioisotopes at Lawrence Livermore National Laboratory. The beam blocker was a W alloy that had built up considerable levels of activation from high energy particle irradiation over the course of 20 years. The isolation of 173,174 Lu from the bulk material required a complex chemical separation scheme due to the large mass and the wide variety of elements present. The final yield of 173,174 Lu was 76.7 ± 4.8% with an extremely high radiopurity and chemical purity. The reduction in W mass from the initial material to the final sample was 8 × 10 10 . In conclusion, the results show great promise for extracting large quantities of Lu radioisotopes from these types of W beam blockers at the Facility for Rare Isotope Beams, which will be irradiated at levels significantly higher than the beam blocker investigated here.

and nuclear chemistry↗

Disjunctive optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems

This paper proposes a new optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems. The model optimizes both investment decisions (e.g., size, location, and time to install, retire and decommission facilities) and operation decisions (e.g., on/off status, operating capacity, and expected power output). It is also able to optimize reserve systems (or backup systems), as well as the main systems, to improve power systems reliability. An impact of operational strategies of generators (i.e., participating in electricity production vs. remaining as idle units during operation) on power systems reliability is considered. Probability of equipment failures and capacity failure states are used to rigorously estimate the power systems reliability depending on design and operation strategies. The optimization model is formulated with Generalized Disjunctive Programming (GDP), which is reformulated as a mixed-integer linear programming (MILP) model using the Hull relaxation. Two reliability-related penalties, such as downtime penalty and unmet demand penalty, are included in the objective function to maximize reliability while minimizing the total net present cost. Furthermore, a bilevel decomposition with tailored cuts is developed to reduce computational times of the multi-scale optimization model. The effectiveness of the proposed model is shown by comparing the results with the results obtained from the expansion planning models that do not explicitly consider reliability. In conclusion, we also show that the proposed bilevel decomposition is computationally efficient for solving large scale problems through 5-years and 10-years planning case studies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sulfuric Acid Improves the Reactivity of Zeolites via Dealumination

The demand for supplementary cementitious materials (SCMs), like fly ash, slag, and silica fume, is projected to rise over the next few decades. However, global decarbonization efforts, such as decommissioning of coal-fired power plants, will limit the supply of SCMs. Therefore, alternative SCM sources are a critical need for the cement and concrete industry. However, the high crystallinity of zeolites limits their pozzolanic reactivity. The goal of this work was to improve the reactivity of two common zeolites, namely clinoptilolite and SSZ-13, by treating them with sulfuric acid. The treatment enhanced zeolite reactivity via dealumination and decreased particle sizes, which led to increased reactivity with calcium hydroxide, as indicated by a 42.0% increase in reaction heat measured by isothermal calorimetry. Here, we elucidate mechanistic understanding that smaller particle sizes induced by acid treatment accelerated peak heat evolution, while free aluminates from dealumination increased heat via direct reaction with aqueous Ca 2+ .

36 MATERIALS SCIENCE↗

Water intensity of photovoltaic module manufacturing at the terawatt scale

As the U.S. ramps photovoltaic (PV) manufacturing to the terawatt scale and emphasizes re-shoring manufacturing, potential regional impacts on the U.S. water supply should be considered, particularly since many PV companies rely almost exclusively on public water supplies for manufacturing. This work surveys the academic literature and PV manufacturer reports to estimate the water intensity of monocrystalline silicon, multicrystalline silicon, and cadmium telluride modules manufactured at the terawatt scale, determining that on average, cadmium telluride manufacturing is less water intensive on a per megawatt scale – this is anticipated to be true for all thin film PV manufacturing. While much lower than the water intensity of thermoelectric (e.g., coal) energy generation, significant issues and gaps with PV manufacturing data quality in academic studies are identified which cause estimates to vary by over 1000x (0.04 – 49 trillion liters/terawatt). Data issues are discussed and the need for accurate accounting of water resources (e.g., via continuous, updated information during PV manufacturing) is highlighted. The opportunity to reconfigure decommissioned thermoelectric sites to PV manufacturing is also explored. Finally, factors that influence PV manufacturing water intensity, from individual manufacturing steps to trends across the PV industry, are examined and water conservation opportunities are presented.

14 SOLAR ENERGY↗

Measures of the environmental footprint of the front end of the nuclear fuel cycle

Previous estimates of environmental impacts associated with the front end of the nuclear fuel cycle (FEFC) have focused primarily on energy consumption and CO2 emissions. Results have varied widely. This work builds upon reports from operating facilities and other primary data sources to build a database of front end environmental impacts. This work also addresses land transformation and water withdrawals associated with the processes of the FEFC. These processes include uranium extraction, conversion, enrichment, fuel fabrication, depleted uranium disposition, and transportation. To allow summing the impacts across processes, all impacts were normalized per tonne of natural uranium mined as well as per MWh(e) of electricity produced, a more conventional unit for measuring environmental impacts that facilitates comparison with other studies. This conversion was based on mass balances and process efficiencies associated with the current once-through LWR fuel cycle. Total energy input is calculated at 8.7 x 10- 3 GJ(e)/MWh(e) of electricity and 5.9 x 10- 3 GJ(t)/MWh(e) of thermal energy. It is dominated by the energy required for uranium extraction, conversion to fluoride compound for subsequent enrichment, and enrichment. An estimate of the carbon footprint is made from the direct energy consumption at 1.7 kg CO2/MWh(e). Water use is likewise dominated by requirements of uranium extraction, totaling 154 L/MWh(e). Land use is calculated at 8 x 10- 3 m2/MWh(e), over 90% of which is due to uranium extraction. Quantified impacts are limited to those resulting from activities performed within the FEFC process facilities (i.e. within the plant gates). Energy embodied in material inputs such as process chemicals and fuel cladding is identified but not explicitly quantified in this study. Inclusion of indirect energy associated with embodied energy as well as construction and decommissioning of facilities could increase the FEFC energy intensity estimate by a factor of up to 2.

99 GENERAL AND MISCELLANEOUS↗