SATS Enhanced Capabilities and Demonstration of Improved Ramp Rates for In-Cell Testing

This report presents the development of the second-generation Severe Accident Test Station, referred to as SATS 2.0. SATS 2.0 represents a major advancement in addressing critical research needs for the United States nuclear industry, particularly in relation to fuel fragmentation, relocation, and dispersal (FFRD) concerns associated with the nuclear industry’s goal to extend fuel burnup beyond a peak rod average of 62 GWd/tU. The central objective of SATS 2.0 was the deployment a new furnace capable of achieving heating rates up to 100°C/s. This achievement addresses critical capability gaps, enabling assessment of prioritized research objectives established by the Electric Power Research Institute’s (EPRI) Collaborative Research on Advanced Fuel Technologies (CRAFT) working group. These research objectives are directly related to high-burnup loss-of-coolant accident (LOCA) conditions and the effects of prolonged exposure to elevated temperatures, both of which are crucial to enhancing nuclear safety and efficiency. The SATS 2.0 system builds upon prior experience with the original SATS system, which focused on evaluating accident-tolerant fuel (ATF) cladding concepts during accident conditions. However, the new system not only expands upon prior core capabilities by achieving higher heating rates with a better furnace but also plans to incorporate novel auxiliary systems to create a versatile platform for addressing current research needs. For example, a system was developed for the quantification and characterization of fission gas released during high-temperature transients. Additionally, in situ measurement capabilities were developed, such as digital image correlation which enabled the real-time capture of strain related to balloon and burst events and fiber-optic sensors that allowed for high-fidelity characterization of temperature gradients. Demonstration tests of the new 12-lamp furnace achieved heating rates up to 120°C/s. Notably, SATS 2.0 demonstrated its capacity to simulate LOCA burst tests at different pressures, yielding burst data that align with historical empirical models. Moreover, the system exhibited its capability to simulate complex conditions observed in anticipated operational occurrences, while effectively mitigating temperature overshoots. These accomplishments mark significant progress toward overcoming FFRD challenges and advancing the United States nuclear industry's safety basis and technical capabilities for extended burnup.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Near-Real-Time Forecast of Satellite-Based Soil Moisture Using Long Short-Term Memory with an Adaptive Data Integration Kernel

Nowcasts, or near-real-time (NRT) forecasts, of soil moisture based on the Soil Moisture Active and Passive (SMAP) mission could provide substantial value for a range of applications including hazards monitoring and agricultural planning. To provide such a NRT forecast with high fidelity, we enhanced a time series deep learning architecture, long short-term memory (LSTM), with a novel data integration (DI) kernel to assimilate the most recent SMAP observations as soon as they become available. The kernel is adaptive in that it can accommodate irregular observational schedules. Testing over the CONUS, this NRT forecast product showcases predictions with unprecedented accuracy when evaluated against subsequent SMAP retrievals. It showed smaller error than NRT forecasts reported in the literature, especially at longer forecast latency. The comparative advantage was due to LSTM’s structural improvements, as well as its ability to utilize more input variables and more training data. The DI-LSTM was compared to the original LSTM model that runs without data integration, referred to as the projection model here. We found that the DI procedure removed the autocorrelated effects of forcing errors and errors due to processes not represented in the inputs, for example, irrigation and floodplain/lake inundation, as well as mismatches due to unseen forcing conditions. The effects of this purely data-driven DI kernel are discussed for the first time in the geosciences. Furthermore, this work presents an upper-bound estimate for the random component of the SMAP retrieval error.

54 ENVIRONMENTAL SCIENCES↗

The Quantum Nature of the Neutrino

Over the last 100 years we have learned much about the neutrino, but there remain interesting questions about this weakly interacting particle. In particular, at LLNL we are developing an experiment to measure the quantum nature of the neutrino. The 2015 long range plan recom mended tonne-scale neutrinoless double beta decay experiments as the top new project priority and this experiment will target the quantum nature of the neutrino. The LLNL team is motivated and focused on developing the best technology for this experiment which is a liquid xenon time projection chamber called nEXO. Work on nEXO at LLNL started in 2015 with an LDRD and program development funds to de velop the nEXO concept, publish sensitivity predictions, explore alternatives and risks, and to build a credible project team and this effort is on going. In addition, we received research funding from DOE-SC NP and LLNL manages pre-conceptual R&D for the nEXO collaboration a portion of which is executed at LLNL. LLNL has a long history of building large projects, science projects and time projection chambers, but nEXO is in fact the first project of this scale that LLNL is prepared to lead for DOE-SC NP. We have the tools, skills, people and motivation to make nEXO a reality. The current program devel opment dollars are used to prepare the nEXO concept for down select and CD1. These internal LLNL dollars pay for a number of things including project staff to organize the nEXO collaboration for the various reviews, to develop the draft plans and structure to manage the project as well as setting up external advisory committees. The DOE-SC NP base funding is targeted at simulation and analysis of the nEXO concept in preparation for the down select and refinement of the under standing of the detector as well as scientific effort on the large xenon test stand (LXTS) that will burn down one of the largest risks to the nEXO project. Lastly, LLNL is leading the pre-conceptual R&D effort and managing the funds for the nEXO collaboration. LLNL continues to build the best scientific team for nEXO and this year that includes adding Ethan Bernard to lead the efforts on the LXTS. We will also soon add a new postoc, Samuel Hedges, in the fall to the LLNL nEXO team. The effort this year was influenced by the portfolio review, and there were a number of scientific activities led by LLNL to prepare for this review. In addition, we again took a lead role on the new sensitivity paper as well as publishing a paper based analyzing the effects of skin xenon in nEXO. LLNL leads the software and analysis for the project and we continued work in this area as well. High voltage remains a significant risk for the project and we continue to make progress on the LXTS that will mitigate this risk. Lastly we remain active in looking at how to scale the technology to larger scales, and expect to produce a paper on this topic in the near future.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Oak Ridge National Laboratory Modernizing the Kokkos Build System: Using CMake to Encapsulate the Complexity of Build Instructions for Performance Portable Libraries

Kokkos, a C++ library focused on performance portability, requires a build system that can work with a variety of compilers and hardware. Ideally, users need only select the compiler and architecture and should not have to know or specify how programs using Kokkos are built. CMake can be used to create a flexible, robust build system and automatically configures compilers and settings based on the user’s inputs. Nevertheless, Kokkos’ requirements as a performance portability library for the build system exceed CMake’s current capabilities. This report describes the requirements, solutions, and testing of various implementations to create a CMake-based build system suitable for Kokkos. It compares the strengths and shortcomings of the approaches and evaluates the implementations with respect to the requirements. Because no solution was found to meet all of the requirements, the Kokkos team engaged with the CMake development team to discuss and plan a path toward support for performance-portable build systems in CMake in the future.

97 MATHEMATICS AND COMPUTING↗

CMS Outer Tracker Module QA

The High Luminosity Large Hadron Collider is a planned upgrade to the LHC that will allow it to take up to 7 times as much data. Upgrades to all detector systems, including the Outer Tracker, are necessary to allow them to handle the increased radiation and pileup. Fermilab has been tasked with assembling modules for the Outer Tracker system. This presentation discusses the QA tests performed on these modules and the integration procedure required to ensure all modules work in sync. The QA tests include sensor IV curves, MaPSA testing, visual inspection, skeleton testing, and module testing. There are additional tests that can only be performed on integrated modules that are working in sync, and developing an understanding of the timing and latency of the modules is necessary to perform this synchronization.

Hobbeheydar, Samuel [Fermilab; Carnegie Mellon U. ↗

CMS Outer Tracker Module QA

The High Luminosity Large Hadron Collider is a planned upgrade to the LHC that will allow it to take up to 7 times as much data. Upgrades to all detector systems, including the Outer Tracker, are necessary to allow them to handle the increased radiation and pileup. Fermilab has been tasked with assembling modules for the Outer Tracker system. This presentation discusses the QA tests performed on these modules and the integration procedure required to ensure all modules work in sync. The QA tests include sensor IV curves, MaPSA testing, visual inspection, skeleton testing, and module testing. There are additional tests that can only be performed on integrated modules that are working in sync, and developing an understanding of the timing and latency of the modules is necessary to perform this synchronization.

Hobbeheydar, Samuel [Fermilab; Carnegie Mellon U. ↗

BETO 2021 Peer Review - Catalytic Upgrading of Pyrolysis Vapors 2.3.1.314

Catalytic fast pyrolysis (CFP) is a versatile pathway for the direct liquefaction of biomass and waste carbon sources to generate a stabilized bio-oil intermediate that can be further processed into renewable fuels, chemicals, and materials. The objective of this project is advance the CFP state-of-technology through integrated catalyst and process development, expand market responsiveness by creating routes to novel co-products, and provide experimental data to inform process modelling and scale-up activities. Research advancements over the past two years include reducing analytical uncertainty by achieving 100 ± 1% carbon balances during reaction testing with woody biomass, improving process efficiency by achieving a 4x increase in catalyst cycle length, demonstrating compatibility with waste feedstocks, and confirming process durability for 100+ reaction cycles. Additionally, this project supported a comprehensive pathway review to evaluate scale-up needs. This review resulted in the early identification of technical risks and informed proactive planning for the BETO 2022 Verification. Other impacts from this project include generation of broadly enabling scientific knowledge (14 publications/18 presentations since 2019), engagement with industry partners (e.g., Johnson Matthey and ExxonMobil), and identification of a promising pathway to market that addresses emerging demands for biogenic refinery feedstocks.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Scientific Technical Report for "Microgrid RD&D and Testing of PIDC and PWD Systems"

Alstom Grid Inc’s (ALSTOM Grid) Research Design and Development (RD&D) project, “Microgrid RD&D and Testing for PIDC and PWD” was conducted in partnership with Philadelphia Industrial Development Corporation (PIDC) in its role as owner’s representative and manager of a vibrant commercial and industrial community, involving critical loads in one of the nation’s largest unregulated, non-military electric distribution systems. PIDC needed to develop solutions to address the planned considerable growth in Distributed Energy Resources (DER) Combined Heat Plan (CHP), Renewables, Distributed Generation (DG), Demand Response (DR) and Storage. In supporting the corporate objective, PIDC needed a new class of control systems for achieving enhanced energy resilience of their critical infrastructure operation during adverse conditions together with carbon emission reduction and optimization of the overall system operation economics through system energy efficiency during normal and emergency operating conditions. Additionally, PIDC anticipated the need to support a new class of commercial agreements with tenants, such as those for Urban Outfitters, for guaranteed one hundred percent (100%) grid resilience and electric power supply in case of utility outage conditions. The project was designed to address the challenges for the commercial & industrial (C&I) communities. But more importantly, the project included development of scalable and replicable solutions intended to target a multitude of the nation’s electric distribution communities. The project researched and developed a fully comprehensive prototype consisting of microgrid operation and control functions including islanding, synchronization and reconnection, protection, voltage, frequency, and power quality management, dispatch, and system resiliency. The project provided the foundation required to significantly enhance the overall national objectives set by the DOE for energy resilience, emission reduction and system energy efficiency improvement, including protection of critical infrastructure and public resources.

14 SOLAR ENERGY↗

HDG-1 Experiment Irradiation Monitoring Data Qualification Final Report

SUMMARY The U.S. Department of Energy (DOE) Advanced Reactor Technologies (ART) Graphite Research and Development (GRD) Program is conducting a series of six experiments to quantify the effects of irradiation on nuclear-grade graphite. This report documents the qualification of irradiation monitoring data for the fifth experiment, High Dose Graphite-1 (HDG-1). Qualified monitoring data are required by the ART program to support the design and licensing of the first high-temperature reactor (HTR) nuclear plant. Data are classified as Qualified if they meet the usage requirements described in the experiment planning and quality assurance (QA) documents, Failed if they do not meet those requirements and provide no usable information, or Trend if they do not fully meet all requirements but still provide useful information subject to an assessment of how any deficiencies may affect a particular use of the data. HDG-1 irradiation began with Advanced Test Reactor (ATR) Cycle 168B on August 24, 2020, and concluded after Cycle 173C on January 27, 2025. The HDG-1 capsule was removed from the reactor core twice—during core internal change (CIC) Cycle 170A and powered axial locator mechanism (PALM) Cycle 172A—to prevent overheating of the graphite specimens during high-power PALM cycles. The capsule was therefore irradiated during a total of seven normal ATR cycles: 168B, 169A, 171A, 171B, 173A, 173B, and 173C. Irradiation monitoring data evaluated in this report include thermocouple (TC) temperature, gas flow rate, gas moisture, gas pressure, specimen load, and graphite stack displacement. Temperature. A total of 14,508,065 TC temperature records were captured. Of these, 13,901,785 (95.8%) are Qualified and 606,280 (4.2%) are Failed. The principal source of failed temperature data was the instrument failure of TC-9 (Zone 2) on June 24, 2024, and TC-10 (Zone 1) on July 5, 2024, near the end of Cycle 173A, which resulted in 595,554 Failed readings. An additional 379 missing values and 10,347 slightly negative values from TC-13 during ATR outages are also Failed. Neither TC-9 nor TC-10 was used as a temperature-control TC, and their failures did not compromise capsule condition monitoring. Correlation analysis of all 13 TCs found no evidence of virtual junction formation. Control chart analysis revealed clear downward drift of approximately 80°C for TC-6 (Zone 3) relative to other stable TCs, and possible downward drift of approximately 60°C for TC-13 relative to the Zone 5 control TC (TC-1), though TC-13 remained consistent with the Zone 2 control TC (TC-12). Gas flow. A total of 20,088,090 gas flow rate records were captured. Of these, 19,941,463 (99.3%) are Qualified and 146,627 (0.7%) are Failed due to missing values. All argon, helium, and total gas flow data were within expected ranges throughout the irradiation. Gas moisture. A total of 1,116,005 outlet gas moisture values were captured. Of these, 1,101,421 (98.7%) are Qualified and 14,584 (1.3%) are Failed, comprising 14,556 out-of-range values and 28 missing values. The out-of-range moisture values exceeded 22,000 ppmv for approximately 1 week at the beginning of Cycle 173A, when accumulated moisture evaporated after the capsule was retrieved from water storage during PALM Cycle 172A and reinserted into the east flux trap. Moisture levels returned to below 25 ppmv for the remaining three cycles, and the transient high-moisture event did not affect the integrity of specimen irradiation. Gas pressure. A total of 7,812,035 gas pressure values were captured. Of these, 6,642,048 (85.0%) are Qualified and 1,169,987 (15.0%) outlet pressure values are Failed, comprising 718,537 zero outlet pressure values due to sensor failure from Cycle 168B through Cycle 171B, 54,550 missing values, and 396,900 too-low outlet pressure values, ranging from 1.1 to 1.6 psia after sensor replacement during Cycle 173A. Load. A total of 6,696,030 load values were captured. Of these, 6,694,580 (99.98%) are Qualified and 1,450 (0.02%) are Failed due to missing values. Applied loads to the six specimen stacks were stable throughout the irradiation. Stack displacement. A total of 6,696,030 displacement values were captured. Of these, 5,713,297 (85.32%) are Qualified and 3,781 (0.06%) are Failed due to missing values. Stack displacement increased consistently throughout the irradiation, reaching approximately 3.08 in. for Channels 5 and 6 by the end of irradiation. 978,952 (14.62%) substantially elevated displacements observed for Channel 6 beginning in Cycle 171A and for Channel 5 beginning in Cycle 173A are assigned Trend status. Raising pressure. A total of 1,115,999 raising pressure values were captured. Of these, 1,115,430 (99.95%) are Qualified and 569 (0.05%) are Failed due to missing values. Ram pressure. A total of 6,696,030 ram pressure values were captured. Of these, 6,692,249 (99.95%) are Qualified and 3,484 (0.05%) are Failed due to missing values. Stack raising was perf

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nitrated Anion Exchange Resin Disposal Plan Calcination Studies

Reillex HPQ resin was nitrated in a manner matching procedures in use by the Aqueous Nitrate Recovery Facility. The resin was kept wet and then calcined to determine if nitrate was present in the residue. The potential for dispersion during heating and generation of soot or ash was evaluated. A series of experiments were performed by calcining the resin to 650 °C, and both residual solids and liquids were collected and measured for nitrates by Raman spectroscopy and test strip measurements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling household-level party composition behavior for multiparty activities: a random parameter nested logit modeling approach

This study presents findings of a household-level party composition model for multiparty activities. It exploits data from a comprehensive Household Travel Survey conducted by Chicago Metropolitan Agency of Planning. The study estimates a random parameter nested logit model to capture households’ unobserved preference heterogeneity and non-proportional substitution patterns in terms of activity party composition for multiparty activities. A wide variety of household demographics, activity attributes and residential neighborhood characteristics are examined in this paper. The magnitude of the impacts of the determinants are tested in this study by analyzing the elasticity of the variables, which suggests that household demographics and attributes of the multiparty activities have significant effects on the household-level activity party composition. Residential neighborhood characteristics, although somewhat less impactful, still play a meaningful role. This model will be implemented within the POLARIS transportation systems simulator to improve the activity generation modeling workflow, and the prediction accuracy of various activity-travel components.

activity party composition↗

Seeing through noise in power laws

Despite widespread claims of power laws across the natural and social sciences, evidence in data is often equivocal. Modern data and statistical methods reject even classic power laws such as Pareto’s law of wealth and the Gutenberg–Richter law for earthquake magnitudes. We show that the maximum-likelihood estimators and Kolmogorov–Smirnov (K-S) statistics in widespread use are unexpectedly sensitive to ubiquitous errors in data such as measurement noise, quantization noise, heaping and censorship of small values. This sensitivity causes spurious rejection of power laws and biases parameter estimates even in arbitrarily large samples, which explains inconsistencies between theory and data. We show that logarithmic binning by powers of λ > 1 attenuates these errors in a manner analogous to noise averaging in normal statistics and that λ thereby tunes a trade-off between accuracy and precision in estimation. Binning also removes potentially misleading within-scale information while preserving information about the shape of a distribution over powers of λ, and we show that some amount of binning can improve sensitivity and specificity of K-S tests without any cost, while more extreme binning tunes a trade-off between sensitivity and specificity. We therefore advocate logarithmic binning as a simple essential step in power-law inference.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CMDV (CM)4 Project - University of Washington contribution. Final report

The original goal of this project was to diagnose and improve CLUBB, the turbulence and cloud fraction parameterization used in DOE’s E3SM model. For this purpose, we planned to use large-eddy simulation (LES) and ARM observations from the NE Pacific Ocean and the SGP site, in coordination with ARM’s LASSO program. It was determined that for these cloud regimes, many of the turbulent ‘moment closures’ which underlie CLUBB’s mathematical formulation are inconsistent with LES, which is an appropriate benchmark for testing this. The research assistant found that these closures could be more accurately formulated using machine learning using the LES as a training dataset. However the resulting parameterization proved to quickly drift away from physical plausibility. A novel machine-learning based boundary layer parameterization called MARBLE based on matching the time evolution of a parameterized cloud-topped boundary layer to reanalysis was then developed and published.

54 ENVIRONMENTAL SCIENCES↗

Modeling Environmental Effects on Ventilated Spent Fuel Storage Systems

This report describes newly developed external environment wind effects models of spent nuclear fuel (SNF) dry storage systems. The primary purpose of these wind effects models is to better understand particle deposition on SNF canisters in the context of chloride-induced stress corrosion cracking. The goal of this effort is to further the understanding and improve the wind effects model of the Nuclear Horizontal Modular Storage (NUHOMS ® ) Advanced Horizontal Storage Module–High Seismic (AHSM-HS) storage system in support of the planned Canister Deposition Field Demonstration (CDFD) project (Durbin et al. 2021, Suffield et al. 2021). The steps in this wind effects investigation begin with a validation case of comparing experimental data with a STAR-CCM+ computational fluid dynamics (CFD) model of the Belowground Vertical Dry Cask Simulator (BVDCS) with the external environment explicitly modeled. Next, a test case is performed with the AHSM-HS models comparing solar-loading strategies for a standalone and wind effects model in STAR-CCM+ and a standalone model in ANSYS Mechanical Parametric Design Language (APDL). The final portion of this study compares results of the validation exercise with applications of wind effects models for two horizontal storage systems, a site specific NUHOMS ® horizontal storage module and a NUHOMS ® AHSM-HS.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

IPv6 Tunneling and Translation Technologies Pilot

Based on the latest DOE (Department of Energy) milestones, Sandia needs to convert to IPv6 (Internet Protocol version 6)-only networks over the next 5 years. Our original IPv6 migration plan did not include migrating to IPv6-only networks at any point within the next 10 years, so it must necessarily change. To be successful in this endeavor, we need to evaluate technologies that will enable us to deploy IPv6-only networks early without creating system stability or security issues. We have set up a test environment using technology representative of our production network where we configured and evaluated industry standard translation technologies and techniques. Based on our results, bidirectional translation between IPv4 (Internet Protocol version 4) and IPv6 is achievable with our current equipment, but due to the complexity of the configuration, may not scale well to our production environment.

97 MATHEMATICS AND COMPUTING↗

Regulatory Innovations Platforms for Public Utilities

This paper is about the design, functions, and implementation of regulatory innovations platforms for public utility. Such platforms are intended to enable the rapid testing of new technologies and business models, incorporating at least some regulatory flexibility as necessary to facilitate testing, while managing and limiting exposure to associated risks. The platforms are also designed to ensure rapid learning for all participating parties, including innovators, utility companies, and utility regulators.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ARC disruption physics and strategy

Commonwealth Fusion Systems (CFS) plans to operate a tokamak power plant called ARC in the early 2030s. Tokamak plasmas have stability limits that, if crossed, lead to a rapid termination of the plasma, referred to as a disruption. Disruptions pose a melt risk to the first wall resulting from thermal and non-thermal particle heat fluxes, and an electromagnetic loading risk on all metal components within the equilibrium coils. A comprehensive set of models is used herein to provide an assessment of both mitigated and unmitigated ARC disruption loads. A preliminary massive gas injection system is baselined and a runaway electron mitigation coil option is proposed to close possible gaps in the baseline. It is predicted that all ARC disruption loads are within a factor of 2 of the disruption loads in SPARC, a tokamak presently under construction by CFS, and therefore SPARC provides an opportunity to calibrate models, test solutions and inform the design of ARC. The goal for ARC is disruption-free operation, however, the pragmatic design target is to withstand one mitigated disruption per day, and to restart the plasma following mitigation in tens of seconds without interrupting the power output. Unmitigated disruptions must be rare, and experience with unmitigated disruption impacts in SPARC will better define what rare means. The implications of this strategy for plasma disruptivity and disruption prediction are discussed, and operating the ARC scenario on SPARC is expected to refine the ARC final design and operational plan.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗