Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Critical Infrastructure for Ocean Research and Societal Needs in 2030

The United States has jurisdiction over 3.4 million square miles of ocean expanse greater than the land area of all fifty states combined. This vast marine area offers researchers opportunities to investigate the ocean's role in an integrated Earth system, but also presents challenges to society, including damaging tsunamis and hurricanes, industrial accidents, and outbreaks of waterborne diseases. The 2010 Gulf of Mexico Deepwater Horizon oil spill and 2011 Japanese earthquake and tsunami are vivid reminders that a broad range of infrastructure is needed to advance our still-incomplete understanding of the ocean. The National Research Council (NRC)'s Ocean Studies Board was asked by the National Science and Technology Council's Subcommittee on Ocean Science and Technology, comprised of 25 U.S. government agencies, to examine infrastructure needs for ocean research in the year 2030. This request reflects concern, among a myriad of marine issues, over the present state of aging and obsolete infrastructure, insufficient capacity, growing technological gaps, and declining national leadership in marine technological development; issues brought to the nation's attention in 2004 by the U.S. Commission on Ocean Policy. A 15-member committee of experts identified four themes that encompass 32 future ocean research questions enabling stewardship of the environment, protecting life and property, promoting economic vitality, and increasing fundamental scientific understanding. Many of the questions in the report (e.g., sea level rise, sustainable fisheries, the global water cycle) reflect challenging, multidisciplinary science questions that are clearly relevant today, and are likely to take decades of effort to solve. As such, U.S. ocean research will require a growing suite of ocean infrastructure for a range of activities, such as high quality, sustained time series observations or autonomous monitoring at a broad range of spatial and temporal scales. Consequently, a coordinated national plan for making future strategic investments becomes an imperative to address societal needs. Such a plan should be based upon known priorities and should be reviewed every 5-10 years to optimize the federal investment. The committee examined the past 20 years of technological advances and ocean infrastructure investments (such as the rise in use of self-propelled, uncrewed, underwater autonomous vehicles), assessed infrastructure that would be required to address future ocean research questions, and characterized ocean infrastructure trends for 2030. One conclusion was that ships will continue to be essential, especially because they provide a platform for enabling other infrastructure autonomous and remotely operated vehicles; samplers and sensors; moorings and cabled systems; and perhaps most importantly, the human assets of scientists, technical staff, and students. A comprehensive, long-term research fleet plan should be implemented in order to retain access to the sea. The current report also calls for continuing U.S. capability to access fully and partially ice-covered seas; supporting innovation, particularly the development of biogeochemical sensors; enhancing computing and modeling capacity and capability; establishing broadly accessible data management facilities; and increasing interdisciplinary education and promoting a technically-skilled workforce. The committee also provided a framework for prioritizing future investment in ocean infrastructure. They recommend that development, maintenance, or replacement of ocean research infrastructure assets should be prioritized in terms of societal benefit, with particular consideration given to usefulness for addressing important science questions; affordability, efficiency, and longevity; and ability to contribute to other missions or applications. These criteria are the foundation for prioritizing ocean research infrastructure investments by estimating the economic costs and benefits of each potential infrastructure investment, and funding those investments that collectively produce the largest expected net benefit over time. While this type of process is clearly subject to budget constraints, it could quantify the often informal evaluation of linkages between infrastructure, ocean research, the value of information produced, societal objectives, and economic benefits. Addressing the numerous complex science questions facing the entire ocean research enterprise in 2030 from government to academia, industry to nonprofits, local to global scale represents a major challenge, requiring collaboration across the breadth of the ocean sciences community and nearly seamless coordination between ocean-related federal agencies.

47 OTHER INSTRUMENTATION↗

Engine structures: A bibliography of Lewis Research Center's research for 1980-1987

This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Structures Division of the NASA Lewis Research Center from 1980 through 1987. All the publications were announced in the l980 to 1987 issues of STAR (Scientific and Technical Aerospace Reports) and or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

Source record↗

Bibliography of Lewis Research Center technical publications announced in 1988

This bibliography contains abstracts of the technical reports that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1988. Subject, author, and corporate source indexes are also included. All the publications were announced in the 1988 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

Source record↗

Reliability and Integrity Management Scoping Study

The U.S. Nuclear Regulatory Commission (NRC) is developing the regulatory framework and technical expertise to support regulatory review of advanced non-light water reactor (ANLWR) designs. The NRC staff expects most of these designs to use the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC) Section XI, Division 2 “Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Power Plants” for developing and implementing pre-service inspection (PSI) and in-service inspection (ISI) programs. The NRC recently endorsed ASME BPVC Section XI, Division 2 (BPV XI-2) in Regulatory Guide (RG) 1.246. This new ASME code is yet to be used in any applications submitted for NRC review. This report provides an overview of the current state of knowledge and practices within the industry for the use of BPV XI-2 for the development and implementation of a PSI and ISI program for non-light water reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Configuration Management Process Assessment Strategy

Purpose: To propose a strategy for assessing the development and effectiveness of configuration management systems within Programs, Projects, and Design Activities performed by technical organizations and their supporting development contractors. Scope: Various entities CM Systems will be assessed dependent on Project Scope (DDT&E), Support Services and Acquisition Agreements. Approach: Model based structured against assessing organizations CM requirements including best practices maturity criteria. The model is tailored to the entity being assessed dependent on their CM system. The assessment approach provides objective feedback to Engineering and Project Management of the observed CM system maturity state versus the ideal state of the configuration management processes and outcomes(system). center dot Identifies strengths and risks versus audit gotcha's (findings/observations). center dot Used "recursively and iteratively" throughout program lifecycle at select points of need. (Typical assessments timing is Post PDR/Post CDR) center dot Ideal state criteria and maturity targets are reviewed with the assessed entity prior to an assessment (Tailoring) and is dependent on the assessed phase of the CM system. center dot Supports exit success criteria for Preliminary and Critical Design Reviews. center dot Gives a comprehensive CM system assessment which ultimately supports configuration verification activities.*

Henry, Thad↗

FEMP Focus: 2011 Volume 20 Issue 1

Department of Energy (DOE); Federal Energy Management Program; FEMP Focus Newsletter; December 2010; Alternative Financing, Guidance Documents, Recovery Act Technical Assistance, Training, Energy Awareness

Alternative Financing, Guidance Documents, Recover↗

Demand Response in Residential Energy Code: Technical Brief

As buildings account for over 75% of U.S. electricity use, effectively managing their loads can greatly facilitate the transition towards a clean, reliable grid. Grid-interactive efficient buildings (GEBs) combine efficiency and demand flexibility with smart technologies and communication to provide occupant comfort and productivity while serving the grid as a distributed energy resource (DER). In turn, GEBs can play a key role in ensuring access to an affordable, reliable, sustainable, and modern U.S. electric power system. Their national adoption could provide $\$$100-200 billion in U.S. electric power system cost savings over the next two decades. The associated reduction in CO 2 emissions is estimated at 6% per year by 2030 (DOE 2021). Building codes represent standard design practice in the construction industry and continually evolve to include advanced technologies and innovative practices. Historically, national model energy codes establish minimum efficiency requirements for new construction (ICC 2020). Expanding codes to support GEB capabilities is a pivotal step towards realizing demand flexibility in support of a clean grid by addressing capabilities to improve interoperability between smart building systems, the grid, and renewable energy resources. Realizing GEBs requires buildings with automated demand response (DR) capabilities that enable standardized communication with or control of, subject to explicit consumer consent, energy smart appliances or home energy management systems. This is achieved through direct or indirect (i.e., via an aggregator) communication between appliances and the electric grid. Energy codes can also support DR communication standardization and advance the deployment of building-integrated DERs such as energy storage, generation, and electric vehicles (EVs). Incorporating automated DR capabilities in energy codes provides many benefits to the consumers. Specifically, it aligns building electric load demand with intermittent renewable energy source availability, decreases peak load on the electric grid, allows buildings to respond to utility price signals, supports electrical network reliability and market growth of products and processes aligned with clean economic growth. The incorporation of DR into the model residential energy codes was considered for both the 2021 and 2024 International Energy Conservation Code (IECC) code development cycles. The approved DR measures in the 2021 cycle were removed in response to appeals (ICC 2020). Updated language was presented for consideration again for the 2024 IECC, where it was negotiated and again approved, and again removed in response to appeals (ICC 2024). This resulted in many sections, including sections on demand responsive controls, being moved to the credits options or an appendix as a voluntary application. This technical brief updates the proposed DR components such that they can be considered by states and local governments for direct incorporation into their codes, as well as for future IECC energy code development. The proposal refinements are intended to support consistency in approach and provide a degree of certainty for building owners, designers, contractors, manufacturers, and building and fire safety professionals. The scope of this technical brief includes three strategies for DR in residential buildings: 1) smart thermostats with demand-responsive control, 2) electric water heating incorporating demand-responsive controls and communication and 3) grid Integrated solar and energy storage systems.

2021 IECC↗

Balancing Predictive and Reactive Science Planning for Mars 2020 Perseverance

The design of the science planning process for a space science mission needs to find a balance between operational and resource constraints and scientific decision-making. Science planning has previously been characterized as either predictive or reactive. Predictive science planning is needed when constraints drive science activities to be planned far in advance. For example, a combination of long one-way light time plus high-stakes science decisions drove the Cassini-Huygens mission to Saturn to have an extremely predictive planning process. On the other extreme, reactive science planning is needed when constraints drive science activities to be planned based on the results of the previous plan. For example, the Mars Exploration Rover mission interacted with the surface of Mars, and so the planning team needed to know the state of the rover at the end of each planning cycle before starting the next cycle. Operational and resource constraints that require management on intermediate timescales has led to the development of a science planning process between these two extremes. For example, the Mars Science Laboratory is a technically complex rover and has a parallel predictive process that allows the operations team to manage engineering constraints several days in advance while maintaining the reactive tactical planning process similar to that of MER. The Mars 2020 Perseverance rover is a technically complex rover in the MSL style, but has an added layer of science complexity: it is tasked with collecting a returnable cache of scientifically valuable samples of Mars within prime mission. Thus, the science planning process also needs to accommodate high-stakes longer-term science decisions in the style of Cassini. In order to balance the push-pull of these constraints, we have developed a science campaign-focused operational paradigm for Mars 2020 Perseverance that allows for both predictive planning to accommodate technological complexity and high-stakes science decisions as well as reactive planning to accommodate the realities of interacting with the martian surface. This paradigm influenced the design of operational processes and operational tools.

Spanovich, Nicole↗

A Socio-Technical Perspective on Repository Monitoring - 12229

Monitoring geological repositories for high-activity radioactive wastes has both technical and social dimensions, which are closely interrelated. To investigate the implications of this for geological disposal, data on experts' expectations of repository monitoring and the functions that it is expected to serve were analysed. The analysis drew on strategic and technical documents on monitoring produced by national agencies and by international organisations or projects; interviews with specialists in radioactive waste management organisations on monitoring and on their perceptions of societal concerns and expectations; and observations from technical workshops on repository monitoring. Three main rationales for monitoring were found: performance confirmation; decision support in a step-wise process; and public and stakeholder confidence building. The expectation that monitoring will enhance public confidence is then examined from a social scientific perspective and the potential for and challenges to using monitoring in this way are reviewed. In conclusion, implications for stakeholder engagement in the development of monitoring objectives and strategies are discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASA Technical Standards Program

The NASA Technical Standards Program was officially established in 1997 as result of a directive issued by the Administrator. It is responsible for Agency wide technical standards development, adoption (endorsement), and conversion of Center-unique standards for Agency wide use. One major element of the Program is the review of NSA technical standards products and replacement with non-Government Voluntary Consensus Standards in accordance with directions issued by the Office of Management and Budget. As part of the Program's function, it developed a NASA Integrated Technical Standards Initiative that consists of and Agency wide full-text system, standards update notification system, and lessons learned-standards integration system. The Program maintains a 'one stop-shop' Website for technical standards ad related information on aerospace materials, etc. This paper provides information on the development, current status, and plans for the NAS Technical Standards Program along with metrics on the utility of the products provided to both users within the nasa.gov Domain and the Public Domain.

Gill, Paul S.↗

NASA Technical Standards Program

The NASA Technical Standards Program was officially established in 1997 as result of a directive issued by the Administrator. It is responsible for Agency wide technical standards development, adoption (endorsement), and conversion of Center-unique standards for Agency wide use. One major element of the Program is the review of NSA technical standards products and replacement with non-Government Voluntary Consensus Standards in accordance with directions issued by the Office of Management and Budget. As part of the Program s function, it developed a NASA Integrated Technical Standards Initiative that consists of and Agency wide full-text system, standards update notification system, and lessons learned - standards integration system. The Program maintains a "one stop-shop" Website for technical standards ad related information on aerospace materials, etc. This paper provides information on the development, current status, and plans for the NAS Technical Standards Program along with metrics on the utility of the products provided to both users within the nasa.gov Domain and the Public Domain.

Gill, Paul S.↗

Unpinning the Lynchpin: Development of a system to introduce redundancy at Department of Energy laboratories

The United States Department of Energy (DOE) laboratory system employs over 78,000 people and had a budget of $8.1 billion for Fiscal Year 2023 (FY23). This diverse workforce includes employees at all levels from operational support staff to senior level management. Together, the labs take on incredibly complex and unique technical challenges in an attempt to address fundamental National and global needs. These technical challenges often require specialized training such that only a single person is truly capable of completing specific tasks. With the modern competitive environment, and an aging workforce, the risk of technical capability loss is highly probable with potentially severe impact. An online survey of Lawrence Livermore National Laboratories (LLNL) employees, a typical DOE lab, found that of responders with greater than 10 years of experience, 100% of respondents felt burnt out, 40% felt they were not paid fairly, and 50% believe that not enough is done by leadership to retain them as an employee. Couple that to an aging workforce, and the risk of losing institutional knowledge due to single point of failure, or lynchpin, is significant. There is a need for a system which reduces the risk of operational and technical losses due to lynchpin employees leaving the organization. A mitigation of this risk would lead to the successful transfer of knowledge from one generation to the next, improving the rate of development and minimizing general risk of mistakes.

99 GENERAL AND MISCELLANEOUS↗

Sandia National Laboratories support of the Iraq Nuclear Facility Dismantlement and Disposal Program.

Because of past military operations, lack of upkeep and looting there are now enormous radioactive waste problems in Iraq. These waste problems include destroyed nuclear facilities, uncharacterized radioactive wastes, liquid radioactive waste in underground tanks, wastes related to the production of yellow cake, sealed radioactive sources, activated metals and contaminated metals that must be constantly guarded. Iraq currently lacks the trained personnel, regulatory and physical infrastructure to safely and securely manage these facilities and wastes. In 2005 the International Atomic Energy Agency (IAEA) agreed to organize an international cooperative program to assist Iraq with these issues. Soon after, the Iraq Nuclear Facility Dismantlement and Disposal Program (the NDs Program) was initiated by the U.S. Department of State (DOS) to support the IAEA and assist the Government of Iraq (GOI) in eliminating the threats from poorly controlled radioactive materials. The Iraq NDs Program is providing support for the IAEA plus training, consultation and limited equipment to the GOI. The GOI owns the problems and will be responsible for implementation of the Iraq NDs Program. Sandia National Laboratories (Sandia) is a part of the DOS's team implementing the Iraq NDs Program. This report documents Sandia's support of the Iraq NDs Program, which has developed into three principal work streams: (1) training and technical consultation; (2) introducing Iraqis to modern decommissioning and waste management practices; and (3) supporting the IAEA, as they assist the GOI. Examples of each of these work streams include: (1) presentation of a three-day training workshop on 'Practical Concepts for Safe Disposal of Low-Level Radioactive Waste in Arid Settings;' (2) leading GOI representatives on a tour of two operating low level radioactive waste disposal facilities in the U.S.; and (3) supporting the IAEA's Technical Meeting with the GOI from April 21-25, 2008. As noted in the report, there was significant teaming between the various participants to best help the GOI. On-the-ground progress is the focus of the Iraq NDs Program and much of the work is a transfer of technical and practical skills and knowledge that Sandia uses day-to-day. On-the-ground progress was achieved in July of 2008 when the GOI began the physical cleanup and dismantlement of the Active Metallurgical Testing Laboratory (LAMA) facility at Al Tuwaitha, near Baghdad.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Center Cybersecurity, Supply Chain Risk Management, and Emerging Regulation Cohort Summary: Takeaways and Action Plans

This report summarizes the outcomes of the Data Center Cohort under the Department of Energy’s Technical Assistance for Digital Assurance (TADA) initiative, aimed at enhancing grid resilience through cybersecurity, supply chain risk management (SCRM), and Cyber-Informed Engineering (CIE). The cohort engaged 17 organizations across utilities, data center operators, vendors, and technology providers in three sessions combining presentations, discussions, and exercises. Key topics included AI-driven load behavior, cybersecurity vulnerabilities in UPS/BESS and cooling systems, governance gaps at utility–data center boundaries, and supply chain integrity. Five cross-cutting themes emerged: interconnection architecture vulnerabilities, fragmented governance, AI-driven stability risks, lack of regulatory frameworks, and long-term supply chain concerns. Actionable recommendations were developed, including implementing DMZ segmentation, formalizing vendor access agreements, designing AI workload limits, and advancing standards through NERC and state-level programs. These strategies aim to strengthen resilience, clarify responsibilities, and ensure secure integration of data centers into the grid.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Determining and Unlocking Untapped Demand-Side Management Potential in South Africa: Demand Response at the Grid Edge

The National Renewable Energy Laboratory (NREL), funded through the Climate Technology and Change Network (CTCN), has provided technical assistance to key energy sector entities in South Africa to examine untapped demand-side management potential. NREL partnered with the Council for Scientific and Industrial Research (CSIR) and included key South Africa stakeholders: Eskom, the South African National Energy Development Institute (SANEDI), and the Department of Mineral and Resources and Energy (DMRE), including the CTCN National Designated Entity (NDE), the Department of Science and Innovation (DSI). South Africa is currently experiencing an energy crisis with extensive load shedding. While the load shedding crisis in South Africa is a supply side problem, demand-side management provides opportunities to achieve energy efficiency and to reduce peak demand. DSM also has huge potential to help alleviate load shedding, which is a last resort form of DSM.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis

This report presents an analytical methodology to identify alternative options to manage interconnection costs and streamline interconnection timelines for distribution system-connected photovoltaic (PV) systems not co-located with load. Specifically, the report details the methodology and results of an analysis that: 1. Identifies potential grid violations that would be induced by a PV system requesting interconnection to a distribution circuit; 2. Identifies multiple technically viable options for mitigating the potential violations, including infrastructure upgrades, downsizing the PV system size, curtailment of PV, and addition of battery energy storage; 3. Defines the required technical operating parameters of the system in order to mitigate all potential violations (the "Operating Envelope"); 4. Compares the economics of each option, from the PV developer's perspective. The analysis supports the ongoing evolution of interconnection standards for combined PV and energy storage systems by providing a methodology to define allowable maximum export limits during each hour. The methodology presented could be used by utilities as part of the interconnection study process, to inform negotiations with DER developers and the drafting of mutually acceptable interconnection agreements. The resulting technical operating parameters could be included as part of the interconnection service agreement (ISA) between the system owner and the utility company. The companion report to this analysis, Gill et al. (2022), details the envisioned framework for the implementation of the technical operating parameters.

14 SOLAR ENERGY↗

Ipsilateral Dual-Site, Same-Sitting Percutaneous Lung Biopsy: A Feasibility Study

PurposePatients with thoracic malignancies often have more than one site of pulmonary, nodal or pleural disease within one hemithorax. In addition, large heterogeneous lesions may comprise distinct, mixed pathological entities. Histological analysis of these lesions can alter tumour staging and treatment options. We investigated the feasibility, safety and benefit of performing image-guided percutaneous lung biopsy (PLB) of two lesions in the same hemithorax at a single sitting.Materials and MethodsTen consecutive outpatients with two or more potential disease foci within the same hemithorax were analysed over a 15-month period. The mean age of the patients was 66 years (range 46–81 years). Patients underwent CT-guided coaxial 20G core biopsy of both lesions, with separate coaxial punctures for each lesion. Patients were managed as per established local institution ambulatory lung biopsy protocol using small-calibre Heimlich-valve chest drain (HVCD) to treat significant post-PLB pneumothorax in an outpatient setting. Data regarding lesion characteristics, diagnoses and complications were recorded.ResultsAll 10 patients (n = 20 biopsies, 100% technical success) received informative histological diagnosis on both lesions. This altered management in all cases. Although a high rate of pneumothorax occurred (60%; 6/10), only two of these patients required treatment with HVCD. No other significant complications occurred in those patients with small asymptomatic pneumothoraces or those that required HVCD placement.ConclusionsDual-site lung biopsy, performed as a single procedure, is potentially a safe and effective technique for diagnosing patients with multiple thoracic lesions, and can provide useful staging information to guide patient management.

62 RADIOLOGY AND NUCLEAR MEDICINE↗