Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical issues”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Performance Testing of Thermal Interface Filler Materials in a Bolted Aluminum Interface Under Thermal/Vacuum Conditions

A thermal interface material is one of the many tools often used as part of the thermal control scheme for space-based applications. Historically, at Marshall Space Flight Center, CHO-THERM 1671 has primarily been used for applications where an interface material was deemed necessary. However, numerous alternatives have come on the market in recent years. It was decided that a number of these materials should be tested against each other to see if there were better performing alternatives. The tests were done strictly to compare the thermal performance of the materials relative to each other under repeatable conditions and do not take into consideration other design issues, such as off-gassing, electrical conduction, isolation, etc. The purpose of this Technical Memorandum is to detail the materials tested, test apparatus, procedures, and results of these tests. The results show that there are a number of better performing alternatives now available.

Glasgow, S. D.↗

Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

An Interim Report on NASA's Draft Space Technology Roadmaps

NASA has developed a set of 14 draft roadmaps to guide the development of space technologies under the leadership of the NASA Office of the Chief Technologist (OCT). Each of these roadmaps focuses on a particular technology area (TA). The roadmaps are intended to foster the development of advanced technologies and concepts that address NASA's needs and contribute to other aerospace and national needs. OCT requested that the National Research Council conduct a study to review the draft roadmaps, gather and assess relevant community input, and make recommendations and suggest priorities to inform NASA's decisions as it finalizes its roadmaps. The statement of task states that "based on the results of the community input and its own deliberations, the steering committee will prepare a brief interim report that addresses high-level issues associated with the roadmaps, such as the advisability of modifying the number or technical focus of the draft NASA roadmaps." This interim report, which does not include formal recommendations, addresses that one element of the study charge. NASA requested this interim report so that it would have the opportunity to make an early start in modifying the draft roadmaps based on feedback from the panels and steering committee. The final report will address all other tasks in the statement of task. In particular, the final report will include a prioritization of technologies, will describe in detail the prioritization process and criteria, and will include specific recommendations on a variety of topics, including many of the topics mentioned in this interim report. In developing both this interim report and the final report to come, the steering committee draws on the work of six study panels organized by technical area, loosely following the organization of the 14 roadmaps, as follows: A Panel 1: Propulsion and Power TA01 Launch Propulsion Systems TA02 In-Space Propulsion Technologies TA03 Space Power and Energy Storage Systems TA13 Ground and Launch Systems Processing B Panel 2: Robotics, Communications, and Navigation TA04 Robotics, TeleRobotics, and Autonomous Systems TA05 Communication and Navigation Systems C Panel 3: Instruments and Computing TA08 Science Instruments, Observatories, and Sensor Systems TA11 Modeling, Simulation, Information Technology, and Data Processing D Panel 4: Human Health and Surface Exploration TA06 Human Health, Life Support, and Habitation Systems TA07 Human Exploration Destination Systems E Panel 5: Materials Panel TA10 Nanotechnology TA12 Materials, Structures, Mechanical Systems, and Manufacturing TA14 Thermal Management Systems F Panel 6: Entry, Descent, and Landing Panel TA09 Entry, Descent, and Landing Systems In addition to drawing on the expertise represented on the steering committee and panels, the committee obtained input from each of 14 public workshops held on each of the 14 roadmaps. At these 1-day workshops, invited speakers, guests, and members of the public engaged in discussions on the different technology areas and their value to NASA. Broad community input was also solicited from a public website, where more than 240 public comments were received on the draft roadmaps in response to application of criteria (such as benefit, risk and reasonableness, and alignment with NASA and national goals) that the steering committee established. This interim report reflects the results of deliberations by the steering committee in light of these public inputs as well as additional inputs from the six panels. The steering committee's final report will be completed early in 2012. That report will prioritize the technologies that span the entire scope of the 14 roadmaps and provide additional guidance on crosscutting themes and other relevant topics.

Source record↗

Simplified Aircraft-Based Paired Approach: Concept Definition and Initial Analysis

Simplified Aircraft-based Parallel Approach (SAPA) is an advanced concept proposed by the Federal Aviation Administration (FAA) to support dependent parallel approach operations to runways with lateral spacing closer than 2500 ft. At the request of the FAA, NASA performed an initial assessment of the potential performance and feasibility of the SAPA concept, including developing and assessing an operational implementation of the concept and conducting a Monte Carlo wake simulation study to examine the longitudinal spacing requirements. The SAPA concept was shown to have significant operational advantages in supporting the pairing of aircraft with dissimilar final approach speeds. The wake simulation study showed that support for dissimilar final approach speeds could be significantly enhanced through the use of a two-phased altitudebased longitudinal positioning requirement, with larger longitudinal positioning allowed for higher altitudes out of ground effect and tighter longitudinal positioning defined for altitudes near and in ground effect. While this assessment is preliminary and there are a number of operational issues still to be examined, it has shown the basic SAPA concept to be technically and operationally feasible.

Johnson, Sally C.↗

Space Mission Operations Ground Systems Integration Customer Service

The facility, which is now the Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center in Huntsville, AL, has provided continuous space mission and related services for the space industry since 1961, from Mercury Redstone through the International Space Station (ISS). Throughout the long history of the facility and mission support teams, the HOSC has developed a stellar customer support and service process. In this era, of cost cutting, and providing more capability and results with fewer resources, space missions are looking for the most efficient way to accomplish their objectives. One of the first services provided by the facility was fax transmission of documents to, then, Cape Canaveral in Florida. The headline in the Marshall Star, the newspaper for the newly formed Marshall Space Flight Center, read "Exact copies of Documents sent to Cape in 4 minutes." The customer was Dr. Wernher von Braun. Currently at the HOSC we are supporting, or have recently supported, missions ranging from simple ISS payloads requiring little more than "bentpipe" telemetry access, to a low cost free-flyer Fast, Affordable, Science and Technology Satellite (FASTSAT), to a full service ISS payload Alpha Magnetic Spectrometer 2 (AMS2) supporting 24/7 operations at three operations centers around the world with an investment of over 2 billion dollars. The HOSC has more need and desire than ever to provide fast and efficient customer service to support these missions. Here we will outline how our customer-centric service approach reduces the cost of providing services, makes it faster and easier than ever for new customers to get started with HOSC services, and show what the future holds for our space mission operations customers. We will discuss our philosophy concerning our responsibility and accessibility to a mission customer as well as how we deal with the following issues: initial contact with a customer, reducing customer cost, changing regulations and security, and cultural differences, to ensure an efficient response to customer issues using a small Customer Service Team (CST) and adaptability, constant communication with customers, technical expertise and knowledge of services, and dedication to customer service. The HOSC Customer Support Team has implemented a variety of processes, and procedures that help to mitigate the potential problems that arise when integrating ground system services for a variety of complex missions and the lessons learned from this experience will lead the future of customer service in the space operations industry.

Roth, Karl↗

Ceramic Matrix Composite (CMC) Thermal Protection Systems (TPS) and Hot Structures for Hypersonic Vehicles

Thermal protection systems (TPS) and hot structures are required for a range of hypersonic vehicles ranging from ballistic reentry to hypersonic cruise vehicles, both within Earth’s atmosphere and non-Earth atmospheres. This includes single-stage to orbit (SSTO), two-stage to orbit (TSTO) accelerators, access to space vehicles, and hypersonic cruise vehicles. This presentation will start out with a brief discussion of aerodynamic heating and thermal management techniques to address the high heating. The argument is presented that as we move from rocket-based vehicles to air-breathing vehicles, we need to move away from the “insulated airplane” approach used on the Space Shuttle Orbiter to a wide range of TPS and hot structure approaches. The primary portion of the paper will discuss issues and design options for CMC TPS and hot structure components. The two primary technical challenges impacting the use of CMC TPS and hot structures for hypersonic vehicles are environmental durability and fabrication, and will be discussed briefly.

ceramic matrix composites↗

Technological and Medical Human Health and Well-Being Options in Deep Space

Zeroth order, maintenance of human health requires supportive protection from the hazards of space, including supplying breathable air, comfortable temperatures, a supportive diet/nutrition, radiation protection, and sufficient gravity to avoid the combinatorial impacts of such effecting human operability and health. Spacecraft operability must be “fail-safe” to ensure these basic human life support conditions are maintained throughout the mission and the mission(s) must be affordable. There are known effects and unknowns effects regarding aspects of human health for Mars duration missions. Mars has the order of a third g. We have no data regarding the health impacts of this on humans or the combinatorial effects associated with 45% GCR on the Martian surface over time. There is a suspicion that if humans survive such conditions over long times they will evolve to living at reduced g and become “Martians”. Cascading failures and subcritical degradations in systems of systems causing an overall unrecoverable failure are a potential issue. There are two exremely complex systems associated with humans-Mars missions: the technical, engineering, and architectural system of systems that enable the mission and the humans. Both need to be mutually configured and operated to mitigate the overall risks and hazards of the mission. Regarding the humans that mitigation includes both the mission risks and supporting-to-increasing the human immune and other concomitant physiological systems. This report will summarize the risks, current mitigation approaches, and putative approaches including lifestyle, nutrition, and “wellness” approaches to possibly improve the human capacity to withstand the large number of combinatorial human physiological rigors of the missions. The wellness observations also apply to and are derived from Earth terrestrial applicable research.

Dennis M Bushnell↗

A Techno-Economic Analysis of Emission Controls on Hydrocarbon Biofuel Production

Biofuels have the potential to reduce our dependency on petroleum-derived transportation fuels and decrease greenhouse gas (GHG) emissions. Although the overall GHG emissions from biofuels are expected to be lower when compared to those of petroleum fuels, the process of converting biomass feedstocks into biofuels emits various air pollutants, which may be subject to federal air quality regulation or emission limits. While prior research has evaluated the technical and economic feasibility of biofuel technologies, gaps still exist in understanding the regulatory issues associated with the biorefineries and their economic implications on biofuel production costs (referred to as minimum fuel selling price (MFSP) in this study). The aim of our research is to evaluate the economic impact of implementing emission reduction technologies at biorefineries and estimate the cost effectiveness of two primary control technologies that may be required for air permitting purposes. We analyze a lignocellulosic sugars-to-hydrocarbon biofuel production pathway developed by the National Renewable Energy Laboratory (NREL) and implement air emission controls in Aspen Plus to evaluate how they affect the MFSP. Results from this analysis can help inform decisions about biorefinery siting and sizing, as well as mitigate the risks associated with air permitting.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluating Tradeoffs for Water, Fire, Biofuels, and Fish

The Washington State Academy of Sciences (WSAS) is a not-for-profit organization of more than 300 elected members who are nationally recognized for their scientific and technical expertise. All members of the National Academies of Sciences, Engineering and Medicine who reside in Washington State are invited to join; others are elected in recognition of their scientific and technical contributions to our nation and their desire to contribute their expertise to inform issues in Washington State

Wigmosta, Mark S.↗

New understanding of rhizosphere processes enabled by advances in molecular and spatially resolved techniques

Understanding the role played by microorganisms within soil systems is challenged by the unique intersection of physics, chemistry, mineralogy and biology in fostering habitat for soil microbial communities. To address these challenges will require observations across multiple spatial and temporal scales to capture the dynamics and emergent behavior from complex and interdependent processes. The heterogeneity and complexity of the rhizosphere require advanced techniques that press the simultaneous frontiers of spatial resolution, analyte sensitivity and specificity, reproducibility, large dynamic range, and high throughput. Fortunately many exciting technical advancements are now available to inform and guide the development of new hypotheses. The aim of this Special issue is to provide a holistic view of the rhizosphere in the perspective of modern molecular biology methodologies that enabled a highly-focused, detailed view on the processes in the rhizosphere, including numerous, strong and complex interactions between plant roots, soil constituents and microorganisms. We discuss the current rhizosphere research challenges and knowledge gaps, as well as perspectives and approaches using newly available state-of-the-art toolboxes. These new approaches and methodologies allow the study of rhizosphere processes and properties, and rhizosphere as a central component of ecosystems and biogeochemical cycles.

Holistic view↗

Writing Competitive Proposals [Slides]

A proposal is a written response to an opportunity offered by a funding organization. Proposals must meet a SOLICITOR’S needs, not YOUR needs. A solicited proposal is a written response to a specific solicitation issued by a sponsor. These solicitations are typically called RFPs, or Requests for Proposals. RFPs are specific in their requirements regarding format and technical content. Scientists at Los Alamos often deal with this type of proposal — Laboratory-Directed Research and Development (LDRD) proposals are one example. An unsolicited proposal is one submitted to a sponsor who has not issued a specific solicitation. It usually comes about during interactions at meetings or conferences. In some instances, a sponsor may be visiting for another reason when the possibility for an unsolicited proposal becomes available. A pre-proposal is one in which a sponsor wishes to gage competition before having participants prepare a formal, full-length proposal. These types of scenarios imply that the actual proposal could be highly competitive and will usually be by invitation only.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Review Of Rheology Models For Hanford Waste Blending

The area of rheological property prediction was identified as a technology need in the Hanford Tank Waste – waste feed acceptance initiative area during a series of technical meetings among the national laboratories, Department of Energy-Office of River Protection, and Hanford site contractors. Meacham et al. delivered a technical report in June 2012, RPP-RPT-51652 “One System Evaluation of Waste Transferred to the Waste Treatment Plant” that included estimating of single shell tank waste Bingham plastic rheological model constants along with a discussion of the issues inherent in predicting the rheological properties of blended wastes. This report was selected as the basis for moving forward during the technical meetings. The report does not provide an equation for predicting rheological properties of blended waste slurries. The attached technical report gives an independent review of the provided Hanford rheological data, Hanford rheological models for single tank wastes, and Hanford rheology after blending provided in the Meacham report. The attached report also compares Hanford to SRS waste rheology and discusses some SRS rheological model equations for single tank wastes, as well as discussing SRS experience with the blending of waste sludges with aqueous material, other waste sludges, and frit slurries.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bridging the Divide between Safety and Risk Management for your Project or Program

This presentation will bridge the divide between these separate but overlapping disciplines and help explain how to use Risk Management as an effective management decision support tool that includes safety. Risk Management is an over arching communication tool used by management to prioritize and effectively mitigate potential problems before they concur. Risk Management encompasses every kind of potential problem that can occur on a program or project. Some of these are safety issues such as hazards that have a specific likelihood and consequence that need to be controlled and included to show an integrated picture of accepted) mitigated, and residual risk. Integrating safety and other assurance disciplines is paramount to accurately representing a program s or projects risk posture. Risk is made up of several components such as technical) cost, schedule, or supportability. Safety should also be a consideration for every risk. The safety component can also have an impact on the technical, cost, and schedule aspect of a given risk. The current formats used for communication of safety and risk issues are not consistent or integrated. The presentation will explore the history of these disciplines, current work to integrate them, and suggestions for integration for the future.

Lutomski, Mike↗

Design for reliability: NASA reliability preferred practices for design and test

This tutorial summarizes reliability experience from both NASA and industry and reflects engineering practices that support current and future civil space programs. These practices were collected from various NASA field centers and were reviewed by a committee of senior technical representatives from the participating centers (members are listed at the end). The material for this tutorial was taken from the publication issued by the NASA Reliability and Maintainability Steering Committee (NASA Reliability Preferred Practices for Design and Test. NASA TM-4322, 1991). Reliability must be an integral part of the systems engineering process. Although both disciplines must be weighed equally with other technical and programmatic demands, the application of sound reliability principles will be the key to the effectiveness and affordability of America's space program. Our space programs have shown that reliability efforts must focus on the design characteristics that affect the frequency of failure. Herein, we emphasize that these identified design characteristics must be controlled by applying conservative engineering principles.

Lalli, Vincent R.↗

Intermittent Renewable Management Pilot Phase 2

The Intermittent Renewable Management Pilot - Phase 2 (IRM2) was designed to study the feasibility of demand-side resources to participate into the California Independent System Operator (CAISO) wholesale market as proxy demand resources (PDR). The pilot study focused on understanding the issues related with direct participation of third-parties and customers including customer acceptance; market transformation challenges (wholesale market, technology); technical and operational feasibility; and value to the rate payers, DR resource owners and the utility on providing an enabling mechanism for DR resources into the wholesale markets. The customer had the option of committing to either three contiguous hour blocks for 24 days or six contiguous hours for 12 days a month with day-ahead notification that aligned with the CAISO integrated forward market. As a result of their being available, the customer was paid $10/ kilowatt (kW)-month for capacity in addition to CAISO energy settlements. The participants were limited to no more than a 2 megawatt (MW) capacity with a six-month commitment. Four participants successfully engaged in the pilot. In this report, we provide the description of the pilot, participant performance results, costs and value to participants as well as outline some of the issues encountered through the pilot. Results show that participants chose to participate with storage and the value of CAISO settlements were significantly lower than the capacity payments provided by the utility as incentive payments. In addition, this pilot revealed issues both on the participant side and system operations side. These issues are summarized in the report.The Intermittent Renewable Management Pilot - Phase 2 (IRM2) was designed to study the feasibility of demand-side resources to participate into the California Independent System Operator (CAISO) wholesale market as proxy demand resources (PDR). The pilot study focused on understanding the issues related with direct participation of third-parties and customers including customer acceptance; market transformation challenges (wholesale market, technology); technical and operational feasibility; and value to the rate payers, DR resource owners and the utility on providing an enabling mechanism for DR resources into the wholesale markets.

99 GENERAL AND MISCELLANEOUS↗

Milestones for Selection, Characterization, and Analysis of the Performance of a Repository for Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain.

This report presents a concise history in tabular form of events leading up to site identification in 1978, site selection in 1987, subsequent characterization, and ongoing analysis through 2009 of the performance of a repository for spent nuclear fuel and high - level radioactive waste at Yucca Mountain in southern Nevada. The tabulated events generally occurred in five periods: (1) commitment to mined geologic disposal and identification of sites; (2) site selection and analysis, based on regional geologic characterization through literature and analogous data; (3) feasibility analysis demonstrating calculation procedures and importance of system components, based on rough measures of performance using surface exploration, waste process knowledge, and general laboratory experiments; (4) suitability analysis demonstrating viability of disposal system, based on environment - specific laboratory experiments, in - situ experiments, and underground disposal system characterization; and (5) compliance analysis, based on completed site - specific characterization . The current sixth period beyond 2010 represents a new effort to set waste management policy in the United States. Because the relationship is important to understanding the evolution of the Yucca Mountain Project , the tabulation also shows the interaction between the policy realm and technical realm using four broad categories of events : (a) Regulatory requirements and related federal policy in laws and court decisions, (c) Presidential and agency directives, (c) technical milestones of implementing institutions, and (d) critiques of the Yucca Mountain Project and pertinent national and world events related to nuclear energy and radioactive waste. Preface The historical progression of technical milestones for the Yucca Mountain Project was originally developed for 10 journal articles in a special issue of Reliability Engineering System Safety on the performance assessment for the Yucca Mountain license application [1-10]. The listing of mile stones, a distinct feature of those articles, has been collected and tabulated here. A lthough a brief description is presented here (based on the summaries in the 10 journal articles), the emphasis remains on the tabulation because of its usefulness in providing a comprehensive but concise history of the Yucca Mountain Project. The tabulation presented here is more elaborate than originally presented in that many of the interactions that occurred between the technical realm and policy realm can be depicted in separate columns. The usefulness of the milestones table is due in part to L.A. Connolly, for editorial and reference support, and S.K. Best, Raytheon, and L. Mays, Sandia National Laboratories (SNL), for illustration support. Reviewers P.N. Swift, SNL, and K. Gupta, University of Oklahoma, helped improve the discussion. The historical perspective presented is that of the author and is not necessarily held by reviewers, Sandia National Laboratories , and the US Department of Energy. As a historic perspective, the author is reporting on the work of others; however, any interpretative error s of the documentation are those of the author alone. The characterization and modeling of the Yucca Mountain disposal system required numerous participants with expertise in many areas of science and technology, as evident from the extensive reference list. Their diligent efforts are generally acknowledged here and through the many references to their impressive work, but the 10 journal articles acknowledge by name many of the numerous participants that contributed to the Yucca Mountain Project .

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Technical Basis for Proposed Changes to DOE-STD-1194-2019, Nuclear Material Attractiveness Determination and Categorization

The Department of Energy (DOE)’s Technical Standard DOE-STD-1194-2019 (dated September 2019), Nuclear Materials Control and Accountability, provides key guidance for the determination of Special Nuclear Material (SNM) attractiveness levels. Attractiveness levels are a key component in the security categorization of SNM processed, used, and stored at DOE facilities. Upon review, the writing team identified specific components relating to the determination of attractiveness levels that could be modified to improve clarity, reduce burden on sites, and/or better align with the graded safeguards principle that is central to the DOE’s nuclear security program. The report outlines the original verbiage, issues with implementation of that verbiage, proposed new verbiage, and the expected benefits thus serving as the technical basis for the proposed changes.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗