Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Technical Note: Confirming the prescribed angle of CT localizer radiographs and c-arm projection acquisitions

Purpose: Accurate CT radiograph angle is not usually important in diagnostic CT. However, there are applications in radiation oncology and interventional radiology in which the orientation of the x-ray source and detector with respect to the patient is clinically important. The authors present a method for measuring the accuracy of the tube/detector assembly with respect to the prescribed tube/detector position for CT localizer, fluoroscopic, and general radiograph imaging using diagnostic, mobile, and c-arm based CT systems. Methods: A mathematical expression relating the x-ray projection of two metal BBs is related to gantry angle. Measurement of the BBs at a prescribed gantry (i.e., c-arm) angle can be obtained and using this relation the prescribed versus actual gantry angle compared. No special service mode or proprietary information is required, only access to projection images is required. Projection images are available in CT via CT localizer radiographs and in the interventional setting via fluorography. Results: The technique was demonstrated on two systems, a mobile CT scanner and a diagnostic CT scanner. The results confirmed a known issue with the mobile scanner and accurately described the CT localizer angle of the diagnostic system tested. Conclusions: This method can be used to quantify gantry angle, which is important when projection images are used for procedure guidance, such as in brachytherapy and interventional radiology applications.

61 RADIATION PROTECTION AND DOSIMETRY↗

Results of the Nuclotron-M project

The main goal of the Nuclotron-M project, approved in 2007, was formulated as follows: modernization of the main accelerator systems for reliable and safe operation of the Nuclotron as a part of the accelerator facility NICA (Nuclotron-based Ion Collider Facility) being constructed at JINR. Demonstration of heavy-ion beam acceleration (with atomic mass number higher than 100) as well as safe and stable operation of the main superconducting system operation at a magnetic field of up to 2 T had been defined as criteria of successful project fulfillment. Another very important issue is performance of stable, long-term beam runs and increase of the accelerated beam intensity. All the main goals of the Nuclotron-M project had been successfully achieved by the end of 2010. In this report we give an overview of the project realization chronology and present the main experimental results obtained at LHEP Nuclotron accelerator facility in the period from 2007 to early 2011.

43 PARTICLE ACCELERATORS↗

Modified Method for Reconstructing the Image from Projections in Magnetic Resonance Tomography

A method for reconstructing the image from projections in magnetic resonance tomography using an excitation pulse with a linear frequency modulation has been considered. The shape of the spin echo envelope coincides with the projection of the spin density onto the direction of the axis along which the magnetic field gradient is applied. The spin echo excitation by a sinc pulse and a pulse with a linear frequency modulation has been simulated. The former pulse excites the required cross section of a 3D object, while the latter pulse has made it possible to form the spin echo envelope, which coincides in shape with the projection of the spin density of nuclei onto the direction of the gradient. The set of the projections onto different directions of the gradient has made it possible to reconstruct the 2D image of a section.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Function Preserving Projection

With function preserving projection (FPP), we aim to address high-dimensional data exploration challenges common in many scientific applications. Instead of preserving the global or local geometric structure of a dataset like traditional dimensionality reduction methods (e.g., principal component analysis, t-stochastic neighborhood embedding), the proposed approach finds a linear projection that reveal interpretable (yet potentially nonlinear) pattern of the properties of interests defined on a highdimensional domain (e.g., simulation yield defined on the input parameter space). The key insight driving FPP is the fact that while non-linear embeddings are difficult to interpret, humans are highly skilled in understanding complex visual patterns. FPP lets users select the complexity of a pattern they consider interpretable, allows to find a joint projection that explains multiple functions, and provides a confidence statistic (akin to a p-value) indicating how salient the resulting pattern is. We demonstrate the efficacy of the proposed method on several synthetic and scientific datasets for both continuous (regression) and discrete (classification) problems of interests and illustrate the scalability of FPP by finding an optimal projection for close to 40 gigabytes in around 10 minutes.

Liu, SHUSEN↗

Vegetation Representation Influences Projected Streamflow Changes in the Colorado River Basin

Vegetation parameters for the Variable Infiltration Capacity (VIC) hydrologic model were recently updated using observations from the Moderate Resolution Imaging Spectroradiometer (MODIS). Previous work showed that these MODIS-based parameters improved VIC evapotranspiration simulations when compared to eddy covariance observations. Due to the importance of evapotranspiration within the Colorado River basin, this study provided a basin-by-basin calibration of VIC soil parameters with updated MODIS-based vegetation parameters to improve streamflow simulations. Interestingly, while both configurations had similar historic streamflow performance, end-of-century hydrologic projections, driven by 29 downscaled global climate models under the RCP8.5 emissions scenario, differed between the two configurations. The calibrated MODIS-based configuration had an ensemble mean that simulated little change in end-of-century annual streamflow volume (+0.4%) at Lees Ferry, Arizona, relative to the historical period (1960–2005). In contrast, the previous VIC configuration, which is used to inform decisions about future water resources in the Colorado River basin, projected an 11.7% decrease in annual streamflow. Both VIC configurations simulated similar amounts of evapotranspiration in the historical period. However, the MODIS-based VIC configuration did not show as much of an increase in evapotranspiration by the end of the century, primarily within the upper basin’s forested areas. Differences in evapotranspiration projections were the result of the MODIS-based vegetation parameters having lower leaf area index values and less forested area compared to previous vegetation estimates used in recent Colorado River basin hydrologic projections. These results highlight the need to accurately characterize vegetation and better constrain climate sensitivities in hydrologic models.

54 ENVIRONMENTAL SCIENCES↗

Towards provision of regularly updated climate data from the Coupled Model Intercomparison Project

The Coupled Model Intercomparison Project (CMIP) is a flagship of the World Climate Research Programme (WCRP). CMIP has become a recognised ‘brand’ in climate circles evolving over the last thirty years from a targeted research activity by a small number of climate modelling centres intercomparing their Earth System Model (ESM) simulations to a broad international coordinated research effort (Durack et al, 2025). CMIP is organized as a research activity leveraging funded and in-kind contributions from experts within modelling centres and the broader scientific community supported more recently by a fully-funded International Project Office. Within CMIP, Model Intercomparison Projects (MIPs) are community-designed to understand past, present and future climate. CMIP data provides a valuable resource for climate research and is routinely used to assess model representation of climate processes and test scientific hypotheses in the context of model uncertainty and (forced and internal) variability as evident from its prolific use in scientific publications1 . The impact relies on enabling infrastructure (most prominently via the Earth System Grid Federation (ESGF)), which allows sharing of simulation output, provision of the boundary conditions used in each simulation, and definition of the data standards that are essential to facilitating wide use of the data. The impact is supplemented by the wide-ranging scrutiny to which model simulations are subjected. Beyond its use in research, CMIP data is a key resource for communities producing derived climate information from downscaling and impact studies, such as the Coordinated Regional Downscaling Experiment (CORDEX; Gutowski et al., 2016) and the Intersectoral Impacts MIP (ISIMIP; Frieler et al., 2024). Government, academic and commercial entities also increasingly rely on CMIP and its downstream data for climate risk assessments and climate services (for example, Copernicus Climate Change Service and World Bank portal). This means that, although CMIP is a research activity, it increasingly serves a secondary and very relevant role as a provider of climate data – a long-recognised dichotomy (Stevens, 2024). Research and applications have distinct needs, with the former requiring flexibility and generality and the latter consistency. Here we explain how the design of the research activity has been adapted to reduce the burdens imposed by applications and how the research infrastructure might evolve to further enable scientific inquiry. We propose one possible approach to consistently providing model information and projections for applications in the future.

Environmental sciences↗

SECARB Project Overview Book

In 2003, the United States Department of Energy (DOE) issued awards initiating seven Regional Carbon Sequestration Partnerships (RCSP) spanning the United States and portions of Canada. Managed by DOE’s National Energy Technology Laboratory (NETL), the RCSPs currently represent more than 400 state agencies, universities, and private companies, spanning 43 states, three Native American Organizations, and four Canadian provinces. The Southern States Energy Board (SSEB) received an award on October 1, 2003, which established the Board’s overall management and administration of the Southeast Regional Carbon Sequestration Partnership, or SECARB. The geographical region currently includes 13 states and a network of more than 100 stakeholders. The Nation’s leading scientists, university researchers, national laboratories, industrial representatives, environmental organizations, and many others have taken a proactive approach at identifying and characterizing the most promising options for technology deployment and carbon dioxide (CO2) utilization and storage (CCUS) for the Southeast. The results obtained during these injections will be important to the future commercialization of CCUS technologies and the continued use of fossil fuels as a significant energy source in a manner that is environmentally responsible. Each of the six SECARB project locations has been locally coordinated by its own field team. The field teams assume responsibility for the technical scope of work, local education and outreach, permitting, monitoring, verification, and accounting (MVA), and maintaining the validation test’s schedule and budget. Each team contributes new information to the continued characterization of the region. In addition, a task is dedicated to integrating field data and filling gaps in regional characterization data sets. Data and tools developed in the Continued Characterization task are incorporated into a relational database and geographic information system (GIS). All field tests, the continued characterization project, and the cross-cutting functions are designed to support the DOE roadmap by validating technologies and identifying locations throughout the region that could support full-scale CCUS deployment opportunities. Detailed fact sheets for the SECARB projects are available on the SECARB website at www.secarbon.org (see “Projects” tab).

RCSP↗

PRIMO - The P&A Project Optimizer

In support of the Methane Emissions Reduction Program (MERP) and under the National Methane Emissions Reduction Initiative (NEMRI), the National Energy Technology Laboratory (NETL) and NETL site support contractors are developing and releasing an open-source decision-support tool (“PRIMO”) to help organizations determine which marginal conventional wells (MCWs) or other low-producing wells make the best candidates for plugging utilizing MERP funds, while also optimizing subsequent plugging and abandonment (P&A) campaigns for both program impact and efficiency. The framework—which is fully customizable—provides three main capabilities: 1. Ranking candidate wells (based on user preferences) 2. Identifying high-impact, high-efficiency P&A project candidates (with transparently computed scores for relevant metrics) 3. Comparing competing P&A projects quantitatively (through transparently computed project impact and efficiency scores) As such, PRIMO is a versatile, fully customizable tool that is meant to support organizations in making data-based, transparent, and defensible well selection and P&A project design decisions. For questions, comments or feedback, please contact primo@netl.doe.gov.

MERP↗

In-Kind Contributions: The PIP-II Project at Fermilab

The Proton Improvement Plan II (PIP-II) Project is the first U.S. accelerator project that has significant contributions from international partners. A project management framework was created to fully integrate and make consistent across all partners the design, development, and delivery of In-Kind Contributions (IKC) into PIP-II. This framework consists of planning documentation, procedures, and communication and assessment processes to control schedule, risk, quality, and technical integration over the lifetime of the project. The purpose of this paper is to present the PIP-II IKC model put in place to properly integrate the IKC deliverables into the PIP-II Linac and share experience and lessons learned from its early implementation.

43 PARTICLE ACCELERATORS↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

43 PARTICLE ACCELERATORS↗

Pansophy enhancements for SRF through collecting and analyzing inputs/outputs to further project efficiency in reporting and performance

SRF cavity and Cryomodule testing and production requires a consistent means of collecting and analyzing data against quality and production parameters. JLab's engineering data management system, Pansophy, is utilized to assist project leaders and subject matter experts (SMEs) with such tasks, by providing a means to data mine key parameter indicators (KPI) and production planning and status data. Recent enhancements to reporting and trending have been utilized for the LCLS-II and CEBAF 12GeV upgrade projects. Further enhancements are being planned for future projects, like SNS-PPU, such as KPI trending, KPI quality, vendor quality, production timelines and user defined queries. Being able to understand past trends will assist with enhancements to future projects.

Bookwalter, Valerie D.↗

Lessons from Iowa: Development of a 270 Megawatt Compressed Air Energy Storage Project in Midwest Independent System Operator

The Iowa Stored Energy Park was an innovative, 270 Megawatt, $400 million compressed air energy storage (CAES) project proposed for in-service near Des Moines, Iowa, in 2015. After eight years in development the project was terminated because of site geological limitations. However, much was learned in the development process regarding what it takes to do a utility-scale, bulk energy storage facility and coordinate it with regional renewable wind energy resources in an Independent System Operator (ISO) marketplace. Lessons include the costs and long-term economics of a CAES facility compared to conventional natural gas-fired generation alternatives; market, legislative, and contract issues related to enabling energy storage in an ISO market; the importance of due diligence in project management; and community relations and marketing for siting of large energy projects. Although many of the lessons relate to CAES applications in particular, most of the lessons learned are independent of site location or geology, or even the particular energy storage technology involved.

25 ENERGY STORAGE↗

Washoe Wisk'e'em Project

The Washoe Tribe Wiskem Project (Project) was a Congressionally Directed Project identified for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2010. The Project focused on installing up to four small vertical wind turbines at designated locations on Tribal lands to offset energy costs for the Tribe. The Washoe Tribe will use and analyze data collected from the wind turbines to better understand the wind resource.

17 WIND ENERGY↗

Navajo Hopi Land Commission Renewable Energy Development Project (NREP)

The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketing tools to support outreach efforts targeting the public, vendors, investors and government audiences.

14 SOLAR ENERGY↗

Siting protocols for marine and hydrokinetic energy projects

Project Objective: The purpose of this project is to identify and address regulatory issues that affect the cost, time and the management of potential effects as it relates to siting and permitting advanced water power technologies. Background: The overall goal of this effort is to reduce the cost, time and effort of managing potential effects from the development advanced water power projects as it relates to the regulatory process in siting and permitting. To achieve this goal, a multi-disciplinary team will collect and synthesize existing information regarding regulatory processes into a user-friendly online format. In addition, the team will develop a framework for project planning and assessment that can incorporate existing and new information. The team will actively collaborate and coordinate with other efforts that support or influence regulatory process. Throughout the process, the team will engage in an iterative, collaborative process for gathering input and testing ideas that involves the relevant stakeholders across all sectors at the national, regional, and all state levels.

16 TIDAL AND WAVE POWER↗

Benchmark Imagery Project: Report on Generation of Synthetic Images

The “Benchmark Imagery” project is a DOE NA-22-funded effort whose three-year goal is to create a suite of imagery that can be used to test geospatial algorithms used for extracting semantic content from overhead images of industrial facilities (e.g., auto-annotation). The project is a collaborative effort between Los Alamos National Laboratory (LANL) and the Lawrence Livermore National Laboratory (LLNL). Although a variety of image modalities are used to capture overhead photographs of terrestrial facilities, the current focus of the effort of this project is on collecting and annotating conventional visual-band (RGB or RGB/NIR) images. Presently, the set of images consists of 114 airborne images of various US industrial facilities. We have annotated all of the images in the imagery set, using a constrained vocabulary of about a dozen general terms such as “building,” ”tower,” or “electrical substation.” The project plans to include synthetic and composite images in addition to actual photographs. In preparation for using synthetic images, we have built a proof-of-principle synthetic image of a fictitious nuclear power plant. This report describes the key aspects of creating that image.

97 MATHEMATICS AND COMPUTING↗

Standard Measurement and Verification Plan for Lighting Retrofit Projects for Buildings and Building Sites

This document provides a framework for standard measurement and verification (M&V) of lighting retrofit and replacement projects. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for lighting projects. It includes details on all aspects of effectively measuring light levels of existing and post-retrofit projects, conducting power measurement, and developing cost-effectiveness analysis. This framework M&V plan also enables consistent comparison among similar lighting projects, and may be used to develop M&V plans for non--lighting-technology retrofits and new installations.

Richman, Eric E.↗

San Francisco Biofuel Program: Brown Grease to Biodiesel Demonstration (Project Report)

Municipal wastewater treatment facilities have typically been limited to the role of accepting wastewater, treating it to required levels, and disposing of its treatment residuals. However, a new view is emerging which includes wastewater treatment facilities as regional resource recovery centers. This view is a direct result of increasingly stringent regulations, concerns over energy use, carbon footprint, and worldwide depletion of fossil fuel resources. Resources in wastewater include chemical and thermal energy, as well as nutrients, and water. A waste stream such as residual grease, which concentrates in the drainage from restaurants (referred to as Trap Waste), is a good example of a resource with an energy content that can be recovered for beneficial reuse. If left in wastewater, grease accumulates inside of the wastewater collection system and can lead to increased corrosion and pipe blockages that can cause wastewater overflows. Also, grease in wastewater that arrives at the treatment facility can impair the operation of preliminary treatment equipment and is only partly removed in the primary treatment process. In addition, residual grease increases the demand in treatment materials such as oxygen in the secondary treatment process. When disposed of in landfills, grease is likely to undergo anaerobic decay prior to landfill capping, resulting in the atmospheric release of methane, a greenhouse gas (GHG). This research project was therefore conceptualized and implemented by the San Francisco Public Utilities Commission (SFPUC) to test the feasibility of energy recovery from Trap Waste in the form of Biodiesel or Methane gas. The research goals are given below: To validate technology performance; To determine the costs and benefits [including economic, socioeconomic, and GHG emissions reduction] associated with co-locating this type of operation at a municipal wastewater treatment plant (WWTP); To develop a business case or model for replication of the program by other municipal agencies (as applicable). In order to accomplish the goals of the project, the following steps were performed: 1. Operation of a demonstration facility designed to receive 10,000 to 12,000 gallons of raw Trap Waste each day from private Trap Waste hauling companies. The demonstration facility was designed and built by Pacific Biodiesel Technologies (PBTech). The demonstration facility would also recover 300 gallons of Brown Grease per day from the raw Trap Waste. The recovered Brown Grease was expected to contain no more than 2% Moisture, Insolubles, and Unsaponifiables (MIU) combined. 2. Co-digestion of the side streams (generated during the recovery of 300 gallons of Brown Grease from the raw Trap Waste) with wastewater sludge in the WWTP's anaerobic digesters. The effects of the side streams on anaerobic digestion were quantified by comparison with baseline data. 3. Production of 240 gallons per day of ASTM D6751-S15 grade Biodiesel fuel via a Biodiesel conversion demonstration facility, with the use of recovered Brown Grease as a feedstock. The demonstration facility was designed and built by Blackgold Biofuels (BGB). Side streams from this process were also co-digested with wastewater sludge. Bench-scale anaerobic digestion testing was conducted on side streams from both demonstration facilities to determine potential toxicity and/or changes in biogas production in the WWTP anaerobic digester. While there is a lot of theoretical data available on the lab-scale production of Biodiesel from grease Trap Waste, this full-scale demonstration project was one of the first of its kind in the United States. The project's environmental impacts were expected to include: Reduction of greenhouse gas emissions by prevention of the release of methane at landfills. Although the combustion product of Biodiesel and Methane gas produced in the Anaerobic digester, Carbon Dioxide, is also a greenhouse gas; it is 20 times weaker for the same amount (per mole) released, making its discharge preferable to that of Methane. The use of Biodiesel in place of fossil-fuel derived Diesel was expected to reduce net Carbon Dioxide, Ash Particulate, Sulfate, Silicate, and Soot emissions, thereby improving air quality.

09 BIOMASS FUELS↗