International Good Practice in Preparing for Decommissioning - 18404

The transition of a nuclear facility from operation to the implementation of dismantling is a critical phase in every decommissioning project. Several organizational and technical modifications are needed to adapt the facility to meet the new objectives and requirements. A variety of activities need to be planned and performed to support the transition and to prepare the dismantling of the facility. Experience has shown that it is essential to start with preparations for decommissioning at a very early stage, at best already during the design stage of the facility but at least during the operational stage. The preparation of the transition for decommissioning and dismantling (D and D) is a key issue for the success of the global D and D project to minimize delays and undue costs; to optimize personnel and other resources; and to initiate preparatory activities for decommissioning in a planned, timely and cost-effective manner and thus to ensure safe and efficient decommissioning. With the growing number of nuclear facilities reaching the decommissioning stage, the Working Party on Decommissioning and Dismantling (WPDD) within the Nuclear Energy Agency of OECD formed the Task Group on Preparing for Decommissioning. This group of experts include regulators, nuclear operators and independent experts to review the strategic aspects to optimize the preparations for decommissioning from the last years of operation onwards. This paper gives and overview of the work carried out by TGPFD between 2015 and 2017 and covers strategic approaches, issues and risks and observations of good practice rather than providing detailed descriptions of methods or technologies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

H-Canyon facility remains a national asset after finding innovative solution to funding issues - 15278

In recent years, there has been an increase in the number of missions for the H-Canyon facility at the Savannah River Site, as its capabilities are being recognized as an increasingly important asset for the Department of Energy (U.S. DOE). The sustainability of that asset was called into question in 2011, when funding from U.S. DOE's Environmental Management (EM) program became insufficient to sustain processing. Through the acquisition of new customers, funding was restored and H Canyon missions have seen new life. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Overview of Project Planning for Hot-Isostatic Pressure Treatment of High-Level Waste Calcine for the Idaho Cleanup Project - 12289

The Calcine Disposition Project is responsible for retrieval, treatment by hot-isostatic pressure, packaging, and disposal of highly radioactive calcine stored at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site in southeast Idaho. In the 2009 Amended Record of Decision: Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement the Department of Energy documented the selection of hot-isostatic pressure as the technology to treat the calcine. The Record of Decision specifies that the treatment results in a volume-reduced, monolithic waste form suitable for transport outside of Idaho by a target date of December 31, 2035. That target date is specified in the 1995 Idaho Settlement Agreement to treat and prepare the calcine for transport out of Idaho in exchange for allowing storage of Navy spent nuclear fuel at the INL Site. The project is completing the design of the calcine-treatment process and facility to comply with Record of Decision, Settlement Agreement, Idaho Department of Environmental Quality, and Department of Energy requirements. A systems engineering approach is being used to define the project mission and requirements, manage risks, and establish the safety basis for decision making in compliance with DOE O 413.3B, 'Program and Project Management for the Acquisition of Capital Assets'. The approach draws heavily on 'design-for-quality' tools to systematically add quality, predict design reliability, and manage variation in the earliest possible stages of design when it is most efficient. Use of these tools provides a standardized basis for interfacing systems to interact across system boundaries and promotes system integration on a facility-wide basis. A mass and energy model was developed to assist in the design of process equipment, determine material-flow parameters, and estimate process emissions. Data generated from failure modes and effects analysis and reliability, availability, maintainability, and inspectability analysis were incorporated into a time and motion model to validate and verify the capability to complete treatment of the calcine within the required schedule. The Calcine Disposition Project systems engineering approach, including use of industry-proven design-for-quality tools and quantitative assessment techniques, has strengthened the project's design capability to meet its intended mission in a safe, cost-effective, and timely manner. Use of these tools has been particularly helpful to the project in early design planning to manage variation; improve requirements and high-consequence risk management; and more effectively apply alternative, interface, failure mode, RAMI, and time and motion analyses at the earliest possible stages of design when their application is most efficient and cost effective. The project is using these tools to design and develop HIP treatment of highly radioactive calcine to produce a volume-reduced, monolithic waste form with immobilization of hazardous and radioactive constituents. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations for Emerging Markets for Energy Savings Certificates

Early experiences with energy savings certificates (ESCs) have revealed both their merit and the challenges associated with them. In the United States, there has been little activity to date, so any lessons must be drawn from experiences in Italy, the United Kingdom (UK), France, and elsewhere. The staying power of European examples, particularly in Italy, demonstrates that ESCs can help initiate more efficiency projects. Although a robust market for renewable energy certificates (RECs) has emerged in both the voluntary and policy compliance contexts in the United States, ESCs have yet to gain significant traction. This report looks at the opportunity presented by ESCs, the unique challenges they bring, a comparison with RECs that can inform expectations about ESC market development, and the solutions and best practices early ESC market experience have demonstrated. It also examines whether there are real market barriers that have kept ESCs from being adopted and what structural features are necessary to develop effective trading programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

World Record Earned Value Management System Certification for Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 13181

On projects that require Earned Value Management (EVMS) Certification, it is critical to quickly prepare for and then successfully obtain certification. This is especially true for government contracts. Projects that do poorly during the review are subject to financial penalties to their company and they lose creditability with their customer creating problems with the project at the outset. At East Tennessee Technology Park (ETTP), we began preparing for Department of Energy (DOE) certification early during proposal development. Once the contract was awarded, while still in transition phase from the previous contractor to our new company, we immediately began reviewing the project controls systems that were in place on the project and determined if any replacements needed to be made immediately. The ETTP contract required the scheduling software to be upgraded to Primavera P6 and we determined that no other software changes would be done prior to certification. Next, preparation of the Project Controls System Description (PCSD) and associated procedures began using corporate standards as related to the project controls systems. During the transition phase, development was started on the Performance Measurement Baseline which is the resource loaded schedule used to measure our performance on the project and which is critical to good Earned Value Management of the project. Early on, and throughout the baseline review, there was positive feedback from the Department of Energy that the quality of the new baseline was good. Having this superior baseline also contributed to our success in EVMS certification. The combined companies of URS and CH2M Hill had recent experience with certifications at other Department of Energy sites and we were able to capitalize on that knowledge and experience. Generic PCSD and procedures consistent with our co-operations approach to Earned Value Management were available to us and were easily tailorable to the specifics of our contract and site. We also had corporate EVMS experts available to us so as to draw upon their recent certification experiences with lessons learned. This knowledge was especially helpful for training of personnel that were involved in the certification which included Project Controls, Project Management and Control Account Managers. We were also able to bring in these corporate experts to assist with our training efforts. To assure our readiness for the review, we conducted a 'White Hat' review. The 'White Hat' team consisted of corporate experts in EVMS along with an industry expert in EVMS from Humphrey and Associates. This review identified early any weaknesses that we had so corrections could be enacted prior to the EVMS Certification Readiness Review. It also helped give the evaluators confidence that we had done proper due diligence prior to their arrival. Also critical to our success, was early communication with our evaluators. It is important to start the communications early to ensure you understand the expectations of the certification team and the process that will be used during the certification. Communication through the entire process is critical to understand expectations and issues along the way. Very important to the overall process was management commitment, support and reinforcement. Management made sure that all personnel involved knew the importance and made preparations a priority. This was noted as a key strength by the evaluators during the out-brief. As a result of our preparation, our review yielded one Corrective Action Report (CAR) and two Continuous Improvement Opportunities (CIOs). The Certification team in their out-brief explained that this was the lowest number of CARs and CIOs in the history of EVMS certifications in the DOE Complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Starting DIADEM medium-level waste interim storage's construction - 15034

As part of its decommissioning policy, the nuclear energy division of CEA has identified materials whose high enough radioactive features authorize neither sustainable storage in existing facilities nor evacuation to a French operational geological disposal. Pending availability of definitive solutions, it was decided to explore the possibility to store these materials in a new installation, the subject of DIADEM project [1]. The need was first identified in Marcoule's site, especially to accommodate future waste dismantling of Phenix reactor. Quickly the interest of a centralized storage for all CEA waste of this type appeared to bring together the best expertise to the design and operation of storage. Waste will be stored either to use benefits of radioactive decay or to wait for the commissioning of a new disposal. DIADEM is designed for an operating estimated lifetime of fifty years. This paper deals with the prior safety assessment completed in 2014, the project management and the first steps of the facility construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Development of a Small-Scale Project Model for Waste Management at the Port Hope Conversion Facility - 19126

Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. Over time, Cameco's ongoing operations contributed to an increase in the volume of low-level radioactive waste managed onsite. Since 2011, Cameco has completed annual waste management campaigns with the goal of accelerating the recycle/disposal of accumulated legacy radioactive wastes stored at its Ontario operations. With disposal options for low-level radioactively contaminated wastes in Canada limited due to cost considerations and no commercially accessible landfills licensed for radioactive material. In recent years, Cameco has started to ship marginally contaminated wastes (<500 ppm uranium) to the United States for disposal in an appropriate landfill owned by US Ecology in Idaho. Numerous successful campaigns totaling over 1,000 successful shipments, have been completed to transport drummed and/or bagged material by rail in gondola cars to the disposal facility in Idaho since 2011. All shipments have been completed in compliance with all environmental regulations, with a perfect compliance record maintained to date. To achieve this excellent compliance record, the campaigns require careful planning by both organizations, as well as deployment of personnel from the Idaho facility during the campaign for project management, characterization and/or radiation monitoring support. As the accumulated waste inventory has been reduced through these projects, the scope and duration of each campaign has also decreased. In the last few years, road transport directly to the Idaho facility has also been utilized. This option allows for the deployment of small projects that may be completed for a smaller inventory of a specific waste type and to manage newly-generated low-level radioactive wastes on an ongoing basis. These projects have ranged from a single standard van shipment to multiple trucks running continuous loops between the Ontario and Idaho or Ontario and an intermediary site and have been utilized for marginally contaminated wastes (<500 ppm uranium) as well as marginally contaminated wastes with additional hazard classification. Cameco and US Ecology personnel have collaborated to develop characterization and shipment procedures that enable these projects to be executed in full compliance with all Canadian and US regulations, without deployment of personnel from the Idaho facility, while maintaining adequate oversight by both organizations to ensure that the waste is safely and compliantly managed. These protocols have been implemented and optimized for the Port Hope Conversion Facility and will be rolled out to other Cameco facilities in Ontario through 2019. Cameco expects to utilize the small project model for the long term to ensure that eligible marginally contaminated wastes (<500 ppm uranium) are managed appropriately to ensure that once the legacy material is eliminated, it remains so. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Design of the Belgian Geological Disposal Facility for Category B and C Wastes - 19341

For more than 40 years, ONDRAF/NIRAS (the federal agency responsible for managing radioactive waste and enriched fissile materials in Belgium) has been studying the concept of a geological disposal facility (GDF), within poorly indurated clays, as an option for the long-term management of both category B waste (low-level and intermediate-level long-lived waste - LILW-LL) and category C waste (high-level waste - HLW and spent fuel). The proposed Belgian reference option for disposal of such waste is a GDF within poorly indurated clays, located at a depth of between 200 m and 600 m. Within the framework of the first Safety and Feasibility Case (SFC-1) undertaken by ONDRAF/NIRAS, the former GDF layout, which dates back from 2003 has been updated. The first part of the paper describes the main drivers behind the evolution of the former 2003 GDF design towards the current reference SFC-1 design. It also details how these drivers, related to operational and constructional constraints, have affected the GDF layout, such as the disposal gallery length, the crossing shapes of the GDF galleries and the layout of access and waste shafts. The second part of the paper focuses on the engineering and construction challenges generated by GDF development within poorly indurated clays. This includes discussion of the impact of the specific mechanical characteristics such poorly indurated clays have on the construction methods used for the shafts, the rock support (concrete lining), the drift connections, the crossings and the global GDF design. These construction methods have been selected based on research conducted at the underground research laboratory HADES in Mol (Belgium). Finally, the main axes for further development of the GDF design within the SFC-1 framework is presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Augmented Reality for Managing Nuclear Infrastructure and Operations - 19605

Emerging augmented reality tools offer great promise for helping manage nuclear infrastructure throughout its life cycle. These tools have the ability to provide operators with actionable holographic information as they work. Perhaps more excitingly these tools also feature sensors that provide the ability to document work at very high spatial resolution. These sensors include onboard cameras as well as active infrared sensors that can capture 3D geometry information on-the-fly. Coupling the visualization and sensing tools provided by augmented reality headsets with computational intelligence opens up many exciting new possibilities for managing nuclear infrastructure throughout its life cycle. In this presentation we show a number of examples of how augmented reality tools can be incorporated into the management of nuclear infrastructure. We show examples of using augmented reality as a human-machine interface for robotic control, and we show examples of augmented reality being interfaced with external sensors. Finally, we show how these sensing and visualization capabilities of augmented reality can be interfaced with intelligent algorithms to help operators perform their work in nuclear facilities. The goal of the work is to spark discussions on how emerging augmented reality tools can help enable the next generation of efficient, high-performance nuclear infrastructure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Systematic Analysis of Drivers and Barriers of Cross-Sectorial Learning Between Nuclear and Oil and Gas Decommissioning Projects - 20139

Project and megaproject management in the energy sector have historically focused on the planning and delivery of the construction of infrastructure. Therefore, policies are predominantly oriented to support the construction of infrastructure rather than its decommissioning. However, globally, several facilities have reached (or will soon reach) their end-of-life and need to be decommissioned. These facilities span across the energy sector, including nuclear power plants and oil and gas rigs, whose decommissioning present unprecedented techno-socio-economic challenges. Moreover, globally, their decommissioning cost is estimated to reach hundreds of billions of US dollars and this budget keeps increasing, with limited knowledge-transfer across industries to mitigate the spiraling increase of this figure. Cross-sectorial knowledge-transfer is a way to tackle this matter and improve the planning and delivery of decommissioning and waste management projects. The aim of this research is to build a road-map based on cross-sectorial industrial experience, designed to promote the sharing of good practices between projects both within and across industries dealing with major decommissioning and waste management challenges. To reach this aim, the tacit knowledge of senior practitioners on several large scale nuclear and oil and gas decommissioning projects is made explicit by the means of semi-structured interviews, systematically analyzed through directed content analysis. The results of this analysis include a list of good practices that could and should be transferred to nuclear decommissioning projects, including the need to promote the adoption of incentives explicitly linked to the project deliverables, and to develop long-term plans to support smooth transition from operations to decommissioning. Suggestions about how the knowledge-transfer can be promoted within and across organizations are also discussed. In this way, this research provides practical guidance for project managers and policymakers on how to support the planning and delivery of projects with improved performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY 2008 Next Generation Safeguards Initiative International Safeguards Education and Training Pilot Progerams Summary Report

Key component of the Next Generation Safeguards Initiative (NGSI) launched by the National Nuclear Security Administration is the development of human capital to meet present and future challenges to the safeguards regime. An effective university-level education in safeguards and related disciplines is an essential element in a layered strategy to rebuild the safeguards human resource capacity. Two pilot programs at university level, involving 44 students, were initiated and implemented in spring-summer 2008 and linked to hands-on internships at LANL or LLNL. During the internships, students worked on specific safeguards-related projects with a designated Laboratory Mentor to provide broader exposure to nuclear materials management and information analytical techniques. The Safeguards and Nuclear Material Management pilot program was a collaboration between the Texas A&M University (TAMU), Los Alamos National Laboratory (LANL) and Lawrence Livermore National Laboratory (LLNL). It included a 16-lecture course held during a summer internship program. The instructors for the course were from LANL together with TAMU faculty and LLNL experts. The LANL-based course was shared with the students spending their internship at LLNL via video conference. A week-long table-top (or hands-on) exercise on was also conducted at LANL. The student population was a mix of 28 students from a 12 universities participating in a variety of summer internship programs held at LANL and LLNL. A large portion of the students were TAMU students participating in the NGSI pilot. The International Nuclear Safeguards Policy and Information Analysis pilot program was implemented at the Monterey Institute for International Studies (MIIS) in cooperation with LLNL. It included a two-week intensive course consisting of 20 lectures and two exercises. MIIS, LLNL, and speakers from other U.S. national laboratories (LANL, BNL) delivered lectures for the audience of 16 students. The majority of students were senior classmen or new master's degree graduates from MIIS specializing in nonproliferation policy studies. Other university/organizations represented: University of California in LA, Stanford University, and the IAEA. Four of the students that completed this intensive course participated in a 2-month internship at LLNL. The conclusions of the two pilot courses and internships was a NGSI Summer Student Symposium, held at LLNL, where 20 students participated in LLNL facility tours and poster sessions. The Poster sessions were designed to provide a forum for sharing the results of their summer projects and providing experience in presenting their work to a varied audience of students, faculty and laboratory staff. The success of bringing together the students from the technical and policy pilots was notable and will factor into the planning for the continued refinement of their two pilot efforts in the coming years.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Wildland Fire Management Plan for Brookhaven National Laboratory

This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel. The BNL Fire Department is the lead on wildfire suppression. However, the BNL Natural Resource Manager will be assigned to all wildland fires as technical resource advisor.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nevada National Security Site 2011 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2011 results. During 2011, groundwater samples were collected and static water levels were measured at the three pilot wells surrounding the Area 5 RWMS. Samples were collected at UE5PW-1 on March 8, August 2, August 24, and October 19, 2011; at UE5PW-2 on March 8, August 2, August 23, and October 19, 2011; and at UE5PW-3 on March 8, August 2, August 23, and October 19, 2011. Static water levels were measured at each of the three pilot wells on March 1, June 7, August 1, and October 17, 2011. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Initial total organic carbon and total organic halides results for samples collected in August 2011 were above previous measurements and, in some cases, above the established investigation limits. However, after field sample pumps and tubing were disinfected with Clorox solution, the results returned to normal levels. Final results from samples collected in 2011 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Doing Business with the Federal Government (Fact Sheet)

To do business with the Federal Government, it is best to target the appropriate program. This document outlines resources for doing business with the Federal Government.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Management of Innovative Projects over the Life Cycle of Distributed Aviation Systems

Distributed aviation systems are considered. Different stages in the life cycle of such systems are investigated. Recommendations are made regarding the appropriate project-management methods at different stages in the life cycle in addressing research, design, and other problems and ensuring effective operation of a distributed system and its components.

42 ENGINEERING↗

Future of Work with Robotics - 18599

The DOE Environmental Management mission continues with remaining tasks that are high-hazards to human workers and high-consequences to the nation, resulting in potentially high risks to project costs and schedules. This is the mission pull. At the same time, robotic technologies are hitting a turning point with increased productivity and reliability within society, supporting a technology push. Enabling this push are better computer processing following Moore's Law, breakthroughs in biometric and learning algorithms,and riding a wave of venture funding for intended commercialization of mechatronic and Internet of Thing (IOT) projects. There has been overall improvements in material technologies, algorithms, and software standardization with tools/libraries such as the Robot Operating System (ROS). The internet has made knowledge ubiquitous and the cell phone sector has pushed the boundaries of systems-on-chip technology. This current growth is a race between large global technology companies, and between countries that understand that there is a prize with increased commerce based on being a leader in the field of robotics and automation. This technological advances have placed this technology solidly within the next 4. Industrial Revolution being tracked by the World Economic Council. Policies and law can slow this progression down, but technological changes in adjacent fields will put additional pressure on human workers by being more economical and in saving lives. A fundamental issue is will this change be gradual or disruptive such as with the forecasted singularity. There is also a realization with automation that the transition of human workers to other fields may be temporary, but in the long run, workers may run out of viable work and long-term occupations. The obvious future of human jobs are most assured by those who can embrace the change through the design, development, installment, and maintenance of the technology. Younger workers can be re-educated while older humans can be re-trained. The goal of this paper is to explore all the forces that are enabling this revolution, investigating its many impacts, and speculating on the future of human jobs during nuclear remediation. Automation has made an impact to the manufacturing sector, and has since expanded to the retail and services sectors. The question is will this same automation transition, including robotics and artificial intelligence, occur to the environmental management and cleanup sector, and how should we prepare ourselves for this change. (author)

42 ENGINEERING↗

Identifying requisite changes to support modern maintenance practices - 294

Modern data science and processing require the use of modern maintenance records. With traditional record-keeping practices, the isolated nature of the data, as well as the presence of handwritten maintenance work orders and incomplete service logs, severely limit the amount of progress that can be made towards advanced condition-based maintenance. These condition-based methods of diagnostics, prognostics, and maintenance planning are a primary goal of next-generation plant operations and maintenance strategies, and are all dependent on the availability of quality plant data including maintenance data. By implementing changes to maintenance record-keeping practices, such as the use of a computerized maintenance management system, key data will become available to allow for implementation of state-of-the-art data analysis methods. This paper covers the benefits of utilizing digital record systems to increase maintenance data availability in terms of condition-based maintenance and asset management. The ability of these methods to enable state-of-the-art practices within industrial organizations is discussed to offer insight into ways that these improvements to operating strategy will contribute to improvements in world-class maintenance excellence. A discussion of the future of asset management in terms of data analytics, maintenance decision support, and data integration is provided to illustrate the changing landscape of plant management. The result is an examination of innovative maintenance strategies and discussion of challenges related to the future of asset management and implementing modern maintenance practices. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

TANKS 18 AND 19-F STRUCTURAL FLOWABLE GROUT FILL MATERIAL EVALUATION AND RECOMMENDATIONS

Cementitious grout will be used to close Tanks 18-F and 19-F. The functions of the grout are to: (1) physically stabilize the final landfill by filling the empty volume in the tanks with a non compressible material; (2) provide a barrier for inadvertent intrusion into the tank; (3) reduce contaminant mobility by (a) limiting the hydraulic conductivity of the closed tank and (b) reducing contact between the residual waste and infiltrating water; and (4) providing an alkaline, chemically reducing environment in the closed tank to control speciation and solubility of selected radionuclides. The objective of this work was to identify a single (all-in-one) grout to stabilize and isolate the residual radionuclides in the tank, provide structural stability of the closed tank and serve as an inadvertent intruder barrier. This work was requested by V. A. Chander, High Level Waste (HLW) Tank Engineering, in HLW-TTR-2011-008. The complete task scope is provided in the Task Technical and QA Plan, SRNL-RP-2011-00587 Revision 0. The specific objectives of this task were to: (1) Identify new admixtures and dosages for formulating a zero bleed flowable tank fill material selected by HLW Tank Closure Project personnel based on earlier tank fill studies performed in 2007. The chemical admixtures used for adjusting the flow properties needed to be updated because the original admixture products are no longer available. Also, the sources of cement and fly ash have changed, and Portland cements currently available contain up to 5 wt. % limestone (calcium carbonate). (2) Prepare and evaluate the placement, compressive strength, and thermal properties of the selected formulation with new admixture dosages. (3) Identify opportunities for improving the mix selected by HLW Closure Project personnel and prepare and evaluate two potentially improved zero bleed flowable fill design concepts; one based on the reactor fill grout and the other based on a shrinkage compensating flowable fill mix design. (4) Prepare samples for hydraulic property measurements for comparison to the values in the F and H- Tank Farm Performance Assessments (PAs). (5) Identify a grout mix for the Tanks 18-F and 19-F Grout Procurement Specification [Forty, 2011 a, b, c]. Results for two flowable zero bleed structural fill concepts containing 3/8 inch gravel (70070 Series and LP-8 Series) and a sand only mix (SO Series) are provided in this report. Tank Farm Engineering and SRNL Project Management selected the 70070 mix as the base case for inclusion in Revision 0 of the Tanks 18-F and 19-F grout procurement specification [Forty 2011 a] and requested admixture recommendations and property confirmation for this formulation [Forty, 2011 b]. Lower cementitious paste mixes were formulated because the 70070 mix is over designed with respect to strength and generates more heat from hydration reactions than is desirable for mass pour application. Work was also initiated on a modification of the recommended mix which included shrinkage compensation to mitigate fast pathways caused by shrinkage cracking and poor physical bonding to the tank and ancillary equipment. Testing of this option was postponed to FY12.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗