Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Design and Checkout of a High Speed Research Nozzle Evaluation Rig

The High Flow Jet Exit Rig (HFJER) was designed to provide simulated mixed flow turbojet engine exhaust for one- seventh scale models of advanced High Speed Research test nozzles. The new rig was designed to be used at NASA Lewis Research Center in the Nozzle Acoustic Test Rig and the 8x6 Supersonic Wind Tunnel. Capabilities were also designed to collect nozzle thrust measurement, aerodynamic measurements, and acoustic measurements when installed at the Nozzle Acoustic Test Rig. Simulated engine exhaust can be supplied from a high pressure air source at 33 pounds of air per second at 530 degrees Rankine and nozzle pressure ratios of 4.0. In addition, a combustion unit was designed from a J-58 aircraft engine burner to provide 20 pounds of air per second at 2000 degrees Rankine, also at nozzle pressure ratios of 4.0. These airflow capacities were designed to test High Speed Research nozzles with exhaust areas from eighteen square inches to twenty-two square inches. Nozzle inlet flow measurement is available through pressure and temperature sensors installed in the rig. Research instrumentation on High Speed Research nozzles is available with a maximum of 200 individual pressure and 100 individual temperature measurements. Checkout testing was performed in May 1997 with a 22 square inch ASME long radius flow nozzle. Checkout test results will be summarized and compared to the stated design goals.

Castner, Raymond S.↗

NASA/University Joint Venture in Space Science (JOVE)

The spectra of the Ring Nebula at position angle 124 degrees, covering a spectral range from [O III] 3727 A to [S II] 6723 A is obtained using McDonald Observatory's 82-inch telescope (operated by the University of Texas at Austin). This work was carried out in September of 1991. During the 1992 summer, the analysis of the McDonald spectra were carried out and compared the results with the IUE (UV) spectra of the Ring Nebula. In addition, IRAF was successfully installed on NASA/Jove Sun IPC workstation (polaris) during September 1993 and the installation of three additional Sun workstations (mizar, dubhe, and merak) is about to be completed.

Quigley, Robert J.↗

Improving the Performance of Two-Stage Gas Guns By Adding a Diaphragm in the Pump Tube

Herein, we study the technique of improving the gun performance by installing a diaphragm in the pump tube of the gun. A CFD study is carried out for the 0.28 in. gun in the Hypervelocity Free Flight Radiation (HFF RAD) range at the NASA Ames Research Center. The normal, full-length pump tube is studied as well as two pump tubes of reduced length (approximately 75% and approximately 33% of the normal length). Significant improvements in performance are calculated to be gained for the reduced length pump tubes upon the addition of the diaphragm. These improvements are identified as reductions in maximum pressures in the pump tube and at the projectile base of approximately 20%, while maintaining the projectile muzzle velocity or as increases in muzzle velocity of approximately 0.5 km/sec while not increasing the maximum pressures in the gun. Also, it is found that both guns with reduced pump tube length (with diaphragms) could maintain the performance of gun with the full length pump tube without diaphragms, whereas the guns with reduced pump tube lengths without diaphragms could not. A five-shot experimental investigation of the pump tube diaphragm technique is carried out for the gun with a pump tube length of 75% normal. The CFD predictions of increased muzzle velocity are borne out by the experimental data. Modest, but useful muzzle velocity increases (2.5 - 6%) are obtained upon the installation of a diaphragm, compared to a benchmark shot without a diaphragm.

Bogdanoff, D. W.↗

The 1997 HST Calibration Workshop with a New Generation of Instruments

The Second Servicing mission in early 1997 has brought major changes to the Hubble Space Telescope (HST). Two of the original instruments, Faint Object Spectrograph (FOS) and Goddard High Resolution Spectrograph (GHRS), were taken out, and replaced by completely new instruments, the Space Telescope Imaging Spectrograph (STIS) and the Near Infrared Camera Multi-Object Spectrograph (NICMOS). Two new types of detectors were installed, and for the first time, HST gained infrared capabilities. A new Fine Guidance Sensor (FGS) was installed, with an alignment mechanism that could improve substantially both guiding and astrometric capabilities. With all these changes come new challenges. The characterization of the new instruments has required a major effort, both by their respective Investigation Definition Teams and at the Space Telescope Science Institute. All necessary final calibrations for the retired spectrographs needed to be carried out, and their properties definitively characterized. At the same time, work has continued to improve our understanding of the instruments that have remained on board. The results of these activities were discussed in the 1997 HST (Hubble Space Telescope) Calibration Workshop. The main focus of the Workshop was to provide users with the tools and the understanding they need to use HST's instruments and archival data to the best of their possibilities. This book contains the written record of the Workshop. As such, it should provide a valuable tool to all interested in using existing HST data or in proposing for new observations.

Casertano, S.↗

Shuttle Liquid Fly Back Booster Configuration Options

This paper surveys the basic configuration options available to a Liquid Fly Back Booster (LFBB), integrated with the Space Shuttle system. The background of the development of the LFBB concept is given. The influence of the main booster engine (BME) installations and the Fly Back Engine (FBE) installation on the aerodynamic configurations are also discussed. Limits on the LFBB configuration design space imposed by the existing Shuttle flight and ground elements are also described. The objective of the paper is to put the constrains and design space for an LFBB in perspective. The object of the work is to define LFBB configurations that significantly improve safety, operability, reliability and performance of the Shuttle system and dramatically lower operations costs.

Healy, T. J., Jr.↗

Qualification of the Tropical Rainfall Measuring Mission Solar Array Deployment System

The Tropical Rainfall Measuring Mission (TRMM) solar arrays are placed into orbital configuration by a complex deployment system. Its two wings each comprise twin seven square solar panels located by a twelve foot articulated boom. The four spring-driven hinge lines per wing are rate-limited by viscous dampers. The wings are stowed against the spacecraft kinematically, and released by five pyrotechnically-actuated mechanisms. Since deployment failure would be catastrophic, a total of 17 deployment tests were completed to qualify the system for the worst cast launch environment. This successful testing culminated in the flawless deployment of the solar arrays on orbit, 15 minutes after launch in November 1997. The custom gravity negation system used to perform deployment testing is modular to allow its setup in several locations, including the launch site in Japan. Both platform and height can be varied, to meet the requirements of the test configuration and the test facility. Its air pad floatation system meets tight packaging requirements, allowing installation while stowed against the spacecraft without breaking any flight interfaces, and avoiding interference during motion. This system was designed concurrently with the deployment system, to facilitate its installation, to aid in the integration of the flight system to the spacecraft, while demonstrating deployment capabilities. Critical parameters for successful testing were alignment of deployment axes and tables to gravity, alignment of table seams to minimize discontinuities, and minimizing pressure drops in the air supply system. Orbital performance was similar to that predicted by ground testing.

Lawrence, Jon↗

STS-88 Day 07 Highlights

On this seventh day of the STS-88 mission, the flight crew, Commander Robert D. Cabana, Pilot Frederick W. Sturckow, and Mission Specialists Nancy J. Currie, James H. Newman, Jerry L. Ross, and Sergei Krikalev are seen preparing for a 6-1/2 hour space walk. During this walk Newman and Ross install two box-like antennas on the outside of the Unity module. In addition they remove launch restraints over four hatchways, install insulating covers on the trunnion pins, and free one of two balky antennas on Zarya's backup rendezvous navigation system.

Source record↗

A Microsoft Project-Based Planning, Tracking, and Management Tool for the National Transonic Facility's Model Changeover Process

The removal and installation of sting-mounted wind tunnel models in the National Transonic Facility (NTF) is a multi-task process having a large impact on the annual throughput of the facility. Approximately ten model removal and installation cycles occur annually at the NTF with each cycle requiring slightly over five days to complete. The various tasks of the model changeover process were modeled in Microsoft Project as a template to provide a planning, tracking, and management tool. The template can also be used as a tool to evaluate improvements to this process. This document describes the development of the template and provides step-by-step instructions on its use and as a planning and tracking tool. A secondary role of this document is to provide an overview of the model changeover process and briefly describe the tasks associated with it.

Vairo, Daniel M.↗

STS-96 FD Highlights and Crew Activities Report: Flight Day 05

On this fifth day of the STS-96 Discovery mission, the flight crew, Commander Kent V. Rominger, Pilot Rick D. Husband, and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette, and Valery Ivanovich Tokarev are seen performing logistics transfer activities within the Discovery/International Space Station orbiting complex. The crew transfers supplies, equipment, and water. Payette and Tokarev perform maintenance activities on the storage batteries in the Zarya module. Barry and Tokarev install acoustic insulation around some of the fans inside Zarya. Jernigan and Husband install shelving in 2 soft stowage racks. Husband and Barry troubleshoot and perform maintenance activities on the Early Communications System. At the end of the workday, Rominger, Jernigan, and Barry discussed the progress of the mission with NBC's "Today," CBS "This Morning," and CNN.

Source record↗

STS-96 Mission Highlights

In this second part of a three-part video mission-highlights set, on-orbit spacecrew activities performed on the STS-96 Space Shuttle Orbiter Discovery and the International Space Station are reviewed. The flight crew consists of Kent V. Rominger, Commander; Rick D. Husband, Pilot; and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette (Canadian), and Valery Ivanovich Tokarev (Russian). The primary goals of this mission were to work on logistics and resupply the International Space Station. This second part in the mission series features video from Flight Day 4-7 (FD 4-7). FD 4 of STS-96 presents astronauts Tammy Jernigan and Dan Barry completing the second longest space walk in shuttle history. Footage includes Jernigan and Barry transferring and installing two cranes from the shuttle's payload bay to locations on the outside of the station. The astronauts enter the International Space Station delivering supplies and prepare the outpost to receive its first resident crew, scheduled to arrive in early 2000 on FD 5. The video also captures the crew involved in logistics transfer activities within the Discovery/ISS orbiting complex. FD 6 includes footage of Valery Tokarev and Canadian astronaut Julie Payette charging out the final six battery recharge controller units for two of Zarya's power-producing batteries and all crew members' involvement in logistics transfer activities from the SPACEHAB module to designated locations in the International Space Station. With the transfer work of FD 6 all but complete, the astronauts conduct some additional work, installing parts of a wireless strain gauge system that will help engineers track the effects of adding modules to the station throughout its assembly. Moving the few remaining items from Discovery to the ISS, then closing a series of hatches within the station's modules leading back to the shuttle are the primary activities contained in FD 7. Final coverage features Discovery's astronauts finishing their work inside the International Space Station, closing all of the hatches and readying the shuttle's small thrusters to be fired to raise the entire complex's orbit in preparation for the undocking and departure set for FD 8.

Source record↗

Alternatives to Silicon Rubber Thermal Barrier in RSRM Nozzle Joints

Thiokol Propulsion encountered a situation where gas path can form in the Filler material in joints between the phenolic in the Space Shuttle Reusable Solid Rocket Motor nozzle. An investigation determined that the method for injecting the filler material into the joint created a pressurized pocket of air that forced its way to the surface while the filler was curing. The path that the air took remained open some situations leaving a path for hot gas to get deep into the joint. The condition that created the gas path has been corrected by modifications to the manufacturing process, but a design solution that would reduce processing time is being pursued. A strip of open cell installed deep into the joint, can serve as a barrier to the Filler material. Testing indicates that the foam eliminates the pressure pocket, and does not prevent detection of leakage of the o-ring seals during leak test. Open cell foam does not have thermal resistance capability and mechanical structure, which would be required in the event of a gas path. A replacement to open cell foam is now being considered. Braided carbon fiber rope has the permeability characteristics of foam and it has thermal resistance characteristics as well. Braided carbon fiber rope (BCFR) has been tested in simulated joints in subscale rocket motor. Results of the testing indicate that braided carbon fiber rope can significantly reduce gas temperature by as much es 3000 F in a nozzle joint configuration. BCFR can be installed as a barrier to stop the joint filler material or it can used as the thermal barrier alone.

Totman, Peter D.↗

The CEOS International Directory Network Progress and Plans: Spring, 1999

The Global Change Master Directory (GCMD) serves as the software development hub for the Committee on Earth Observation Satellites' (CEOS) International Directory Network (IDN). The GCMD has upgraded the software for the IDN nodes as Version 7 of the GCMD: MD7-Oracle and MD7-Isite, as well as three other MD7 experimental interfaces. The contribution by DLR representatives (Germany) of the DLR Thesaurus will be demonstrated as an educational tool for use with MD7-Isite. The software will be installed at twelve nodes around the world: Brazil, Argentina, the Netherlands, Canada, France, Germany, Italy, Japan, Australia, New Zealand, Switzerland, and several sites in the United States. Representing NASA for the International Directory Network and the CEOS Data Access Subgroup, NASA's contribution to this international interoperability effort will be updated. Discussion will include interoperability with the CEOS Interoperability Protocol (CIP), features of the latest version of the software, including upgraded capabilities for distributed input by the IDN nodes, installation logistics, "mirroring', population objectives, and future plans.

Olsen, Lola M.↗

Flight Test Results for the HST Orbital Systems Test (HOST) Capillary Pump Loop Cooling System

The Near Infrared Camera and Multi Object Spectrometer (NICMOS) was installed in the Hubble Space Telescope (MST) in February 1997. Shortly thereafter, the instrument experienced a thermal short in its solid nitrogen dewar system which will significantly shorten the instrument's useful life. A reverse Brayton cycle mechanical refrigerator will be installed during the Third Servicing Mission (SM3) to provide cooling for the instrument, and thereby extend its operations. A Capillary Pump Loop (CPL) and radiator system was designed, built and tested to remove up to 500 watts of heat from the mechanical cryocooler and its associated electronics. The HST Orbital Systems Test (HOST) platform was flown on the Space Shuttle Discovery (STS-95) as a flight demonstration of the cryocooler system, CPL control electronics, and the CPL/Radiator. This paper will present the flight test results and thermal performance of the CPL system in detail.

Buchko, M.↗

Shuttle Liquid Fly Back Booster Configuration Options

This paper surveys the basic configuration options available to a Liquid Fly Back Booster (LFBB), integrated with the Space Shuttle system. The background of the development of the LFBB concept is given. The influence of the main booster engine (BME) installations and the fly back engine (FBE) installation on the aerodynamic configurations are also discussed. Limits on the LFBB configuration design space imposed by the existing Shuttle flight and ground elements are also described. The objective of the paper is to put the constrains and design space for an LFBB in perspective. The object of the work is to define LFBB configurations that significantly improve safety, operability, reliability and performance of the Shuttle system and dramatically lower operations costs.

Healy, Thomas J., Jr.↗

Hybrid Thermal Control Testing of a Cryogenic Propellant Tank

This report presents the experimental results of a hybrid thermal control system, one that integrates a passive system (multi-layer insulation) with an active system (a mechanical cyrocooler) applied to cryogenic propellant storage. These experiments were performed on a 1.39 m diameter spherical propellant tank filled with LH2 while installed in an evacuated chamber. The tank heat transfer to the cryocooler was accomplished with a condenser installed in the ullage of the tank and mated to the second stage of the cooler, and by conduction, through copper leaves mated to the first stage of the cooler. The first hybrid system test was performed with both the condenser and the leaves, a configuration that had excess capacity to remove the heat entering the tank; the second test was performed with only the condenser, with a capacity closely matched to the tank heating rate. In both of these tests, the goal of zero boil-off was achieved.

Plachta, David W.↗

The CEOS International Directory Network: Progress and Plans, Spring, 1999

The Global Change Master Directory (GCMD) serves as the software development hub for the Committee on Earth observation Satellites' (CEOS) International Directory Network (IDN). The GCMD has upgraded the software for the IDN nodes as Version 7 of the GCMD: MD7-Oracle and MD7-Isite, as well as three other MD7 experimental interfaces. The contribution by DLR representatives (Germany) of the DLR Thesaurus will be demonstrated as an educational tool for use with MD7-Isite. The software will be installed at twelve nodes around the world: Brazil, Argentina, the Netherlands, Canada, France, Germany, Italy, Japan, Australia, New Zealand, Switzerland, and several sites in the United States. Representing NASA for the International Directory Network and the CEOS Data Access Subgroup, NASA's contribution to this international interoperability effort will be updated. Discussion will include interoperability with the CEOS Interoperability Protocol (CIP), features of the latest version of the software, including upgraded capabilities for distributed input by the IDN nodes, installation logistics, "mirroring", population objectives, and future plans.

Olsen, Lola M.↗

Development of a 12-Thrust Chamber Kerosene /Oxygen Primary Rocket Sub-System for an Early (1964) Air-Augmented Rocket Ground-Test System

Airbreathing/Rocket combined-cycle, and specifically rocket-based combined- cycle (RBCC), propulsion systems, typically employ an internal engine flow-path installed primary rocket subsystem. To achieve acceptably short mixing lengths in effecting the "air augmentation" process, a large rocket-exhaust/air interfacial mixing surface is needed. This leads, in some engine design concepts, to a "cluster" of small rocket units, suitably arrayed in the flowpath. To support an early (1964) subscale ground-test of a specific RBCC concept, such a 12-rocket cluster was developed by NASA's Marshall Space Flight Center (MSFC). The small primary rockets used in the cluster assembly were modified versions of an existing small kerosene/oxygen water-cooled rocket engine unit routinely tested at MSFC. Following individual thrust-chamber tests and overall subsystem qualification testing, the cluster assembly was installed at the U. S. Air Force's Arnold Engineering Development Center (AEDC) for RBCC systems testing. (The results of the special air-augmented rocket testing are not covered here.) While this project was eventually successfully completed, a number of hardware integration problems were met, leading to catastrophic thrust chamber failures. The principal "lessons learned" in conducting this early primary rocket subsystem experimental effort are documented here as a basic knowledge-base contribution for the benefit of today's RBCC research and development community.

Pryor, D.↗

The Evolution of Dust in the Multiphase ISM: Grain Destruction Processes

This proposal covered year one of a long term project in which we acquired the necessary hardware and softwaxe needed to calculate grain destruction processes in the interstellar medium (ISM). The long term goal of this research is to develop a model for the dust evolution in the ISM capable of explaining observations of elemental depletions, the grain size distribution, and the emission characteristics of the ISM from the X-ray through the FIR. We purchased a SUN Ultra 10 workstation and peripheral devices including an Exabyte Tape drive, HP Laser Printer, and Seagate External Hard Disk. The PI installed the hardware and Solaris operating system on the workstation and integrated the hardware into the network. Software was also purchased to enable connections to the workstation from a PC (Hummingbird Exceed). Additional freeware required to carry out the proposed program was installed on the system including compilers (g77, gcc, g++), editors (emacs), a markup language (LaTeX), and display programs (WIP, XV, SAOtng). We have also successfully modified the required plot files to work with our system which display the results of grain processing.

Wolfire, Mark↗