Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

SPHERES and Astrobee: Space Station Robotic Free Flyers

Free-flying space robots can be used when humans are present to off-load routine work, to increase astronaut productivity, and to handle contingencies. The International Space Station (ISS), for example, is a continuously manned orbital laboratory the size of a large house, which contains many thousands of inventory items and hundreds of diverse payloads and experiments - all of which have to be managed by 6 person crew. To help with this, NASA is developing and testing robotic free-flyers on the ISS. SPHERES (Synchronized Position Hold, Engage, Reorient, Experimental Satellites) is an ISS facility with three nano-satellites designed to research estimation, control, and autonomy algorithms. SPHERES are volleyball-sized, have their own power, propulsion and navigation systems, and work on the ISS under astronaut supervision. For more than 10 years, NASA has made SPHERES available to other U.S. government agencies, schools, commercial companies and students as a platform for science, technology development, and education. SPHERES will soon be succeeded by the new Astrobee free-flying robot. Astrobee builds on the success of SPHERES, but in addition to research, the robot will also be used for housekeeping and monitoring duties without astronaut supervision. Astrobee makes extensive use of open-source (the complete software stack is available on GitHub) and is scheduled to be installed on the ISS in late Spring 2018.

Benavides, Jose V.↗

Seeker 1.0: Prototype Robotic Free Flying Inspector Mission Overview

Seeker 1.0 is a prototype free flying robot that will one day be capable of inspecting human-rated spacecraft. Building off previous free flyer experience, this technology will eventually improve safety of human spacecraft by offering a variety of inspection capabilities for both routine and emergency scenarios providing increased capability and safety over current inspection methods. Seeker 1.0 is capable of 6 degree of freedom flight via a cold gas propulsion system and can operate up to 1 hour via a semi-autonomous guidance, navigation, and control system. The prototype spacecraft is capable of capturing still images at a variety of resolutions up to 13 MP. The initial test flight utilizes a command and data relay box called Kenobi. Kenobi is a derivative of the Seeker design and will communicate between Cygnus and Seeker and store data for post-mission downlink. Seeker and Kenobi have launched inside a NanoRacks External CubeSat Deployer (NRCSD-E) attached to the NG-11 Cygnus ISS resupply vehicle and will operate after Cygnus departs ISS and moves to a safe altitude. Operations will last approximately 30 minutes and will consist of basic vehicle maneuvers while capturing high-resolution still images. With any remaining time and propellant, Seeker will demonstrate additional safety capabilities and maneuvers required for operations around a crewed spacecraft. The Seeker project utilized the Class IE process that allows for streamlined flight hardware development and increased mission risk tolerance.

Spacecraft Inspection↗

Leveraging CSPP: Building a cloud based direct broadcast processing system

Reducing the time that it takes to have useful satellite information is very important because timely access allows for more informed decision making. This is especially true in time critical situations like disaster response and financial market analysis. One way to achieve reductions in the overall time between information capture and delivery to use the direct broadcast from weather satellites. In this work, we describe a state driven satellite information system that captures a satellite’s direct broadcast signal and uses cloud-based resources to provide end-user controlled processing. The system takes advantage of the reliability and customizability of Amazon Web Services to provide fast and reliable access to a system that takes the direct broadcast signal and leverages the CSPP software as well as dynamically supplied end-user processing modules to produce a user desired information product. Finally, we describe the development process and how a flexible design allowed for changes as the capabilities of the processing platform evolved and the lessons we learned from the process.

CSPP↗

Space Station body mounted radiator design

Consideration has been given to utilizing the external area of the Space Station common modules or resource nodes to provide heat rejection. A program was undertaken to define the best body mounted radiator design, to define and build a full size test article and to conduct testing to verify performance. Trade studies were conducted and a preferred design selected. The selected design employed high performance grooved heat pipes of an off-the-shelf design. Twenty panels, each about 1.2 m wide by 5.6 m long are installed on each module rejecting a total of about 12 kW. The radiators are interfaced with the module thermal control loop by use of a refrigerant 21 loop with an on-orbit operable disconnect at each panel. A one-panel test article has been designed and is currently being fabricated. Testing is scheduled to be conducted in June of 1987.

Fleming, M. L.↗

ART/Ada design project, phase 1. Task 2 report: Detailed design

Various issues are studied in the context of the design of an Ada based expert system building tool. Using an existing successful design as a starting point, the impact is analyzed of the Ada language and Ada development methodologies on that design, the Ada system is redesigned, and its performance is analyzed using both complexity-theoretic and empirical techniques. The algorithms specified in the overall design are refined, resolving and documenting any open design issues, identifying each system module, documenting the internal architecture and control logic, and describing the primary data structures involved in the module.

Allen, Bradley P.↗

Structural Verification of the Space Shuttle's External Tank Super LightWeight Design: A Lesson in Innovation

The Super LightWeight Tank (SLWT) team was tasked with a daunting challenge from the outset: boost the payload capability of the Shuttle System by safely removing 7500 lbs. from the existing 65,400 lb. External Tank (ET). Tools they had to work with included a promising new Aluminum Lithium alloy, the concept of a more efficient structural configuration for the Liquid Hydrogen (LH2) tank, and a highly successful, mature Light Weight Tank (LWT) program. The 44 month schedule which the SLWT team was given for the task was ambitious by any measure. During this time the team had to not only design, build, and verify the new tank, but they also had to move a material from the early stages of development to maturity. The aluminum lithium alloy showed great promise, with an approximately 29% increase in yield strength, 15% increase in ultimate strength, 5 deg/O increase in modulus and 5 deg/O decrease in density when compared to the current 2219 alloy. But processes had to be developed and brought under control, manufacturing techniques perfected, properties characterized, and design allowable generated. Because of the schedule constraint, this material development activity had to occur in parallel with design and manufacturing. Initial design was performed using design allowable believed to be achievable with the Aluminum Lithium alloy system, but based on limited test data. Preliminary structural development tests were performed with material still in the process of iteration. This parallel path approach posed obvious challenges and risks, but also allowed a unique opportunity for interaction between the structures and materials disciplines in the formulation of the material.

Otte, Neil↗

Hardware Development Process for Human Research Facility Applications

The simple goal of the Human Research Facility (HRF) is to conduct human research experiments on the International Space Station (ISS) astronauts during long-duration missions. This is accomplished by providing integration and operation of the necessary hardware and software capabilities. A typical hardware development flow consists of five stages: functional inputs and requirements definition, market research, design life cycle through hardware delivery, crew training, and mission support. The purpose of this presentation is to guide the audience through the early hardware development process: requirement definition through selecting a development path. Specific HRF equipment is used to illustrate the hardware development paths. The source of hardware requirements is the science community and HRF program. The HRF Science Working Group, consisting of SCientists from various medical disciplines, defined a basic set of equipment with functional requirements. This established the performance requirements of the hardware. HRF program requirements focus on making the hardware safe and operational in a space environment. This includes structural, thermal, human factors, and material requirements. Science and HRF program requirements are defined in a hardware requirements document which includes verification methods. Once the hardware is fabricated, requirements are verified by inspection, test, analysis, or demonstration. All data is compiled and reviewed to certify the hardware for flight. Obviously, the basis for all hardware development activities is requirement definition. Full and complete requirement definition is ideal prior to initiating the hardware development. However, this is generally not the case, but the hardware team typically has functional inputs as a guide. The first step is for engineers to conduct market research based on the functional inputs provided by scientists. CommerCially available products are evaluated against the science requirements as well as modifications needed to meet program requirements. Options are consolidated and the hardware development team reaches a hardware development decision point. Within budget and schedule constraints, the team must decide whether or not to complete the hardware as an in-house, subcontract with vendor, or commercial-off-the-shelf (COTS) development. An in-house development indicates NASA personnel or a contractor builds the hardware at a NASA site. A subcontract development is completed off-site by a commercial company. A COTS item is a vendor product available by ordering a specific part number. The team evaluates the pros and cons of each development path. For example, in-bouse developments utilize existing corporate knowledge regarding bow to build equipment for use in space. However, technical expertise would be required to fully understand the medical equipment capabilities, such as for an ultrasound system. It may require additional time and funding to gain the expertise that commercially exists. The major benefit of subcontracting a hardware development is the product is delivered as an end-item and commercial expertise is utilized. On the other hand, NASA has limited control over schedule delays. The final option of COTS or modified COTS equipment is a compromise between in-house and subcontracts. A vendor product may exist that meets all functional requirements but req uires in-house modifications for successful operation in a space environment. The HRF utilizes equipment developed using all of the paths described: inhouse, subcontract, and modified COTS.

Bauer, Liz↗

PredGuid+A: Orion Entry Guidance Modified for Aerocapture

PredGuid+A software was developed to enable a unique numerical predictor-corrector aerocapture guidance capability that builds on heritage Orion entry guidance algorithms. The software can be used for both planetary entry and aerocapture applications. Furthermore, PredGuid+A implements a new Delta-V minimization guidance option that can take the place of traditional targeting guidance and can result in substantial propellant savings. PredGuid+A allows the user to set a mode flag and input a target orbit's apoapsis and periapsis. Using bank angle control, the guidance will then guide the vehicle to the appropriate post-aerocapture orbit using one of two algorithms: Apoapsis Targeting or Delta-V Minimization (as chosen by the user). Recently, the PredGuid guidance algorithm was adapted for use in skip-entry scenarios for NASA's Orion multi-purpose crew vehicle (MPCV). To leverage flight heritage, most of Orion's entry guidance routines are adapted from the Apollo program.

Lafleur, Jarret↗

G2 Autonomous Control for Cryogenic Delivery Systems

The Independent System Health Management-Autonomous Control (ISHM-AC) application development for cryogenic delivery systems is intended to create an expert system that will require minimal operator involvement and ultimately allow for complete autonomy when fueling a space vehicle in the time prior to launch. The G2-Autonomous Control project is the development of a model, simulation, and ultimately a working application that will control and monitor the cryogenic fluid delivery to a rocket for testing purposes. To develop this application, the project is using the programming language/environment Gensym G2. The environment is an all-inclusive application that allows development, testing, modeling, and finally operation of the unique application through graphical and programmatic methods. We have learned G2 through training classes and subsequent application development, and are now in the process of building the application that will soon be used to test on cryogenic loading equipment here at the Kennedy Space Center Cryogenics Test Laboratory (CTL). The G2 ISHM-AC application will bring with it a safer and more efficient propellant loading system for the future launches at Kennedy Space Center and eventually mobile launches from all over the world.

cryogenic fluids↗

The Heliopause Electrostatic Rapid Transit System (HERTS) Design, Trades, and Analyses Performed in the First Year of a Two Year Investigation

The Heliopause Electrostatic Rapid Transit System (HERTS)1 was one of the seven total Phase II NASA Innovative Advanced Concepts (NIAC) that was down-selected in 2015 for continued funding and research. In Phase I we learned that a spacecraft propelled by an Electric Sail (E-Sail) can travel great astronomical distances, such as to the Heliopause region of the solar system (approx.100 to 120 AU) in approximately one quarter of the time (10 years) versus the time it took the Voyager spacecraft launched in 1977 (36 years). The current work within the Phase II NIAC effort builds upon the work that was done in the Phase I NIAC and is focused on: 1) Testing of plasma interaction with a charged wire in a unique MSFC test chamber, 2) Development of a Particle-in-Cell (PIC) models that are validated in the plasma testing and used to extrapolate to the E-Sail propulsion system design. 3) Further down select of a wire deployment and control approach from those narrowed down in the Phase I effort. This paper will document the findings to date (June, 2016) of the above focused areas.

Wiegmann, Bruce M.↗

Increasing Flight Software Reuse with OpenSatKit

In January 2015 the NASA Goddard Space Flight Center (GSFC) released the Core Flight System (cFS) as open source under the NASA Open Source Agreement (NOSA) license. The cFS is based on flight software (FSW) developed for 12 spacecraft spanning nearly two decades of effort and it can provide about a third of the FSW functionality for a low-earth orbiting scientific spacecraft. The cFS is a FSW framework that is portable, configurable, and extendable using a product line deployment model. However, the components are maintained separately so the user must configure, integrate, and deploy them as a cohesive functional system. This can be very challenging especially for organizations such as universities building cubesats that have minimal experience developing FSW. Supporting universities was one of the primary motivators for releasing the cFS under NOSA. This paper describes the OpenSatKit that was developed to address the cFS deployment challenges and to serve as a cFS training platform for new users. It provides a fully functional out-of-the box software system that includes NASA's cFS, Ball Aerospace's command and control system COSMOS, and a NASA dynamic simulator called 42. The kit is freely available since all of the components have been released as open source. The kit runs on a Linux platform, includes 8 cFS applications, several kit-specific applications, and built in demos illustrating how to use key application features. It also includes the software necessary to port the cFS to a Raspberry Pi and instructions for configuring COSMOS to communicate with the target. All of the demos and test scripts can be rerun unchanged with the cFS running on the Raspberry Pi. The cFS uses a 3-tiered layered architecture including a platform abstraction layer, a Core Flight Executive (cFE) middle layer, and an application layer. Similar to smart phones, the cFS application layer is the key architectural feature for users to extend the FSW functionality to meet their mission-specific requirements. The platform abstraction layer and the cFE layers go a step further than smart phones by providing a platform-agnostic Application Programmer Interface (API) that allows applications to run unchanged on different platforms. OpenSatKit can serve two significant architectural roles that will further help the adoption of the cFS and help create a community of users that can share assets. First, the kit is being enhanced to automate the integration of applications with the goal of creating a virtual cFS "App Store".. Second, a platform certification test suite can be developed that would allow users to verify the port of the cFS to a new platform. This paper will describe the current state of these efforts and future plans.

Computer Programming and Software↗

Developed AprilNav, an Indoor Navigation and Localization System for Autonomous Testing of Electric Sail Dynamics

An electrostatic sail (E-sail) is a new type of propulsion which harnesses the Sun's solar wind to propel a spacecraft. Voyager I took about 40 years to reach interstellar space using solid rocket propellant, whereas electrostatic sails can travel the same distance in 6-10 years by using small but constant acceleration. As part of Marshall Space Flight Center's (MSFC) Space Systems Dept. and Advanced Concepts Office, we are continuing research for the HERTS (Heliopause Electrostatic Rapid Transit System) E-sail project. Previous researchers developed a Nano Air-bearing Simulator (NAS) prototype for initial testing of E-sails; this prototype was properly documented in CAD (Computer-Aided Drafting) in order to build a second improved NAS. MSFC's Robotic Lab (Flat Floor) allows for 2-dimensional simulations of spacecraft dynamics by attaching air bearings to a system. An indoor navigation system AprilNav, was developed and has been implemented on the ceiling of the flat floor for localization and autonomous testing of the two bearing-equipped NAS. With two NAS, tether dynamics between the two simulators as well as steering control algorithms are being tested on the flat floor using AprilNav.

Schuler, Tristan↗

Advances in Aero-Propulsive Modeling for Fixed-Wing and eVTOL Aircraft Using Experimental Data

Small unmanned aircraft and electric vertical takeoff and landing (eVTOL) aircraft have recently emerged as vehicles able to perform new missions and stimulate future air transportation methods. This dissertation presents several system identification research advancements for these modern aircraft configurations enabling accurate mathematical model development for flight dynamics simulations based on wind-tunnel and flight-test data. The first part of the dissertation focuses on advances in flight-test system identification methods using small, fixed-wing, remotely-piloted, electric, propeller-driven aircraft. A generalized approach for flight dynamics model development for small fixed-wing aircraft from flight data is described and is followed by presentation of novel flight-test system identification applications, including: aero-propulsive model development for propeller aircraft and nonlinear dynamic model identification without mass properties. The second part of the dissertation builds on established fixed-wing and rotary-wing aircraft system identification methods to develop modeling strategies for transitioning, distributed propulsion, eVTOL aircraft. Novel wind-tunnel experiment designs and aero-propulsive modeling approaches are developed using a subscale, tandem tilt-wing, eVTOL aircraft, leveraging design of experiments and response surface methodology techniques. Additionally, a method applying orthogonal phase-optimized multisine input excitations to aircraft control effectors in wind-tunnel testing is developed to improve test efficiency and identified model utility. Finally, the culmination of this dissertation is synthesis of the techniques described throughout the document to form a flight-test system identification approach for eVTOL aircraft that is demonstrated using a high-fidelity flight dynamics simulation. The research findings highlighted throughout the dissertation constitute substantial progress in efficient empirical aircraft modeling strategies that are applicable to many current and future aeronautical vehicles enabling accurate flight simulation development, which can subsequently be used to foster advancement in many other pertinent technology areas.

system identification↗

Integrated Simulation Design Challenges to Support TPS Repair Operations

During the Orbiter Repair Maneuver (ORM) operations planned for Return to Flight (RTF), the Shuttle Remote Manipulator System (SRMS) must grapple the International Space Station (ISS), undock the Orbiter, maneuver it through a long duration trajectory, and orient it to an EVA crewman poised at the end of the Space Station Remote Manipulator System (SSRMS) to facilitate the repair of the Thermal Protection System (TPS). Once repair has been completed and confirmed, then the SRMS proceeds back through the trajectory to dock the Orbiter to the Orbiter Docking System. In order to support analysis of the complex dynamic interactions of the integrated system formed by the Orbiter, ISS, SRMS, and SSMS during the ORM, simulation tools used for previous ‘nominal’ mission support required substantial enhancements. These upgrades were necessary to provide analysts with the capabilities needed to study integrated system performance. Prevalent throughout this ORM operation is a dynamically varying topology. In other words, the ORM starts with the SRMS grappled to the mated Shuttle/ISS stack (closed loop topology), moves to an open loop chain topology consisting of the Shuttle, SRMS, and ISS, and then, at the repair configuration, extends the chain topology to one consisting of the Shuttle, SMS, ISS, and SSRMS/EVA crewman. The resulting long dynamic chain of vehicles and manipulators may exhibit significant motion between the Shuttle worksite and the EVA crewman due to the system flexibility throughout the topology (particularly within the SRMS/SSRMS joints and links). Since the attachment points of both manipulators span the flexible structure of the ISS, simulation analysis may also need to take that into consideration. Moreover, due to the lengthy time duration associated with the maneuver and repair, orbital effects become a factor and require the ISS vehicle control system to maintain active attitude control. Several facets of the ORM operation make the associated analytical efforts different from previous mission support, including: (1) the magnitude of the SRMS handled payload (Le., Orbiter class), (2) the orbital effects induced on the integrated system consisting of the large Shuttle and ISS masses connected by a light flexible SRMS, (3) long duration environmental consequences due to the lengthy operational times associated with the maneuver and repair of the TPS, (4) active attitude control (as opposed to free drift) interacting with the SRMS and SSRMS manipulators (also due to the length of the maneuver and repair), (5) relative dynamics between the EVA crewman and thc worksite influenced by the extended flexible topology. In order to meet these analysis challenges, an ORM simulation architecture was developed leveraging upon numerous pre-existing simulation elements to analyze the various subsystems individually. For example, core manipulator subsystem simulations for both the SRMS and SSRMS were originally combined to provide the dual-arm dynamics topology simulation (in the absence of orbital dynamics and vehicle control). This capability was later merged with the simulation used to analyze SRMS loading with a heavy payload in the orbital environment with an active payload control system (in this case, the ISS Attitude Control System (ACS)), configured for the ORM. The resulting worksite dynamics simulation, based off of the modified ORM simulation, provided the extended topological chain of vehicles and manipulators, while taking into account the orbital effects of both the Shuttle and ISS (as well as its ACS). Verification and validation (V&V) of these integrated simulations became a challenge in itself. A systematic approach needed to be developed such that integration simulation results could be tested against previous constituent simulations upon which these simulations were built. General V&V categories included: (1) core orbital state propagation, (2), stand-alone SRMS, (3) stand-alone SSRMS, (4) stand-alone ISS ACS, (5) integrated Shuttle, SRMS, ISS (with active ACS) in the orbital environment, and (5) dual-arm SRMS/SSRMS dynamics topology. Integrated simulation V&V run suites were created and correlated to verification runs from subsystem simulations, in order to establish the validity of the results. This paper discusses the simulation design challenges encountered while developing simulation capabilities to mirror the ORM operations. The paper also describes the incremental build approach that was utilized, starting with the subsystem simulation elements and integration into increasing more complex simulations until the resulting ORM worksite dynamics simulation had been assembled. Furthermore, the paper presents an overall integrated simulation V&V methodology based upon a subsystem level testing, integrated comparisons, and phased checkout.

Thermal Protection System↗

Aircraft wing weight build-up methodology with modification for materials and construction techniques

An aircraft wing weight estimating method based on a component buildup technique is described. A simplified analytically derived beam model, modified by a regression analysis, is used to estimate the wing box weight, utilizing a data base of 50 actual airplane wing weights. Factors representing materials and methods of construction were derived and incorporated into the basic wing box equations. Weight penalties to the wing box for fuel, engines, landing gear, stores and fold or pivot are also included. Methods for estimating the weight of additional items (secondary structure, control surfaces) have the option of using details available at the design stage (i.e., wing box area, flap area) or default values based on actual aircraft from the data base.

York, P.↗

Apollo 16 Mission Anomaly Report No. 1: Oxidizer Deservicing Tank Failure

The command module reaction control system is emptied of all remaining propellant using ground support equipment designed to provide an acid/base neutralization of the propellant in both the liquid and gaseous phases so that it may be disposed of safely. During the deactivation operation of the oxidizer from the Apollo 16 command module on 7 May 1972, the scrubber tank of the decontamination unit exploded, destroying the ground support equipment unit and damaging the building that housed the operation. Only minor injuries were received by the personnel in the area and the command module was not damaged. Test results show that the failure was caused by an insufficient quantity of neutralizer for the quantity of oxidizer. This insufficiency lead to exothermic nitration-type reactions which produced large quantities of gas at a very high rate and failed the decontamination tank.

Source record↗

Design of Plant Gas Exchange Experiments in a Variable Pressure Growth Chamber

Sustainable human presence in extreme environments such as lunar and martian bases will require bioregenerative components to human life support systems where plants are used for generation of oxygen, food, and water. Reduced atmospheric pressures will be used to minimize mass and engineering requirements. Few studies have assessed the metabolic and developmental responses of plants to reduced pressure and varied oxygen atmospheres. The first tests of hypobaric pressures on plant gas exchange and biomass production at the Johnson Space Center will be initiated in January 1996 in the Variable Pressure Growth Chamber (VPGC), a large, closed plant growth chamber rated for 10.2 psi. Experiments were designed and protocols detailed for two complete growouts each of lettuce and wheat to generate a general database for human life support requirements and to answer questions about plant growth processes in reduced pressure and varied oxygen environments. The central objective of crop growth studies in the VPGC is to determine the influence of reduced pressure and reduced oxygen on the rates of photosynthesis, dark respiration, evapotranspiration and biomass production of lettuce and wheat. Due to the constraint of one experimental unit, internal controls, called pressure transients, will be used to evaluate rates of CO2 uptake, O2 evolution, and H2O generation. Pressure transients will give interpretive power to the results of repeated growouts at both reduced and ambient pressures. Other experiments involve the generation of response functions to partial pressures of O2 and CO2 and to light intensity. Protocol for determining and calculating rates of gas exchange have been detailed. In order to build these databases and implement the necessary treatment combinations in short time periods, specific requirements for gas injections and removals have been defined. A set of system capability checks will include determination of leakage rates conducted prior to the actual crop growouts. Schedules of experimental events for lettuce and wheat are outlined and include replications in time of diurnal routines, pressure transients, variable pO2, pO2/pCO2 ratio, and light intensity responses.

Corey, Kenneth A.↗

ARC+(Registered Trademark) and ARC PC Welding Simulators: Teach Welders with Virtual Interactive 3D Technologies

123 Certification Inc., a Montreal based company, has developed an innovative hands-on welding simulator solution to help build the welding workforce in the most simple way. The solution lies in virtual reality technology, which has been fully tested since the early 90's. President and founder of 123 Certification Inc., Mr. Claude Choquet Ing. Msc. IWE. acts as a bridge between the welding and the programming world. Working in these fields for more than 20 years. he has filed 12 patents world-wide for a gesture control platform with leading edge hardware related to simulation. In the summer of 2006. Mr Choquet was proud to be invited to the annual IIW International Weld ing Congress in Quebec City to launch the ARC+ welding simulator. A 100% virtual reality system and web based training center was developed to simulate multi process. multi-materiaL multi-position and multi pass welding. The simulator is intended to train welding students and apprentices in schools or industries. The welding simulator is composed of a real welding e[eetrode holder (SMAW-GTAW) and gun (GMAW-FCAW). a head mounted display (HMD), a 6 degrees of freedom tracking system for interaction between the user's hands and head. as well as external audio speakers. Both guns and HMD are interacting online and simultaneously. The welding simulation is based on the law of physics and empirical results from detailed analysis of a series of welding tests based on industrial applications tested over the last 20 years. The simulation runs in real-time, using a local logic network to determine the quality and shape of the created weld. These results are based on the orientation distance. and speed of the welding torch and depth of penetration. The welding process and resulting weld bc.1d are displayed in a virtual environment with screenplay interactive training modules. For review. weld quality and recorded process values can be displayed and diagnosed after welding. To help in the le.tming process, a learning curve for each student and each Virtual Welding Class'" can be plotted, for an instructor's review or a required third party evaluation.

Choquet, Claude↗