Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “active space selection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Analytical Approach for Estimating Preliminary Mass of ARES I Crew Launch Vehicle Upper Stage Structural Components

In January 2004, President Bush gave the National Aeronautics and Space Administration (NASA) a vision for Space Exploration by setting our sight on a bold new path to go back to the Moon, then to Mars and beyond. In response to this vision, NASA started the Constellation Program, which is a new exploration launch vehicle program. The primary mission for the Constellation Program is to carry out a series of human expeditions ranging from Low Earth Orbit to the surface of Mars and beyond for the purposes of conducting human exploration of space, as specified by the Vision for Space Exploration (VSE). The intent is that the information and technology developed by this program will provide the foundation for broader exploration activities as our operational experience grows. The ARES I Crew Launch Vehicle (CLV) has been designated as the launch vehicle that will be developed as a "first step" to facilitate the aforementioned human expeditions. The CLV Project is broken into four major elements: First Stage, Upper Stage Engine, Upper Stage (US), and the Crew Exploration Vehicle (CEV). NASA's Marshall Space Flight Center (MSFC) is responsible for the design of the CLV and has the prime responsibility to design the upper stage of the vehicle. The US is the second propulsive stage of the CLV and provides CEV insertion into low Earth orbit (LEO) after separation from the First Stage of the Crew Launch Vehicle. The fully integrated Upper Stage is a mix of modified existing heritage hardware (J-2X Engine) and new development (primary structure, subsystems, and avionics). The Upper Stage assembly is a structurally stabilized cylindrical structure, which is powered by a single J-2X engine which is developed as a separate Element of the CLV. The primary structure includes the load bearing liquid hydrogen (LH2) and liquid oxygen (LOX) propellant tanks, a Forward Skirt, the Intertank structure, the Aft Skirt and the Thrust Structure. A Systems Tunnel, which carries fluid and electrical power functions to other Elements of the CLV, is included as secondary structure. The MSFC has an overall responsibility for the integrated US element as well as structural design an thermal control of the fuel tanks, intertank, interstage, avionics, main propulsion system, Reaction Control System (RCS) for both the Upper Stage and the First Stage. MSFC's Spacecraft and Vehicle Department, Structural and Analysis Design Division is developing a set of predicted mass of these elements. This paper details the methodology, criterion and tools used for the preliminary mass predictions of the upper stage structural assembly components. In general, weight of the cylindrical barrel sections are estimated using the commercial code Hypersizer, whereas, weight of the domes are developed using classical solutions. HyperSizer is software that performs automated structural analysis and sizing optimization based on aerospace methods for strength, stability, and stiffness. Analysis methods range from closed form, traditional hand calculations repeated every day in industry to more advanced panel buckling algorithms. Margin-of-safety reporting for every potential failure provides the engineer with a powerful insight into the structural problem. Optimization capabilities include finding minimum weight panel or beam concepts, material selections, cross sectional dimensions, thicknesses, and lay-ups from a library of 40 different stiffened and sandwich designs and a database of composite, metallic, honeycomb, and foam materials. Multiple different concepts (orthogrid, isogrid, and skin stiffener) were run for multiple loading combinations of ascent design load with and with out tank pressure as well as proof pressure condition. Subsequently, selected optimized concept obtained from Hypersizer runs was translated into a computer aid design (CAD) model to account for the wall thickness tolerance, weld land etc for developing the most probable weight of the components. The flow diram summarizes the analysis steps used in developing these predicted mass.

Aggarwal, Pravin↗

Design Evolution and Verification of the A-3 Chemical Steam Generator

Following is an overview of the Chemical Steam Generator system selected to provide vacuum conditions for a new altitude test facility, the A-3 Test Stand at Stennis Space Center (SSC) in Bay St. Louis, MS. A-3 will serve as NASA s primary facility for altitude testing of the J-2X rocket engine, to be used as the primary propulsion device for the upper stages of the Ares launch vehicles. The Chemical Steam Generators (CSGs) will produce vacuum conditions in the test cell through the production and subsequent supersonic ejection of steam into a diffuser downstream of the J-2X engine nozzle exit. The Chemical Steam Generators chosen have a rich heritage of operation at rocket engine altitude test facilities since the days of the Apollo program and are still in use at NASA White Sands Test Facility (WSTF) in New Mexico. The generators at WSTF have been modified to a degree, but are still very close to the heritage design. The intent for the A-3 implementation is to maintain this heritage design as much as possible, making minimal updates only where necessary to substitute for obsolete parts and to increase reliability. Reliability improvements are especially desired because the proposed system will require 27 generators, which is nine times the largest system installed in the 1960s. Improvements were suggested by the original design firm, Reaction Motors, by NASA SSC and NASA WSTF engineers, and by the A-3 test stand design contractor, Jacobs Technology, Inc. (JTI). This paper describes the range of improvements made to the design to date, starting with the heritage generator and the minor modifications made over time at WSTF, to the modernized configuration which will be used at A-3. The paper will discuss NASA s investment in modifications to SSC s E-2 test facility fire a full-scale Chemical Steam Generator in advance of the larger steam system installation at A-3. Risk mitigation testing will be performed in early 2009 at this test facility to verify that the CSGs operate as expected. The generator which will undergo this testing is of the most recent A-3 configuration, and will be instrumented far in excess of what is normally required for operation. The extra data will allow for easier troubleshooting and more complete knowledge of expected generator performance. In addition, the early testing will give SSC personnel experience in operating the CSG systems, which will expedite the process of installation and activation at A-3. Each Chemical Steam Generator is supported by a complement of valves, instruments, and flow control devices, with the entire assembly called a "module." The generators will be installed in groups of three, historically called "units". A module is so called because of its modular ability to be replaced or serviced without disturbing the other two modules installed on the same unit. A module is pictured in Figure 1, shown with its generator secured by white bands in its shipping (vs. installed) configuration. The heritage system at WSTF is composed of a single unit (three generator modules), pictured in Figure 2 as it was installed in 1965. In contrast, A-3 will have nine units operating in parallel to achieve vacuum conditions appropriate for testing the J-2X engine. Each of the combustors operates in two modes and achieves the so-called "full-steam" mode after all three of its stages ignite. Ignition of the first stage is achieved by exciting a spark plug; the second stage and main stage are lit by the flame front of the previous stage. The main stage burns approximately 97% of the total propellant flow and uses the heat energy to vaporize water into superheated steam. While the main stage remains unlit, the combustor is in so-called "idle" mode. In the WSTF system, this idle mode is not optimized for water usage, and does not need to be, as the water is pumped from a large reservoir. The water supply at A-3 will be contained in tanks with finite volume, so water optimization is preferred for the modnized configuration. Multiple solutions for this issue have been proposed, with the leading concept being a change to the operational definition of "idle mode," with the generator running in a lower heat flux condition.

Kirchner, Casey K.↗

Storage of Physical Sample Metadata in the Astrobiology Habitable Environments Database (AHED)

The National Aeronautics and Space Administration has begun an effort to store, curate, and publish information about physical samples collected and analyzed in conjunction with NASA-funded astrobiology research. Astrobiology is a multidisciplinary area of scientific research being conducted by collaborating teams of biologists, chemists, geologists, atmospheric scientists, oceanographers, astrophysicists, astronomers, and other specialists. Astrobiology studies the origin, evolution, and distribution of life in the Universe. NASA uses the results of astrobiology research to focus its future missions on targets of opportunity for the discovery of life off Earth. Astrobiology researchers conduct both field-based and laboratory-based research, during which physical samples are collected, processed, and catalogued. The cataloguing practices employed by different teams of astrobiologists vary widely, and there are no specific standards available to guide the collection and recording of astrobiology sample data. The disparity in data collection approaches and the lack of a centralized sample repository makes it difficult for astrobiology teams to share data and benefit from resultant synergies.To facilitate data sharing within the astrobiology community, NASA is developing a prototype database the Astrobiology Habitable Environments Database (AHED) and an associated set of data collection templates. The database will store information about samples, along with associated measurements and analyses, including information about biological cultures enriched or isolated from samples, and the results of analyses performed on the samples (e.g., via spectrography, microscopy, etc.). In addition, the system will store contextual information about field sites where samples were collected, the instruments or equipment used for analysis, and people and institutions involved in their collection. AHED is being implemented on top of Open Data Repository's Data Publisher [1], an open source software platform for the publication of scientific datasets. The data collection templates under development represent an initial attempt to propose a set of metadata for capture and storage within AHED. The design of these templates is being conducted by a consolidated group of astrobiologists from active research teams at NASA Ames Research Center, assisted by data science and software engineering specialists. These initial templates must be vetted with the broader astrobiology community through a defined process to ensure that they meet community needs. Each template captures a different type of data collection record. For each template, we are developing a list of fields to be captured, including a set of required entry fields, a set of recommended but optional fields, and a set of discretionary fields. A datatype selected from a variety of text and numeric types is specified for each field. Included is a 'choice' type that restricts user input to an enumerated list of values. Many of the fields and field values capture information of particular interest to the astrobiology community, and are intended to facilitate search and retrieval of relevant data across multiple datasets.

Keller, Rich↗

Global Sensitivity Analysis of Simulated Remote Sensing Polarimetric Observations Over Snow

This study presents a detailed theoretical assessment of the information content of passive polarimetric observations over snow scenes, using a global sensitivity analysis (GSA) method. Conventional sensitivity studies focus on varying a single parameter while keeping all other parameters fixed. In contrast, the GSA correctly addresses the covariance of state parameters across their entire parameter space, hence favoring a more correct interpretation of inversion algorithms and the optimal design of their state vectors. The forward simulations exploit a vector radiative transfer model to obtain the Stokes vector emerging at the top of the atmosphere for different solar zenith angles, when the bottom boundary consists of a vertically resolved snowpack of non-spherical grains. The presence of light-absorbing particulates (LAPs), either embedded in the snow or aloft in the atmosphere above in the form of aerosols, is also considered. The results are presented for a set of wavelengths spanning the visible (VIS), near-infrared (NIR), and shortwave infrared (SWIR) region of the spectrum. The GSA correctly captures the expected, high sensitivity of the reflectance to LAPs in the VIS–NIR and to grain size at different depths in the snowpack in the NIR–SWIR. With adequate viewing geometries, mono-angle measurements of total reflectance in the VIS–SWIR (akin to those of the Moderate Resolution Imaging Spectroradiometer, MODIS) resolve grain size in the top layer of the snowpack sufficiently well. The addition of multi-angle polarimetric observations in the VIS–NIR provides information on grain shape and microscale roughness. The simultaneous sensitivity in the VIS–NIR to both aerosols and snow-embedded impurities can be disentangled by extending the spectral range to the SWIR, which contains information on aerosol optical depth while remaining essentially unaffected when the same particulates are mixed with the snow. Multi-angle polarimetric observations can therefore (i) effectively partition LAPs between the atmosphere and the surface, which represents a notorious challenge for snow remote sensing based on measurements of total reflectance only and (ii) lead to better estimates of grain shape and roughness and, in turn, the asymmetry parameter, which is critical for the determination of albedo. The retrieval uncertainties are minimized when the degree of linear polarization is used in place of the polarized reflectance. The Sobol indices, which are the main metric for the GSA, were used to select the state parameters in retrievals performed on data simulated for multiple instrument configurations. Improvements in retrieval quality with the addition of measurements of polarization, multi-angle views, and different spectral channels reflect the information content, identified by the Sobol indices, relative to each configuration. The results encourage the development of new remote sensing algorithms that fully leverage multi-angle and polarimetric capabilities of modern remote sensors. They can also aid flight planning activities, since the optimal exploitation of the information content of multi-angle measurements depends on the viewing geometry. The better characterization of surface and atmospheric parameters in snow-covered regions advances research opportunities for scientists of the cryosphere and ultimately benefits albedo estimates in climate models.

remote sensing↗

Work on Planetary Atmospheres and Planetary Atmosphere Probes

A summary final report of work accomplished is presented. Work was performed in the following areas: (1) Galileo Probe science analysis, (2) Galileo probe Atmosphere Structure Instrument, (3) Mars Pathfinder Atmosphere Structure/Meteorology instrument, (4) Mars Pathfinder data analysis, (5) Science Definition for future Mars missions, (6) Viking Lander data analysis, (7) winds in Mars atmosphere Venus atmospheric dynamics, (8) Pioneer Venus Probe data analysis, (9) Pioneer Venus anomaly analysis, (10) Discovery Venus Probe Titan probe instrument design, and (11) laboratory studies of Titan probe impact phenomena. The work has resulted in more than 10 articles published in archive journals, 2 encyclopedia articles, and many working papers. This final report is organized around the four planets on which there was activity, Jupiter, Mars, Venus, and Titan, with a closing section on Miscellaneous Activities. A major objective was to complete the fabrication, test, and evaluation of the atmosphere structure experiment on the Galileo probe, and to receive, analyze and interpret data received from the spacecraft. The instrument was launched on April 14, 1989. Calibration data were taken for all experiment sensors. The data were analyzed, fitted with algorithms, and summarized in a calibration report for use in analyzing and interpreting data returned from Jupiter's atmosphere. The sensors included were the primary science pressure, temperature and acceleration sensors, and the supporting engineering temperature sensors. Computer programs were written to decode the Experiment Data Record and convert the digital numbers to physical quantities, i.e., temperatures, pressures, and accelerations. The project office agreed to obtain telemetry of checkout data from the probe. Work to extend programs written for use on the Pioneer Venus project included: (1) massive heat shield ablation leading to important mass loss during entry; and (2) rapid planet rotation, which introduced terms of motion not needed on Venus. When the Galileo Probe encountered Jupiter, analysis and interpretation of data commenced. The early contributions of the experiment were to define (1) the basic structure of the deep atmosphere, (2) the stability of the atmosphere, (3) the upper atmospheric profiles of density, pressure, and temperature. The next major task in the Galileo Probe project was to refine, verify and extend the analysis of the data. It was the verified, and corrected data, which indicated a dry abiabatic atmosphere within measurement accuracy. Temperature in the thermosphere was measured at 900 K. Participation in the Mars atmospheric research included: (1) work as a team member of the Mars Atmosphere Working Group, (2) contribution to the Mars Exobiology Instrument workshop, (3) asssistance in planning the Mars global network and (4) assitance in planning the Soviet-French Mars mission in 1994. This included a return to the Viking Lander parachute data to refine and improve the definition of winds between 1.5 and 4 kilometer altitude at the two entry sites. The variability of the structure of Mars atmosphere was addressed, which is known to vary with season, latitude, hemisphere and dust loading of the atmosphere. This led to work on the Pathfinder project. The probe had a deployable meteorology mast that had three temperature sensors, and a wind sensor at the tip of the mast. Work on the Titan atmospheric probe was also accomplished. This included developing an experiment proposal to the European Space Agency (ESA), which was not selected. However, as an advisor in the design and preparation of the selected experiment the researcher interacted with scientist on the Huygens Probe Atmosphere Structure Experiment. The researcher also participated in the planning for the Venus Chemical Probe. The science objectives of the probe were to resolve unanswered questions concerning the minor species chemistry of Venus' atmosphere that control cloud formation, greenhouse effectiveness, and the thermal structure. The researcher also reviewed problems with the Pioneer Venus Probe, that caused anomalies which occurred on the Probes at and below 12.5 km level of the Venus' atmosphere. He convened and participated in a workshop that concluded the most likely hardware cause was insulation failure in the electrical harness outside the Probes' pressure vessels. It was discovered that the shrink tubing material failed at 600K. This failure could explain the anomalies experienced by the probes. The descent data of the Pioneer probes, and the Soviet Vega Lander was analyzed to evaluate the presence of small scale gravity waves in and below the Venus cloud layer.

Lester, Peter↗

Optical Properties of Thin Film Molecular Mixtures

Thin films composed of molecular mixtures of metal and dielectric are being considered for use as solar selective coatings for a variety of space power applications. By controlling the degree of molecular mixing, the solar selective coatings can be tailored to have the combined properties of high solar absorptance, alpha, and low infrared emittance, epsilon. On orbit, these combined properties would simultaneously maximize the amount of solar energy captured by the coating and minimize the amount of thermal energy radiated. Mini-satellites equipped with solar collectors coated with these cermet coatings may utilize the captured heat energy to power a heat engine to generate electricity, or to power a thermal bus that directs heat to remote regions of the spacecraft. Early work in this area identified the theoretical boundary conditions needed to operate a Carnot cycle in space, including the need for a solar concentrator, a solar selective coating at the heat inlet of the engine, and a radiator. A solar concentrator that can concentrate sunlight by a factor of 100 is ideal. At lower values, the temperature of the solar absorbing surface becomes too low for efficient heat engine operation, and at higher values, cavity type heat receivers become attractive. In designing the solar selective coating, the wavelength region yielding high solar absorptance must be separated from the wavelength region yielding low infrared emittance by establishing a sharp transition in optical properties. In particular, a sharp transition in reflectance is desired in the infrared to achieve the desired optical performance. For a heat engine operating at 450C, a sharp transition at 1.8 micrometers is desired. The radiator completes the heat flow through the Carnot cycle. Additional work has been done supporting the use of molecular mixtures for terrestrial applications. Sputter deposition provides a means to apply coatings to the tubes that carry a working fluid at the focus of trough-style collectors. Sputtering offers considerable flexibility in coating conditions, including a wide variety of metal and dielectric targets. Coating designs range from simple two or three layer coatings to complex coatings that are purposely graded to be metal-rich at their base and oxide-rich at their surface in order to yield the desired solar selective properties. In these cermet coatings, molecular islands of metal are thought to be embedded in a three dimensional matrix of dielectric. Recent work has identified the use of custom made ion beam sputter deposition targets to produce coatings containing molecular mixtures of metal and dielectric. The targets are cylindrical and the surface consists of a gradually changing composition of metal and dielectric. Rotating the cylinder under the beam during ion beam sputter deposition yields a coating that is a molecular mixture of metal and dielectric, with the composition changing through the thickness of the coating. The optical properties of these coatings are not only dependent on their thickness and chemical composition, but are also dependent on the extent of the through thickness gradient established during deposition. This paper presents a summary of the optical properties of several thin film molecular mixtures designed as solar selective coatings. Optical performance is first identified as a function of wavelength, from the ultraviolet to the visible and infrared. Coating composition, thickness, and gradient from metal to dielectric also play an important role. Additional work for future activities is also identified.

Jaworske, Donald A.↗

Marshall Space Flight Center Propulsion Systems Department (PSD) KM Initiative

NASA Marshall Space Flight Center s Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities with in the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center Of Excellence (AISCE), Intergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KM implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to support the planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have been performed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural/KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level systems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

Caraccioli, Paul↗

Marshall Space Flight Center Propulsion Systems Department (PSD) Knowledge Management (KM) Initiative

NASA Marshall Space Flight Center's Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities within the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center of Excellence (AISCE), lntergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KNI implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to suppo~th e planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have beon pedormed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural1KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level svstems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, - evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

Caraccioli, Paul↗

Accomplishments of the Advanced Reusable Technologies (ART) RBCC Project at NASA/Marshall Space Flight Center

The focus of the NASA / Marshall Space Flight Center (MSFC) Advanced Reusable Technologies (ART) project is to advance and develop Rocket-Based Combined-Cycle (RBCC) technologies. The ART project began in 1996 as part of the Advanced Space Transportation Program (ASTP). The project is composed of several activities including RBCC engine ground testing, tool development, vehicle / mission studies, and component testing / development. The major contractors involved in the ART project are Aerojet and Rocketdyne. A large database of RBCC ground test data was generated for the air-augmented rocket (AAR), ramjet, scramjet, and ascent rocket modes of operation for both the Aerojet and Rocketdyne concepts. Transition between consecutive modes was also demonstrated as well as trajectory simulation. The Rocketdyne freejet tests were conducted at GASL in the Flight Acceleration Simulation Test (FAST) facility. During a single test, the FAST facility is capable of simulating both the enthalpy and aerodynamic conditions over a range of Mach numbers in a flight trajectory. Aerojet performed freejet testing in the Pebble Bed facility at GASL as well as direct-connect testing at GASL. Aerojet also performed sea-level static (SLS) testing at the Aerojet A-Zone facility in Sacramento, CA. Several flight-type flowpath components were developed under the ART project. Aerojet designed and fabricated ceramic scramjet injectors. The structural design of the injectors will be tested in a simulated scramjet environment where thermal effects and performance will be assessed. Rocketdyne will be replacing the cooled combustor in the A5 rig with a flight-weight combustor that is near completion. Aerojet's formed duct panel is currently being fabricated and will be tested in the SLS rig in Aerojet's A-Zone facility. Aerojet has already successfully tested a cooled cowl panel in the same facility. In addition to MSFC, other NASA centers have contributed to the ART project as well. Inlet testing and parametrics were performed at NASA / Glenn Research Center (GRC) and NASA / Langley Research Center (LaRC) for both the Aerojet and Rocketdyne concepts. LaRC conducted an Air-Breathing Launch Vehicle (ABLV) study for several vehicle concepts with RBCC propulsion systems. LaRC is also performing a CFD analysis of the ramjet mode for both flowpaths based on GASL test conditions. A study was performed in 1999 to investigate the feasibility of performing an RBCC flight test on the NASA / Dryden Flight Research Center (DFRC) SR-71 aircraft. Academia involvement in the ART project includes parametric RBCC flowpath testing by Pennsylvania State University (PSU). In addition to thrust and wall static pressure measurements, PSU is also using laser diagnostics to analyze the flowfield in the test rig. MSFC is performing CFD analysis of the PSU rig at select test conditions for model baseline and validation. Also, Georgia Institute of Technology (GT) conducted a vision vehicle study using the Aerojet RBCC concept. Overall, the ART project has been very successful in advancing RBCC technology. Along the way, several major milestones were achieved and "firsts" accomplished. For example, under the ART project, the first dynamic trajectory simulation testing was performed and the Rocketdyne engine A5 logged over one hour of accumulated test time. The next logical step is to develop and demonstrate a flight-weight RBCC engine system.

Nelson, Karl W.↗

NASA Space Environment Analog for Training, Engineering, Science, and Technology (SEATEST) 6 Detailed Final Report

After more than 50 years since the last crewed lunar landing, plans for more missions to the moon are in development. For these missions, efficient and sustainable logistics will be critical. Additionally, innovative methods of cargo transfer to and from a lunar outpost should be considered for successfully establishing a permanent presence on the moon. SEATEST (Space Environment Analog for Training, Engineering, Science, and Technology) is an immersive mission-analogous operational atmosphere where buoyancy effects and supplemental weights can simulate partial gravity conditions similar to those astronauts will experience on the moon. SEATEST 6 took place at the University of Southern California (USC) Wrigley Marine Science Center on Santa Catalina Island from July 18-30, 2023. The analog was used to collect preliminary logistics data on two different offloading conceptual methods (a davit and a zipline) during a simulated lunar mission. Pre-test analysis indicated for a crew of two on a 14-day mission, approximately three Medium Pressurized Logistics Containers (MPLC) sized logistics containers (or a total of 37.5 single Cargo Transfer Bag Equivalents (CTBE)) would be needed to support a mission. A Computer-Aided Design (CAD) analysis was employed on the SEATEST airlock mockup to determine how many logistic containers would fit with two suited crewmembers, don/doff stands, and hatch operations. It was determined that for SEATEST, a total of 15 1.0 Small Pressurized Logistics Containers (SPLCs) and 8 2.0 SPLCs would adequately fit into the approximate 9.5 cubic meter airlock volume. This does not fully represent a complete 14-day logistic supply; however, it does provide a preliminary estimate to initiate design conversations between logistics teams and crew at this early stage of development. Data were collected in eight logistics transfer scenarios over two days with four scenarios per day. Five test subject crew participated in scenarios as pairs. Scenarios included two sizes of logistics containers – 1.0 SPLC (equivalent to a single Cargo Transfer Bag (CTB) and 2.0 SPLC (equivalent to two CTBs). Planed evaluations included the use of a logistics port compared to transfer through an Airlock hatch, offloading methods based on either a davit or a zipline system, choreography of cargo in the airlock to permit ingress and suit doffing, and dust removal protocols for an understanding of the overall impact to transfer ops. Data collected included objective data (task times for conducting overall tasks and subtasks, full audio/video of test activities, and inadvertent “dings” on hardware) and subjective data (crew consensus of: task acceptability and capability assessment ratings related to best practices, considerations, and constraints for EVA-driven logistics transfer ConOps, sim quality of the test environment, and more general debrief comments). The two logistic offloading transfer concepts (davit, zipline) presented both advantages and limitations. The davit’s flexibility in allowing the crew to pick up the containers without physical interaction was well regarded by the crew. Some limitations of select davit hardware components were noted, but the overall concept was acceptable. The zipline system proved to be the most efficient way of moving logistics from the lander to the airlock and eliminated the need for dust operations. However, extended and repetitive lifting of containers to the line could be fatiguing. In conclusion, logistics transfer could hypothetically be achieved without an offloading method; however, the time requirement for such operations would be prohibitive. Results of crew subjective feedback proposed a combined or hybrid davit/zipline method to increase efficiency.

Logistics↗

The Disruptive Technology That is Additive Construction: System Development Lessons Learned for Terrestrial and Planetary Applications

Disruptive technologies are unique in that they spawn other new technologies and applications as they grow. These activities are usually preceded by the question, "What If?" For example, "What if we could use an emerging technology and in-situ materials to promote exploration on the Moon or Mars, and then use that same technology to keep our troops out of harm's way and/or help the worlds' homeless?" This question allows us to flip the mindset of "how can people create more valuable innovation?" to "how can innovation create more valuable people?." This approach allows us to view augmented human labor as an inclusive opportunity, not a threat. The discipline of Additive Construction is growing rapidly due to the flexibility, speed, safety and logistics benefits offered as compared to standard construction techniques. Additive construction is a disruptive technology in that it employs the principles of additive manufacturing on a human habitat structure scale. Developed initially for emergency management and disaster relief applications, additive construction has now grown into military infrastructure and planetary (Moon and Mars) surface infrastructure applications as well. Additive Construction with Mobile Emplacement (ACME) is a NASA technology development project that seeks to demonstrate the feasibility of constructing shelters for human crews, and other surface infrastructure, on the Moon or Mars for a future human presence. The ACME project will allow, for the first time, the 3-dimensional printing of surface structures on planetary bodies using local materials for construction, thereby tremendously reducing launch and transportation mass and logistics. Some examples of infrastructure that could be constructed using robotic additive construction methods are landing pads, rocket engine blast protection berms, roads, dust free zones, equipment shelters, habitats and radiation shelters. Terrestrial applications include the development of surface structures using Earth-based materials for emergency response, disaster relief, general construction, and housing at all economic levels. This paper will describe the progress made by the NASA ACME project with a focus on prototypes and full scale additive construction demonstrations using both Portland cement concrete and other indigenous material mixtures. Rationale for the use of additive construction for both terrestrial and planetary applications will be explored and a thorough state-of-the-art of additive construction techniques will be presented. An evolutionary history of NASA's additive construction development efforts, dating back to 2004, will be included. The paper will then step through a series of trade studies performed to inform key processing and design decisions in the development of the full-scale ACES-3 system developed by NASA and the Jacobs Space Exploration Group for the U.S. Army Corps of Engineers (USACE) Construction Engineers Research Laboratory (CERL) in Champaign, IL. The selection of aggregate and binders, based on in-situ materials, will also be presented and discussed

Space Processing↗

SMOS/SMAP Synergy for SMAP Level 2 Soil Moisture Algorithm Evaluation

Soil Moisture Active Passive (SMAP) satellite has been proposed to provide global measurements of soil moisture and land freeze/thaw state at 10 km and 3 km resolutions, respectively. SMAP would also provide a radiometer-only soil moisture product at 40-km spatial resolution. This product and the supporting brightness temperature observations are common to both SMAP and European Space Agency's Soil Moisture and Ocean Salinity (SMOS) mission. As a result, there are opportunities for synergies between the two missions. These include exploiting the data for calibration and validation and establishing longer term L-band brightness temperature and derived soil moisture products. In this investigation we will be using SMOS brightness temperature, ancillary data, and soil moisture products to develop and evaluate a candidate SMAP L2 passive soil moisture retrieval algorithm. This work will begin with evaluations based on the SMOS product grids and ancillary data sets and transition to those that will be used by SMAP. An important step in this analysis is reprocessing the multiple incidence angle observations provided by SMOS to a global brightness temperature product that simulates the constant 40 degree incidence angle observations that SMAP will provide. The reprocessed brightness temperature data provide a basis for evaluating different SMAP algorithm alternatives. Several algorithms are being considered for the SMAP radiometer-only soil moisture retrieval. In this first phase, we utilized only the Single Channel Algorithm (SCA), which is based on the radiative transfer equation and uses the channel that is most sensitive to soil moisture (H-pol). Brightness temperature is corrected sequentially for the effects of temperature, vegetation, roughness (dynamic ancillary data sets) and soil texture (static ancillary data set). European Centre for Medium-Range Weather Forecasts (ECMWF) estimates of soil temperature for the top layer (as provided as part of the SMOS ancillary data) were used to correct for surface temperature effects and to derive microwave emissivity. ECMWF data were also used for precipitation forecasts, presence of snow, and frozen ground. Vegetation options are described below. One year of soil moisture observations from a set of four watersheds in the U.S. were used to evaluate four different retrieval methodologies: (1) SMOS soil moisture estimates (version 400), (2) SeA soil moisture estimates using the SMOS/SMAP data with SMOS estimated vegetation optical depth, which is part of the SMOS level 2 product, (3) SeA soil moisture estimates using the SMOS/SMAP data and the MODIS-based vegetation climatology data, and (4) SeA soil moisture estimates using the SMOS/SMAP data and actual MODIS observations. The use of SMOS real-world global microwave observations and the analyses described here will help in the development and selection of different land surface parameters and ancillary observations needed for the SMAP soil moisture algorithms. These investigations will greatly improve the quality and reliability of this SMAP product at launch.

Bindlish, Rajat↗

LunaNet Position, Navigation, and Timing Services and Signal, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. September 2022 introduced the National Aeronautics and Space Administration’s (NASA) Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever commercial mission, launched by a commercial launch service provider, aiming to land on the lunar surface. The NASA Artemis programme plans initial crewed landings and traverses in 2025, supported by the Lunar Gateway, followed by regular launches to build the lunar systems (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with Commercial Lunar Payload Services (CLPS, (NASA, n.d.)) to deliver science and technology to the Moon, with launches starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) programme plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target the Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, and surface crew and rovers). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This includes a description of the high-level LANS concept and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗

Zoledronate Prevents Simulated Weightlessness-Induced Bone Loss in the Cancellous Compartment While Blunting the Efficacy of a Mechanical Loading Countermeasure

Astronauts using high-force resistance training while weightless show a high-turnover remodeling state within the skeletal system, with resorption and formation biomarkers being elevated. One countermeasure for the skeletal health of astronauts includes an antiresorptive of the bisphosphonate (BP) drug class. We asked, does the combination of an anti-resorptive and high-force exercise during weightlessness have negative effects on bone remodeling and strength? In this study, we developed an integrated model to mimic the mechanical strain of exercise via cyclical loading (CL) in mice treated with the BP Zoledronate (ZOL) combined with hind limb unloading (HU) to simulate weightlessness. We hypothesized that ZOL prevents structural degradation from simulated weightlessness and that CL and ZOL interact to render CL less effective. Thirty-two C57BL/6 mice (male, 16 weeks old, n=8/group) were exposed to 3 weeks of either HU or normal ambulation (NA). Cohorts of mice received one subcutaneous injection of ZOL (45μg/kg), or saline vehicle (VEH), prior to the start of HU. The right tibia was axially compressed in vivo 60x/day to 9N (+1200μstrain on the periosteal surface) and repeated 3x/week during HU. Left tibiae served as a within subject, non-compressed control. Ex vivo μCT was performed on all subjects to determine cancellous and cortical architectural parameters. Static and dynamic histomorphometry were carried out for the left and right tibiae to determine osteoclast- and osteoblast relevant surfaces. Further, micro damage was assessed in select groups by basic-fuchsin staining to test whether CL had an effect. For all assays, a multivariate (2x2x2) ANCOVA model was used to account for body weight changes. Additionally, for the tibiae, we incorporated a random effect for the subject (hence, a mixed model) to account for observations of both left and right tibiae within each subject. P < 0.05 was considered significant. In the cancellous compartment of the proximal tibial metaphysis, we observed a main effect from each independent variable, as determined by structural and histomorphometric assays. Specifically, as expected, ZOL showed an increase in the cancellous bone volume to total volume fraction (BV/TV, +32%) and trabecular number (+18%) compared to the VEH. As expected, ZOL decreased osteoclast surface (OC/BS) by -45% compared to VEH. Surprisingly, ZOL reduced mineralizing surface (MS/BS) and bone formation rate (BFR), indicators of osteoblast activity, by -40% and -54%, respectively, compared to VEH. Altogether, ZOL-treated mice displayed a low turnover state of remodeling in the metaphysis. In the context of skeletal aging, we speculate that ZOL prevented age-related cancellous strut loss during the experiment. As a main effect, as expected, HU decreased BV/TV by - 31% via reductions in both trabecular thickness (-11%) and number (-22%) compared to NA controls. Additionally, HU decreased MS/BS by -38% and bone formation rate (BFR) by -50% compared to NA controls. Altogether, these data are consistent with structural degradation resulting from imbalanced remodeling that favors resorption. As a main effect, CL increased BV/TV by +15% via increased trabecular thickness (+12%) compared to the noncompressed limb. As expected, CL increased MS/BS (+20%) and BFR (+24%), indicating osteoblast mineralization contributed to bone gains. These data show that CL provided an anabolic stimulus to the cancellous tissue. We observed unique interactions in ZOL*CL and HU*CL. First, ZOL prevented CL-induced increases in BV/TV and trabecular number, as compared to VEH. In the context of skeletal aging, these data suggest no added benefit from CL in the ZOL-treated mice. Interestingly, no microdamage was observed in mice that were unloaded and treated with ZOL (independent of CL). Secondly, HU prevented CL-induced increases in BFR, as compared to NA controls. These data suggest that either exercise is less effective or the kinetics of formation are slower during simulated weightlessness. Osteoclast surface was unchanged by either treatment. Thus, in contrast to exercising astronauts, these data do not suggest a high-turnover state in the metaphysis. To assess mechanical properties as a function of HU or ZOL, we tested the left femur in three-point bending ex vivo. As expected, HU decreased stiffness (-30%) compared to NA, and ZOL increased stiffness compared to VEH (+28%). Interestingly, HU increased the post-yield displacement, related to collagenous tensile loading, compared to NA (+20%). ZOL increased yield force (+11%) and ultimate force (+17%), which seems to explain the significant effect of ZOL increasing total energy (work-to-fracture, +15%), while not affecting the post yield displacement. Taken together, ZOL did not have detrimental affect on mechanical properties. Our integrated model simulates the combination of weightlessness, exercise-induced mechanical strain, and anti-resorptive treatment that astronauts experience during space missions. We conclude that Zoledronate was an effective countermeasure against weightlessness-induced bone loss, though zoledronate, as well as weightlessness, rendered exercise-related mechanical loading less effective.

bone↗

MESSENGER at Mercury: Early Orbital Operations

The MErcury Surface, Space ENvironment, GEochemistry, and Ranging (MESSENGER) spacecraft, launched in August 2004 under NASA's Discovery Program, was inserted into orbit about the planet Mercury in March 2011. MESSENGER's three flybys of Mercury in 2008-2009 marked the first spacecraft visits to the innermost planet since the Mariner 10 flybys in 1974-1975. The unprecedented orbital operations are yielding new insights into the nature and evolution of Mercury. The scientific questions that frame the MESSENGER mission led to the mission measurement objectives to be achieved by the seven payload instruments and the radio science experiment. Interweaving the full set of required orbital observations in a manner that maximizes the opportunity to satisfy all mission objectives and yet meet stringent spacecraft pointing and thermal constraints was a complex optimization problem that was solved with a software tool that simulates science observations and tracks progress toward meeting each objective. The final orbital observation plan, the outcome of that optimization process, meets all mission objectives. MESSENGER's Mercury Dual Imaging System is acquiring a global monochromatic image mosaic at better than 90%coverage and at least 250 m average resolution, a global color image mosaic at better than 90%coverage and at least 1 km average resolution, and global stereo imaging at better than 80%coverage and at least 250 m average resolution. Higher-resolution images are also being acquired of targeted areas. The elemental remote sensing instruments, including the Gamma-Ray and Neutron Spectrometer and the X-Ray Spectrometer, are being operated nearly continuously and will establish the average surface abundances of most major elements. The Visible and Infrared Spectrograph channel of MESSENGER's Mercury Atmospheric and Surface Composition Spectrometer is acquiring a global map of spectral reflectance from 300 to 1450 nm wavelength at a range of incidence and emission angles. Targeted areas have been selected for spectral coverage into the ultraviolet with the Ultraviolet and Visible Spectrometer (UVVS). MESSENGER's Mercury Laser Altimeter is acquiring topographic profiles when the slant range to Mercury's surface is less than 1800 km, encompassing latitudes from 201S to the north pole. Topography over the remainder of the southern hemisphere will be derived from stereo imaging, radio occultations, and limb profiles. MESSENGER's radio science experiment is determining Mercury's gravity field from Doppler signals acquired during frequent downlinks. MESSENGER's Magnetometer is measuring the vector magnetic field both within Mercury's magnetosphere and in Mercury's solar wind environment at an instrument sampling rate of up to 20 samples/s. The UVVS is determining the three-dimensional, time-dependent distribution of Mercury's exospheric neutral and ionic species via their emission lines. During each spacecraft orbit, the Energetic Particle Spectrometer measures energetic electrons and ions, and the Fast Imaging Plasma Spectrometer measures the energies and mass per charge of thermal plasma components, both within Mercury's magnetosphere and in Mercury's solar-wind environment. The primary mission observation sequence will continue for one Earth year, until March 2012. An extended mission, currently under discussion with NASA, would add a second year of orbital observations targeting a set of focused follow-on questions that build on observations to date and take advantage of the more active Sun expected during 2012-2013. MESSENGER's total primary mission cost, projected at $446 M in real-year dollars, is comparable to that of Mariner 10 after adjustment for inflation.

Planetary Science↗

MESSENGER at Mercury: Early Orbital Operations

The MErcury Surface, Space ENvironment, GEochemistry, and Ranging (MESSENGER) spacecraft, launched in August 2004 under NASA's Discovery Program, was inserted into orbit about the planet Mercury in March 2011. MESSENGER's three flybys of Mercury in 2008-2009 marked the first spacecraft visits to the innermost planet since the Mariner 10 flybys in 1974-1975. The unprecedented orbital operations are yielding new insights into the nature and evolution of Mercury. The scientific questions that frame the MESSENGER mission led to the mission measurement objectives to be achieved by the seven payload instruments and the radio science experiment. Interweaving the full set of required orbital observations in a manner that maximizes the opportunity to satisfy all mission objectives and yet meet stringent spacecraft pointing and thermal constraints was a complex optimization problem that was solved with a software tool that simulates science observations and tracks progress toward meeting each objective. The final orbital observation plan, the outcome of that optimization process, meets all mission objectives. MESSENGER's Mercury Dual Imaging System is acquiring a global monochromatic image mosaic at better than 90% coverage and at least 250 m average resolution, a global color image mosaic at better than 90% coverage and at least 1 km average resolution, and global stereo imaging at better than 80% coverage and at least 250 m average resolution. Higher-resolution images are also being acquired of targeted areas. The elemental remote sensing instruments, including the Gamma-Ray and Neutron Spectrometer and the X-Ray Spectrometer, are being operated nearly continuously and will establish the average surface abundances of most major elements. The Visible and Infrared Spectrograph channel of MESSENGER's Mercury Atmospheric and Surface Composition Spectrometer is acquiring a global map of spectral reflectance from 300 to 1450 nm wavelength at a range of incidence and emission angles. Targeted areas have been selected for spectral coverage into the ultraviolet with the Ultraviolet and Visible Spectrometer (UVVS). MESSENGER's Mercury Laser Altimeter is acquiring topographic profiles when the slant range to Mercury's surface is less than 1800 km, encompassing latitudes from 20 deg. S to the north pole. Topography over the remainder of the southern hemisphere will be derived from stereo imaging, radio occultations, and limb profiles. MESSENGER's radio science experiment is determining Mercury's gravity field from Doppler signals acquired during frequent downlinks. MESSENGER's Magnetometer is measuring the vector magnetic field both within Mercury's magnetosphere and in Mercury's solar wind environment at an instrument sampling rate of up to 20 samples/s. The UVVS is determining the three-dimensional, time-dependent distribution of Mercury's exospheric neutral and ionic species via their emission lines. During each spacecraft orbit, the Energetic Particle Spectrometer measures energetic electrons and ions, and the Fast Imaging Plasma Spectrometer measures the energies and mass per charge of thermal plasma components, both within Mercury's magnetosphere and in Mercury's solar-wind environment. The primary mission observation sequence will continue for one Earth year, until March 2012. An extended mission, currently under discussion with NASA, would add a second year of orbital observations targeting a set of focused follow-on questions that build on observations to date and take advantage of the more active Sun expected during 2012-2013. MESSENGER's total primary mission cost, projected at $446 M in real-year dollars, is comparable to that of Mariner 10 after adjustment for inflation.

mercury↗

Lunanet Position, Navigation, and Timing Services and Signals, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. In September 2022 the National Aeronautics and Space Administration (NASA) introduced the Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever mission launched by a commercial launch service provider aiming to land on the lunar surface. The NASA Artemis program plans initial crewed landings and surface traverses in 2025, supported by the Lunar Gateway. Regular launches will follow to build the lunar systems for a sustained presence as presented in the Artemis Plan (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with commercial providers through the Commercial Lunar Payload Services program (CLPS, (NASA, n.d.)) will deliver science and technology demonstration missions to the Moon starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) program plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services, that may be combined with onboard sensors. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, surface crew, rovers, and deployed science payloads). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that would be provided by a system that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This paper includes a description of the high-level LANS concept, and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗