Remote Retrieval, Disruption and Processing of Legacy Nuclear Waste - 16179

The UK National Nuclear Laboratory (NNL) is currently undertaking, in conjunction with Sellafield Ltd, a series of high profile trials of robotic equipment on a full scale test facility at their Workington Laboratory in England. These trials are designed to underpin and substantiate the processes proposed for the remote retrieval, disruption and processing of legacy Miscellaneous Beta Gamma Waste (MBGW) from a number of different donor plants on the Sellafield site, including some of the older fuel storage ponds and storage silos. These processes will be conducted inside the new Box Encapsulation Plant (BEP) which is due to be commissioned at Sellafield by 2020. These processes will subsequently enable Sellafield Ltd to safely recover legacy Intermediate Level Waste (ILW) from the older storage facilities on site and process it into a safer form which is more suitable for long term storage and then ultimately final disposal in a Geological Disposal Facility. As part of this legacy waste processing within the BEP plant, MBGW waste items will have to be remotely removed from a variety of different types of import skips. This waste will then be transferred, using robots, into the export container, which is a 3 m{sup 3} box liner, where the processed waste will be flood grouted to produce an encapsulated waste package. As part of this processing, any MBGW items consisting of sealed containers will have to be remotely disrupted before being grout encapsulated. This disruption is in order to (a) release any trapped liquors or gases from the containers and (b) ensure full grout infiltration of the container contents, thus minimising the amount of free liquors and voids within the final waste product. The NNL are conducting this technical work to confirm the viability of the proposed concept, processes and equipment. The developed solution consists of a linear layout of processing equipment with a pair of heavy duty, standard industrial, 'commercially off the shelf' (COTS) robots positioned around a Waste Handling Table. These robots have a 500 kg payload capacity and are operated remotely to handle all of the various types of MBGW waste, including the heavy and bulky items. The robots can be operated in manual tele-operation mode as well as pre-programmed automatic mode and have a range of primary and secondary tooling in order to perform the waste processing and disruption tasks as well as undertake general house-keeping and cleaning duties within the cell. The main tools include two types of hydraulic grab for the main waste recovery and handling tasks and a hydraulic shear for the waste disruption activities, but a number of other tools have also been designed and built for ancillary activities, such as a set of general purpose gripper jaws, drilling tool, bolt removal tool, pump tool, spray tool and a number of different housekeeping tools etc. The robot trials were started in November 2014, and have attracted a significant degree of high level stakeholder interest, including the UK Nuclear Decommissioning Authority (NDA), Office for Nuclear Regulation (ONR), Environment Agency (EA) and Radioactive Waste Management Limited (RWML) witnessing a number of the critical demonstration trials. Robots of the type selected are readily available, robust, reliable and easy to use. The trials have been very successful in proving the retrieval, processing and disruption operations, reducing the burden in the legacy waste facilities. Utilising robots to perform these tasks will lower the probability of producing non-compliant waste packages. In addition the robots can increase the consolidation of incoming waste skips into outgoing 3 m{sup 3} box liners, significantly increasing packing efficiencies and reducing the overall number of export containers produced thus lowering the decommissioning and waste storage/disposal costs. The trials have also enabled an assessment of the optimum way to operate the robots, as well as their reliability and maintainability issues. Engineering work associated with recovering failed robots and removing them from a typical Sellafield plant environment and then subsequently replacing them with functioning robots has also been undertaken and further work is now planned. The success of the trials, completed safely to a very challenging timescale, has enabled the use of robots in BEP to be endorsed as a viable option by the key stakeholders. Following a robust decision making process, this was a clear cut decision. The technical development and testing of the robot technology is currently continuing in order to investigate areas such as robot reliability, failure recoveries, human factors, ease of waste identification, optimisation of throughput rates, nuclearisation modifications etc. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from FUSRAP - 16200

The US DOE Office of Legacy Management (LM) is the long-term steward for 90 sites remediated under numerous regulatory regimes including the Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In addition, LM holds considerable historical information, gathered in the 1970's, to determine site eligibility for remediation under FUSRAP. To date, 29 FUSRAP sites are in LM's inventory of sites for long-term surveillance and maintenance (LTS and M), and 25 are with the US Army Corps of Engineers (USACE) for remediation or in the process of being transitioned to LM. It is forecasted that 13 FUSRAP sites will transfer from the USACE to LM over the next 10 years; however, the timing of the transfers is strongly dependent upon federal funding of the ongoing remedial actions. Historically, FUSRAP sites were generally cleaned up for unrestricted industrial use or remediated to the cleanup standards at that time, and their use remained unchanged. Today, these sites as well as the adjacent properties are now changing or envisioned to have changes in land use, typically from industrial to commercial or residential uses. The implication of land-use change affects DOE's LTS and M responsibility for the sites under LM stewardship as well as the planning for the additional sites scheduled to transition in time. Coinciding with land-use changes at or near FUSRAP sites is an increased community awareness of these sites. As property development increases near FUSRAP sites, the general public and interested stakeholders regularly inquire about the sufficiency of cleanups that impact their neighborhoods and communities. LM has used this experience to address a series of lessons learned to improve our program management in light of the changing conditions of our sites. We describe these lessons learned as (1) improved stakeholder relations, (2) enhanced LTS and M requirements for the sites, and (3) greater involvement in the transition process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transition and Transfer of Remediated FUSRAP Sites from USACE to US DOE for Long-Term Surveillance and Maintenance - 16209

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS and M). US DOE's Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS and M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM's perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS and M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Ambivalent Role of Participants in Nuclear Waste Decisions - 16360

Today's global nuclear sector has entered a critical juncture. Waste management solutions have the potential to influence the prospects of whether new plants will be built and when aging plants will be decommissioned. Even in countries without nuclear power plants, the siting of nuclear waste can present communication challenges and opportunities for public involvement. As new nuclear programs withstand scrutiny, local communities share their want for solutions to nuclear waste before new plant construction commences. Developing nations have begun to explore the potential of adding nuclear power production to their energy mix. They carefully watch established nuclear players to accelerate their plans with lessons learned elsewhere. Some newcomers to nuclear energy will make decisions on new construction based on other operators' abilities to reconcile public concerns regarding radioactive waste. Distinct forms of government, cultural norms and means of public discourse present innovative approaches and changing expectations worldwide. This paper explores how practitioners are evaluating ways to activate stakeholders on nuclear waste siting in nations embarking on new nuclear programs. It investigates the incentives that people have to participate and legitimize the formation of laws, regulations and standards for nuclear materials management. Finally, it highlights examples of public participation techniques from established operating environments and posits that overly prescriptive requirements for stakeholder engagement can reduce the authenticity of public involvement and weaken confidence among participants in the decision making process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstration of Wide Area Radiological Decontamination and Mitigation Technologies for Building Structures and Vehicles - 16508

Researchers at the U.S. Environmental Protection Agency in collaboration with the Department of Homeland Security conducted the 'Wide-Area Urban Radiological Contaminant, Mitigation, and Clean-Up Technology Demonstration' in Columbus, Ohio on June 22-25, 2015. EPA's National Homeland Security Research Center (NHSRC) demonstrated five wide-area radiological decontamination technologies (including strippable coatings, gels, and chemical foam technologies) on an urban building. Decontamination technologies were applied to remove the contaminants from the building's surfaces by physical, chemical, or other methods, which in practice could reduce radiation exposure level. In addition, NHSRC teamed with the Department of Homeland Security (DHS) to demonstrate several radiological contaminant mitigation technologies including building and vehicle wash technologies, as well as several approaches to contain wash water and radioactive particles. 'Radiological contaminant mitigation' technologies are measures taken to reduce adverse impacts of radiological contamination on people and the environment, and facilitate such purposes as restoration of first responder services and critical infrastructure. Radiological contaminant mitigation technologies are designed for containing and removing radiological contamination on the surface in the first hours or days following a radiological event (early phase response). Such technologies include 'radiological particle containment', which is design to prevent the spread of particles which might result from vehicle or foot traffic. Radiological particle containment technologies are applicable for early phase response to contain the radionuclides and to reduce radiation dose to responders and the public. Mitigation also includes 'gross decontamination' technologies, which perform a type of decontamination that is conducted with the goal of reducing contamination levels. This reduction may not meet final cleanup levels, but may be useful to mitigate some public hazard or contain contamination. The purpose of the demonstrations was to educate potential end-users and stakeholders of this technology about a 'Toolbox of Options' for radiological decontamination, as well as radiological contaminant mitigation. Both demonstrations were conducted using a 75-year old brick building and the surrounding area (including parking lots) in Columbus, OH. No radioactive contaminants were applied during either demonstration, as the objective was to duplicate and implement realistic operational conditions for these technologies. Surrogate contaminants such as particle tracers were used in several demonstrations. The decontamination technologies were used in a scaled-up setting with application to the building. Contaminant mitigation technologies were demonstrated on the building as well as on vehicles. Example technology application techniques/accessories included an articulating boom lift, repelling boatswain chair, stand-alone surface material structures, high-volume foam applicators, fire truck foam applicator, a vehicle wash tent for vehicles, particle tracers to simulate radiological contaminants, and high- and low-technology liquid containment approaches. Results and stakeholder observations from the demonstration are now publically in a report entitled 'Technical Report for the Demonstration of Radiological Decontamination and Mitigation Technologies for Building Structures and Vehicles' available at http://www.epa.gov/hsresearch Example information that was obtained included decontamination rate, contaminant mitigation and containment capacity, user friendliness of each technology, the required utilities (electric, water, etc.) for each technology, skill of worker required, and the cost. The condition (color, texture, integrity, etc.) of each building material present on the structure along with all structural components such as gutters, windows, doors, etc. were carefully examined and documented. All demonstrations were open to individuals, organizations, and local, state, federal, tribal, and international governments who may be involved with implementing or planning radiological incident response. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Evolution of Chemical Waste Treatment in the Nuclear Industry Simple Solutions for Complex Problems - 16694

The U.S. nuclear waste treatment industry was born in the 1980s and early 1990s with the end of the Cold War, the peak of commercial nuclear power, and after implementation of federal regulations that drove new disposal requirements for radioactive waste generators. New regulations resulted in soaring costs for radioactive waste disposal, and thus an industry was born that focused on recycling, volume reduction, and waste form improvement. New treatment facilities and technologies were started that primarily dealt with low-level radioactive wastes; however, there was little to no treatment capacity for wastes commingled with hazardous chemicals. Large volumes of 'mixed wastes', of which many became known as 'orphan wastes', were being stored on U.S. Department of Energy (DOE) sites with no path for disposal and thus posed a risk to workers, the public, and the environment. Perma-fix Environmental Services, Inc. (Perma-Fix), which started in the hazardous waste industry in 1990 and had developed facilities and technologies to treat hazardous wastes, evolved in the late 90's to meet this mixed waste market opportunity. By adapting our technologies and collaborating with waste generators to understand their needs, we successfully developed treatment and disposition solutions for some of the most challenging mixed wastes in the U.S. By establishing a pathway for treatment and disposal of orphan wastes, Perma-Fix played an important role in the safe treatment and disposition of orphan wastes, which facilitated closure of DOE sites such as Rocky Flats, Mound, and Fernald. We found that understanding chemistry and having experience in managing the hazardous constituents of mixed wastes allowed us to apply solutions that were not overly complex and expensive. Further, by adapting proven hazardous waste treatment solutions to wastes commingled with contaminants such as polychlorinated biphenyls (PCBs), mercury, and organics we were able to safely manage even more problematic mixed wastes. During the 1980's, commercial low-level radioactive waste treatment and disposal solutions were being developed. At the same time, the federal government began dealing with increasing stakeholder demands for permanent solutions of more complex radioactive wastes such as high-level waste (HLW) and transuranic (TRU) wastes. HLW and TRU waste disposal became a contentious political issue between the federal government, regulatory agencies, and the public. As a result, DOE was mandated to develop treatment and disposal methodologies to address these wastes. DOE's Waste Isolation Pilot Plant (WIPP) facility solved most issues with disposition of TRU wastes; however, for HLW (for example tank wastes at Hanford, Savannah River, and Idaho) the complexity of the wastes and the fact that government entities were developing political solutions for waste treatment resulted in a variety of complex and expensive solutions. Decades later we still do not have a permanent solution for HLW. Whether some simple commercial approaches are possible, what regulatory changes should occur, and what the implications may be if we do not change our current path, will be discussed. After two decades, we see the low-level nuclear waste industry maturing and replicating the path of the hazardous waste industry. When new hazardous waste federal regulations were enacted in the 1970's and 1980's, the hazardous waste industry began to boom with new company start-ups and construction of numerous treatment and disposal facilities. Initially, this was a good business to be in, managing dangerous wastes in an environmentally safe and responsible manner, and it was profitable. However, over-capacity and fierce competition drove down pricing, and companies failed. This ultimately led to a major consolidation within the hazardous waste industry. Similarly and more recently in the nuclear industry, over-capacity and competition has driven down profitability, companies have failed, and there is a major consolidation occurring within sectors of the industry. For consolidation to be successful and healthy for either industry, a leader must emerge to set the direction for the others and establish a sustainable path that is acceptable for waste generators, stakeholders, and investors. This was the case for the hazardous waste industry. This paper will examine the parallels between the hazardous and nuclear waste industries as they have matured and evolved, and what discuss the long term implications of consolidation within the nuclear industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Beginner's Guide to Understanding Power System Model Results for Long-Term Resource Plans

This presentation summarizes a recently published beginner's guide for understanding power system model results for long-term resource plans. This guide is designed to improve decision-making in the electricity planning process by strengthening dialogue between system planners and relevant stakeholders. It focuses on interpreting scenario results generated by power system planning models. These results are often used to inform integrated resource plans, which are long-term plans for a utility to meet future electricity requirements. Whether you are a state utility commissioner, commission staff, part of a state energy office, an intervenor in the planning process, or another stakeholder, this guide is designed to help you better weigh in on the modeling methods or interpret the model results to improve decision-making. This guide can enhance your understanding to ask the right questions, which can enable better understanding of results and key assumptions, data, and methods.

ENERGY PLANNING, POLICY, AND ECONOMY↗

The D and D of Nuclear Facilities: a Systemic Approach for Project Organization and Monitoring - 18099

The Decontamination and Decommissioning (D and D) of Licensed Nuclear facilities takes place under circumstances which make it a very complex field. On the one hand, more and more facilities of widely varying types are concerned, and many D and D projects are currently running or planned. A nuclear facility's life cycle is often very long and the building may be modified or impacted by incidents during its operation. These changes need to be known and taken into account for the D and D plans, in order to ensure safety at all times. In addition, the numerous stakeholders involved in a project express needs which impose many requirements. These encompass various points of view, and data from different detail levels must be managed to satisfactorily meet them. On the other hand, legacy data (including records, plans etc.) is a recurring issue for D and D projects. The quality and availability of relevant data regarding the different phases of the nuclear facility lifetime may be insufficient, for instance due to the lack of traceability practices in the past. The uncertainty level is not always specified and explained, old documents can be damaged and are not necessarily digitized, etc. It is therefore particularly important to define the relevant type of raw data to be collected and traced for D and D projects as early as possible. In this context, CEA (Commissariat a l'energie Atomique et aux energies Alternatives) has been analyzing past D and D projects for many years. The goal is to facilitate reproducibility by generalizing best practices and promoting efficient organizational rules and technical solutions. A method is currently being studied to help project managers to prepare specifications for future D and D operations and improve both the efficiency and the relevance of the decommissioning strategy throughout each project, depending on the expected quality of its end-state. This method first consists in formalizing and specifying the entire set of requirements to be taken into consideration, e.g. technical, operational, logistical, regulatory, financial, organizational, safety and security, human, ethical, or, naturally, environmental aspects. Second, based on these requirements, it will enable the project team to structure, check, and then to demonstrate the coherence and feasibility of the project from both the technological and organizational points of view. Lastly, the method will enable the evaluation of the various possible solutions for the management of dismantling products, for instance, regarding the waste outlets: direct disposal or interim storage. To conclude, the method should permit a constant re-evaluation of the D and D strategy depending on the possible evolution of the stakeholders' requirements, and thus it should optimize the monitoring of D and D projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

To the 'Safety related?' Question: What is Related to Safety? - 18430

Most, if not all, national programs for radioactive waste management (RWM) pledge their overall commitment to safety or - in the case of radioactive waste disposal - to long-term safety. Therefore, it may be somewhat surprising to find that the term 'safety' is hardly defined in these programs. The same holds for some of the core international guidance literature on the deep geological repository (DGR) 'safety case' concept. With respect to stakeholder concern over the safety of geological disposal, it seems, however, advisable to seek common ground in the understanding of the idea of 'safety'. In this paper, we review and discuss the most relevant international guidance literature's provision (or non-provision) of definitions of 'safety' in the context of radioactive waste disposal. Against this background, we develop a tentative, practical, glossary-style definition of 'safety' in the DGR context. As a seed of discussion, it may help to eventually expose possible mismatches in the base assumptions of safety experts and other stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cold Commissioning Simulant Selection for the Hanford Tank Waste Treatment Plant LAW Facility - 18465

Commissioning the Low-Activity Waste (LAW) Facility of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) will require large volumes (∼2,000,000 liters) of a non-radioactive, chemically analogous waste simulant. Cold commissioning will provide for operator training in an integrated facility, demonstration of mechanical process equipment capacity, environmental performance demonstration of emissions control systems, and process control systems shakedown and tuning. Selection of the cold commissioning simulant is following a structured four-phase process to arrive at the preferred composition and recipe. Phases I, II and III are complete. Phase I laid the framework for decision making with preparation of a Project Management Plan, an update to the Simulant Development, Approval, Validation, and Documentation procedure, and a kickoff meeting to gather stakeholder input into the simulant definition and selection criteria. Phase II consisted of a comprehensive literature search and compilation of LAW simulant recipes, followed by initial screening against the selection criteria identified in Phase I. This process identified 72 candidate simulant recipes and down-selected 9 for further study. Phase III studies involved a) statistical comparisons of the similarity of candidate simulant compositions to the tank waste feed vector, b) process modelling of the commissioning sequence with each simulant to estimate glass former and simulant material consumption, offgas and effluent volumes and compositions, and product glass volumes and compositions, and c) evaluation of simulants against the immobilized LAW glass composition algorithm to determine allo able waste loading to ensure compliance with product specifications and process constraints. The results of these studies identified two of the candidate recipes to be carried forward to full-scale testing. Phase IV consists of testing these two recipes at vendor facilities to determine scalability, fabricability, and stability of the simulants when produced at industrial scale. Scalability is the ability to take a recipe from bench scale (1 to 40 liters) batch size to full scale (>35,000 liters) batch size. Fabricability is the ability of a recipe to be prepared in large batches without the need for complex or expensive mechanical equipment, heating, or cooling systems. Stability is the ability of a simulant to withstand long term storage and variations in environmental conditions without unacceptable changes in key characteristics (the set of chemical, physical, and rheological parameters that the simulant is intended to exhibit during cold commissioning tests). Simulants will also be tested for compatibility with other startup material (i.e., frit), tuning simulants, and environmental performance demonstration test spiking solutions to ensure against unexpected situations. Using a structured process is essential when making high impact decisions such as waste simulant selection. Proper planning and a clear explanation of how the decision process will unfold is key to obtaining stakeholder buy-in as more information is gathered. The documentation resulting from this structured selection process will be compiled and summarized in a Cold Commissioning Simulant Definition deliverable due to the Department of Energy 24 months before the start of Cold Commissioning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste is our Product. Developing, Implementing and Optimising Waste Management at Dounreay - 19039

The UK's Fast Breeder Reactor Research programme was centred at Dounreay, in the very north of Scotland, from 1955. Since 1994, the site has been focused on decommissioning, and represents one of the most complex, technically challenging and hazardous nuclear clean-up projects in Europe. Since 2012, Dounreay Site Restoration Ltd (DSRL) has been contracted by the NDA as the Site License Company to deliver the defined scope of work, under a Target Cost contract, to decommission the site to achieve the Interim End State by 2030-2033, whilst managing the transition of its people. All parties, including DSRL's Parent Body Organisation Cavendish Dounreay Partnership Ltd (a consortium of Cavendish Nuclear, AECOM, and Jacobs), recognise that there are significant technical and regulatory challenges to achieve this, as well as safely managing the transition for our workforce on what is effectively a 'closure' contract. The product of decommissioning is waste; over the course of the programme, a full range of higher activity and lower level radioactive wastes will be generated, and must be safely managed. This paper will address: - The Policy issues relating to radioactive waste management at Dounreay, including particular issues relating to implementation of Scottish policy, including how Waste Management is Optimised. - An overview of the decommissioning programme and the delivery of an Interim End State; - The type, range and nature of radioactive wastes requiring safe management at Dounreay; - Higher Activity Wastes (HAW): - Setting higher activity waste strategy; defining products and interim storage requirements; - Technical, regulatory and stakeholder issues for HAW strategy; - Lower Activity Wastes: - Setting Low Level Waste (LLW) strategy; defining a disposal product and development and status for Dounreay's LLW Disposal Vaults; - Implementing LLW strategy; - Technical, regulatory and stakeholder issues for LLW strategy; - Optimising Waste Management -Optimising waste from generation (from decommissioning workfaces) through to disposal -why, and how; - The Waste Informed Decommissioning model as a methodology and approach; - Impact and importance of Waste Management on a target cost contract; - Establishment of a Waste Optimisation Programme to drive ownership, delivery and culture change; - Management responsibilities and informing organisational design; - Sharing and learning from Best Practice; - The Challenge - how to ensure workforce and teams are engaged in delivering optimisation requirements; - Conclusions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Site-Specific Advisory Board Experience - A Members Perspective - 19069

The input of stakeholders and in particular the local community, in decisions related to environmental cleanup is critical to the success of the Department of Energy (DOE) Environmental Management (EM) mission. DOE EM engages stakeholders in a variety of ways and the Site-Specific Advisory Boards (SSABs) represent one avenue. SSABs are federally appointed citizens' panels that provide independent and unbiased advice and recommendations to the DOE EM. The Oak Ridge Site Specific Advisory Board (ORSSAB) is the citizens' panel that provides advice and recommendations to the DOE Oak Ridge Office of EM (OREM). The Board considers specific issues on a Work Plan that is developed each fiscal year through a collaborative effort. Issues are introduced through presentations by DOE OREM personnel at monthly Board meetings and further explored through field trips to specific sites (if appropriate) and subcommittee meetings. Issue groups comprised of ORSSAB members are formed and these personnel take on the task of developing a recommendation (if warranted) on the issue. The recommendation follows an approval process and when (if) approved by the Board is submitted to DOE OREM. Although the development of recommendations is the primary mission of the ORSSAB, the Chair and Vice Chair also participate in Chairs Meetings, held twice a year and comprised of the Chair and Vice Chair of each of the eight DOE EM SSAB's across the country. Additional recommendations pertinent to all the sites are developed through these collaborations. Once endorsed by the member Boards, these recommendations are submitted to DOE EM headquarters. Participation in the Chair's meetings and other engagement opportunities allow Board members to become well educated in DOE EMs mission so that recommendations can be as relevant, meaningful and specific as possible. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Collaborative Management for Complex Closure Teams - 19246

The closure documentation for government waste management sites requires a multidisciplinary approach to achieve success. This approach is necessary and similar to approaches utilized across remediation projects in the private and public sectors [1]. Closure documentation for government projects can range from tens of pages to upwards of thousands of pages. They normally take more than six months to put together - although, in many cases, it takes years - with multiple revisions. These documents, while all unique, share common themes with regards to communication and conflict with the other waste management projects. This paper explores the challenges in management and leadership approaches for generating technical documents, such as those found in the closure missions at government hazardous waste management sites. These matrixed teams are composed of many different members with varying expertise and experience, each with different stakeholder backgrounds. These teams experience challenges not only from using a matrixed approach - where the majority of the members are only partially engaged in the project - but also from integrating each of their respective stakeholder group's cultural individualities [2]. The Project Leads, who head up these highly matrixed projects, operate in environments comprised of virtual project teams- or more specifically in this context, intensive virtual project teams. Most of the participants are within the same city, but all of the document project teams operate with some level of organizational dispersion. Moreover, the larger a project becomes the more dispersed the team becomes. The frequent addition of sub-contracting resources by Project Leads further disperses the group and dilutes communication. The difficulties in communication derive from complications in the goal setting stages of a project and can manifest across the project team in the form of motivational issues, disengagement, quality expectations, and a loss of understanding. This puts a considerable amount of importance on a Project Lead to establish goals through the appropriate tools and methodology. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 13: TRU Waste Generator Sites - Implementation of the New US DOE WIPP WAC

This panel focused on the next phase of the US National Transuranic (TRU) Program (NTP) to support shipments to the Waste Isolation Pilot Plant (WIPP: located in Carlsbad, New Mexico, USA). Topics include program changes to increase waste stream approval efficiency, Documented Safety Analysis (DSA)/Waste Acceptance Criteria (WAC), TRUPACT-III and Remote Handled (RH) shipments, lessons learned from NTP waste certification and transportation, and NTP transportation stakeholder engagement and support programs. Presentations proposed include: 1 - National TRU Program Update (Kenneth Princen, US DOE (USA)); 2 - WIPP WAC (Rev 9) Implementation (Mark Pearcy, Nuclear Waste Partnership, LLC (USA)); 3 - Remote-Handled (RH) TRU Waste Update (J.R. Stroble, US DOE (USA)); 4 - National TRU Program Transportation Stakeholder Engagement and Support (James Mason, US DOE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Comprehensive and Centralized Waste Management System - 19412

Information Systems Laboratories (ISL) has designed a new single, integrated, waste management and control system to administer all aspects of nuclear waste management. The overriding goal of the initiative is to provide federal, state, and local agencies with operational awareness, management, and programmatic support for all functions related to nuclear waste management. Over decades of waste management federal agencies have sponsored or directly paid for the development, operation, and control of multiple systems to track and control its waste - with varied success. Multiple contractors have generated disparate control systems/databases and literally mountains of data. Past approaches have not provided a single, integrated, real time data management system. ISL's analysis of past failed efforts has reveal four common symptoms: - Control/management systems that are not compatible; - Programmatic costs that increase with systems use and re-work; - Systems focused on specific sets of data; - Inaccurate or outdated data sets. An integrated waste management and control system that collects and displays real-time, accurate inventory, waste container certification, transportation certification, emplacement, and shipment related data improve operational awareness and overcomes these limitations. Using its vast knowledge and experience in developing numerous waste tracking and management systems, ISL has leveraged its own in-house knowledge and gathered requests from stakeholders all across the industry to design a system that meets the needs of users at all levels of the nuclear waste management process. Using the highly successful and widely used Waste Data System (WDS) designed for the Waste Isolation Pilot Plant as a core component, ISL has designed a system that greatly expands on the functionality of the WDS to exceed its current focus of management of Transuranic Waste shipments. The new system is designed to provide the ability to track a wide range of waste types from Transuranic, High Level, Low Level, Mixed, and any nuclear related material. The main focus of the system is to provide federal regulators a comprehensive and real-time oversight into the handling of all nuclear waste materials. Oversight activities include, but are not limited to, strategy development, projections, metrics, incentive development, tracking, budget review, government cost estimating, and integrated schedules. The major components of the system are summarized below: - The Centralized Waste Management System (CWMS), which will include assimilating and validating known sources of data into the CWMS. - The programmatic reporting support component, which will handle queries from regulators, track compliance with regulatory requirements, and maintain the dashboard for federal management. - Both the CWMS and the programmatic reporting support component will use a standard set of business rules that govern system operations and allow site and program specific needs and limits for all waste programs and types to be captured and maintained. This presentation will provide details of each component of the system detailing its use, interfaces with other components, and value to stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site H-Canyon Collaborative Advanced Technology Demonstration (ATD) Program Review - 19499

The purpose of the Department of Energy-Environmental Management Office of Technology Development's (DOE-EM TD) Science of Safety (SOS) Robotics Initiative is to pull innovative commercial off the shelf (COTS) and near ready technologies to the field to expedite remaining EM mission clean up and enhance worker safety. A goal of this program is to demonstrate to DOE facilities the value of these available new technologies and their potential uses to solve difficult problems. In support of this goal, the Savannah River Site (SRS) H-Canyon Air Exhaust (HCAEX) tunnel biannual inspection task has been selected to demonstrate and evaluate the benefit of pulling advanced technology solutions to EM facilities. This is a highly collaborative task facilitated by SRNL and engaging SRS H-Canyon facility stakeholders, National Laboratory robotic and concrete inspection SMEs and university robotic and sensor researchers. Presently, the SRS HCAEX tunnel inspection consists of a visual examination to evaluate the structural integrity of the tunnel. Personal access is prohibited in the tunnel due to extreme conditions, thus the examination is accomplished remotely by deploying cameras mounted on a robotic crawler deployed into the tunnel. While the ability to see inside the tunnel in recent years has been highly valuable, it is desirable to have a better understanding of the environment to support a more thorough structural analysis and for long term planning purposes. This higher order of understanding can be accomplished through advanced COTS sensors and tools and those currently in development and near ready. The advanced technologies selected for demonstration will be evaluated for hosting on the FY19 HCAEX tunnel inspection crawler platform. The HCAEX ATD task is expected to be performed over a two-year period with year one now concluding. At WM2018, we presented the H-Canyon stakeholder's high priority inspection and remote handling needs, the collaboration team and the planned process of developing an integrated solution. This presentation will review the initial scope and inspection needs, then discuss the past year's progress to address these needs. The discussion includes the results of the Concrete Integrated Product Team (CIPT) formed to evaluate promising concrete NDE inspection technologies and a Lidar based tunnel mapping sensor suite solution. Highlighted in the discussion will be the engagement and pulling of university developed research and development to include student engagement through the formation and hosting of the SRNL Robotics and Sensors Intern team and collaboration with MSIPP funded Robotic Arm Concrete NDT Inspection University researchers. Lastly, the path forward to complete the demonstration will be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successful Implementation of a Natural Resource Restoration Plan at the Fernald Preserve - 19568

The Fernald Preserve, Ohio, Site is a former uranium-processing plant that underwent extensive remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is situated on a 425-hectare (ha) (1050-acre) tract of land, approximately 29 kilometers (km) (18 miles) northwest of Cincinnati, Ohio. The US Department of Energy (DOE) Office of Legacy Management is responsible for management of the site. Site remediation and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. The remediation of buildings and contaminated soil was completed in 2006, but aquifer remediation is ongoing. Portions of the site are open to the public, including approximately 11 km (7 miles) of walking trails that are open year-round and a Fernald Preserve Visitors Center open four days a week. Stakeholders were instrumental in providing recommendations for final land use of the site as an undeveloped park with an emphasis on wildlife. Final land use decisions were also instrumental in the resolution of a CERCLA natural resource damage claim. The State of Ohio sued DOE in 1986 for damages to state natural resources under Section 107 of CERCLA. The suit was stayed until completion of all Records of Decision (RODs) for the site. The last ROD was signed in 1996. DOE, which was both a Natural Resource Trustee (NRT) and a potentially responsible party (PRP) under CERCLA, initiated consultation with other site NRTs in 1993. A Trustee Council was formed that included DOE, Ohio Environmental Protection Agency (representing the State of Ohio), and the US Fish and Wildlife Service (representing the US Department of the Interior). The NRTs agreed collectively to conduct sitewide ecological restoration, consistent with the stakeholder vision of final land use. A conceptual restoration plan was drafted in 1998. This Natural Resource Restoration Plan (NRRP) developed goals for site restoration, as well as provisions for monitoring and maintenance of restored areas. The NRTs signed a Memorandum of Understanding in 2001, and DOE integrated ecological restoration design and construction into remediation and closure activities for the site. The NRT relationship became contentious in the following years as a result of a disagreement over monitoring commitments and compensation for groundwater injury. Final settlement was reached in 2008. As part of the settlement, DOE paid $13.75 million into the NRT fund as compensation for natural resource damages. In addition, the NRRP was finalized, and long-term commitments for monitoring and maintenance of ecologically restored areas were put in place. An Environmental Covenant was established and recorded with Hamilton and Butler Counties that ensures site activity and use limitations remain in place. The NRTs used a portion of the settlement funds to initiate the Paddys Run Conservation Project. This effort is a means to secure development rights and conservation easements within the Paddys Run watershed. Paddys Run is a third-order stream located on the western side of the Fernald Preserve. The NRTs partnered with Three Valley Conservation Trust to obtain assistance with land acquisition and conservation easement management, and since the program's inception in the Fall of 2012, more than 1820 ha (4500 acres) have been permanently protected via easement or purchase. Future decisions by the NRTs regarding monitoring and maintenance of restored areas will be negotiated in 2020. The site Restored Area Maintenance Plan (RAMP) was developed in 2010. The RAMP is a requirement within the NRRP and is scheduled for review following 10 years of implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗