Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

An Introduction to Flight Software Development: FSW Today, FSW 2010

Experience and knowledge gained from ongoing maintenance of Space Shuttle Flight Software and new development projects including Cockpit Avionics Upgrade are applied to projected needs of the National Space Exploration Vision through Spiral 2. Lessons learned from these current activities are applied to create a sustainable, reliable model for development of critical software to support Project Constellation. This presentation introduces the technologies, methodologies, and infrastructure needed to produce and sustain high quality software. It will propose what is needed to support a Vision for Space Exploration that places demands on the innovation and productivity needed to support future space exploration. The technologies in use today within FSW development include tools that provide requirements tracking, integrated change management, modeling and simulation software. Specific challenges that have been met include the introduction and integration of Commercial Off the Shelf (COTS) Real Time Operating System for critical functions. Though technology prediction has proved to be imprecise, Project Constellation requirements will need continued integration of new technology with evolving methodologies and changing project infrastructure. Targets for continued technology investment are integrated health monitoring and management, self healing software, standard payload interfaces, autonomous operation, and improvements in training. Emulation of the target hardware will also allow significant streamlining of development and testing. The methodologies in use today for FSW development are object oriented UML design, iterative development using independent components, as well as rapid prototyping . In addition, Lean Six Sigma and CMMI play a critical role in the quality and efficiency of the workforce processes. Over the next six years, we expect these methodologies to merge with other improvements into a consolidated office culture with all processes being guided by automated office assistants. The infrastructure in use today includes strict software development and configuration management procedures, including strong control of resource management and critical skills coverage. This will evolve to a fully integrated staff organization with efficient and effective communication throughout all levels guided by a Mission-Systems Architecture framework with focus on risk management and attention toward inevitable product obsolescence. This infrastructure of computing equipment, software and processes will itself be subject to technological change and need for management of change and improvement,

Gouvela, John↗

On-board fault management for autonomous spacecraft

The dynamic nature of the Cargo Transfer Vehicle's (CTV) mission and the high level of autonomy required mandate a complete fault management system capable of operating under uncertain conditions. Such a fault management system must take into account the current mission phase and the environment (including the target vehicle), as well as the CTV's state of health. This level of capability is beyond the scope of current on-board fault management systems. This presentation will discuss work in progress at TRW to apply artificial intelligence to the problem of on-board fault management. The goal of this work is to develop fault management systems. This presentation will discuss work in progress at TRW to apply artificial intelligence to the problem of on-board fault management. The goal of this work is to develop fault management systems that can meet the needs of spacecraft that have long-range autonomy requirements. We have implemented a model-based approach to fault detection and isolation that does not require explicit characterization of failures prior to launch. It is thus able to detect failures that were not considered in the failure and effects analysis. We have applied this technique to several different subsystems and tested our approach against both simulations and an electrical power system hardware testbed. We present findings from simulation and hardware tests which demonstrate the ability of our model-based system to detect and isolate failures, and describe our work in porting the Ada version of this system to a flight-qualified processor. We also discuss current research aimed at expanding our system to monitor the entire spacecraft.

Fesq, Lorraine M.↗

Summary of Orbital Debris Workshop

An Orbital Debris Workshop was conducted in July 1982. The working groups established were related to measurements of large particles, modeling of large particles, measurements of small particles, spacecraft hazard and shielding requirements, and space object management. The results of the Orbital Debris Workshop reaffirm the need for research to better understand the character of orbital debris, its effects on future spacecraft, and the related requirements for policy. A clear charter is required for this research to receive the necessary support, focus, and coordination. It was recommended that NASA assume the role of lead agency. The first task is to develop an overall plan with both Department of Defense and the North American Aerospace Defense Command participation.

Kessler, D. J.↗

A rapid prototyping/artificial intelligence approach to space station-era information management and access

Applications of rapid prototyping and Artificial Intelligence techniques to problems associated with Space Station-era information management systems are described. In particular, the work is centered on issues related to: (1) intelligent man-machine interfaces applied to scientific data user support, and (2) the requirement that intelligent information management systems (IIMS) be able to efficiently process metadata updates concerning types of data handled. The advanced IIMS represents functional capabilities driven almost entirely by the needs of potential users. Space Station-era scientific data projected to be generated is likely to be significantly greater than data currently processed and analyzed. Information about scientific data must be presented clearly, concisely, and with support features to allow users at all levels of expertise efficient and cost-effective data access. Additionally, mechanisms for allowing more efficient IIMS metadata update processes must be addressed. The work reported covers the following IIMS design aspects: IIMS data and metadata modeling, including the automatic updating of IIMS-contained metadata, IIMS user-system interface considerations, including significant problems associated with remote access, user profiles, and on-line tutorial capabilities, and development of an IIMS query and browse facility, including the capability to deal with spatial information. A working prototype has been developed and is being enhanced.

Carnahan, Richard S., Jr.↗

Nuclear Materials Management Program at the NNSS

The Nevada National Security Site (NNSS), formerly the Nevada Test Site, was established in 1951 mainly for weapons testing; because special nuclear materials (SNM) were expended during the tests, a nuclear material management program was not required. That changed in December 2004 with the receipt of Category I SNM for purposes other than weapons testing. At that time, Material Control and Accountability and Nuclear Material Management were a joint laboratory (Los Alamos and Lawrence Livermore) effort with nuclear material management being performed at the laboratories. That changed in March 2006 when the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office appointed sole responsibility to the Management and Operations (M&O) contractor, National Security Technologies, LLC (NSTec). Since 2006 the basic nuclear material management work was completed by a combination of M&O employees and subcontractors, but a true Nuclear Material Management (NMM) Program was not determined to be necessary until recently. With expanding missions and more nuclear material (NM) coming to the NNSS, it became imperative to have an organization to manage these materials; therefore, an NMM Manager was officially appointed by NSTec in 2012. In June 2011 a Gap Analysis and white paper was completed by a subcontractor; this presentation will include highlights from those documents along with our plans to resolve the “gaps” and stand up a functional and compliant NMM Program at the NNSS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modular Platforms for Advanced Inspection, Locomotion, and Manipulation - 17150

Robots can provide remote access, manipulation, and inspection capabilities to augment human workers and improve safety in potentially dangerous decommissioning, radioactive waste management, and emergency response operations. However, such activities may require navigating challenging and unstructured environments, such as those with uneven terrain, obstacles, or loose debris. This remains a difficult task, even for modern robots. What's more, a robot's physical design can inhibit it from accessing hard-to-reach areas such as the tight spaces around, underneath, or inside piping and equipment. To address these challenges, we have developed a series of physically robust hardware modules that can be configured into a variety of robot morphologies, specialized to support different operational needs. Each hardware module consists of a number of onboard sensors and a high performance actuator with a series elastic element to sense and control interaction forces for improved locomotion and manipulation. Using this hardware, we have designed several robotic platforms that support the access, manipulation, and inspection requirements of decommissioning and radioactive waste management. To highlight current capabilities and potential opportunities for technological improvement, we present the outcomes from field demonstrations of our modular platforms at the Office of Environmental Management's Science of Safety Portsmouth Gaseous Diffusion Plant Robotics Challenge. Specifically, results include a serpentine robot climbing vertical structures such as pipes, posts, and supports to demonstrate advanced inspection. Additionally, we discuss field trials of a similar modular configuration that yields a highly dexterous manipulator arm and camera system capable of adding manipulation and inspection functionality to existing structures. Results are presented from inspection tasks in which the manipulator is installed on another mobile robotic platform. Finally, we show our hardware modules can be reconfigured into platforms capable of withstanding significant impacts and of alternative means of locomotion, as may be required to cross terrain too challenging for traditional wheeled robots. Results describe the performance of a hexapod robot that uses proprioceptive feedback to locomote in outdoor trials reminiscent of emergency response conditions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IPG Job Manager v2.0 Design Documentation

This viewgraph presentation provides a high-level design of the IPG Job Manager, and satisfies its Master Requirement Specification v2.0 Revision 1.0, 01/29/2003. The presentation includes a Software Architecture/Functional Overview with the following: Job Model; Job Manager Client/Server Architecture; Job Manager Client (Job Manager Client Class Diagram and Job Manager Client Activity Diagram); Job Manager Server (Job Manager Client Class Diagram and Job Manager Client Activity Diagram); Development Environment; Project Plan; Requirement Traceability.

Hu, Chaumin↗

Special Report on the "Department of Energy's Efforts to Meet Accountability and Performance Reporting Objectives of the American Recovery and Reinvestment Act"

The purpose of the American Recovery and Reinvestment Act of 2009 (Recovery Act) was to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy will receive an unprecedented $38 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The Recovery Act requires transparency and accountability over these funds. To this end, the Office of Management and Budget (OMB) issued guidance requiring the Department to compile and report a wide variety of funding, accounting, and performance information. The Department plans to leverage existing information systems to develop accounting and performance information that will be used by program managers and ultimately reported to Recovery.gov, the government-wide source of Recovery Act information, and to OMB. The Department's iManage iPortal, a system that aggregates information from a number of corporate systems, will serve as the main reporting gateway for accounting information. In addition, the Department plans to implement a methodology or system that will permit it to monitor information reported directly to OMB by prime funding recipients. Furthermore, performance measures or metrics that outline expected outcomes are being developed, with results ultimately to be reported in a recently developed Department-wide system. Because of the significance of funds provided and their importance to strengthening the Nation's economy, we initiated this review to determine whether the Department had taken the steps necessary to ensure that Recovery Act funds can be appropriately tracked and are transparent to the public, and whether the benefits of the expenditures can be properly measured and reported clearly, accurately, and in a timely manner. Although not yet fully mature, we found that the Department's efforts to develop, refine, and apply the control structure needed to ensure accurate, timely, and reliable reporting to be both proactive and positive. We did, however, identify certain issues relating to Recovery Act performance management, accounting and reporting accuracy, and timeliness that should be addressed and resolved. In particular, at the time of our review: (1) Program officials had not yet determined whether existing information systems will be able to process anticipated transaction increases associated with the Recovery Act; (2) System modifications made to the Department's performance management system to accommodate Recovery Act performance measures had not yet been fully tested and verified; (3) The ability of prime and sub-recipients to properly segregate and report both accounting and performance information had not been determined; (4) There was a lack of coordination between Headquarters organizations related to aspects of Recovery Act reporting. For example, we observed that the Offices of Fossil Energy and Program, Analysis and Evaluation were both involved in developing job creation estimates that could yield significantly different results; and, (5) A significant portion (91 of 142, or 64 percent) of the performance measures developed for the Recovery Act activities were not quantifiable. In some instances, Project Operating Plans had not been finalized and we were not able to verify that all needed performance measures had been developed. Furthermore, the Department had not developed specific metrics to measure federal and contractor jobs creation and retention, an essential Recovery Act objective. The Department had devoted a great deal of time and resources to identifying and mitigating Recovery Act-related risks. For example, the Department developed a risk assessment tool that is intended to assist programs in identifying risks that can prevent its Recovery Act projects from meeting their intended goals. We also found that program staff and management officials at multiple levels were actively engaged in designing Recovery Act-related control and accountability programs. These efforts ranged from updating existing information systems to developing matrices designed to ensure that all required reporting and performance elements were addressed. Each of these activities required substantial effort and was accomplished within a relatively short period. Further, we noted that the Office of the Chief Financial Officer had been instrumental in helping impacted program elements identify issues that could adversely affect the Department's ability to execute its accounting, reporting, and performance monitoring responsibilities. While much has been done, additional work is necessary if the Department is to successfully manage Recovery Act-related risks. For example, as previously noted, OMB has issued guidance establishing Recovery Act monitoring and reporting requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Report of the facility definition team spacelab UV-Optical Telescope Facility

Scientific requirements for the Spacelab Ultraviolet-Optical Telescope (SUOT) facility are presented. Specific programs involving high angular resolution imagery over wide fields, far ultraviolet spectroscopy, precisely calibrated spectrophotometry and spectropolarimetry over a wide wavelength range, and planetary studies, including high resolution synoptic imagery, are recommended. Specifications for the mounting configuration, instruments for the mounting configuration, instrument mounting system, optical parameters, and the pointing and stabilization system are presented. Concepts for the focal plane instruments are defined. The functional requirements of the direct imaging camera, far ultraviolet spectrograph, and the precisely calibrated spectrophotometer are detailed, and the planetary camera concept is outlined. Operational concepts described in detail are: the makeup and functions of shuttle payload crew, extravehicular activity requirements, telescope control and data management, payload operations control room, orbital constraints, and orbital interfaces (stabilization, maneuvering requirements and attitude control, contamination, utilities, and payload weight considerations).

Source record↗

Priority scheme planning for the robust SSM/PMAD testbed

Whenever mixing priorities of manually controlled resources with those of autonomously controlled resources, the space station module power management and distribution (SSM/PMAD) environment requires cooperating expert system interaction between the planning function and the priority manager. The elements and interactions of the SSM/PMAD planning and priority management functions are presented. Their adherence to cooperating for common achievement are described. In the SSM/PMAD testbed these actions are guided by having a system planning function, KANT, which has insight to the executing system and its automated database. First, the user must be given access to all information which may have an effect on the desired outcome. Second, the fault manager element, FRAMES, must be informed as to the change so that correct diagnoses and operations take place if and when faults occur. Third, some element must engage as mediator for selection of resources and actions to be added or removed at the user's request. This is performed by the priority manager, LPLMS. Lastly, the scheduling mechanism, MAESTRO, must provide future schedules adhering to the user modified resource base.

Elges, Michael R.↗

Modular space station, phase B extension. Program operations plan

An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.

Source record↗

Integrating Immersive Visualization in Molten-Salt Reactor Waste Management for Experimental Design and Planning

Molten-salt reactors (MSRs) represent a promising solution for next-generation nuclear energy, offering advantages in safety, fuel efficiency, and waste minimization. However, their liquid-fueled design presents unique challenges for spent fuel management, making post-shutdown waste characterization essential for developing effective strategies. Despite this need, there is a notable absence of visualization platforms specifically tailored to the unique characteristics and analytical requirements of MSR waste management. Existing tools in the nuclear industry are primarily designed for reactor operations or generic data exploration and lack both integration with MSR-specific multiphysics frameworks and the ability to simultaneously visualize time-dependent thermal fields, chemical composition evolution, and radiation distribution patterns. To address these limitations, this paper presents an immersive virtual reality (VR) visualization platform that processes and displays high-fidelity multiphysics simulation output from the Multiphysics Object-Oriented Simulation Environment (MOOSE) framework in real-time, using Unity. The platform visualizes MSR waste characteristics such as nuclide decay, salt cooling, and corrosion by using Exodus II output data and running on a VR headset. It includes a user-friendly interface with features such as visibility toggling, cross-sectional slicing, and time-series animation for exploring simulation data. These capabilities support experimental design, stakeholder engagement, and public communication by making complex reactor behavior more accessible and understandable. By enhancing spatial reasoning and reducing cognitive load, this immersive environment fosters more effective communication and decision-making in MSR waste management.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Conditions Data Management System for HEP Experiments

Conditions data infrastructure for both ATLAS and CMS have to deal with the management of several Terabytes of data. Distributed computing access to this data requires particular care and attention to manage request-rates of up to several tens of kHz. Thanks to the large overlap in use cases and requirements, ATLAS and CMS have worked towards a common solution for conditions data management with the aim of using this design for data-taking in Run 3. In the meantime other experiments, including NA62, have expressed an interest in this cross- experiment initiative. For experiments with a smaller payload volume and complexity, there is particular interest in simplifying the payload storage. The conditions data management model is implemented in a small set of relational database tables. A prototype access toolkit consisting of an intermediate web server has been implemented, using standard technologies available in the Java community. Access is provided through a set of REST services for which the API has been described in a generic way using standard Open API specications, implemented in Swagger. Such a solution allows the automatic generation of client code and server stubs and further allows changes in the backend technology transparently. An important advantage of using a REST API for conditions access is the possibility of caching identical URLs, addressing one of the biggest challenges that large distributed computing solutions impose on conditions data access, avoiding direct DB access by means of standard web proxy solutions.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Managerial leadership assessment - Personality correlates of and sex differences in ratings by leaders, peers, and followers

A performance appraisal was conducted at a Fortune 500 airline. Evaluations of each manager were taken from his or her management, peers and subordinates. These ratings were related to personality clusters revealing patterns for males similar to those found between personality and performance in pilot populations. A case is made that piloting aircraft requires similar skills to managing other complex enterprises and that similar profiles predict success in each.

Gibson, Robert H.↗

Education and Training Module in Alertness Management

The education and training module (ETM) in alertness management has now been integrated as part of the training regimen of the Pilot Proficiency Awards Program ("WINGS") of the Federal Aviation Administration. Originated and now maintained current by the Fatigue Countermeasures Group at NASA Ames Research Center, the ETM in Alertness Management is designed to give pilots the benefit of the best and most recent research on the basics of sleep physiology, the causes of fatigue, and strategies for managing alertness during flight operations. The WINGS program is an incentive program that encourages pilots at all licensing levels to participate in recurrent training, upon completion of which distinctive lapel or tie pins (wings) and certificates of completion are awarded. In addition to flight training, all WINGS applicants must attend at least one FAA-sponsored safety seminar, FAA-sanctioned safety seminar, or industry recurrent training program. The Fatigue Countermeasures Group provides an FAA-approved industry recurrent training program through an on-line General Aviation (GA) WINGS ETM in alertness management to satisfy this requirement. Since 1993, the Fatigue Countermeasures Group has translated fatigue and alertness information to operational environments by conducting two-day ETM workshops oriented primarily toward air-carrier operations subject to Part 121 of the Federal Aviation Regulations pertaining to such operations. On the basis of the information presented in the two-day ETM workshops, an ETM was created for GA pilots and was transferred to a Web-based version. To comply with the requirements of the WINGS Program, the original Web-based version has been modified to include hypertext markup language (HTML) content that makes information easily accessible, in-depth testing of alertness-management knowledge, new interactive features, and increased informational resources for GA pilots. Upon successful completion of this training module, a participant receives a computer- screen display of a certificate of completion. The certificate, which includes the pilot s name and an identifying number, can be printed out and submitted, for ground training credit, with the pilot s WINGS application.

Mallis, M. M.↗

A database management capability for Ada

The data requirements of mission critical defense systems have been increasing dramatically. Command and control, intelligence, logistics, and even weapons systems are being required to integrate, process, and share ever increasing volumes of information. To meet this need, systems are now being specified that incorporate data base management subsystems for handling storage and retrieval of information. It is expected that a large number of the next generation of mission critical systems will contain embedded data base management systems. Since the use of Ada has been mandated for most of these systems, it is important to address the issues of providing data base management capabilities that can be closely coupled with Ada. A comprehensive distributed data base management project has been investigated. The key deliverables of this project are three closely related prototype systems implemented in Ada. These three systems are discussed.

Chan, Arvola↗

Power Management and Distribution System Developed for Thermionic Power Converters

A spacecraft solar, bimodal system combines propulsion and power generation into a single integrated system. An Integrated Solar Upper Stage (ISUS) provides orbital transfer capabilities, power generation for payloads, and onboard propulsion to the spacecraft. A key benefit of a bimodal system is a greater payload-to-spacecraft mass ratio resulting in lower launch vehicle requirements. Scaling down to smaller launch vehicles increases space access by reducing overall mission cost. NASA has joined efforts with the Air Force Phillips Laboratory to develop enabling technologies for such a system. The NASA/Air Force bimodal concept uses solar concentrators to focus energy into an integrated power plant. This power plant consists of a graphite core that stores thermal energy within a cavity. An array of thermionic converters encircles the graphite cavity and provides electrical energy conversion functions. During the power generation phase of the bimodal system, the thermionic converters are exposed to the heated cavity and convert the thermal energy to electricity. Near-term efforts of the ISUS bimodal program are focused on a ground demonstration of key technologies in order to proceed to a full space flight test. Thermionic power generation is one key technology of the bimodal concept. Thermionic power converters impose unique operating requirements upon a power management and distribution (PMAD) system design. Single thermionic converters supply large currents at very low voltages. Operating voltages can vary over a range of up to 3 to 1 as a function of operating temperature. Most spacecraft loads require regulated 28-volts direct-current (Vdc) power. A combination of series-connected converters and powerprocessing boosters is required to deliver power to the spacecraft's payloads at this level.

Baez, Anastacio N.↗