Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear Data Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 7)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 8)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations for High-Wattage Waste (Rev. 9)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations for High-Wattage Waste (Rev. 10)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations for High-Wattage Waste (Rev. 11)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations for High-Wattage Waste (Rev. 12)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rolling Process Modeling Report. Finite-Element Model Validation and Parametric Study on various Rolling Process parameters

Pacific Northwest National Laboratory (PNNL) has been investigating manufacturing processes for the uranium-10% molybdenum alloy plate-type fuel for high-performance research reactors in the United States. This work supports the U.S. Department of Energy National Nuclear Security Administration’s Office of Material Management and Minimization Reactor Conversion Program. This report documents modeling results of PNNL’s efforts to perform finite-element simulations to predict roll-separating forces for various rolling mill geometries for PNNL, Babcock & Wilcox Co., Y-12 National Security Complex, Los Alamos National Laboratory, and Idaho National Laboratory. The model developed and presented in a previous report has been subjected to further validation study using new sets of experimental data generated from a rolling mill at PNNL. Simulation results of both hot rolling and cold rolling of uranium-10% molybdenum coupons have been compared with experimental results. The model was used to predict roll-separating forces at different temperatures and reductions for five rolling mills within the National Nuclear Security Administration Fuel Fabrication Capability project. This report also presents initial results of a finite-element model microstructure-based approach to study the surface roughness at the interface between zirconium and uranium-10% molybdenum.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

'Radon Concentration Survey in Inner Rooms from Deputy Chamber and National Congress-Brasilia/DF'

Radon gas has been monitored in many environments such as rural and urban houses, high natural radioactivity areas and underground mining regions. Nevertheless few data are reported in literature about studies in state buildings. So we get in touch with these buildings managers, where work the Deputy Chamber and the National Congress in Brasilia--DF, in order to obtain radon data in these state buildings, so representative for brazilian people. In order to make a preliminary scanning of radon concentration in these buildings, it was put in selected points, radon nuclear track passive detectors type SSNTD, specifically polycarbonate Lexan, which were exposed for periods from two to five months. Afterwards they were sent to Nuclear Engineering Institute in Rio de Janeiro for analysis of {sup 222}Rn contents. Derived values, whose average value was about 73 Bq/m{sup 3}, were all under maximum permissible limits for radon 200 Bq/m{sup 3}, established by International Comission on Radiological Protection--ICRP 65, for inner environments of houses and state buildings. This work has been coordinated by CNEN Office in Braselia with effective participation of Nuclear Engineering Institute from CNEN--RJ, that has worked since beginning of april 2004, supplying and analysing radon detectors.

54 ENVIRONMENTAL SCIENCES↗

Replete v. 2.0

SAND2021-15136 O Replete is a Java library that contains several common and useful utilities in a variety of categories including expression parsing, multi-threading, data pipelines, user interface, database connectivity, Unix shell emulation, information generalization, and Maven standardization. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

McClain, Jonathan↗

mvBayesPy

SAND2025-11476O The mvBayesPy tool is a Python package that performs multivariate Bayesian analysis on generic data. It includes tools for regression modeling, diagnosis, basis decomposition, sensitivity analysis and visualization. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Tucker, James [Sandia National Lab. (SNL-CA), Live↗

MJO CP Tensor Decompositions

SAND2025-14273O MJO CP Tensor Decompositions is a Python tool for computing canonical polyadic (CP) decompositions of MERRA2 observational data to understand the onset and evolution of the Madden-Julian Oscillation (MJO). Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Bull, Diana [Sandia National Lab. (SNL-CA), Liverm↗

FY2023 Site Sustainability Plan

The Sandia National Laboratories site sustainability plan and its associated DOE Sustainability Dashboard data entries encompass Sandia National Laboratories contributions toward meeting the DOE sustainability goals. This site sustainability plan fulfills the contractual requirement for National Technology & Engineering Solutions of Sandia, LLC, the management and operating contractor for Sandia National Laboratories, to deliver an annual sustainability plan to the DOE National Nuclear Security Administration Sandia Field Office.

54 ENVIRONMENTAL SCIENCES↗

2022 Annual Site Environmental Report for Sandia National Laboratories, Livermore, California

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at Sandia National Laboratories, California. Activities at this multiprogram engineering and science laboratory support the nuclear weapons stockpile program, energy and environmental research, homeland security, micro- and nanotechnologies, and basic science and engineering research. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report provides a summary of environmental monitoring information and compliance activities that occurred at Sandia National Laboratories, California during calendar year 2022 unless noted otherwise. General site and environmental program information is also included. This report was prepared in accordance with DOE O 231.1B, Environment, Safety and Health Reporting.

54 ENVIRONMENTAL SCIENCES↗

Materials Characterization, Prediction, and Control Project: Summary Report on Material Characterization, Part 1

The Pacific Northwest National Laboratory (PNNL) undertook the Materials Characterization, Prediction, and Control (MCPC) Laboratory Directed Research and Development Project to advance understanding of nuclear material processing and enable multifold acceleration in the development and qualification of new material systems in national security and advanced energy applications (Smith 2021). The MCPC Project executed research across three scientific vertices—material characterization, predictive modeling, and data analytics—with extensive support by a data curation and management team. The central technical objective in the MCPC Project was to improve the prediction and characterization of the process-structure-property relationships within the microstructurally refined region of stainless-steel samples prepared utilizing friction stir processing (FSP). Application of the FSP technique is well established at PNNL within the Solid Phase Processing capability through many years of investment across a range of materials and applications (PNNL 2024). Three distinct rounds of FSP experiments were performed by the experimental team, producing replicate samples utilizing across different nominal processing conditions (Condition IDs) listed in Table 1. The starting material on which FSP was applied was commercially available unprocessed stainless-steel type 316L material. Chosen processing conditions were very diverse, and some were intentionally chosen to produce defects. Several samples experienced tool breakage during experimentation, so a full set of three replicates was not produced for every nominal processing condition.

36 MATERIALS SCIENCE↗

Materials Characterization, Prediction, and Control Project: Summary Report on Material Characterization, Part 2

The Pacific Northwest National Laboratory (PNNL) undertook the Materials Characterization, Prediction, and Control (MCPC) Laboratory Directed Research and Development Project to advance understanding of nuclear material processing and enable multifold acceleration in the development and qualification of new material systems in national security and advanced energy applications (Smith 2021). The MCPC Project executed research across three scientific vertices—material characterization, predictive modeling, and data analytics—with extensive support by a data curation and management team. The central technical objective in the MCPC Project was to improve the prediction and characterization of the process-structure-property relationships within the microstructurally refined region of stainless-steel samples prepared utilizing friction stir processing (FSP). Application of the FSP technique is well established at PNNL within the Solid Phase Processing capability through many years of investment across a range of materials and applications (PNNL 2024).

36 MATERIALS SCIENCE↗

Materials Characterization, Prediction, and Control Project: Summary Report on Material Characterization, Part 3

The Pacific Northwest National Laboratory (PNNL) undertook the Materials Characterization, Prediction, and Control (MCPC) Laboratory Directed Research and Development Project to advance understanding of nuclear material processing and enable multifold acceleration in the development and qualification of new material systems in national security and advanced energy applications (Smith 2021). The MCPC Project executed research across three scientific vertices—material characterization, predictive modeling, and data analytics—with extensive support by a data curation and management team. The central technical objective in the MCPC Project was to improve the prediction and characterization of the process-structure-property relationships within the microstructurally refined region of stainless-steel samples prepared utilizing friction stir processing (FSP). Application of the FSP technique is well established at PNNL within the Solid Phase Processing capability through many years of investment across a range of materials and applications (PNNL 2024).

36 MATERIALS SCIENCE↗

Materials Characterization, Prediction, and Control Project: Summary Report on Material Characterization, Part 4

The Pacific Northwest National Laboratory (PNNL) undertook the Materials Characterization, Prediction, and Control (MCPC) Laboratory Directed Research and Development Project to advance understanding of nuclear material processing and enable multifold acceleration in the development and qualification of new material systems in national security and advanced energy applications (Smith 2021). The MCPC Project executed research across three scientific vertices—material characterization, predictive modeling, and data analytics—with extensive support by a data curation and management team. The central technical objective in the MCPC Project was to improve the prediction and characterization of the process-structure-property relationships within the microstructurally refined region of stainless-steel samples prepared utilizing friction stir processing (FSP). Application of the FSP technique is well established at PNNL within the Solid Phase Processing capability through many years of investment across a range of materials and applications (PNNL 2024).

36 MATERIALS SCIENCE↗

Main Power Distribution Unit for the Jupiter Icy Moons Orbiter (JIMO)

Around the year 2011, the Jupiter Icy Moons Orbiter (JIMO) will be launched and on its way to orbit three of Jupiter s planet-sized moons. The mission goals for the JIMO project revolve heavily around gathering scientific data concerning ingredients we, as humans, consider essential: water, energy and necessary chemical elements. The JIM0 is an ambitious mission which will implore propulsion from an ION thruster powered by a nuclear fission reactor. Glenn Research Center is responsible for the development of the dynamic power conversion, power management and distribution, heat rejection and ION thrusters. The first test phase for the JIM0 program concerns the High Power AC Power Management and Distribution (PMAD) Test Bed. The goal of this testing is to support electrical performance verification of the power systems. The test bed will incorporate a 2kW Brayton Rotating Unit (BRU) to simulate the nuclear reactor as well as two ION thrusters. The first module of the PMAD Test Bed to be designed is the Main Power Distribution Unit (MPDU) which relays the power input to the various propulsion systems and scientific instruments. The MPDU involves circuitry design as well as mechanical design to determine the placement of the components. The MPDU consists of fourteen relays of four different variations used to convert the input power into the appropriate power output. The three phase system uses 400 Vo1ts(sub L-L) rms at 1000 Hertz. The power is relayed through the circuit and distributed to the scientific instruments, the ION thrusters and other controlled systems. The mechanical design requires the components to be positioned for easy electrical wiring as well as allowing adequate room for the main buss bars, individual circuit boards connected to each component and power supplies. To accomplish creating a suitable design, AutoCAD was used as a drafting tool. By showing a visual layout of the components, it is easy to see where there is extra room or where the components may interfere with one another. By working with the electrical engineer who is designing the circuit, the specific design requirements for the MPDU were determined and used as guidelines. Space is limited due to the size of the mounting plate therefore each component must be strategically placed. Since the MPDU is being designed to fit into a simulated model of the spacecraft systems on the JIMO, components must be positioned where they are easily accessible to be wired to the other onboard systems. Mechanical and electrical requirements provided equally important limits which are combined to produce the best possible design of the MPDU.

Papa, Melissa R.↗