Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

The Venus radar mapper mission

The Venus Radar Mapper (VRM) Mission, in 1988, will be the next NASA mission to Venus. This paper describes the mission as it is currently planned, showing how the design of the science payload, the spacecraft, and the mission satisfies the science objectives and requirements as well as other programmatic constraints. The VRM mission is dedicated to obtaining Synthetic Aperture Radar (SAR) images of at least 70 percent of the surface of Venus at a resolution of 1 km per line pair or better (comparable to the coverage and resolution of the Mars Mariner 9 mission). Additional investigations will study the interior geophysical characteristics of the planet using altimetric data and gravity field measurements of the planet.

Dallas, S. S.↗

Spacelab Mission Implementation Cost Assessment (SMICA)

A total savings of approximately 20 percent is attainable if: (1) mission management and ground processing schedules are compressed; (2) the equipping, staffing, and operating of the Payload Operations Control Center is revised, and (3) methods of working with experiment developers are changed. The development of a new mission implementation technique, which includes mission definition, experiment development, and mission integration/operations, is examined. The Payload Operations Control Center is to relocate and utilize new computer equipment to produce cost savings. Methods of reducing costs by minimizing the Spacelab and payload processing time during pre- and post-mission operation at KSC are analyzed. The changes required to reduce costs in the analytical integration process are studied. The influence of time, requirements accountability, and risk on costs is discussed. Recommendation for cost reductions developed by the Spacelab Mission Implementation Cost Assessment study are listed.

Guynes, B. V.↗

The First Spacelab Mission

The role of the mission manager in coordinating the payload with the space transportation system is studied. The establishment of the investigators working group to assist in achieving the mission objectives is examined. Analysis of the scientific requirements to assure compatibility with available resources, and analysis of the payload in order to define orbital flight requirements are described. The training of payload specialists, launch site integration, and defining the requirements for the operation of the integrated payload and the payload operations control center are functions of the mission manager. The experiences gained from the management of the Spacelab One Mission, which can be implemented in future missions, are discussed. Examples of material processing, earth observations, and life sciences advances from the First Spacelab Mission are presented.

Craft, H.↗

Mars mission concepts and opportunities

Trajectory and mission requirement data are presented for Earth Mars opposition and conjunction class roundtrip flyby and stopover mission opportunities available between 1997 and 2045. The opposition class flyby mission uses direct transfer trajectories to and on return from Mars. The opposition class stopover mission employs the gravitational field of Venus to accelerate the space vehicle on either the outbound or inbound leg in order to reduce the propulsion requirement associated with the opposition class mission. The conjunction class mission minimizes propulsion requirements by optimizing the stopover time at Mars.

Archie C Young↗

A manned Mars mission concept with artificial gravity

A series of simulated manned Mars missions was analyzed by a computer model. Numerous mission opportunities and mission modes were investigated. Sensitivity trade studies were performed of the vehicle all-up mass and propulsion stage sizes as a function of various levels of conservatism in mission velocity increment margins, payload mass and propulsive stage characteristics. The longer duration but less energetic type of conjunction class mission is emphasized. The specific mission opportunity reviewed was for a 1997 departure. From the trade study results, a three and one-half stage vehicle concept evolved, utilizing a Trans-Mars Injection (TMI) first stage derived from the Space Shuttle External Tank (ET).

Hubert P Davis↗

Manned Mars mission cost estimate

The potential costs of several options of a manned Mars mission are examined. A cost estimating methodology based primarily on existing Marshall Space Flight Center (MSFC) parametric cost models is summarized. These models include the MSFC Space Station Cost Model and the MSFC Launch Vehicle Cost Model as well as other modes and techniques. The ground rules and assumptions of the cost estimating methodology are discussed and cost estimates presented for six potential mission options which were studied. The estimated manned Mars mission costs are compared to the cost of the somewhat analogous Apollo Program cost after normalizing the Apollo cost to the environment and ground rules of the manned Mars missions. It is concluded that a manned Mars mission, as currently defined, could be accomplished for under $30 billion in 1985 dollars excluding launch vehicle development and mission operations.

Hamaker, Joseph↗

Trajectory options for the Comet Rendezvous Asteroid Flyby mission

The Comet Rendezvous Asteroid Flyby mission is strongly supported by the scientific community. Two major events during the past year have forced a re-analysis of the mission options, with the goal of selecting a baseline mission for launch in 1993. Venus and earth gravity assists can be used to allow rendezvous with comet Tempel 2 in 1996; the scientific potential of the resulting mission is excellent. Although backup mission opportunities have been identified, the significantly longer flight times weaken the scientific appeal of these missions.

Miller, S. L.↗

Marshall Space Flight Center's role in EASE/ACCESS mission management

The Marshall Space Flight Center (MSFC) Spacelab Payload Project Office was responsible for the mission management and development of several successful payloads. Two recent space construction experiments, the Experimental Assembly of Structures in Extravehicular Activity (EASE) and the Assembly Concept for Construction of Erectable Space Structures (ACCESS), were combined into a payload managed by the center. The Ease/ACCESS was flown aboard the Space Shuttle Mission 61-B. The EASE/ACCESS experiments were the first structures assembled in space, and the method used to manage this successful effort will be useful for future space construction missions. The MSFC mission management responsibilities for the EASE/ACCESS mission are addressed and how the lessons learned from the mission can be applied to future space construction projects are discussed.

Hawkins, Gerald W.↗

Civil missions applications study

This study collects and categorizes a forecast of ambitious civilian space missions; it also assesses their requirements for power and the application of space nuclear power systems to meet these needs. Although the results of this 1986 study have been recast to reflect recent NASA planning (Ride's Bold New Initiatives), the basic mission and power requirements forecast remain essentially the same. Civil mission applications have been organized into four major areas with one additional topic: (1) Earth orbiting missions (including Space Stations, Earth Observing Missions, and materials processing); (2) Planetary exploration; (3) Manned lunar base; and (4) Manned Mars Mission; plus (5) Extra-solar spacecraft (i.e., the Thousand AU explorer concept).

Mankins, John Carlton↗

The Magellan mission to Venus

The Magellan mission will be the next NASA mission to Venus. This paper describes the mission as it is currently planned, showing how the design of the science payload, the spacecraft, and the mission satisfies the science objectives and requirements as well as other programmatic constraints. The Magellan mission is dedicated to obtaining SAR images of at least 70 percent of the surface of Venus at a resolution of 1 km per line-pair, or better, which is comparable to the coverage and resolution of the Mars Mariner 9 mission. Other investigations will study the geophysical characteristics of the planet using altimetric data and gravity field measurements, and measurements to determine global surface emissivity.

Dallas, S. S.↗

Spacecraft technology requirements for future NASA missions

By working with advanced planners in the NASA Office of Space Science and Applications (OSSA), a spacecraft technology model has been generated that represents the predominant themes of their respective programs for the next twenty years. This set of missions serves as a base from which a few representative and challenging landmark missions have been extracted to serve as a focal point for identifying the most critical technology issues. Each mission requires significant advances in several technology disciplines in order to be feasible. The mission set selected to serve as a technology focus reflects the increased emphasis within NASA on a potential civil space leadership initiative, and include the Geostationary Earth Observing PLatform from the Planet Earth initiative and the precursor Mars Rover and Sample Return mission from the Mars Exploration Initiative. These missions are briefly described and the key technology requirements are discussed.

Hudson, Wayne R.↗

The importance of batteries in unmanned missions

A brief overview of the current set of unmanned missions that are currently in operation and those planned for the next 5 to 10 years was presented. The important role of batteries in the development of successful missions was discussed. The workhorse battery, the NiCd, and its use throughout historical missions was explored. Its role on Observers and Landers was discussed, and the success those batteries had. The recent events in the issues of quality and life for NiCd batteries were discussed. These discussions focused on the current design activities for Mars Observer (MO), TOPEX, and Mariner Mark II. Separator selection and the need for uniform testing procedures to develop a quality battery product that can perform to mission requirements were discussed. The recent experiences with the GRO battery failure and the other events have led JPL to the decision to develop a testing program in conjunction with other NASA centers to determine the best separator material for these two missions. The decision for separator material and battery design must be made a year from now. Thus there will not be time to perform a total 2-year accelerated test. The JPL plan for coping with this compromise was discussed. A discussion of where NiH2 batteries are beginning to have an impact and the difficulties with their implementation were addressed. Such missions at Earth Observing System (EOS) and the NOAA series of satellites rely upon NiH2 for success but were not chosen for TOPEX or MO due to their large volume requirements.

Klein, John W.↗

Human exploration mission studies

The Office of Exploration has established a process whereby all NASA field centers and other NASA Headquarters offices participate in the formulation and analysis of a wide range of mission strategies. These strategies were manifested into specific scenarios or candidate case studies. The case studies provided a systematic approach into analyzing each mission element. First, each case study must address several major themes and rationale including: national pride and international prestige, advancement of scientific knowledge, a catalyst for technology, economic benefits, space enterprise, international cooperation, and education and excellence. Second, the set of candidate case studies are formulated to encompass the technology requirement limits in the life sciences, launch capabilities, space transfer, automation, and robotics in space operations, power, and propulsion. The first set of reference case studies identify three major strategies: human expeditions, science outposts, and evolutionary expansion. During the past year, four case studies were examined to explore these strategies. The expeditionary missions include the Human Expedition to Phobos and Human Expedition to Mars case studies. The Lunar Observatory and Lunar Outpost to Early Mars Evolution case studies examined the later two strategies. This set of case studies established the framework to perform detailed mission analysis and system engineering to define a host of concepts and requirements for various space systems and advanced technologies. The details of each mission are described and, specifically, the results affecting the advanced technologies required to accomplish each mission scenario are presented.

Cataldo, Robert L.↗

Mars Rover/Sample Return mission trade studies

Mission trade studies for a preliminary definition of a flight-separable Mars Rover/Sample Return (MRSR) mission are presented. The MRSR initiative consists of two separate mission elements: a Mars Rover and a Mars Sample Return. Various strategies are discussed for completing the interplanetary portion of the MRSR mission. Five mission options which are characterized by different launch configurations are discussed, and the resulting spacecraft mass needed to accomplish the mission is presented relative to the capabilities of launch vehicles assumed to be available during the timeframe under consideration.

Soldner, John K.↗

Final Environmental Impact Statement for the Galileo Mission (Tier 2)

This Final Environmental Impact Statement (FEIS) addresses the proposed action of completing the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle in October 1989, and the alternative of canceling further work on the mission. The Tier 1 (program level) EIS (NASA 1988a) considered the Titan IV launch vehicle as an alternative booster stage for launch in May 1991 or later. The May 1991 Venus launch opportunity is considered a planetary back-up for the Magellan (Venus Radar Mapper) mission, the Galileo mission, and the Ulysses mission. Plans were underway to enable the use of a Titan IV launch vehicle for the planetary back-up. However, in November 1988, the U.S. Air Force, which procures the Titan IV for NASA, notified NASA that it could not provide a Titan IV vehicle for the May 1991 launch opportunity due to high priority Department of Defense requirements. Consequently, NASA terminated all mission planning for the Titan IV planetary back-up. A minimum of 3 years is required to implement mission-specific modifications to the basic Titan IV launch configuration; therefore, insufficient time is available to use a Titan IV vehicle in May 1991. Thus, the Titan IV launch vehicle is no longer a feasible alternative to the STS/Inertial Upper Stage (IUS) for the May 1991 launch opportunity.

Source record↗

Performance comparisons of nuclear thermal rocket and chemical propulsion systems for piloted missions to Phobos/Mars

Performance capability of nuclear thermal rocket (NTR) and chemical propulsion systems, operating with and without aerobraking, are compared for a selected set of Mars mission opportunities in the 2000 to 2020 timeframe. Both high- and low-energy mission opportunities are investigated. Results are presented as the required initial mass in low earth orbit (IMLEO) to perform the missions. Missions exclusively using chemical propulsion systems have the greatest initial masses. Significant mass reductions are realized by utilizing either aerobrake or NTR technology or both. As mission energy requirements increase, the benefit of implementing aerobrake or NTR technology increases, resulting in IMLEO mass reductions on the order of 60 to 75 percent when compared with all-propulsive chemical missions. By combining both advanced technologies, still greater mass reductions are possible.

Borowski, S. K.↗

Mars Rover/Sample Return mission definition

Mission trade studies for a preliminary definition of a flight-separable Mars Rover/Sample Return (MRSR) mission are presented. The MRSR initiative consists of two separate mission elements: a Mars Rover and a Mars Sample Return. Various strategies are discussed for completing the interplanetary portion of the MRSR mission. Five mission options which are characterized by different launch configurations are discussed, and the resulting spacecraft mass needed to accomplish the mission is presented relative to the capabilities of launch vehicles assumed to be available during the timeframe under consideration.

Friedlander, Alan L.↗

Orbital mechanics and mission design; Proceedings of the AAS/NASA International Symposium, Greenbelt, MD, Apr. 24-27, 1989

The present conference discusses topics in LEO mechanics, the earth-sun-moon orbital regime, space navigation, and lunar and planetary missions. Attention is given to an improved technique for passive eccentricity control, H-I launch vehicle mission planning, glideslope approaches, the control of Space Station-based tethered systems, rendezvous operations in GEO, launch-window expansion and trajectory correction for the First Lunar Swingby, the nature of lunar gravity assists, and the numerical determination of libration-point trajectories with solar exclusion zone-avoiding out-of-plane maneuvers. Also discussed are the interferometric tracking of multiple spacecraft, an improved determination of Martian satellite orbits, the Magellan Venus Mapping Mission, the Mars Rover Sample Return Mission, round-trip trajectories for manned Mars exploration, advanced missions using fusion propulsion, Vesta trajectories and navigation, and Voyager interstellar mission design.

Teles, Jerome↗