Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Lessons learned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

A Ground Systems Architecture Transition for A Distributed Operations System

The Marshall Space Flight Center (MSFC) Ground Systems Department (GSD) recently undertook an architecture change in the product line that serves the ISS program. As a result, the architecture tradeoffs between data system product lines that serve remote users versus those that serve control center flight control teams were explored extensively. This paper describes the resulting architecture that will be used in the ISS payloads program, and the resulting functional breakdown of the products that support that architecture. It also describes the lessons learned from the path that was followed, as a migration of products cause the need to reevaluate the allocation of functions across the architecture. The result is a set of innovative ground system solutions that is scalable so it can support facilities of wide-ranging sizes, from a small site up to large control centers. Effective use of system automation, custom components, design optimization for data management, data storage, data transmissions, and advanced local and wide area networking architectures, plus the effective use of Commercial-Off-The-Shelf (COTS) products, provides flexible Remote Ground System options that can be tailored to the needs of each user. This paper offers a description of the efficiency and effectiveness of the Ground Systems architectural options that have been implemented, and includes successful implementation examples and lessons learned.

Sellers, Donna↗

A Ground Systems Architecture Transition for a Distributed Operations System

The Marshall Space Flight Center (MSFC) Ground Systems Department (GSD) recently undertook an architecture change in the product line that serves the ISS program. As a result, the architecture tradeoffs between data system product lines that serve remote users versus those that serve control center flight control teams were explored extensively. This paper describes the resulting architecture that will be used in the International Space Station (ISS) payloads program, and the resulting functional breakdown of the products that support this architecture. It also describes the lessons learned from the path that was followed, as a migration of products cause the need to reevaluate the allocation of functions across the architecture. The result is a set of innovative ground system solutions that is scalable so it can support facilities of wide-ranging sizes, from a small site up to large control centers. Effective use of system automation, custom components, design optimization for data management, data storage, data transmissions, and advanced local and wide area networking architectures, plus the effective use of Commercial-Off-The-Shelf (COTS) products, provides flexible Remote Ground System options that can be tailored to the needs of each user. This paper offers a description of the efficiency and effectiveness of the Ground Systems architectural options that have been implemented, and includes successful implementation examples and lessons learned.

Sellers, Donna↗

AstroDOME: Standardized, Mass-Produceable, Small NASA Astrophysics Observatories for Big Missions

NASA’s Goddard Space Flight Center is investigating the use of small, commercial off the shelf (COTS) spacecraft to enable breakthrough astrophysics research at radically reduced cost over previous generations of missions. This paper will focus on the Mission Systems perspective of this investigation. It will cover the spacecraft to instrument interface, and lessons learned in early concept payload development. Low-cost COTS spacecraft have proliferated in the last ~5 years. They represent an order of magnitude reduction in the cost of spacecraft bus development and acquisition. They are enabled by the advent of low-cost smallsat launch options in the immediately preceding years, and are seeded by recent distributed and disaggregated missions in other sectors such as telecommunications megaconstellations (e.g. Starlink, OneWeb, Project Kuiper) and ongoing Space Development Agency (SDA) developments. Our study was tasked with developing a standardized, mass-produceable, astrophysics payload which is reconfigurable to different wavelength bands while maintaining a single optics bench design, and a standardized mechanical, electrical, data, and thermal interface to the spacecraft bus, and which may be reconfigured to multiple COTS spacecraft offerings. In this paper we will discuss lessons learned from our case study. We will also present identified keys to mission success for performing cutting edge astrophysics observations while taking advantage of economies of scale with a disaggregated, standardized architecture.

Matthew Marcus↗

Application of reusable software components at the SEI

Robert Holibaugh of the Software Engineering Institute described a project which is studying the application of reusable software components. The primary goals are to gain practical experience with state-of-the-art reusable components, methods, and tools and to capture the lessons learned in the application of reuse technology. In addition the project will assess the impact of reuse on the software development process and products and will identify and validate the information that facilities software reuse during system development. The project includes two tasks - a reuse experiment and a redevelopment effort. The reuse experiment will define a life cycle and a methodology for reuse-based development, and define and implement a data collection mechanism for measuring the development. The redevelopment effort will construct a reuse test bed and will redevelop and realistically test subsystems from an embedded mission-critical real-time application. The reuse experiment will produce several products including a tested real-time application, reuse-based components and tools evaluation, a reuse-based development method, a framework for data collection, a framework for measuring productivity, and lessons learned data. Successful development with reusable components will require a rich set of components and an integrating methodology. The Tomahawk Land Attack Missile system is the application for the redevelopment effort.

Holibaugh, Robert↗

Selection of the Ground Segment for the Next Generation Space Telescope (NGST) Flight Demonstrator (Nexus)

Nexus was a technology demonstrator project that was designed to bridge from the Hubble Space Telescope (HST) to its successor, the Next Generation Space Telescope (NGST). This paper focuses on the process used in designing the ground segment for Nexus and the lessons learned in its development. Ground station cost drivers were: (1) Contact time, (2) Cost of transporting data between the ground stations and control center, and (3) Cost savings via ground automation. We found that reducing the communication requirement in just the first 100 days could have reduced the total ground station cost by 40%. Contact time cost dwarfed the cost trade between automation development and off-shift operations personnel. Real-time Telemetry and Control (T&C) system analysis was divided into: (1) Potential reuse of the Nexus real-time (T&C) system for NGST, (2) Feasibility of using a 'Finite State-Based Modeling' product, and (3) Selecting a Commercial Off the Shelf (COTS) versus Government Off The Shelf (GOTS) products. We found that each of the products evaluated in detail (ASIST, EPOCH 2000, and ITOS) could adequately support basic mission requirements. Lessons learned were: (1) Include operations at the beginning of the mission, and (2) Develop an operations concept as soon as possible.

Gal-Edd, Jonathan↗

NASA’s Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress through FY 2024

The National Aeronautics and Space Administration (NASA) Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center (GSFC) has been developing technology to robotically refuel both heritage and recently developed satellites on-orbit funded through NASA’s Space Technology Mission Directorate (STMD). The On-orbit Servicing, Assembly, and Manufacturing 1 (OSAM-1) mission, formerly known as Restore-L, developed a system to refuel a satellite in space and assemble a communications antenna. By demonstrating these capabilities, the mission would advance never-before tested technologies for use in future missions (by NASA, other government organizations, and private industries). The purpose of this paper is to capture the lessons learned from the hardware development of the OSAM-1 Propellant Transfer System (PTS) that are highly relevant for the ISAM community. This paper covers a review of in-space servicing extensibility and critical technologies that were being developed within NExIS, focusing on the fluid transfer refueling technology within the framework of the OSAM-1 PTS. An overview of the technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 2018, 2019 and 2020. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Final assembly, qualification, and functional tests along with installation and acceptance testing of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. Technology development, challenges, lessons learned, along with installation and testing results are discussed, with particular focus on the OSAM-1 assemblies including the PTA and HMA. In addition, testing utilizing the integrated flight simulator test setups will be summarized. The OSAM-1 PTS made great strides in advancing in-space refueling technology; however, there are unfinished development efforts remaining. This paper concludes with a brief summary of the technology shortfalls (gaps) that remain in the key areas of in-space fluid transfer.

ISAM↗

Asteroid Redirect Crewed Mission Space Suit and EVA System Architecture Trade Study

The Asteroid Redirect Crewed Mission (ARCM) requires a Launch/Entry/Abort (LEA) suit capability and short duration Extra Vehicular Activity (EVA) capability for Orion. The EVAs will involve a two-person crew for approximately four hours. Currently, two EVAs are planned with one contingency EVA in reserve. Providing this EVA capability is very challenging due to system level constraints and a new and unknown environment. The goal of the EVA architecture for ARCM is one that builds upon previously developed technologies and lessons learned, and that accomplishes the ARCM mission while providing a stepping stone to future missions and destinations. The primary system level constraints are to 1) minimize system mass and volume and 2) minimize the interfacing impacts to the baseline Orion design. In order to minimize the interfacing impacts and to not perturb the baseline Orion schedule, the concept of adding "kits" to the baseline system is proposed. These kits consist of: an EVA kit (converts LEA suit to EVA suit), EVA Servicing and Recharge Kit (provides suit consumables), the EVA Tools, Translation Aids & Sample Container Kit (the tools and mobility aids to complete the tasks), the EVA Communications Kit (interface between the EVA radio and the MPCV), and the Cabin Repress Kit (represses the MPCV between EVAs). This paper will focus on the trade space, analysis, and testing regarding the space suit (pressure garment and life support system). Historical approaches and lessons learned from all past EVA operations were researched. Previous and current, successfully operated EVA hardware and high technology readiness level (TRL) hardware were evaluated, and a trade study was conducted for all possible pressure garment and life support options. Testing and analysis was conducted and a recommended EVA system architecture was proposed. Pressure garment options that were considered for this mission include the currently in-use ISS EVA Mobility Unit (EMU), all variations of the Advanced Crew Escape Suit (ACES), and the Exploration Z-suit. For this mission, the pressure garment that was selected is the Modified ACES (MACES) with EVA enhancements. Life support options that were considered included short closed-loop umbilicals, long open-loop umbilicals, the currently in-use ISS EMU Portable Life Support System (PLSS), and the currently in development Exploration PLSS. For this mission, the life support option that was selected is the Exploration PLSS. The greatest risk in the proposed architecture is viewed to be the comfort and mobility of the baseline MACES and the delicate balance between adding more mobility features while not compromising landing safety. Feasibility testing was accomplished in low fidelity analogs and in the JSC Neutral Buoyancy Laboratory (NBL) to validate the concept before a final recommendation on the architecture was made. The proposed architecture was found to meet the mission constraints, but much more work is required to determine the details of the required suit upgrades, the integration with the PLSS, and the rest of the tools and equipment required to accomplish the mission. This work and further definition of the remaining kits will be conducted in government fiscal year 14.

Blanco, Raul A.↗

Environmental Testing of the OVEN System for Lunar Water Extraction and Prospecting

Introduction: The presence of water ice in permanently shadowed regions on the lunar surface [1] may enable a sustained human presence on the Moon with minimal need for consumables. However, in order to develop a long term utilization plan that includes the usage of in-situ water we must first understand the abundance, stratigraphy and distribution of this re-source. Multiple space agencies currently have plans for lunar water prospecting missions. The Optimized Volatile Extraction Node (OVEN) was designed for water prospecting missions that require samples to be weighed, sealed, and heated as the means of determining water concentration. This method of water quantification necessitates a fair amount of automation, so a rigorous environmental test program was performed in order to build confidence in the performance of the OVEN design. The work presented here describes the OVEN environmental test program as well as ongoing efforts to improve on the design. Vibration: The OVEN participated in two rounds of random vibration tests. The first test was a stand-alone test performed at the Energy Systems Test Area of the Johnson Space Center. The second test was an integrated test with the mobile platform developed for the Resource Prospector project. The OVEN survived both tests without damage, but the tests did provide valuable lessons learned with regards to specific operations. Thermal Vacuum: The OVEN was successfully demonstrated at a temperature range of -50 to 75 C in a thermal vacuum chamber. The need to heat motor gearboxes at lower temperatures was predetermined so this test program was completed by implementing a method of gearbox heating that used the existing circuitry within the motors. Dust: A custom dynamometer was built in order to determine the torque required to move the various mechanisms within the OVEN at a range of temperatures. The OVEN system was coated with lunar dust simulant in order to determine mechanism torques under a worst-case operating condition. Sublimation: Sublimation losses within the OVEN were quantified through a series of test configurations, including an integrated test in a thermal vacuum chamber at Glenn Research Center [2]. Current Work: The OVEN subsystem is currently not a component of any existing prospecting missions, but work continues that will take the lessons learned from previous environmental tests and improve on the design in order to be considered for future prospecting opportunities. References: [1] Colaprete, A., Schultz, P., Heldmann, J., Wooden, D., Shirley, M., Ennico, K., ... & Sollitt, L. (2010). Detection of water in the LCROSS ejecta plume. science, 330(6003), 463-468. [2] Kleinhenz, J., Smith, J., Roush, T., Colaprete, A., Zacny, K., Paulsen, G., ... & Paz, A. (2018). Volatiles Loss from water bearing regolith simulant at Lunar Environments. In Earth and Space 2018: Engineering for Extreme Environments (pp. 454-466). Reston, VA: American Society of Civil Engineers.

A Paz↗

Ablators - From Apollo to Future Missions to Moon, Mars and Beyond

Apollo was designed to carry astronauts safely back from the Moon at return speeds exceeding 11 km/s and requireddevelopment of a new ablative thermal protection system (TPS) to protect the capsule from entry heating. Mercuryand Gemini, that preceded Apollo, were focused on Earth orbiting system demonstration and lessons learned fromthem were used in Apollo. The ablative material and associated system development for Lunar return conditionsrequired considerable ground and flight testing. Mars Viking Lander missions required a new lighter weight ablatoras entry heating was benign compared to Apollo. Pioneer-Venus and Galileo Probe missions required a new and morecapable ablator than Apollo. After two decades, Mars Pathfinder followed by Mars Exploration Rover missions,smaller than Viking but more demanding, were able to use Viking ablative TPS. At the same time, advances in manufacturing and materials technology led to development of innovative lightweight ablators. These new ablators enabled Stardust and Genesis Sample Return Missions. Around the turn of this century, NASA decided on a scaled-upversion of the Apollo capsule for human exploration of Moon and Mars and the ablative heat shield to protect the CrewExploration Vehicle ended up being the Apollo ablative TPS. The Artemis 1 mission is currently fitted with tiledsystem, different than Orion EFT-1 but with the Apollo ablative material as a result of lessons learned. NASA iscurrently planning on sample return missions from Mars, and this will require robust ablative TPS that can providehigher reliability than any other past mission. There are still unexplored high scientific value destinations in the solarsystem. In situ exploration of Uranus, Neptune, Saturn and sample return missions with return speed much higher thanStardust will require ablators capable of withstanding extreme entry that are also efficient. New ablative TPS havebeen developed in anticipation of these future missions. This paper is intended to tell the story of these ablators,illustrated through examples. We see the use of flight proven ablators was sometimes a risky proposition and newablators perceived to be higher risk have proved otherwise. The history of ablators illustrates the challenges eachmission had to address, either through the use of flight proven or new ablative TPS, to be successful.

Venkatapathy, Ethiraj↗

Reducing NPR 7120.5D to Practice: Transitioning from Design Reviews to the SIR Hardware Review

The Gravity Recovery And Interior Laboratory (GRAIL) mission was the first Jet Propulsion Laboratory (JPL) project initiated under NASA's revised rules for space flight project management, NPR 7120.5D, "NASA Space Flight Program and Project Management Requirements." NASA selected GRAIL through a competitive Announcement of Opportunity process and funded its Phase B Preliminary Design effort. The team's first major milestone was a JPL institutional milestone, the Project Mission System Review (PMSR), which proved an excellent tune-up for the end-of-Phase-B NASA life-cycle review, the Preliminary Design Review (PDR). Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. For the Project Critical Design Review (CDR), lessons learned from the PDR and updated Standing Review Board (SRB) practices from the Agency were factored into the review preparation effort. Additionally, the review was held at the Principal Investigator's institution, the Massachusetts Institute of Technology, rather than at the project management center (JPL), which necessitated additional cross-country coordination steps. The PMSR, PDR, and CDR were design reviews and largely paper-oriented. For the System Integration Review (SIR), the project needed to transition to a hardware review and deal with paper in a very different manner. While many of the practices employed for the design reviews were modified and retained (e.g., review preparation team, gate products management, pre-reviews, SRB coordination), the review agenda, presentation style, and slide templates were significantly changed. A key success factor concerned the handling of project open paper, which was succinctly and effectively communicated to the SRB in presentations.This paper provides a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project SIR preparation and execution activities, including positive and negative lessons learned and identifies recommendations for future NASA (and non- NASA) project teams.

NPR 7120.5D↗

Assembly of 5.5-Meter Diameter Developmental Barrel Segments for the Ares I Upper Stage

Full scale assembly welding of Ares I Upper Stage 5.5-Meter diameter cryogenic tank barrel segments has been performed at the Marshall Space Flight Center (MSFC). One full-scale developmental article produced under the Ares 1 Upper Stage project is the Manufacturing Demonstration Article (MDA) Barrel. This presentation will focus on the welded assembly of this barrel section, and associated lessons learned. Among the MDA articles planned on the Ares 1 Program, the Barrel was the first to be completed, primarily because the process of manufacture from piece parts (barrel panels) utilized the most mature friction stir process planned for use on the Ares US program: Conventional fixed pin Friction Stir Welding (FSW). This process is in use on other space launch systems, including the Shuttle s External Tank, the Delta IV common booster core, the Delta II, and the Atlas V rockets. The goals for the MDA Barrel development were several fold: 1) to prove out Marshall Space Flight Center s new Vertical Weld Tool for use in manufacture of cylindrical barrel sections, 2) to serve as a first run for weld qualification to a new weld specification, and 3) to provide a full size cylindrical section for downstream use in precision cleaning and Spray-on Foam Insulation development. The progression leading into the welding of the full size barrel included sub scale panel welding, subscale cylinder welding, a full length confidence weld, and finally, the 3 seamed MDA barrel processing. Lessons learned on this MDA program have been carried forward into the production tooling for the Ares 1 US Program, and in the use of the MSFC VWT in processing other large scale hardware, including two 8.4 meter diameter Shuttle External Tank barrel sections that are currently being used in structural analysis to validate shell buckling models.

Carter, Robert W.↗

Software Released by LEWICE 2.0 Ice Accretion Software Development Project

Computational icing simulation methods are making the transition from the realm of research to commonplace use in design and certification. As such, standards of software management, design, validation, and documentation must be adjusted to accommodate the increased expectations of the user community with respect to accuracy, reliability, capability, and usability. With this in mind, in collaboration with Glenn's Engineering Design and Analysis Division, the Icing Branch of the NASA Glenn Research Center at Lewis Field began a software improvement project focused on the two-dimensional ice accretion simulation tool LEWICE. This project is serving as an introduction to the concepts of software management and is intended to serve as a pilot project for future icing simulation code development. The LEWICE 2.0 Software Development Project consisted of two major elements: software management and software validation. The software management element consisted of identifying features of well-designed and well-managed software that are appropriate for an analytical prediction tool such as LEWICE and applying them to a revised version of the code. This element included tasks such as identification of software requirements, development and implementation of coding standards, and implementation of software revision control practices. With the application of these techniques, the LEWICE ice accretion code became a more stable and reliable software product. In addition, the lessons learned about software development and maintenance can be factored into future software projects at the outset. The software validation activity was an integral part of our effort to make LEWICE a more accurate and reliable analysis tool. Because of the efforts taken to extensively validate this software, LEWICE 2.0 is more robust than previous releases and can reproduce results accurately across several computing platforms. It also differs from previous versions in the extensive quantitative comparisons of its results with a data base of ice shapes that were generated in Glenn's Icing Research Tunnel. The results of the shape comparisons were analyzed to determine the range of meteorological conditions under which LEWICE 2.0 is within the repeatability found for ice shapes obtained from experiments. These comparisons show that the average variation of LEWICE 2.0 from experimental data is 7.2 percent, whereas the overall variability of the experimental data is 2.5 percent. The LEWICE 2.0 Software Development Project resulted in the release, at the recent Icing Branch LEWICE Workshop, of a more useful and robust analysis tool than was previously available to the icing community. The lessons learned from this project will be applied to the Icing Branch s future software development efforts.

Potapczuk, Mark G.↗

Metal Additive Manufacturing for Rocket Engines: Successes and Failures

NASA has been developing additive manufacturing (AM) for various technical and programmatic advantages for complex rocket engine and aerospace components. This maturation has focused on various AM processes, new alloys, characterizing material properties, developing standards, producing demonstrator parts, and integrating AM hardware in liquid rocket engines through test-fail-fix cycles, as well as application and dissemination of lessons learned of the AM lifecycle. The importance of proper AM processing was made evident in the failure of a Laser Powder Bed Fusion (L-PBF) copper-alloy combustion chamber during a hot-fire test due to a degraded material quality. The hot-fire test aimed to demonstrate high duty cycle under a risk-tolerant development project, where consequences of component failure would be minimal. However, the unintentional component failure emphasized the necessity of robust material characterization and rigorous process control procedures for the safe use of AM components in critical applications. This presentation provides an overview of the development failure, a discussion on the evaluation of the failed chamber and supplemental chambers produced at the same time, a representative material samples that included intentional build witness lines, and a summary of the key results and recommendations from the evaluations. NASA continues to approach AM processes and designs with a level of risk and acceptance of failures that is appropriate for the project objectives, with the overall goal of safe implementation of AM technology and transferring AM technology into commercial space applications. This presentation with provide critical awareness to the community lessons learned on proper implementation of AM.

L-PBF↗

Successes and Failures of Metal Additive Manufacturing for Rocket Engines

NASA has been developing additive manufacturing (AM) for various technical and programmatic advantages for complex rocket engine and aerospace components. This maturation has focused on various AM processes, new alloys, characterizing material properties, developing standards, producing demonstrator parts, and integrating AM hardware in liquid rocket engines through test-fail-fix cycles, as well as application and dissemination of lessons learned of the AM lifecycle. The importance of proper AM processing was made evident in the failure of a Laser Powder Bed Fusion (L-PBF) copper-alloy combustion chamber during a hot-fire test due to a degraded material quality. The hot-fire test aimed to demonstrate high duty cycle under a risk-tolerant development project, where consequences of component failure would be minimal. However, the unintentional component failure emphasized the necessity of robust material characterization and rigorous process control procedures for the safe use of AM components in critical applications. This presentation provides an overview of the development failure, a discussion on the evaluation of the failed chamber and supplemental chambers produced at the same time, a representative material samples that included intentional build witness lines, and a summary of the key results and recommendations from the evaluations. NASA continues to approach AM processes and designs with a level of risk and acceptance of failures that is appropriate for the project objectives, with the overall goal of safe implementation of AM technology and transferring AM technology into commercial space applications. This presentation with provide critical awareness to the community lessons learned on proper implementation of AM.

Additive Manufacturing↗

Spectrometer Scan Mechanism for Encountering Jovian Orbit Trojan Asteroids

This paper describes the design, testing, and lessons learned during the development of the Lucy Ralph (L'Ralph) Scan Mirror System (SMS), composed of the Scan Mirror Mechanism (SMM), Differential Position Sensor System (DPSS) and Mechanism Control Electronics (MCE). The L'Ralph SMS evolved from the Advanced Topographic Laser Altimeter System (ATLAS) Beam Steering Mechanism (BSM), so design comparisons will be made. Lucy is scheduled to launch in October 2021, embarking upon a 12-year mission to make close range encounters in 2025 and 2033 with seven Trojan asteroids and one main belt asteroid that are within the Jovian orbit. The L'Ralph instrument is based upon the New Horizons Ralph instrument, which is a panchromatic and color visible imager and infrared spectroscopic mapper that slewed the spacecraft for imaging. The L'Ralph SMM is to provide scanning for imaging to eliminate the need to slew the spacecraft. One purpose of this paper is to gain understanding of the reasoning behind some of the design features as compared with the ATLAS BSM. We will identify similarities and differences between the ATLAS BSM and the L'Ralph SMM that resulted from the latter's unique requirements. Another purpose of this paper is to focus upon "Lessons Learned" that came about during the development of the L'Ralph SMM and its MCE, both mechanism engineering issues and solutions as well as Ground Support Equipment (GSE) issues and solutions that came about during the validation of requirements process. At the time of this writing, the L'Ralph SMM has been flight qualified and delivered to the project.

Blumenstock, Kenneth A.↗

The Dust Management Project: Final Report

A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

Hyatt, Mark J.↗

Reliability and Maintainability Engineering - A Major Driver for Safety and Affordability

The United States National Aeronautics and Space Administration (NASA) is in the midst of an effort to design and build a safe and affordable heavy lift vehicle to go to the moon and beyond. To achieve that, NASA is seeking more innovative and efficient approaches to reduce cost while maintaining an acceptable level of safety and mission success. One area that has the potential to contribute significantly to achieving NASA safety and affordability goals is Reliability and Maintainability (R&M) engineering. Inadequate reliability or failure of critical safety items may directly jeopardize the safety of the user(s) and result in a loss of life. Inadequate reliability of equipment may directly jeopardize mission success. Systems designed to be more reliable (fewer failures) and maintainable (fewer resources needed) can lower the total life cycle cost. The Department of Defense (DOD) and industry experience has shown that optimized and adequate levels of R&M are critical for achieving a high level of safety and mission success, and low sustainment cost. Also, lessons learned from the Space Shuttle program clearly demonstrated the importance of R&M engineering in designing and operating safe and affordable launch systems. The Challenger and Columbia accidents are examples of the severe impact of design unreliability and process induced failures on system safety and mission success. These accidents demonstrated the criticality of reliability engineering in understanding component failure mechanisms and integrated system failures across the system elements interfaces. Experience from the shuttle program also shows that insufficient Reliability, Maintainability, and Supportability (RMS) engineering analyses upfront in the design phase can significantly increase the sustainment cost and, thereby, the total life cycle cost. Emphasis on RMS during the design phase is critical for identifying the design features and characteristics needed for time efficient processing, improved operational availability, and optimized maintenance and logistic support infrastructure. This paper discusses the role of R&M in a program acquisition phase and the potential impact of R&M on safety, mission success, operational availability, and affordability. This includes discussion of the R&M elements that need to be addressed and the R&M analyses that need to be performed in order to support a safe and affordable system design. The paper also provides some lessons learned from the Space Shuttle program on the impact of R&M on safety and affordability.

Safie, Fayssal M.↗

Manned Mission Planning Considerations when Using a Non-Regenerable CO2 Removal System

As the commercial spacecraft industry increases in size, there will be a corresponding increase in the number of manned spacecraft built and operationally flown each year. Industry teams for these new spacecraft will have multiple design and operational choices to make for each of these spacecraft s subsystems. The carbon dioxide (CO2) removal subsystem of the environmental control and life support system is one that presents such challenges. This paper seeks to aid industry in making design and operations choices by providing a document containing lessons learned by the Space Shuttle Program s Operations team, with specific focus given to the non-regenerable CO2 removal system currently used by the Space Shuttle. Carbon dioxide, one of the key byproducts of respiration, can lead to injury and death if allowed to build up in a spacecraft s habitable environment. Therefore, any spacecraft s environmental control and life support system must contain a method for removing this hazard. These removal systems can either be non-regenerable or regenerable. While this paper defines the difference between these types and presents a generic comparison of their capabilities, the focus is specifically on the Space Shuttle s CO2 removal systems. This will include a short discussion of the Space Shuttle s regenerable amine solid absorption system that was part of the Extended Duration Orbiter (EDO) modification, however, emphasis is given to the non-regenerable Lithium Hydroxide canister system used as the prime removal method employed by the Space Shuttle, including a discussion on why this method was chosen over a regenerable system. A full exposition is given on all of the considerations required for mission planning when using a non-regenerable CO2 removal system. Key discussion items include: airflow lessons learned, recent physiological issues related to short term and long term exposure and how lower levels may be more harmful than previously thought, lithium hydroxide dust issues, mass vs. stowage comparisons, cost, complexity considerations, operational margin considerations, timing considerations with respect to the crew s schedule, and logistical management. The conclusion of the paper finalizes the discussion and contains a listing of considerations in regards to CO2 management using a non-regenerable removal system in the near future.

DeSimpelaere, Edward↗