Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EXCAVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Corrective Action Investigation Plan for Corrective Action Unit 569: Area 3 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

Corrective Action Unit (CAU) 569 is located in Area 3 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 569 comprises the nine numbered corrective action sites (CASs) and one newly identified site listed below: (1) 03-23-09, T-3 Contamination Area (hereafter referred to as Annie, Franklin, George, and Moth); (2) 03-23-10, T-3A Contamination Area (hereafter referred to as Harry and Hornet); (3) 03-23-11, T-3B Contamination Area (hereafter referred to as Fizeau); (4) 03-23-12, T-3S Contamination Area (hereafter referred to as Rio Arriba); (5) 03-23-13, T-3T Contamination Area (hereafter referred to as Catron); (6) 03-23-14, T-3V Contamination Area (hereafter referred to as Humboldt); (7) 03-23-15, S-3G Contamination Area (hereafter referred to as Coulomb-B); (8) 03-23-16, S-3H Contamination Area (hereafter referred to as Coulomb-A); (9) 03-23-21, Pike Contamination Area (hereafter referred to as Pike); and (10) Waste Consolidation Site 3A.

54 ENVIRONMENTAL SCIENCES↗

Technical evaluation of soil remediation alternatives at the building 812 operable unit, lawrence livermore national laboratory site 300

The Department of Energy Livermore Site Office requested a technical review of remedial alternatives proposed for the Building 812 Operable Unit, Site 300 at the Lawrence Livermore National Laboratory. The team visited the site and reviewed the alternatives proposed for soil remediation in the draft RI/FS and made the following observations and recommendations. Based on the current information available for the site, the team did not identify a single technology that would be cost effective and/or ecologically sound to remediate DU contamination at Building 812 to current remedial goals. Soil washing is not a viable alternative and should not be considered at the site unless final remediation levels can be negotiated to significantly higher levels.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Independent review of the x-701b groundwater remedy, portsmouth, ohio: technical evaluation and recommendations

The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-22) to provide independent technical experts to evaluate past and ongoing remedial activities at the Portsmouth facility that were completed to address TCE contamination associated with the X-701B groundwater plume and to make recommendations for future efforts. The Independent Technical Review team was provided with a detailed and specific charter. The charter requested that the technical team first review the past and current activities completed for the X-701B groundwater remedy for trichloroethene (TCE) in accordance with a Decision Document that was issued by Ohio EPA on December 8, 2003 and a Work Plan that was approved by Ohio EPA on September 22, 2006. The remedy for X-701B divides the activities into four phases: Phase I - Initial Source Area Treatment, Phase II - Expanded Source Area Treatment, Phase III - Evaluation and Reporting, and Phase IV - Downgradient Remediation and Confirmation of Source Area Treatment. Phase I of the remedy was completed during FY2006, and DOE has now completed six oxidant injection events within Phase II. The Independent Technical Review team was asked to evaluate Phase II activities, including soil and groundwater results, and to determine whether or not the criteria that were defined in the Work Plan for the Phase II end point had been met. The following criteria are defined in the Work Plan as an acceptable Phase II end point: (1) Groundwater samples from the identified source area monitoring wells have concentrations below the Preliminary Remediation Goal (PRG) for TCE in groundwater, or (2) The remedy is no longer effective in removing TCE mass from the source area. In addition, the charter specifies that if the Review Team determines that the Phase II endpoint has not been reached, then the team should address the following issues: (1) If additional injection events are recommended, the team should identify the type of injection and target soil horizon for these injections; (2) Consider the feasibility of declaring Technical Impracticability and proceeding with the RCRA Cap for the X-701B; and (3) Provide a summary of other cost-effective technologies that could be implemented (especially for the lower Gallia).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NorthernSTAR 1-1/2-Story Demonstration House of Cold Climate Solutions for Affordable Housing

Single family homes in urban areas that are available for renovation by nonprofit developers are often in rough shape (1MM to 2MM nationally). Budgeting has historically focused on improving homes to meet basic housing standards. A rising interest in the long-term impact of homeownership has introduced the need to balance basic needs with home performance. This demonstration project aims to help nonprofit affordable housing developers become familiar with three Building America performance measures, the installation processes, and impacts and benefits of each. A story and a half home in North Minneapolis, MN was presented by Urban Homeworks our local nonprofit partner. The team helped them install three researched upgrade measures: exterior roof insulation or 'overcoat,' exterior foundation insulation, or 'excavationless', and a combined space and water heating HVAC system or 'combi'. To maximize efficiency of application and to address budget issues, the Team worked with Urban Homeworks to identify ways to use volunteers and construction training programs to install the measures. An open invitation to visit the job site was extended to other nonprofit developers and industry partners to encourage dialog about the systems during live installation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Historic Water, Sewer, and Steam/HTHW Systems in Mercury, Area 23, Nevada National Security Site, Nye County, Nevada (Report and Appendix A.)

This report provides documentation intended to satisfy the mitigation requirements for a substantial portion of the above- and belowground utilities in Mercury on the Nevada National Security Site (NNSS) outlined in the associated Memorandum of Agreement (MOA). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) manages the property and anticipates conducting activities in the future that will affect these resources. These structures are entirely within the Mercury Historic District, which is eligible to the National Register of Historic Places. The district is considered eligible under Criteria A and C for the theme of nuclear testing, with a period of significance from 1951 through 1992. The utilities addressed here include the systems related to potable water and steam/high temperature hot water distribution, as well as the sewage system. More specifically, this documentation covers these underground utilities that were installed in Mercury from 1951 through 1977 and aboveground components installed from 1951 through 1992. (See also Appendix B listed separately in OSTI.)

54 ENVIRONMENTAL SCIENCES↗

WIPP Subsidence Monument Leveling Survey - 2007

Sections 2 through 7 of this report define the result of the 2007 leveling survey through the subsidence monuments at the WIPP site. Approximately 15 miles of leveling was completed through nine vertical control loops. The 2007 survey includes the determination of elevation on each of the 48 existing subsidence monuments and the WIPP baseline survey, and 14 of the National Geodetic Survey’s (NGS) vertical control points. The field observations were completed during August through December 2007 by personnel from the Washington TRU Solutions (WTS) Surveying Group, Mine Engineering Department. Digital leveling techniques were utilized to achieve better than Second Order Class II loop closures as outlined by the Federal Geodetic Control Subcommittee (FGCS). Because it is important to perform the subsidence survey in exactly the same manner each year, WIPP procedure (WP 09-ES4001) details each step of the survey. Starting with the 2002 survey this procedure has been used to perform the subsidence survey. Starting with the survey of the year 2001, Loop 1 and redundant survey connections among the various loops were removed from the survey and report. This resulted in a reduction of fieldwork with no loss of accuracy or precision. The redundant connections caused multiple elevations for the same stations. The differences were so slight that they were not used in elevation adjustments for the loops. The redundancy was used to spot gross errors in the field. After several years of surveying these loops it is evident that no gross errors occur that are not also evident in the loop closures. Finally, Section 8 contains Table F, which summarizes the elevations for all surveys from 1987 through 2007, inclusive. A detailed listing of the 1986 through 1997 surveys is contained in the report, WIPP Subsidence Monument Leveling Surveys 1986-1997, DOE/WIPP 98-2293. A reference to the summary reports for each year after 1997 is listed in the reference section of this document.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP Subsidence Monument Leveling Survey - 2008

Sections 2 through 7 of this report define the result of the 2008 leveling survey through the subsidence monuments at the WIPP site. Approximately 15 miles of leveling was completed through nine vertical control loops. The 2008 survey includes the determination of elevation on each of the 48 existing subsidence monuments and the WIPP baseline survey, and 14 of the National Geodetic Survey’s (NGS) vertical control points. The field observations were completed during September through November 2008 by the Washington TRU Solutions (WTS) Mine Engineering Surveyors. Digital leveling techniques were utilized to achieve better than Second Order Class II loop closures as outlined by the Federal Geodetic Control Subcommittee (FGCS). Because it is important to perform the subsidence survey in exactly the same manner each year, WIPP procedure (WP 09-ES4001) details each step of the survey. Starting with the 2002 survey this procedure has been used to perform the subsidence survey. Starting with the survey of the year 2001, Loop 1 and redundant survey connections among the various loops were removed from the survey and report. This resulted in a reduction of fieldwork with no loss of accuracy or precision. The redundant connections caused multiple elevations for the same stations. The differences were so slight that they were not used in elevation adjustments for the loops. The redundancy was used to spot gross errors in the field. After several years of surveying these loops it is evident that no gross errors occur that are not also evident in the loop closures. Finally, Section 8 contains Table F, which summarizes the elevations for all surveys from 1987 through 2008, inclusive. A detailed listing of the 1986 through 1997 surveys is contained in the report, WIPP Subsidence Monument Leveling Surveys 1986-1997, DOE/WIPP 98-2293. A reference to the summary reports for each year after 1997 is listed in the reference section of this document.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP Subsidence Monument Leveling Survey 2009

Sections 2 through 7 of this report define the result of the 2009 leveling survey through the subsidence monuments at the WIPP site. Approximately 15 miles of leveling was completed through nine vertical control loops. The 2009 survey includes the determination of elevation on each of the 48 existing subsidence monuments and the WIPP baseline survey, and 14 of the National Geodetic Survey’s (NGS) vertical control points. The field observations were completed during September through November 2009 by the Washington TRU Solutions (WTS) Mine Engineering Surveyors. Digital leveling techniques were utilized to achieve better than Second Order Class II loop closures as outlined by the Federal Geodetic Control Subcommittee (FGCS). Because it is important to perform the subsidence survey in exactly the same manner each year, WIPP procedure (WP 09-ES4001) details each step of the survey. Starting with the 2002 survey, this procedure has been used to perform the subsidence survey. Starting with the survey of the year 2001, Loop 1 and redundant survey connections among the various loops were removed from the survey and report. This resulted in a reduction of fieldwork with no loss of accuracy or precision. The redundant connections caused multiple elevations for the same stations. The differences were so slight that they were not used in elevation adjustments for the loops. The redundancy was used to spot gross errors in the field. After several years of surveying these loops it is evident that no gross errors occur that are not also evident in the loop closures. Finally, Section 8 contains Table F, which summarizes the elevations for all surveys from 1987 through 2009, inclusive. A detailed listing of the 1986 through 1997 surveys is contained in the report, WIPP Subsidence Monument Leveling Surveys 1986-1997, DOE/WIPP 98-2293. A reference to the summary reports for each year after 1997 is listed in the reference section of this document.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fundamental Regolith Properties, Handling and Water Capture (FLEET) Update

The FLEET project, begun in FY21, was designed to research several concepts for components and subsystems needed for extracting water from planetary ice deposits. This is one of two approaches for providing water off-Earth for direct use and also for feedstock to manufacture spacecraft propellants. The other approach is to extract lattice-bound water and hydroxyl from the minerals that make up the solid grains of rock and regolith. The ultimate intent is to integrate the findings with other efforts, such as, in the creation of complete water-from-ice production systems for various down-stream uses. The project consists of several elements, now in various stages of completion. They are presented here in the approximate order they would generally be applied to a water-extraction system: Digging icy regolith, transporting it, capturing water vapor, and sealing chambers from the outer environment.

regolith excavation↗

Fundamental Research to Enable In-Situ Resource Utilization for NASA’s Artemis Program and Beyond Taking Place at The Glenn Research Center

In Situ Resource Utilization (ISRU) is regarded by many to be the key to future sustainability in space. The National Aeronautics & Space Administration’s (NASA) Space Technology Mission Directorate (STMD) recently published a list of ranked technology shortfalls. ISRU specific capabilities of ‘Extraction and separation of water from extraterrestrial surface material’, ‘Extraction and separation of oxygen from extraterrestrial surface material’, and ‘Produce propellants and mission consumables from extracted in-situ resources’ are within the top 80 shortfalls identified. A team of researchers and engineers at NASA’s Glenn Research Center (GRC) in Cleveland, Ohio, are performing fundamental research and technology maturation to ensure concepts and technologies are ready to support when the mission architecture is primed for ISRU to activate. Through analytical modeling and initial lab-scale testing, researchers are establishing concepts that mature to more sophisticated tests in relevant environments. Numerous studies are underway assessing fundamental behaviors of regolith during various steps of a conceptual ISRU production plant. This paper shares some of GRC’s recent advancements in ISRU research and technology development, in the hopes of providing valuable information to the ISRU community at large, spark ideas for future collaborative endeavors, as well as spur interest in utilizing some of the world-class expertise and facilities GRC has to offer.

ISRU↗

INL @ work: Archaeologist

INL @ work features jobs performed at the lab. For more information about INL careers, visit http://www.facebook.com/idahonationallaboratory.

54 ENVIRONMENTAL SCIENCES↗

Building America Case Study: Demonstration House of Cold-Climate Solutions for Affordable Housing, Minneapolis, Minnesota

Single family homes in urban areas that are available for renovation by nonprofit developers are often in rough shape (1MM to 2MM nationally). Budgeting has historically focused on improving homes to meet basic housing standards. A rising interest in the long-term impact of homeownership has introduced the need to balance basic needs with home performance. This demonstration project aims to help nonprofit affordable housing developers become familiar with three Building America performance measures, the installation processes, and impacts and benefits of each. A story and a half home in North Minneapolis, MN was presented by Urban Homeworks our local nonprofit partner. The team helped them install three researched upgrade measures: exterior roof insulation or 'overcoat,' exterior foundation insulation, or 'excavationless', and a combined space and water heating HVAC system or 'combi'. To maximize efficiency of application and to address budget issues, the Team worked with Urban Homeworks to identify ways to use volunteers and construction training programs to install the measures. An open invitation to visit the job site was extended to other nonprofit developers and industry partners to encourage dialog about the systems during live installation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗