OPTIMIZING THE DESIGN AND DEPLOYMENT OF STATIONARY COMBINED HEAT AND POWER (CHP) FUEL CELL SYSTEMS (FCS) FOR MINIMUM COSTS AND EMISSIONS - MODEL DESIGN (PART II OF II).
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The purpose of the PV Service Life Prediction project is to examine and report on how solar modules are holding up after being in the field for 5 or more years. This poster presents the common problems crystalline-silicon and thin-film modules exhibit, including details of modules from three manufactures that were tested January 13-16, 2014.
Abstract not provided
Briefing for White House personnel and members of various agencies (HUD, USDA, etc.) on SAPC process and see what efficiencies can be brought to Federal contracting process.
Abstract not provided
Abstract Not Provided
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The paper-based procedures currently used for nearly all activities in the commercial nuclear power industry have a long history of ensuring safe operation of the plants. However, there is potential to greatly increase efficiency and safety by improving how the human operator interacts with the procedures. One way to achieve these improvements is through the use of computer-based procedures (CBPs). A CBP system offers a vast variety of improvements, such as context driven job aids, integrated human performance tools (e.g., placekeeping, correct component verification, etc.), and dynamic step presentation. The latter means that the CBP system could only display relevant steps based on operating mode, plant status, and the task at hand. A dynamic presentation of the procedure (also known as context-sensitive procedures) will guide the operator down the path of relevant steps based on the current conditions. This feature will reduce the operator’s workload and inherently reduce the risk of incorrectly marking a step as not applicable and the risk of incorrectly performing a step that should be marked as not applicable. The research team at the Idaho National Laboratory has developed a prototype CBP system for field workers, which has been evaluated from a human factors and usability perspective in four laboratory studies. Based on the results from each study revisions were made to the CBP system. However, a crucial step to get the end users' (e.g., auxiliary operators, maintenance technicians, etc.) acceptance is to put the system in their hands and let them use it as a part of their everyday work activities. In the spring 2014 the first field evaluation of the INL CBP system was conducted at a nuclear power plant. Auxiliary operators conduct a functional test of one out of three backup air compressors each week. During the field evaluation activity, one auxiliary operator conducted the test with the paper-based procedure while a second auxiliary operator followed along with the computer-based procedure. After each conducted functional test the operators were asked a series of questions designed to provide feedback on the feasibility to use a CBP system in the plant and the general user experience of the CBP system. This paper will describe the field evaluation and its results in detail. For example, the result shows that the context driven job aids and the incorporated human performance tools are much liked by the auxiliary operators. The paper will describe and present initial findings from a second field evaluation conducted at second nuclear utility. For this field evaluation a preventive maintenance work order for the HVAC system was used. In addition, there will be a description of the method and objective of two field evaluations planned to be conducted late 2014 or early 2015.
This presentation summarizes NREL finance activities for Department of Energy clients.