Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Configuration planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Electronics Upgrades to the Green is Clean Phoswich Detector Systems and Programmatic Implementation at LANL - Phase II Completion - 18403

Los Alamos National Laboratory (LANL) radiological facilities produce low-density room trash that, in many cases, is not contaminated with radioactivity. It has been estimated that 50 to 90% of low-density room trash is free of radioactive contamination and eligible for inclusion in LANL's Green is Clean (GIC) program. The GIC program is a verification program for non-regulated waste from radiation controlled areas that has been actively segregated as nonradioactive through the use of the waste generator's acceptable knowledge. The GIC program has employed two large area Phoswich gamma ray detector systems (HERCULES and ZEUS) to verify that GIC candidate low-density waste contains no radioactivity above background. The large area (127 cm{sup 2}) Phoswich detectors consist of a thin NaI front crystal (3 mm thick) that is optically coupled to a thick CsI back crystal (50 mm thick). The scintillation properties of the two crystals are different enough to allow the system's electronic components to identify the origin of any pulse. The original systems utilize Nuclear Instrumentation Module (NIM) electronics to process the detector signals. The electronics currently in use by the systems are out of date and some components are no longer manufactured. In 2015, phase I upgrades to the GIC detector systems were completed. Phase I objectives included identifying more modern commercially available electronics that could replace the NIM electronics. A pulse shape discriminator (PSD) module, the Digital Gamma Finder (DGF) Pixie-4 made by XIA LLC, that fits in a compact National Instruments{sup TM} PXI chassis was identified to replace the majority of the original NIM bin electronics - a single Pixie-4 module replaces four NIM amplifiers and four NIM pulse shape analyzers (PSAs). Another phase I objective was to show that that new PSD could separate out the NaI and CsI detector signals in a manner equivalent to or better than the NIM electronics. Proof of concept was achieved in 2015 when a prototype upgrade system on ZEUS was built and tested and gating parameter settings were determined that successfully separated the NaI and CsI signals. Phase II required establishing a LabVIEW software interface with Pixie-4 electronics in lieu of the manufacturer provided Pixie-4 software called the Pixie Viewer. In addition, phase II included 1) final optimization of the gating parameters on the prototype Pixie-4 ZEUS system, 2) finalizing Requirements, Design and Test Plan documents, 3) LabVIEW software interface quality assurance (QA) testing, 4) setting up the HERCULES system with the Pixie-4 upgrade electronics, 5) check source and background calibration of both systems, 6) absolute efficiency determination on both systems and 7) procedure revisions and implementation of both systems into routine operations. In 2017 phase II was completed including the preparation of detailed Requirements, Design and Test Plan documents. The LabVIEW interface software that communicates and controls the Pixie-4 has been completed, merged with the preexisting LabVIEW operations software and fully tested. Gating parameter optimization, configuration of HERCULES with the Pixie-4 electronics, check source and background calibrations and absolute efficiency determinations have all been performed - quantitative results are presented in the full paper. For performance validation, comparison measurements of actual GIC bags on both the HERCULES system using the old NIM Bin electronics and the ZEUS system using the upgraded Pixie-4 electronics have been done and evaluated. Finally, procedure revisions and implementation of both systems into routine operations is currently in process and planned to be complete by the end of calendar year 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Test Reactor -- Testing Capabilities and Plans AND Advanced Test Reactor National Scientific User Facility -- Partnerships and Networks

The Advanced Test Reactor (ATR), at the Idaho National Laboratory (INL), is one of the world’s premier test reactors for providing the capability for studying the effects of intense neutron and gamma radiation on reactor materials and fuels. The physical configuration of the ATR, a 4-leaf clover shape, allows the reactor to be operated at different power levels in the corner “lobes” to allow for different testing conditions for multiple simultaneous experiments. The combination of high flux (maximum thermal neutron fluxes of 1E15 neutrons per square centimeter per second and maximum fast [E>1.0 MeV] neutron fluxes of 5E14 neutrons per square centimeter per second) and large test volumes (up to 122 cm long and 12.7 cm diameter) provide unique testing opportunities. For future research, some ATR modifications and enhancements are currently planned. In 2007 the US Department of Energy designated the ATR as a National Scientific User Facility (NSUF) to facilitate greater access to the ATR for material testing research by a broader user community. This paper provides more details on some of the ATR capabilities, key design features, experiments, and plans for the NSUF.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SDO Delta H Mode Design and Analysis

While on orbit, disturbance torques on a three axis stabilized spacecraft tend to increase the system momentum, which is stored in the reaction wheels. Upon reaching the predefined momentum capacity (or maximum wheel speed) of the reaction wheel, an external torque must be used to unload the momentum. The purpose of the Delta H mode is to manage the system momentum. This is accomplished by driving the reaction wheels to a target momentum state while the attitude thrusters, which provide an external torque, are used to maintain the attitude. The Delta H mode is designed to meet the mission requirements and implement the momentum management plan. Changes in the requirements or the momentum management plan can lead to design changes in the mode. The momentum management plan defines the expected momentum buildup trend, the desired momentum state and how often the system is driven to the desired momentum state (unloaded). The desired momentum state is chosen based on wheel capacity, wheel configuration, thruster layout and thruster sizing. For the Solar Dynamics Observatory mission, the predefined wheel momentum capacity is a function of the jitter requirements, power, and maximum momentum capacity. Changes in jitter requirements or power limits can lead to changes in the desired momentum state. These changes propagate into the changes in the momentum management plan and therefore the Delta H mode design. This paper presents the analysis and design performed for the Solar Dynamics Observatory Delta H mode. In particular, the mode logic and processing needed to meet requirements is described along with the momentum distribution formulation. The Delta H mode design is validated using the Solar Dynamics Observatory High Fidelity simulator. Finally, a summary of the design is provided along with concluding remarks.

Mason, Paul A.↗

Will Solar Panels Help When the Power Goes Out? Planning for PV Resilience

PV systems, like all energy systems, must chart a difficult course in order to improve resilience. They need to simultaneously withstand extreme conditions that cause grid power disruptions, be configured in a way that allows electricity to be delivered to meet the PV user's needs, and overcome disruptions arising from solar resource intermittency. Certain considerations reveal themselves as key to a PV system's resilience benefits. Choice of hardware is critical, as is site selection for the PV array. Voluminous evidence in a hurricane context demonstrates that durable hardware, properly maintained and sited, leads to PV systems surviving extreme weather with their functionality intact. Structurally weak or poorly maintained PV equipment, on the other hand, has demonstrated failures during extreme weather events. PV system stakeholders should ensure that best practices are followed for hardware procurement and siting. It is also important to understand that PV systems are not one-size-fits-all. While incorporating islanding capabilities and energy storage into the system's electrical topology will typically enhance resilience, the user's needs will determine the optimally resilient conformation of any given system. These factors - appropriate hardware, siting, maintenance, and system design - are the primary drivers of PV resilience. PV systems possess high potential for resilient energy generation due to their distributed, abundant, and free fuel supply, but the technology itself does not inherently lead to resilient outcomes. Realizing PV's potential for resilience requires consideration of these determinative factors.

14 SOLAR ENERGY↗

Clearance Analysis of Node 3 Aft CBM to the Stowed FGB Solar Array

In early 2011, the ISS Vehicle Configuration Office began considering the relocation of the Permanent Multipurpose Module (PMM) to the aft facing Common Berthing Mechanism (CBM) on Node 3 to open a berthing location for visiting vehicles on the Node 1 nadir CBM. In this position, computer-aided design (CAD) models indicated that the aft end of the PMM would be only a few inches from the stowed Functional Cargo Block (FGB) port solar array. To validate the CAD model clearance analysis, in the late summer of 2011 the Image Science and Analysis Group (ISAG) was asked to determine the true geometric relationship between the on-orbit aft facing Node 3 CBM and the FGB port solar array. The desired measurements could be computed easily by photogrammetric analysis if current imagery of the ISS hardware were obtained. Beginning in the fall of 2011, ISAG used the Dynamic Onboard Ubiquitous Graphics (DOUG) program to design a way to acquire imagery of the aft face of Node 3, the aft end-cone of Node 1, the port side of pressurized mating adapter 1 (PMA1), and the port side of the FGB out to the tip of the port solar array using cameras on the Space Station Remote Manipulator System (SSRMS). This was complicated by the need to thread the SSRMS under the truss, past Node 3 and the Cupola, and into the space between the aft side of Node 3 and the FGB solar array to acquire more than 100 images from multiple positions. To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which the cameras are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which all of the needed imagery could be acquired. Based on a photogrammetric simulation, it was estimated that the location of the FGB solar array could be measured within an accuracy of about 1 in. in each axis relative to the ISS Analysis Coordinate System (ISSACS). In October 2011, a proposed image-acquisition plan was drafted by ISAG and released for review. The ISS Robotics flight control team (ROBO) proposed minor changes to SPDM positions 1 and 4 to meet ISS proximity requirements. The updated image acquisition plan and draft chit were presented to and approved by the Systems Working Group (SWG) November 18 and were sent to the Vehicle Configuration Board (VCB) in early December 2011. Working with ROBO on 3 successive days (February 21, 22, and 23), ISAG collected 161 images of the ISS. Approximately 40 images were collected from each of the four different SSRMS/SPDM positions, with each set mapping the region from the Node 3 end cone, across Node 1, along the forward port side portion of the FGB, and out the port side FGB solar arrays. From this imagery, the best 80 images were selected for use in the analysis. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for 54 handrail attachment bolts on the aft face of Node 3, in the ISSACS coordinate system. The results of this analysis produced the measured coordinates of 116 points distributed across the face of the FGB solar array panels (see figure 3) along with propagated uncertainty estimates in each coordinate axis. These results were sent to the ISS Vehicle Configuration Office, which sent them to the Configuration Analysis Modeling and Mass Properties (CAMMP) team for comparison with the Russian-provided CAD model for the retracted FGB solar arrays. The CAMMP analysis unexpectedly showed that the measured location of the port FGB solar array was up to 41-in. further outboard than the design and was slightly twisted about its rotational axis. The unexpected comparison results produced some initial concern regarding the accuracy of the photogrammetric measurements. To verify the measured results, ISAG personnel conducted a second analysis using just the imagery of the solar arrays in an arbitrary coordinate system defined by the three corner points of the inboard-most panel, with the design distance between points A1 and A10 as the only scale. The new measurements agreed with the original results to within less than 1 in. RMS in each axis, confirming the original solar array measurements. ISAG produced a final report for the ISS Vehicle Configuration Office documenting an apparent anomaly in the retracted configuration of the port FGB solar arrays. A copy of the measurement report was translated and sent to the Russian Space Agency. During a Vehicle Integrated Performance and Resources (VIPeR) teleconference September 24, 2012, the Russians acknowledged receipt of a translated copy of the ISAG report. The Russian representative stated that the head of the solar array design team claimed that the measured configuration was impossible unless the structure was physically broken. The Russians acknowledged that they had no expertise in photogrammetry, so the analysis technique employed was a "black box" to them, and they did not know how to use the ISAG results. They asked for a single image in which the overextension of the port solar array could be obviously seen. On November 10, 2012, during a face-to-face meeting with their Russian counterparts at JSC, ISAG presented nadir-view imagery of the FGB acquired during Space Shuttle rendezvous. Using the known width of the pressurized portion of the FGB as a scale, this analysis clearly showed that the port FGB solar array was extended outboard further than the Russian design for the retracted solar array.

Liddle, Donn↗

Problem Formulation for Optimal Array Modeling and Planning

In this paper we describe an optimal modeling and planning framework for the future large array of DSN antennas. This framework takes into account the array link performance models, reliability models, constrain models, and objective functions, and determines the optimal sub-array clusters configuration that will support the maximum number of concurrent missions based on mission link properties, antenna element reliabilities, mission requests, and array operation constraints. ..

modeling↗

Novel Sensors for Particle Tracking: a Contribution to the Snowmass Community Planning Exercise of 2021

Five contemporary technologies are discussed in the context of their potential roles in particle tracking for future high energy physics applications. These include sensors of the 3D configuration, in both diamond and silicon, submicron-dimension pixels, thin film detectors, and scintillating quantum dots in gallium arsenide. Drivers of the technologies include radiation hardness, excellent position, vertex, and timing resolution, simplified integration, and optimized power, cost, and material.

Detectors↗

Novel Sensors for Particle Tracking: a Contribution to the Snowmass Community Planning Exercise of 2021

Five contemporary technologies are discussed in the context of their potential roles in particle tracking for future high energy physics applications. These include sensors of the 3D configuration, in both diamond and silicon, submicron-dimension pixels, thin film detectors, and scintillating quantum dots in gallium arsenide. Drivers of the technologies include radiation hardness, excellent position, vertex, and timing resolution, simplified integration, and optimized power, cost, and material.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Leveraging The Open Provenance Model as a Multi-Tier Model for Global Climate Research

Global climate researchers rely upon many forms of sensor data and analytical methods to help profile subtle changes in climate conditions. The U.S. Department of Energy's Atmospheric Radiation Measurement (ARM) program provides researchers with curated Value Added Products (VAPs) resulting from continuous sensor data streams, data fusion, and modeling. The ARM operations staff and software development teams (data producers) rely upon a number of techniques to ensure strict quality control (QC) and quality assurance (QA) standards are maintained. Climate researchers (data consumers) are highly interested in obtaining as much provenance (data quality, data pedigree) as possible to establish data trustworthiness. Currently all the provenance is not easily attainable or identifiable without significant efforts to extract and piece together information from configuration files, log files, codes, and status information from ARM databases. The need for a formalized approach to managing provenance became paramount with the planned addition of 120 new instruments, new data products, and data collection scaling to half a terabyte daily. Last year our research identified the need for a multi-tier provenance model to enable the data consumer easy access to the provenance for their data. This year we are leveraging the Open Provenance Model as a foundational construct that serves the needs of both the VAP producers and consumers, we are organizing the provenance in different tiers of granularity to model VAP lineage, causality at the component level within a VAP, and the causality for each time step as samples are being assembled within the VAP. This paper shares our implementation strategy and how the ARM operations staff and the climate research community can greatly benefit from this approach to more effectively assess and quantify VAP provenance.

54 ENVIRONMENTAL SCIENCES↗

Investigation at High Subsonic Speeds of the Static Longitudinal and Lateral Stability Characteristics of Two Canard Airplane Configurations

The present investigation was conducted in the Langley high-speed 7-by 10-foot tunnel to determine the static longitudinal and lateral stability characteristics at high subsonic speeds of two canard airplane configurations previously tested at supersonic speeds. The Mach number range of this investigation extended from 0.60 to 0.94 and a maximum angle-of-attack range of -2dewg to 24deg was obtained at the lowest test Mach number. Two wing plan forms of equal area were studied in the present tests; one was a 60deg delta wing and the other was a trapezoid wing having an aspect ratio of 3, taper ratio of 0.143, and an unswept 80-percent-chord line. The canard control had a trapezoidal plan form and its area was approximately 11.5 percent of the wing area. The model also had a low-aspect-ratio highly swept vertical tail and twin ventral fins. The longitudinal control characteristics of the models were consistent with past experience at low speed on canard configurations in that stalling of the canard surface occurred at moderate and high control deflections for moderate values of angle of attack. This stalling could impose appreciable limitations on the maximum trim-lift coefficient attainable. The control effectiveness and maximum value of trim-lift was significantly increased by addition of a body flap having a conical shape and located slightly behind the canard surface on the bottom of the body. Addition of the canard surface at 0deg deflection had relatively little effect on overall directional stability of the delta-wing configuration; however, deflection of the canard surface from 0deg to 10deg had a large favorable effect on directional stability at high angles of attack for both the trapezoid- and delta-wing configurations.

Sleeman, William C., Jr.↗

Formation and reconfiguration of tight multi-lane platoons

Advances in vehicular communication technologies are expected to facilitate cooperative driving in the future. Connected and Automated Vehicles (CAVs) are able to collaboratively plan and execute driving maneuvers by sharing their perceptual knowledge and future plans. In this paper, an architecture for autonomous navigation of tight multi-lane platoons traveling on public roads is presented. Using the proposed approach, CAVs are able to form single or multi-lane platoons of various geometrical configurations. They are able to reshape and adjust their configurations according to changes in the environment. The proposed architecture consists of two main components: an offline motion planner system and an online hierarchical control system. The motion planner uses an optimization-based approach for cooperative formation and reconfiguration in tight spaces. A constrained optimization scheme is used to plan smooth, dynamically feasible and collision-free trajectories for all the vehicles within the platoon. The paper addresses online computation limitations by employing a family of maneuvers precomputed offline and stored on a look-up table on the vehicles. The online hierarchical control system is composed of three levels: a traffic operation system (TOS), a decision-maker, and a path-follower. The TOS determines the desired platoon reconfiguration. The decision-maker checks the feasibility of the reconfiguration plan based on real-time information about the surrounding traffic. The reconfiguration maneuver is executed by a low-level path-following feedback controller in real-time. The effectiveness of the approach is demonstrated through simulations of three case studies: (1) formation reconfiguration (2) obstacle avoidance, and (3) benchmarking against behavior-based planning in which the desired formation is achieved using a sequence of motion primitives.

42 ENGINEERING↗

Advanced Coal Wind Hybrid: Economic Analysis

Growing concern over climate change is prompting new thinking about the technologies used to generate electricity. In the future, it is possible that new government policies on greenhouse gas emissions may favor electric generation technology options that release zero or low levels of carbon emissions. The Western U.S. has abundant wind and coal resources. In a world with carbon constraints, the future of coal for new electrical generation is likely to depend on the development and successful application of new clean coal technologies with near zero carbon emissions. This scoping study explores the economic and technical feasibility of combining wind farms with advanced coal generation facilities and operating them as a single generation complex in the Western US. The key questions examined are whether an advanced coal-wind hybrid (ACWH) facility provides sufficient advantages through improvements to the utilization of transmission lines and the capability to firm up variable wind generation for delivery to load centers to compete effectively with other supply-side alternatives in terms of project economics and emissions footprint. The study was conducted by an Analysis Team that consists of staff from the Lawrence Berkeley National Laboratory (LBNL), National Energy Technology Laboratory (NETL), National Renewable Energy Laboratory (NREL), and Western Interstate Energy Board (WIEB). We conducted a screening level analysis of the economic competitiveness and technical feasibility of ACWH generation options located in Wyoming that would supply electricity to load centers in California, Arizona or Nevada. Figure ES-1 is a simple stylized representation of the configuration of the ACWH options. The ACWH consists of a 3,000 MW coal gasification combined cycle power plant equipped with carbon capture and sequestration (G+CC+CCS plant), a fuel production or syngas storage facility, and a 1,500 MW wind plant. The ACWH project is connected to load centers by a 3,000 MW transmission line. In the G+CC+CCS plant, coal is gasified into syngas and CO{sub 2} (which is captured). The syngas is burned in the combined cycle plant to produce electricity. The ACWH facility is operated in such a way that the transmission line is always utilized at its full capacity by backing down the combined cycle (CC) power generation units to accommodate wind generation. Operating the ACWH facility in this manner results in a constant power delivery of 3,000 MW to the load centers, in effect firming-up the wind generation at the project site.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessment of potential advantages of relevant ions for particle therapy: A model based study

Purpose: Different ion types offer different physical and biological advantages for therapeutic applications. The purpose of this work is to assess the advantages of the most commonly used ions in particle therapy, i.e., carbon ({sup 12}C), helium ({sup 4}He), and protons ({sup 1}H) for different treatment scenarios. Methods: A treatment planning analysis based on idealized target geometries was performed using the treatment planning software TRiP98. For the prediction of the relative biological effectiveness (RBE) that is required for biological optimization in treatment planning the local effect model (LEM IV) was used. To compare the three ion types, the peak-to-entrance ratio (PER) was determined for the physical dose (PER{sub PHY} {sub S}), the RBE (PER{sub RBE}), and the RBE-weighted dose (PER{sub BIO}) resulting for different dose-levels, field configurations, and tissue types. Further, the dose contribution to artificial organs at risk (OAR) was assessed and a comparison of the dose distribution for the different ion types was performed for a patient with chordoma of the skull base. Results: The study showed that the advantages of the ions depend on the physical and biological properties and the interplay of both. In the case of protons, the consideration of a variable RBE instead of the clinically applied generic RBE of 1.1 indicates an advantage in terms of an increased PER{sub RBE} for the analyzed configurations. Due to the fact that protons show a somewhat better PER{sub PHY} {sub S} compared to helium and carbon ions whereas helium shows a higher PER{sub RBE} compared to protons, both protons and helium ions show a similar RBE-weighted dose distribution. Carbon ions show the largest variation of the PER{sub RBE} with tissue type and a benefit for radioresistant tumor types due to their higher LET. Furthermore, in the case of a two-field irradiation, an additional gain in terms of PER{sub BIO} is observed when using an orthogonal field configuration for carbon ions as compared to opposing fields. In contrast, for protons, the PER{sub BIO} is almost independent on the field configuration. Concerning the artificial lateral OAR, the volume receiving 20% of the prescribed RBE-weighted dose (V20) was reduced by over 35% using helium ions and by over 40% using carbon ions compared to protons. The analysis of the patient plan showed that protons, helium, and carbon ions are similar in terms of target coverage whereas the dose to the surrounding tissue is increasing from carbon ions toward protons. The mean dose to the brain stem can be reduced by more than 55% when using helium ions and by further 25% when using carbon ions instead of protons. Conclusions: The comparison of the PER{sub RBE} and PER{sub PHY} {sub S} of the three ion types suggests a strong dependence of the advantages of the three ions on the dose-level, tissue type, and field configuration. In terms of conformity, i.e., dose to the normal tissue, a clear gain is expected using carbon or helium ions compared to protons.

60 APPLIED LIFE SCIENCES↗

Application of the CIRSSE cooperating robot path planner to the NASA Langley truss assembly problem

A method for autonomously planning collision free paths for two cooperating robots in a static environment was developed at the Center for Intelligent Robotic Systems for Space Exploration (CIRSSE). The method utilizes a divide-and-conquer type of heuristic and involves non-exhaustive mapping of configuration space. While there is no guarantee of finding a solution, the planner was successfully applied to a variety of problems including two cooperating 9 degrees of freedom (dof) robots. Although developed primarily for cooperating robots the method is also applicable to single robot path planning problems. A single 6 dof version of the planner was implemented for the truss assembly east, at NASA Langley's Automated Structural Assembly Lab (ASAL). The results indicate that the planner could be very useful in addressing the ASAL path planning problem and that further work along these lines is warranted.

Weaver, Jonathan M.↗

Optimizing infrasound observations for sample return capsule re-entry: Insights from OSIRIS-REx and Hayabusa2

The atmospheric entry of meteoroids presents a rare and unpredictable phenomenon, posing challenges for systematic observation and detailed characterization. Such events are nonetheless critical for advancing understanding of acoustic wave propagation, atmospheric structure, and entry dynamics. In contrast, sample return capsules (SRCs) from space missions follow well constrained re-entry trajectories, enabling planned observations of shock wave generation and propagation under controlled conditions. This study compares two SRC atmospheric entries, Hayabusa2 in 2020 and OSIRIS-REx in 2023, to assess how different infrasound array configurations influence shock wave detection and trajectory validation. Hayabusa2’s re-entry was monitored using a distributed network of 28 portable infrasound sensors across seven arrays in Woomera, Australia, permitting three-dimensional reconstruction of the trajectory and analysis of wave characteristics. For OSIRIS-REx, a compact four-sensor array deployed near Eureka Airport provided trajectory confirmation through arrival-time differences and back-azimuth estimates. Spectral and waveform analyses revealed differences in signal properties associated with variations in entry angle and velocity. The results illustrate both the strengths and the limitations of the deployed array configurations. The dense and distributed arrays during Hayabusa2’s re-entry enabled detailed trajectory reconstruction, whereas the compact array at Eureka primarily provided confirmation of signal coherence and back-azimuth consistency. These case studies highlight that even relatively small arrays, if located close to the predicted ground track, can still capture useful information on arrival direction and timing. Such insights provide practical guidance for planning future observational campaigns of SRC returns and other controlled atmospheric entries, and may also inform approaches to opportunistic observations of meteoroid events and other atmospheric acoustic phenomena.

celestial mechanics: orbit determination↗

Dosimetric performance and array assessment of plastic scintillation detectors for stereotactic radiosurgery quality assurance

Purpose: To compare the performance of plastic scintillation detectors (PSD) for quality assurance (QA) in stereotactic radiosurgery conditions to a microion-chamber (IC), Gafchromic EBT2 films, 60 008 shielded photon diode (SD) and unshielded diodes (UD), and assess a new 2D crosshair array prototype adapted to small field dosimetry. Methods: The PSD consists of a 1 mm diameter by 1 mm long scintillating fiber (BCF-60, Saint-Gobain, Inc.) coupled to a polymethyl-methacrylate optical fiber (Eska premier, Mitsubishi Rayon Co., Ltd., Tokyo, Japan). Output factors (S{sub c,p}) for apertures used in radiosurgery ranging from 4 to 40 mm in diameter have been measured. The PSD crosshair array (PSDCA) is a water equivalent device made up of 49 PSDs contained in a 1.63 cm radius area. Dose profiles measurements were taken for radiosurgery fields using the PSDCA and were compared to other dosimeters. Moreover, a typical stereotactic radiosurgery treatment using four noncoplanar arcs was delivered on a spherical phantom in which UD, IC, or PSD was placed. Using the Xknife planning system (Integra Radionics Burlington, MA), 15 Gy was prescribed at the isocenter, where each detector was positioned. Results: Output Factors measured by the PSD have a mean difference of 1.3% with Gafchromic EBT2 when normalized to a 10 x 10 cm{sup 2} field, and 1.0% when compared with UD measurements normalized to the 35 mm diameter cone. Dose profiles taken with the PSD crosshair array agreed with other single detectors dose profiles in spite of the presence of the 49 PSDs. Gamma values comparing 1D dose profiles obtained with PSD crosshair array with Gafchromic EBT2 and UD measured profiles shows 98.3% and 100.0%, respectively, of detector passing the gamma acceptance criteria of 0.3 mm and 2%. The dose measured by the PSD for a complete stereotactic radiosurgery treatment is comparable to the planned dose corrected for its SD-based S{sub c,p} within 1.4% and 0.7% for 5 and 35 mm diameter cone, respectively. Furthermore, volume averaging of the IC can be observed for the 5 mm aperture where it differs by as much as 9.1% compared to the PSD measurement. The angular dependency of the UD is also observed, unveiled by an under-response around 2.5% of both 5 and 35 mm apertures. Conclusions: Output Factors and dose profiles measurements performed, respectively, with the PSD and the PSDCA were in agreement with those obtained with the UD and EBT2 films. For stereotactic radiosurgery treatment verification, the PSD gives accurate results compared to the planning system and the IC once the latter is corrected to compensate for the averaging effect of the IC. The PSD provides precise results when used as a single detector or in a dense array, resulting in a great potential for stereotactic radiosurgery QA measurements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development of Technologies and Capabilities for Coal Energy Resources

This is the final report for the Aerojet Rocketdyne (AR) Advanced Gasification Systems Development (AGSD) project that was initiated on October 1, 2004. The project’s primary objective is to demonstrate technologies that improve the availability and efficiency of gasification-based power plants and to reduce plant capital and operational costs. The objective will be accomplished by (1) development and testing of cooled refractory liners, (2) feed system development and demonstration, (3) pilot plant definition and planning, (4) transport gasifier feed analysis, (5) coal-biomass mixture feed analysis, and (6) coal-biomass mixture pilot scale tests. Task 1, development and testing of cooled refractory liners, was conducted at CANMET Energy Technology Centre in Ottawa, Canada. The test objectives were to screen high conductivity CMC materials with alternate manufacturing methods and a variety of surface treatments for cooled metal tubes in a slagging gasifier environment. During the CMC testing, it was found that a constantly cooled CMC will survive in good conditions and that high porosity CMC resulted in high material erosion and corrosion. During cooled tube testing, it was found that hard metal spray coat and bare Haynes 188 performed the best. Task 2, feed system development and demonstration, was conducted at at the Energy and Environmental Research Center (EERC) at the University of North Dakota (UND). For tasks 2.1-2.6, the test objective was to demonstrate 400-tons/day coal feed system operation (to 1,000 psia gasifier pressures) in ultra-dense phase flow without plugging and to achieve multi-element injector flow-split non-uniformities below 2 %RSD. Testing was successfully completed with no feed system plugging of the feed system. The majority of the other Task 2 activities were associated with the Dry Solids Pump design (Task 2.8 and 2.11), development (Task 2.10), fabrication (Task 2.12), amd testing (Task 2.13-2.15). A variety of tests were performed that verified the capability of the Dry Solids Pump to consolidate various pulverized feedstocks to a state capable of sealing and sustaining downstream outlet pressures during mechanical operation of the pump as well as during periods when the pump was turned off. However, the final operating goals were not achieved. Task 3, pilot plant definition and planning, was to define requirements for an advanced commercial gasifier with a cooled liner and to establish a preferred commercial gasifier system configuration to serve as the reference point for an advanced gasifier pilot plant concept definition. A pilot plant concept was successfully defined that is scalable and traceable to the commercial gasifier configuration. The schedule and cost for design, installation, and long-duration test operation of a pilot plant were estimated at 33 months and $\$$25.6M. Taks 4, transport gasifier feed analysis, was to determine the effects of larger sized transport gasifier low rank coals within the AR dry solids pump. It was found for the two low-rank +100 mesh size transport gasifier coals that the cohesion of these larger materials was significantly less than the coals ground to minus 200 mesh. Also, the gas permeability of the MSL transport coal was found to be significantly higher than the permeability of the PRB transport coal. Task 5, coal-biomass mixture feed analysis, was to determine the effects of coal biomass blends within the AR ultra-dense phase feed system and dry solids pump, and to determine the cost of electricity increase of an integrated gasification combined cycle (IGCC) operating on coal/biomass blends with the AR dry solids pump and ultra-dense phase feed system. In summary, it was found that 75/25 wt% coal/corn stover blends produce reasonable economic results for IGCC operation with minimal dry solids pump modifications – especially if the coal is a low rank coal and the corn stover biomass is pelletized. The increase in electricity cost was found to be 1.1 cents/kWh. Task 6, coal-biomass mixture pilot scale tests, was to determine which coal/biomass blends could be tested in the current dry solids pump without major modifications. As reported in detail in the reports by Sprouse (2010) and Sprouse and Darby (2013), the coal/biomass blend having the least impact on pump configuration and operation is the 90/10 wt% Illinois #6 to corn stover ratio blend. The AGSD program was initiated on October 1, 2004. The interim final report was submitted on October 21, 2010 and covered Task 1, Task 2.1-2.9, and Task 3, performed during budget period 1. This final report covers Task 2.10-2.16, 4, 5, and 6, performed during budget period 2. The interim final report is attached as part of the appendix to this report.

Darby, Alan K.↗

Biomedical and Human Factors Requirements for a Manned Earth Orbiting Station

The primary objective of this study is to determine which biomedical and human factors measurements must be made aboard a space station to assure adequate evaluation of the astronaut's health and performance during prolonged space flights. The study has employed, where possible, a medical and engineering systems analysis to define the pertinent life sciences and space station design parameters and their influence on a measurement program. The major areas requiring evaluation in meeting the study objectives include a definition of the space environment, man's response to the environment, selection of measurement and data management techniques, experimental program, space station design requirements, and a trade-off analysis with final recommendations. The space environment factors that are believed to have a significant effect on man were evaluated. This includes those factors characteristic of the space environment (e. g. weightlessness, radiation) as well as those created within the space station (e. g. toxic contaminants, capsule atmosphere). After establishing the general features of the environment, an appraisal was made of the anticipated response of the astronaut to each of these factors. For thoroughness, the major organ systems and functions of the body were delineated, and a determination was made of their anticipated response to each of the environmental categories. A judgment was then made on the medical significance or importance of each response, which enabled a determination of which physiological and psychological effects should be monitored. Concurrently, an extensive list of measurement techniques and methods of data management was evaluated for applicability to the space station program. The various space station configurations and design parameters were defined in terms of the biomedical and human factors requirements to provide the measurements program. Research design of experimental programs for various station configurations, mission durations, and crew sizes were prepared, and, finally, a trade-off analysis of the critical variables in the station planning was completed with recommendations to enhance the confidence in the measurement program.

EARTH ORBIT↗