Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Concept of Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Connecting Requirements to Architecture and Analysis via Model-Based Systems Engineering

In traditional systems engineering practice, architecture, concept development, and requirements development are related but still separate activities. Concepts for operation, key technical approaches, and related proofs of concept are developed. These inform the formulation of an architecture at multiple levels, starting with the overall system composition and functionality and progressing into more detail. As this formulation is done, a parallel activity develops a set of English statements that constrain solutions. These requirements are often called "shall statements" since they are formulated to use "shall." The separation of requirements from design is exacerbated by well-meaning tools like the Dynamic Object-Oriented Requirements System (DOORS) that remained separated from engineering design tools. With the Europa Clipper project, efforts are being taken to change the requirements development approach from a separate activity to one intimately embedded in formulation effort. This paper presents a modeling approach and related tooling to generate English requirement statements from constraints embedded in architecture definition.

Cole, Bjorn F.↗

Crewed Mars Mission Mode Options for Nuclear Electric/Chemical Hybrid Transportation System

NASA's Human Exploration and Operation Mission Directorate is continuing to study different concepts and options to field human Mars missions as part of NASA's Moon2Mars directive. For crewed missions to Mars, the transportation system sizing is highly dependent on the total mission duration, Mars orbit dwell time, mission concept of operations, and the chosen propulsion system. NASA has been investigating the use of low-thrust electric propulsion systems to augment high-thrust chemical propulsion system for crewed Mars mission to enable a more energy-efficient operations. Recent studies on these missions have focused on ``All-Up'' piloted mission modes in which the in-space transportation system for crew transit departs Earth with everything it needs for the roundtrip journey, with only the Mars landers and surface assets pre-deployed. This design choice was made to minimize the mission operation risk, as the crew could return safely to Earth in the event of a failure to rendezvous or other failure of any pre-deployed assets. As the Mars Architecture Team continues to investigate and understand the Mars mission trade space, alternate mission mode studies were conducted to understand their impact to the transportation system. These include pre-positioning return assets and discarding expended stages to reduce the overall system mass.

Patrick R Chai↗

A concept for Space Shuttle payload ground operations

A Space Transportation System that involves the reusable Space Shuttle offers mankind's next great frontier. The country and the NASA must approach this potential opportunity with an open mind for new ideas and concepts in operations management, business principles, and sensitivity to cost. Our long term future in this new frontier will depend as much on our success in these areas as on our technological successes. This paper attempts to provide, for people with a working understanding of current ground operations, some examples of these evolving concepts.

Mccoy, G.↗

Effects of Communication Modality on Pilot-Controller Coordination during a Simulated m:N Operation

The last decade or so has seen growing interest in new control paradigms and concepts of operation for uncrewed aircraft systems (UAS) in which multiple aircraft are piloted remotely by a single or relatively small number of people. Referred to as “one-to-many” and “many-to- many” (alternatively, “multi-operator, multi-vehicle”)—and frequently expressed as the corresponding ratios, 1:N and m:N—such novel configurations of aircraft and the people who manage them are seen as critical to the path to future operations involving UAS. Examples of industry domains interested in these control paradigms are small package delivery services utilizing small UAS and passenger-carrying, short-range “Urban Air Mobility” (UAM) operations. Stakeholders in such operations have identified communication and coordination of flight activity with air traffic controllers (ATC) as a barrier to operations. In contrast to present-day flight operations, in which a pilot communicates with one ATC on one radio frequency for one aircraft, multi-vehicle operations potentially entail a significant increase in pilot task load for management of comms. New concepts, such as UAS Service Suppliers (USSs) and Providers of Services to UAM (PSUs), have been proposed to address the known bottleneck for Air Traffic Management (ATM) presented by multi-vehicle operations. While progress has been steadily made over years developing USSs and PSUs, it is generally expected that initial UAM operations will rely on traditional voice-over-radio communication with ATC for purposes of ATM. The current study was a human-in-the-loop simulation that had participants, each possessing a Private Pilot License, act as the ground-based pilot-in- command for multiple vehicles in a hypothetical UAM service in the San Francisco Bay Area. The experiment utilized a 2-by-3, within-subjects design in which the pilot’s Vehicle Load (4 vs. 12) and Comm System (Voice, Datalink, and a Hybrid) were manipulated. The task given to pilots was to use the Comm System to coordinate flight activity for all aircraft with appropriate controllers, having to obtain departure and arrival clearances at “vertiport” facilities and transition clearances for any intermediate airspaces along the route. Pilots were additionally responsible for compliance with vectoring instructions issued by ATC. Subjective workload questionnaires (NASA-TLX) were administered following each experimental trial. Screen recordings of the pilot’s Ground Control Station (GCS) and audio recordings of trials were subsequently coded to obtain performance metrics: response times and error rates. Presented in this paper are results related to pilot responses to vectoring instructions issued by ATC. Workload was found to be significantly higher in the 12-Vehicle condition compared to the 4-Vehicle condition, nearly maxing out the NASA-TLX overall workload scale. There was no significant difference made by the Comm System on workload ratings. Pilots’ response times to communications were fastest in the Voice condition, although overall “service time” for compliance was shorter in Datalink and Hybrid conditions in most cases. Errors by pilots were frequent in both Vehicle Load conditions, most perniciously when using the Voice system. The results of this study suggest tradeoffs in advantages and disadvantages of the three comm systems. Recommendations for communication system design are provided taking the tradeoffs into account.

Garrett G Sadler↗

Effects of Communication Modality on Pilot-Controller Coordination during a Simulated m:N Operation

The last decade or so has seen growing interest in new control paradigms and concepts of operation for uncrewed aircraft systems (UAS) in which multiple aircraft are piloted remotely by a single or relatively small number of people. Referred to as “one-to-many” and “many-to- many” (alternatively, “multi-operator, multi-vehicle”)—and frequently expressed as the corresponding ratios, 1:N and m:N—such novel configurations of aircraft and the people who manage them are seen as critical to the path to future operations involving UAS. Examples of industry domains interested in these control paradigms are small package delivery services utilizing small UAS and passenger-carrying, short-range “Urban Air Mobility” (UAM) operations. Stakeholders in such operations have identified communication and coordination of flight activity with air traffic controllers (ATC) as a barrier to operations. In contrast to present-day flight operations, in which a pilot communicates with one ATC on one radio frequency for one aircraft, multi-vehicle operations potentially entail a significant increase in pilot task load for management of comms. New concepts, such as UAS Service Suppliers (USSs) and Providers of Services to UAM (PSUs), have been proposed to address the known bottleneck for Air Traffic Management (ATM) presented by multi-vehicle operations. While progress has been steadily made over years developing USSs and PSUs, it is generally expected that initial UAM operations will rely on traditional voice-over-radio communication with ATC for purposes of ATM. The current study was a human-in-the-loop simulation that had participants, each possessing a Private Pilot License, act as the ground-based pilot-in- command for multiple vehicles in a hypothetical UAM service in the San Francisco Bay Area. The experiment utilized a 2-by-3, within-subjects design in which the pilot’s Vehicle Load (4 vs. 12) and Comm System (Voice, Datalink, and a Hybrid) were manipulated. The task given to pilots was to use the Comm System to coordinate flight activity for all aircraft with appropriate controllers, having to obtain departure and arrival clearances at “vertiport” facilities and transition clearances for any intermediate airspaces along the route. Pilots were additionally responsible for compliance with vectoring instructions issued by ATC. Subjective workload questionnaires (NASA-TLX) were administered following each experimental trial. Screen recordings of the pilot’s Ground Control Station (GCS) and audio recordings of trials were subsequently coded to obtain performance metrics: response times and error rates. Presented in this paper are results related to pilot responses to vectoring instructions issued by ATC. Workload was found to be significantly higher in the 12-Vehicle condition compared to the 4-Vehicle condition, nearly maxing out the NASA-TLX overall workload scale. There was no significant difference made by the Comm System on workload ratings. Pilots’ response times to communications were fastest in the Voice condition, although overall “service time” for compliance was shorter in Datalink and Hybrid conditions in most cases. Errors by pilots were frequent in both Vehicle Load conditions, most perniciously when using the Voice system. The results of this study suggest tradeoffs in advantages and disadvantages of the three comm systems. Recommendations for communication system design are provided taking the tradeoffs into account.

urban air mobility↗

Robotics Plan in Support of DOME Testbed Operations

Various robotic tooling options have been evaluated for the NRIC DOME concept of operations (ConOps). Framatome was contracted to develop a wide-ranging list of commercial off the shelf (COTS) and custom robotic systems to be considered for performing the DOME ConOps functions. Subsequent project tasks from Framatome narrowed down the list and scored the most viable options. The abbreviated list, and associated scoring, has been reviewed and assessed to provide formal recommendations for the robotic ConOps functions of DOME. The overhead telescoping mast & Kraft arm assembly is recommended as the primary system for reactor demobilization and removal. The estimated cost is $\$700$K with a timeline to develop and deliver of about 2.5 years. The mast & Kraft arm would still require an overhead lift system for mobilization and installation. Either the refurbished polar crane or a new gantry crane delivery platform could both serve as the overhead lift and delivery system. The estimated costs for the refurbishment polar crane and new gantry crane systems are, respectively, $\$4.4$M and $\$3$M with about 2.5 years to develop and deliver. A Brokk + Kraft crawler & arm is recommended as a secondary robotic system to support the overhead mast & Kraft arm system. The Brokk + Kraft crawler & arm would cost an estimated $\$726$k and would take about 1.5 years to develop and deliver. The Boston Dynamics SPOT robot is also recommended for the in-service monitoring during experimentation operations. The estimated cost is $\$220$K with a timeline to deliver of 8-14 months. The Elios 3 aerial drone is recommended to perform large area radiation dose rate mapping and visual inspections. The estimated cost is a $\$100$K and will also need about 8-14 months to develop and deliver. A mockup rig is also recommended to be procured an employed to test & verify the robotic capabilities as well as provide needed training for operations personnel. It is estimated that a mockup rig would cost about $\$500$k and would take up to a year to develop and build.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Operating Environmental Health Program

Some concepts of an operational program for medical and environmental health are outlined. Medical services of this program are primarily concerned with emergency care, laboratory examinations, advice to private physician with patient permission, medical monitoring activities, and suggestions for treatment or control of the malfunction.

Lipana, J. G.↗

Visions of the future operational meteorological satellite system

Visionary concepts of the operational environmental satellite system of the 1990's are presented. These exploit planned and anticipated advances in technology. The system comprises 8 Low Earth Orbitors (LEOS) at 500 km height for global coverage at 3 hourly intervals and 3 Geosynchronous Earth Orbitors (GEOS) for Western Hemisphere coverage with stereo capability and near simultaneous viewing of several regional areas. The LEOS emphasize passive and active microwave and Lidar sensing; the GEOS focus on high resolution visible and IR imaging and passive soundings. The GEOS also serve as data relays from the LEOS and as data collection platforms for hazard-related data. An integrated data management system ties the space fleet together and blends the data with that from all other observing systems to process and distribute the data and products to all users.

Atlas, D.↗

Operations engineering: Applying hands-on experience to the development process

The concepts behind operations engineering as applied to the requirements, design, development and testing of data processing systems are presented, together with the associated benefits. The objective of operations engineering is to reduce the overall life cycle costs by integrating operations experience with the development process. To achieve this goal, operations engineering seeks to reduce the development costs by that assuring operational requirements are incorporated into the design and development process as early as possible, and reduce the operational costs by decreasing operations staffing requirements and other related costs through improved system capabilities. The areas for improved system capabilities include: system recovery; data recovery; fault isolation; system operability; system flexibility; system automation; and system reporting. It is described how operations engineering is integrated with the development process, and the difficulties and misconceptions experienced in using operations engineering are discussed.

Alcott, Gary↗

Factors Influencing the Decisions and Actions of Pilots and Air Traffic Controllers in Three Plausible NextGen Environments

In the current air traffic management (ATM) system, pilots and air traffic controllers have well-established roles and responsibilities: pilots fly aircraft and are concerned with energy management, fuel efficiency, and passenger comfort; controllers separate aircraft and are concerned with safety and management of traffic flows. Despite having different goals and obligations, both groups must be able to effectively communicate and interact with each other for the ATM system to work. This interaction will become even more challenging as traffic volume increases dramatically in the near future. To accommodate this increase, by 2025 the national air transportation system in the U.S. will go through a transformation that will modernize the ATM system and make it safer, more effective, and more efficient. This new system, NextGen, will change how pilots and controllers perform their tasks by incorporating advanced technologies and employing new procedures. It will also distribute responsibility between pilots, controllers and automation over such tasks as maintaining aircraft separation. The present chapter describes three plausible concepts of operations that allocate different ATM responsibilities to these groups. We describe how each concept changes the role of each operator and the types of decisions and actions performed by them.

Vu, Kim-Phuong L.↗

Upper E Traffic Management

This is a slide set as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a cooperative, service-based approach that provides services and capabilities in areas (e.g., Upper E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes partner feedback on the following concept elements: Upper E Traffic Management (ETM) planning processes, transit phase of operation, data sharing, time horizons for data sharing, and cooperative integration of military operations. An additional segment of the slides consists of an overview of the UAS Traffic Management (UTM) concept and its relationship to ETM.

Upper E↗

Human Factors for Advanced Reactors

Existing light water reactors in the U.S. are primarily large baseload electricity generating facilities. The concept of operations for these plants remains largely unchanged since the advent of commercial nuclear power—the main control room serves as the hub of plant activities and is staffed with multiple licensed operators who work in tandem under the shift supervisor, and staff such as field workers support the control room remotely. While newer plants have brought the advent of digital human-machine interfaces to replace earlier analog and mechanical instrumentation and controls, much of the control process remains unchanged and manual. It is simply a newer version of legacy concepts. Advanced reactors potentially bring considerable changes to the size, fuel type, automation, and staffing of nuclear power plants, necessitating a fundamental shift not just from analog to digital, but further from human to automation, from onsite to remote, from control to monitoring, and from many to few operators. Despite this multitude of parallel evolutions in reactor designs, many of the vendors developing the next generation of reactors represent smaller research and development enterprises. It is therefore not feasible to address all aspects of plant design at the same time. In particular, the competing design aspects of new reactors present a significant challenge to the development of robust and human factored systems at the plant. As vendors develop new reactor designs, much of the early focus is naturally on the fuel and reactor system technology. Looming behind these early advances is the daunting prospect of first-of-a-kind control concepts that have not yet been developed or validated. A failure to address the human element of reactor design early will lead to missed opportunities. The quickest development process is the replication of existing concepts of operations at legacy plants, even when such systems were long ago surpassed by better human-machine technologies outside the nuclear industry. Conversely, attempting to undertake novel concepts of operations late in the design life cycle of a plant could result in protracted development efforts and delays in licensing and deployment. This does not have to happen, and it is imperative that human factors be considered now, early in the design of new reactors.

99 GENERAL AND MISCELLANEOUS↗

Benefit Opportunities for Integrated Surface and Airspace Departure Scheduling: A Study of Operations at Charlotte-Douglas International Airport

NASA is collaborating with the FAA and aviation industry to develop and demonstrate new capabilities that integrate arrival, departure, and surface air-traffic operations. The concept relies on trajectory-based departure scheduling and collaborative decision making to reduce delays and uncertainties in taxi and climb operations. The paper describes the concept and benefit mechanisms aimed at improving flight efficiency and predictability while maintaining or improving operational throughput. The potential impact of the technology is studied and discussed through a quantitative analysis of relevant shortfalls at the site identified for initial deployment and demonstration in 2017: Charlotte-Douglas International Airport. Results from trajectory analysis indicate substantial opportunity to reduce taxi delays for both departures and arrivals by metering departures at the gate in a manner that maximizes throughput while adhering to takeoff restrictions due mostly to airspace constraints. Substantial taxi-out delay reduction is shown for flights subject to departure restrictions stemming from traffic flow management initiatives. Opportunities to improve the predictability of taxi, takeoff, and climb operations are examined and their potential impact on airline scheduling decisions and air-traffic forecasting is discussed. In addition, the potential to improve throughput with departure scheduling that maximizes use of available runway and airspace capacity is analyzed.

air traffic management↗

Extending the Duration of Crewed Stays on the Lunar Surface

NASA’s Artemis missions aim to return humans to the Moon for the first time since the Apollo Program. Unlike the Apollo missions, Artemis missions will take advantage of pre-emplaced assets on the lunar surface to support crewed exploration, science, and utilization. Although the initial Artemis surface missions are intended to keep crew on the lunar surface for durations ranging from several days to several weeks, crewed stays of longer periods may provide additional support toward NASA’s Moon to Mars Objectives, including long-term exploration and continuous human lunar presence. If mission durations are extended beyond the expected few weeks, the elements and concepts of operation for the lunar architecture will need to be capable of supporting that extension. This paper uses an integrated systems analysis perspective to examine the architectural considerations of extending the duration of human missions on the lunar surface. By identifying these key architectural considerations, this paper offers insight into how elements and operations might meet the demands of potential future mission concepts. This paper does not recommend changes to NASA’s lunar architecture, and it does not evaluate whether any mission concepts affect the relative satisfaction of the Moon to Mars Objectives. However, if crew do remain on the surface for progressively longer periods of time, the functions and capabilities provided by the assets supporting the crew may need to adjust to support the needs of those missions. The functions and capabilities identified as key to enable such extended duration missions include power generation and storage, logistics delivery, radiation mitigation, provision of medical and exercise capability, abort from the lunar surface, maintenance, and the provision of pressurized volume. For example, the medical capabilities available to the crew may become more extensive, and habitable elements may need to change to support longer crewed periods (and shorter quiescent periods). In some cases, these changes may be accomplished through alterations to use cases, operational changes, or the evolution of lunar surface elements, but in other cases, new elements may be preferable. By identifying key considerations for the functions and capabilities of notional lunar surface elements as the length of each crewed mission is extended from several days to continuous human presence on the Moon, this paper assesses how the elements of NASA’s lunar architecture might support the extension of mission durations. In addition, this analysis can help inform future evaluation of whether such extended duration missions improve NASA’s ability to address its Moon to Mars Objectives.

Garrett M. Carman↗

Functional Requirements Document for HALE UAS Operations in the NAS: Step 1. Version 3

The purpose of this Functional Requirements Document (FRD) is to compile the functional requirements needed to achieve the Access 5 Vision of "operating High Altitude, Long Endurance (HALE) Unmanned Aircraft Systems (UAS) routinely, safely, and reliably in the national airspace system (NAS)" for Step 1. These functional requirements could support the development of a minimum set of policies, procedures and standards by the Federal Aviation Administration (FAA) and various standards organizations. It is envisioned that this comprehensive body of work will enable the FAA to establish and approve regulations to govern safe operation of UAS in the NAS on a routine or daily "file and fly" basis. The approach used to derive the functional requirements found within this FRD was to decompose the operational requirements and objectives identified within the Access 5 Concept of Operations (CONOPS) into the functions needed to routinely and safely operate a HALE UAS in the NAS. As a result, four major functional areas evolved to enable routine and safe UAS operations for an on-demand basis in the NAS. These four major functions are: Aviate, Navigate, Communicate, and Avoid Hazards. All of the functional requirements within this document can be directly traceable to one of these four major functions. Some functions, however, are traceable to several, or even all, of these four major functions. These cross-cutting functional requirements support the "Command / Control: function as well as the "Manage Contingencies" function. The requirements associated to these high-level functions and all of their supporting low-level functions are addressed in subsequent sections of this document.

Source record↗

Kennedy Space Center Orion Processing Team Planning for Ground Operations

Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis

Letchworth, Gary↗

High Resolution Visualization Applied to Future Heavy Airlift Concept Development and Evaluation

This paper explores the use of high resolution 3D visualization tools for exploring the feasibility and advantages of future military cargo airlift concepts and evaluating compatibility with existing and future payload requirements. Realistic 3D graphic representations of future airlifters are immersed in rich, supporting environments to demonstrate concepts of operations to key personnel for evaluation, feedback, and development of critical joint support. Accurate concept visualizations are reviewed by commanders, platform developers, loadmasters, soldiers, scientists, engineers, and key principal decision makers at various stages of development. The insight gained through the review of these physically and operationally realistic visualizations is essential to refining design concepts to meet competing requirements in a fiscally conservative defense finance environment. In addition, highly accurate 3D geometric models of existing and evolving large military vehicles are loaded into existing and proposed aircraft cargo bays. In this virtual aircraft test-loading environment, materiel developers, engineers, managers, and soldiers can realistically evaluate the compatibility of current and next-generation airlifters with proposed cargo.

FordCook, A. B.↗

NTP Demonstration Vehicles and Mission Concepts for Generation 1

Nuclear thermal propulsion (NTP) maintains continued interest in support of NASA’s goal to produce a human rated spacecraft for Mars exploration. The NASA/DARPA DRACO effort aims to demonstrate the first nuclear thermal rocket through a flight in 2027. This paper considers the option of a follow-on in-space demonstration supported by a more extensive pre-flight ground test campaign. A concept of operations to accomplish the objectives is outlined and figures of merit for selection of a spacecraft concept are defined. Conceptual designs of various nuclear thermal propulsion demonstration vehicles are presented, spanning a wide trade space. Each concept differently balances performance capability and extensibility to operational missions with schedule, risk, cost of the ground and flight demonstration. Key attributes of notable concepts are provided, with these demonstrating the degree to which each concept can accomplish the objectives considered.