Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONTRACTORS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

High Pressure Low NOx Emissions Research: Recent Progress at NASA Glenn Research Center

In collaboration with U.S. aircraft engine companies, NASA Glenn Research Center has contributed to the advancement of low emissions combustion systems. For the High Speed Research Program (HSR), a 90% reduction in nitrogen oxides (NOx) emissions (relative to the then-current state of the art) has been demonstrated in sector rig testing at General Electric Aircraft Engines (GEAE). For the Advanced Subsonic Technology Program (AST), a 50% reduction in NOx emissions relative to the 1996 International Civil Aviation Organization (ICAO) standards has been at demonstrated in sector rigs at both GEAE and Pratt & Whitney (P&W). During the Ultra Efficient Engine Technology Program (UEET), a 70% reduction in NOx emissions, relative to the 1996 ICAO standards, was achieved in sector rig testing at Glenn in the world class Advanced Subsonic Combustion Rig (ASCR) and at contractor facilities. Low NOx combustor development continues under the Fundamental Aeronautics Program. To achieve these reductions, experimental and analytical research has been conducted to advance the understanding of emissions formation in combustion processes. Lean direct injection (LDI) concept development uses advanced laser-based non-intrusive diagnostics and analytical work to complement the emissions measurements and to provide guidance for concept improvement. This paper describes emissions results from flametube tests of a 9- injection-point LDI fuel/air mixer tested at inlet pressures up to 5500 kPa. Sample results from CFD and laser diagnostics are also discussed.

Chi-Ming, Lee↗

Six Decades of Flight Research: An Annotated Bibliography of Technical Publications of NASA Dryden Flight Research Center, 1946-2006

Titles, authors, report numbers, and abstracts are given for nearly 2900 unclassified and unrestricted technical reports and papers published from September 1946 to December 2006 by the NASA Dryden Flight Research Center and its predecessor organizations. These technical reports and papers describe and give the results of 60 years of flight research performed by the NACA and NASA, from the X-1 and other early X-airplanes, to the X-15, Space Shuttle, X-29 Forward Swept Wing, X-31, and X-43 aircraft. Some of the other research airplanes tested were the D-558, phase 1 and 2; M-2, HL-10 and X-24 lifting bodies; Digital Fly-By-Wire and Supercritical Wing F-8; XB-70; YF-12; AFTI F-111 TACT and MAW; F-15 HiDEC; F-18 High Alpha Research Vehicle, F-18 Systems Research Aircraft and the NASA Landing Systems Research aircraft. The citations of reports and papers are listed in chronological order, with author and aircraft indices. In addition, in the appendices, citations of 270 contractor reports, more than 200 UCLA Flight System Research Center reports, nearly 200 Tech Briefs, 30 Dryden Historical Publications, and over 30 videotapes are included.

Fisher, David F.↗

Final Results for the GRC Supporting Technology Development Project for the 110-Watt Stirling Radioisotope Generator (SRG110)

From 1999 to 2006, the NASA Glenn Research Center (GRC) supported the development of a high-efficiency, nominal 110-We Stirling Radioisotope Generator (SRG110) for potential use on NASA missions, including deep space missions, Mars rovers, and lunar applications. Lockheed Martin (LM) was the system integrator for the SRG110, under contract to the Department of Energy (DOE). Infinia Corporation (formerly Stirling Technology Company) developed the Stirling convertor, first as a contractor to DOE and then under subcontract to LM. The SRG110 development has been redirected, and recent program changes have been made to significantly increase the specific power of the generator. System development of an Advanced Stirling Radioisotope Generator (ASRG) has now begun, using a lightweight, advanced convertor from Sunpower, Inc. This paper summarizes the results of the supporting technology effort that GRC completed for the SRG110. GRC tasks included convertor extended-duration testing in air and thermal vacuum environments, heater head life assessment, materials studies, permanent magnet aging characterization, linear alternator evaluations, structural dynamics testing, electromagnetic interference (EMI) and electromagnetic compatibility (EMC) characterization, organic materials evaluations, reliability studies, and development of an end-to-end system dynamic model. Related efforts are now continuing in many of these areas to support ASRG development.

Schreiber, Jeffrey G.↗

Orion GN and C Overview and Architecture

The Crew Exploration Vehicle, named Orion, is a critical element in the Constellation Program to develop the transportation system needed to send humans back to the moon and then beyond. Lockheed Martin is the prime contractor for the Orion spacecraft, which is managed by the Johnson Space Center. The Orion GN&C sub-system is being jointly developed by NASA and Lockheed Martin through a mode team approach. The GN&C is a critical element of the Orion mission to carry astronauts to low earth orbit to service the International Space Station and then on later flights to transfer and return a crew of four to the moon. The Orion GN&C system must perform monitoring and abort functions during ascent, rendezvous and docking in both low earth and lunar orbits, perform uncrewed lunar loiter operations, perform trans earth injection and atmospheric entry and landing. The Orion also must be integrated with the Ares I Crew Launch Vehicle, the Earth Departure Stage of the Ares V and the Lunar Surface Access Module. This paper provides an overview of the Orion GN&C system. The functional capabilities of the Orion GN&C will be provided in the context of Constellation architecture, the key GN&C requirements will be summarized, the GN&C architecture will be presented, the development schedule and plans will summarized and finally conclusions will be presented.

Hu, Howard↗

Autonomous Airborne Refueling Demonstration: Phase I Flight-Test Results

The first phase of the Autonomous Airborne Refueling Demonstration (AARD) project was completed on August 30, 2006. The goal of this 15-month effort was to develop and flight-test a system to demonstrate an autonomous refueling engagement using the Navy style hose-and-drogue air-to-air refueling method. The prime contractor for this Defense Advanced Research Projects Agency (DARPA) sponsored program was Sierra Nevada Corporation (SNC), Sparks, Nevada. The responsible flight-test organization was the National Aeronautics and Space Administration (NASA) Dryden Flight Research Center (DFRC), Edwards, California, which also provided the F/A-18 receiver airplane (McDonnell Douglas, now The Boeing Company, Chicago, Illinois). The B-707-300 tanker airplane (The Boeing Company) was contracted through Omega Aerial Refueling Services, Inc., Alexandria, Virginia, and the optical tracking system was contracted through OCTEC Ltd., Bracknell, Berkshire, United Kingdom. Nine research flights were flown, testing the functionality and performance of the system in a stepwise manner, culminating in the plug attempts on the final flight. Relative position keeping was found to be very stable and accurate. The receiver aircraft was capable of following the tanker aircraft through turns while maintaining its relative position. During the last flight, six capture attempts were made, two of which were successful. The four misses demonstrated excellent characteristics, the receiver retreating from the drogue in a controlled, safe, and predictable manner that precluded contact between the drogue and the receiver aircraft. The position of the receiver aircraft when engaged and in position for refueling was found to be 5.5 to 8.5 ft low of the ideal position. The controller inputs to the F/A-18 were found to be extremely small.

Dibley, Ryan P.↗

Six Decades of Flight Research: Dryden Flight Research Center, 1946 - 2006 [DVD]

This DVD contains an introduction by Center Director Kevin Peterson, two videos on the history of NASA Dryden Flight Research Center and a bibliography of NASA Dryden Flight Research Center publications from 1946 through 2006. The NASA Dryden 60th Anniversary Summary Documentary video is narrated by Michael Dorn and give a brief history of Dryden. The Six Decades of Flight Research at NASA Dryden lasts approximately 75 minutes and is broken up in six decades: 1. The Early X-Plane Era; 2. The X-15 Era; 3. The Lifting Body Era; 4. The Space Shuttle Era; 5. The High Alpha and Thrust Vectoring Era; and 6. The technology Demonstration Era. The bibliography provides citations for NASA Technical Reports and Conference Papers, Tech Briefs, Contractor Reports, UCLA Flight Systems Research Center publications and Dryden videos. Finally, a link is provided to the NASA Dryden Gallery that features video clips and photos of the many unique aircraft flown at NASA Dryden and its predecessor organizations.

Fisher, David F.↗

Crew Exploration Vehicle Launch Abort Controller Performance Analysis

This paper covers the simulation and evaluation of a controller design for the Crew Module (CM) Launch Abort System (LAS), to measure its ability to meet the abort performance requirements. The controller used in this study is a hybrid design, including features developed by the Government and the Contractor. Testing is done using two separate 6-degree-of-freedom (DOF) computer simulation implementations of the LAS/CM throughout the ascent trajectory: 1) executing a series of abort simulations along a nominal trajectory for the nominal LAS/CM system; and 2) using a series of Monte Carlo runs with perturbed initial flight conditions and perturbed system parameters. The performance of the controller is evaluated against a set of criteria, which is based upon the current functional requirements of the LAS. Preliminary analysis indicates that the performance of the present controller meets (with the exception of a few cases) the evaluation criteria mentioned above.

Sparks, Dean W., Jr.↗

Automated Rendezvous and Docking Sensor Testing at the Flight Robotics Laboratory

The Exploration Systems Architecture defines missions that require rendezvous, proximity operations, and docking (RPOD) of two spacecraft both in Low Earth Orbit (LEO) and in Low Lunar Orbit (LLO). Uncrewed spacecraft must perform automated and/or autonomous rendezvous, proximity operations and docking operations (commonly known as Automated Rendezvous and Docking, (AR&D).) The crewed versions of the spacecraft may also perform AR&D, possibly with a different level of automation and/or autonomy, and must also provide the crew with relative navigation information for manual piloting. The capabilities of the RPOD sensors are critical to the success of the Exploration Program. NASA has the responsibility to determine whether the Crew Exploration Vehicle (CEV) contractor-proposed relative navigation sensor suite will meet the CEV requirements. The relatively low technology readiness of relative navigation sensors for AR&D has been carried as one of the CEV Projects top risks. The AR&D Sensor Technology Project seeks to reduce this risk by increasing technology maturation of selected relative navigation sensor technologies through testing and simulation, and to allow the CEV Project to assess the relative navigation sensors.

Howard, Richard T.↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems and preparing to retire the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo-Saturn and Space Shuttle programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as legacy knowledge gained from nearly 50 years' experience developing space hardware. Early next decade, the Ares I will launch the new Orion Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both Ares I and Ares V are being designed to support longer future trips to Mars. The Exploration Launch Projects Office is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also discusses riskbased, management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it summarizes several notable accomplishments since October 2005, when the Exploration Launch Projects effort officially kicked off, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

A Second Generation Multi-Angle Imaging SpectroRadiometer (MISR-2)

The Multi-angle Imaging SpectroRadiometer (MISR) has been in Earth orbit since December 1999 on NASA's Terra spacecraft. This instrument provides new ways of looking at the Earth's atmosphere, clouds, and surface for the purpose of understanding the Earth's ecology, environment, and climate. To facilitate the potential future continuation of MISR's multi-angle observations, a study was undertaken in 1999 and 2000 under the Instrument Incubator Program (IIP) of NASA Code Y's Earth Science Technology Office (ESTO) to investigate and demonstrate the feasibility of a successor to MISR that will have greatly reduced size and mass. The kernel of the program was the design, construction, and testing of a highly miniaturized camera, one of the nine that would probably be used on a future space borne MISR-like instrument. This demonstrated that the size and mass reduction of the optical system and camera electronics are possible and that filters can be assembled to meet the miniaturized packaging requirements. An innovative, reflective optics design was used, enabling the wavelength range to be extended into the shortwave infrared. This was the smallest all-reflective camera ever produced by the contractor. A study was undertaken to determine the feasibility of implementing nine (multi-angle) cameras within a single structure. This resulted in several possible configurations. It would also be possible to incorporate one of the cameras into an airborne instrument.

spectroradiometers↗

The Road to Mach 10: A History of the X-43A Hypersonic Flight Test Program at NASA Dryden -- Origins to First Flight

The NASA Dryden Flight Research Center, in partnership with the NASA Langley Research Center and industrial contractors, conducted the first flight tests of a supersonic combustion ramjet (scramjet) in 2004. This was a revolutionary airbreathing engine able to operate at speeds above Mach 5, which carries potential for both high-speed atmospheric flight and as a space launcher. For the Dryden engineers, the X-43 program was the culmination of a nearly 60-year history of flight research, going back to the early days of supersonic flight, and to rocket planes such as the X-1, D-558-II Skyrocket, and the X-15. For the propulsion community, it marked a turning point in a quest that had taken nearly as long. The scramjet engine did not arise from the work of a single individual or from a single technological breakthrough. It evolved instead from work under way on ramjets in the early 1950s, and from research programs at the National Advisory Committee for Aeronautics (NACA) Lewis Research Center, at the U.S. Army Aberdeen Proving Ground, and by the U.S. Navy. Studies developed in the course of these disparate projects raised the possibility of supersonic combustion. Many researchers had considered the notion impractical due to the difficulty of stabilizing a flame front in a supersonic airflow. NACA researchers at Lewis attempted to test the idea's feasibility by burning aluminum borohydride in a supersonic wind tunnel. Sustained burning was believed to have been observed at Mach 1.5, Mach 2, and Mach 3 for as long as two seconds.

Peebles, Curtis↗

The Road to Mach 10: A History of the X-43A Hypersonic Flight Test Program at NASA Dryden...Toward the Future

In terms of technology, the X-43A/Hyper-X represented a singular milestone. After nearly a half century of high hopes, studies, wind tunnel tests, proposals, and canceled projects, a scramjet-powered vehicle had flown. The performance of the engine qualified the scramjet design tools and scaling laws. In turn, the theoretical calculations and ground testing could be used to design more advanced engine concepts. Just as important, both the scramjet and vehicle systems had successfully operated in the variable temperatures and densities of the atmosphere. The X-43A systems were able to maintain the exact flight conditions necessary for the scramjet to operate properly. Control deflections to correct the engine-induced moments were close to pre-flight predictions. When the unexpected occurred, such as when the vehicle pitched up during the cowl opening on the second flight, the control system was sufficiently designed to correct the situation. The airframe and wing structure, the thermal protection material, and the internal conditions of the X-43A performed largely as predicted. The HXLV thermal anomaly during the ascent on the third flight and "the Mach 8 unpleasantness" during the descent indicated that the HXLV and X-43A were not as resilient to aerodynamic heating as expected. The X-43A 's airframe drag and lift both were slightly higher than predicted, but still within preflight uncertainty predictions. The stability and control were as predicted, as was the boundary layer transition. The biggest aerodynamic worry before the flight was the separation of the HXLV and the X- 43A. After all was said and done, this went exactly as predicted, proving that non-symmetrical/high-dynamic pressure stage separations could be performed. This in turn meant that two-stage-to-orbit vehicles employing this technology were feasible. The Hyper-X program also served as a training ground for a new generation of scramjet and hypersonic researchers. This included both NASA and contractor personnel, providing them with experience in ground testing and component development; vehicle design, construction, integration, system checkout, and, ultimately, flight testing and data analysis. Additionally, researchers learned the practical details of running a project within finite budget and time limits, about the ambiguousness of risk assessment, and about the need to spend a significant amount of time and effort dealing with engineering problems, such as those with the FAS, that have nothing to do with the project's research goals. Finally, all those who worked on the X-43A project now know what it is like to spend years transforming an idea into a functional vehicle, only for it to be lost in a matter of seconds. And then to go through years of work to correct the problems, to face the possibility that still more might exist, and finally to savor the triumph of two successful flights. For those who will work on the hypersonic projects that emerge in coming years, these experiences may prove to be the most valuable of all.

Peebles, Curtis↗

Orion Orbit Control Design and Analysis

The analysis of candidate thruster configurations for the Crew Exploration Vehicle (CEV) is presented. Six candidate configurations were considered for the prime contractor baseline design. The analysis included analytical assessments of control authority, control precision, efficiency and robustness, as well as simulation assessments of control performance. The principles used in the analytic assessments of controllability, robustness and fuel performance are covered and results provided for the configurations assessed. Simulation analysis was conducted using a pulse width modulated, 6 DOF reaction system control law with a simplex-based thruster selection algorithm. Control laws were automatically derived from hardware configuration parameters including thruster locations, directions, magnitude and specific impulse, as well as vehicle mass properties. This parameterized controller allowed rapid assessment of multiple candidate layouts. Simulation results are presented for final phase rendezvous and docking, as well as low lunar orbit attitude hold. Finally, on-going analysis to consider alternate Service Module designs and to assess the pilot-ability of the baseline design are discussed to provide a status of orbit control design work to date.

Jackson, Mark↗

FY 2005 Scientific and Technical Reports, Articles, Papers, and Presentations

This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel in FY 2005. It also includes papers of MSFC contractors. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.

Narmore, K. A.↗

General Mission Analysis Tool (GMAT) Acceptance Test Plan [Draft]

The information presented in this Acceptance Test Plan document shows the current status of the General Mission Analysis Tool (GMAT). GMAT is a software system developed by NASA Goddard Space Flight Center (GSFC) in collaboration with the private sector. The GMAT development team continuously performs acceptance tests in order to verify that the software continues to operate properly after updates are made. The GMAT Development team consists of NASA/GSFC Code 583 software developers, NASA/GSFC Code 595 analysts, and contractors of varying professions. GMAT was developed to provide a development approach that maintains involvement from the private sector and academia, encourages collaborative funding from multiple government agencies and the private sector, and promotes the transfer of technology from government funded research to the private sector. GMAT contains many capabilities, such as integrated formation flying modeling and MATLAB compatibility. The propagation capabilities in GMAT allow for fully coupled dynamics modeling of multiple spacecraft, in any flight regime. Other capabilities in GMAT inclucle: user definable coordinate systems, 3-D graphics in any coordinate system GMAT can calculate, 2-D plots, branch commands, solvers, optimizers, GMAT functions, planetary ephemeris sources including DE405, DE200, SLP and analytic models, script events, impulsive and finite maneuver models, and many more. GMAT runs on Windows, Mac, and Linux platforms. Both the Graphical User Interface (GUI) and the GMAT engine were built and tested on all of the mentioned platforms. GMAT was designed for intuitive use from both the GUI and with an importable script language similar to that of MATLAB.

Dove, Edwin↗

Developing Capture Mechanisms and High-Fidelity Dynamic Models for the MXER Tether System

A team consisting of collaborators from Tennessee Technological University (TTU), Marshall Space Flight Center, BD Systems, and the University of Delaware (herein called the TTU team) conducted specific research and development activities in MXER tether systems during the base period of May 15, 2004 through September 30, 2006 under contract number NNM04AB13C. The team addressed two primary topics related to the MXER tether system: 1) Development of validated high-fidelity dynamic models of an elastic rotating tether and 2) development of feasible mechanisms to enable reliable rendezvous and capture. This contractor report will describe in detail the activities that were performed during the base period of this cycle-2 MXER tether activity and will summarize the results of this funded activity. The primary deliverables of this project were the quad trap, a robust capture mechanism proposed, developed, tested, and demonstrated with a high degree of feasibility and the detailed development of a validated high-fidelity elastic tether dynamic model provided through multiple formulations.

Canfield, Steven L.↗

Autonomous Airborne Refueling Demonstration, Phase I Flight-Test Results

The first phase of the Autonomous Airborne Refueling Demonstration (AARD) project was completed on August 30, 2006. The goal of this 15-month effort was to develop and flight-test a system to demonstrate an autonomous refueling engagement using the Navy style hose-and-drogue air-to-air refueling method. The prime contractor for this Defense Advanced Research Projects Agency (DARPA) sponsored program was Sierra Nevada Corporation (SNC), Sparks, Nevada. The responsible flight-test organization was the NASA Dryden Flight Research Center (DFRC), Edwards, California, which also provided the F/A-18 receiver airplane (McDonnell Douglas, now The Boeing Company, Chicago, Illinois). The B-707-300 tanker airplane (The Boeing Company) was contracted through Omega Aerial Refueling Services, Inc., Alexandria, Virginia, and the optical tracking system was contracted through OCTEC Ltd., Bracknell, Berkshire, United Kingdom. Nine research flights were flown, testing the functionality and performance of the system in a stepwise manner, culminating in the plug attempts on the final flight. Relative position keeping was found to be very stable and accurate. The receiver aircraft was capable of following the tanker aircraft through turns while maintaining its relative position. During the last flight, six capture attempts were made, two of which were successful. The four misses demonstrated excellent characteristics, the receiver retreating from the drogue in a controlled, safe, and predictable manner that precluded contact between the drogue and the receiver aircraft. The position of the receiver aircraft when engaged and in position for refueling was found to be 5.5 to 8.5 ft low of the ideal position. The controller inputs to the F/A-18 were found to be extremely small

Dibley, Ryan P.↗

2006 NASA Seal/Secondary Air System Workshop; Volume 1

The 2006 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (ii) Overview of NASA s new fundamental aeronautics technology project; (iii) Overview of NASA Glenn Research Center s seal project aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing seal leakages as well as high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Several organizations presented development efforts aimed at developing faster clearance control systems and associated technology to meet future engine needs. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle. Seal technical challenges (including space environments, temperature variation, and seal-on-seal operation) as well as plans to develop the necessary "androgynous" seal technologies were reviewed. Researchers also reviewed seal technologies employed by the Apollo command module that serve as an excellent basis for seals for NASA s new Crew Exploration Vehicle (CEV).

Steinetz, Bruce, M.↗