Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONNECTORS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Characterization of Low-Temperature, Co-Fired Ceramic-Manufactured Electrostatic Thruster-Closeout Report

The goal of the project was to evaluate prototypes of an experimental thruster developed by the University of Arkansas (UA), Fayetteville, AR. The design under evaluation is a radio frequency (RF) electrostatic thruster that was fabricated using the low-temperature, co-fired ceramic (LTCC) materials and fabrication process. This materials system is analogous to printed circuit board (PCB) technology with the most significant difference being that the laminate is replaced by a ceramic material and the copper layer is replaced by printed sinterable silver paste. LTCC designs are baked after fabrication and assembled to realize an entirely monolithic structure with internal conductors, vias, and cavities. In this process, the LTCC electrostatic thruster (LTCC-ET) that is the subject of the present work becomes a monolithic ceramic thruster capable of withstanding temperatures in excess of 500 ºC. The UA and NASA Marshall Space Flight Center (MSFC) jointly performed prototype testing on the LTCC-ET under a NASA Cooperative Agreement Notice (CAN) award. The LTCC-ET was tested at MSFC in May 2018 over a 1-week period. There were two goals for the test program: (1) Testing to determine the operating parameters required to create plasma ignition in the test articles. This was explored by setting a propellant flowrate and increasing RF power until plasma ignition was observed. Testing was conducted with both argon and krypton. (2) Investigate the thrust and specific impulse (Isp) performance of the thruster as a function of propellant flowrate and grid voltage. This goal was not met during the project as technical challenges in maintaining stable plasma ignition arose due to stress and heating of the RF power feed. In summary, a prototype thruster design (consisting of three packaged units) was fabricated by UA and tested for the first time under vacuum conditions at MSFC to experimentally determine basic performance metrics and functionality. It was found that the design was not sufficiently optimized or robust enough in its initial iteration to support a significant test campaign or characterization program. It was concluded that the propellant outlet channels must be reduced in size with the flowpaths adjusted to increase propellant residence time in the thruster, and that the RF connector must be replaced with a version capable of handling higher power throughput and heating. However, even in its unoptimized form, a plasma could be produced in the LTCCET, demonstrating the efficacy of the design approach. The design is especially compelling due to its low cost to manufacture and, more importantly, its scalability of size and power throughput. Low cost and scalability are also important in that additional functionalities, such as thrust vectoring and plume charge neutralization, can be integrated into future designs with minimal additional cost. This project has matured the LTCC-ET development Technology Readiness Level (TRL) from 1 to 2. The low-cost RF plasma source portion of the LTCC device was matured from TRL 2 to 4 through the demonstration of RF plasma ignition under vacuum conditions.

Huang, P.-H. A.↗

Design, Prototyping, and Testing of a Novel Flowpath with an Array of Six 3D Matrix Vitvo Bioreactors for the NASA Bioculture System

The NASA Bioculture System is an advanced cell culture closed-loop system containing highly automated flowpaths designed to conduct long term biology experiments on ISS with earth remote controllable medium flow, temperature, gas composition, medium exchange, cell sampling and fixation. This technology was already demonstrated with successful cardiomyocyte and osteocyte cultures experiments onboard the ISS and is now supporting NASA PI science. The Bioculture System, however, can only support 10 cassettes with disposable flowpaths, each containing a single hollow fiber bioreactor with a culture capacity of about 2ml. This constraint not only severely limits the number of investigators that can conduct experiments in space, but also subjects the experiments to limitations in the number of replicates and conditions that can be studied. To address these limitations, we sought a novel design solution to maximize the number of separate bioreactor cultures and volume that can be conducted simultaneously. To this end we designed, prototyped, and are now testing a six-Vitvo 3D Matrix 2ml bioreactor insert that replaces the conventional Bioculture System hollow fiber bioreactor. This design will allow the Bioculture System to support up to 60 different bioreactors and samples at once. Specifically, the novel gas-tight containment housing insert contains six COTS Rigenerand VITVO bioreactors stacked on each side of a heat sink powered by the existing heating element and pair of temperature sensors. Medium will be distributed into each bioreactor's cell-free chamber via its built-in Luer connector, then across the 3D matrix to the cell chamber, dissipating laminar flow and limiting fluid shear stresses that might mechanostimulate cell cultures. Gas (5% CO2 in air) will be supplied directly to the bioreactor gas-tight housing for exchange via the bioreactor flat-surface gas-permeable membranes, eliminating the need for the existing Bioculture System cassette oxygenator. If successfully implemented on ISS, this new multi-bioreactor insert for the Bioculture System has the potential to make real-time cell science experimentation in space more efficient and accessible to more investigators.

Ma, Kristin R.↗

Simulating Fleet Noise for Notional UAM Vehicles and Operations in New York

This paper presents the results of systems-level simulations using Metrosim that were conducted for notional Urban Air Mobility (UAM)-style vehicles analyzed for two different scenarios for New York (NY). UAM is an aviation industry term for passenger or cargo-carrying air transportation services, which are often automated, operating in an urban/city environment. UAM-style vehicles are expected to use vertical takeoff and landing with fixed wing cruise flight. Metrosim is a metroplex-wide route and airport planning tool that can also be used in standalone mode as a simulation tool. The scenarios described and reported in this paper were used to evaluate a fleet noise prediction capability for this tool. The work was a collaborative effort between the National Aeronautics and Space Administration (NASA), Intelligent Automation, Inc (IAI), and the Port Authority of New York and New Jersey (PANYNJ). One scenario was designed to represent an expanded air-taxi operation from existing helipads around Manhattan to the major New York airports. The other case represented a farther term vision case with commuters using personal air vehicles to hub locations just outside New York, with an air-taxi service running frequent connector trips to a few key locations inside Manhattan. For both scenarios, the trajectories created for the entire fleet were passed to the Aircraft Environmental Design Tool (AEDT) to generate Day-Night Level (DNL) noise contours for inspection. Without data for actual UAM vehicles available, surrogate AEDT empirical Noise-Power-Distance (NPD) tables used a similar sized current day helicopter as the Baseline, and a version of that same data linearly scaled as a first guess at possible UAM noise data. Details are provided for each of the two scenario configurations, and the output noise contours are presented for the Baseline and reduced noise DNL cases.

Glaab, Patricia↗

Tessellation and Numerical Simulation of the in-Space Assembled Telescope (iSAT) Reflector

A novel tessellation method has been developed to allow the use of uniform truss modules to form curved or doubly curved surfaces. To illustrate the method, the structural support for the doubly curved in-Space Assembled Telescope primary reflector is developed. The method intentionally leaves gaps at the nodes between identical connecting modules; the gaps are relatively small, on the order of 0.5% of the lattice characteristic cell size. Uniquely shaped nodal connectors called multi-nuts are generated to fill in the nodal gaps and connect adjacent modules. With optimization techniques, the size of these nodal gaps can be minimized to thereby minimize the incurred structural efficiency losses. Finite element analyses of the primary reflector were performed, and the structural efficiency losses amounted to a natural frequency reduction of 5%. The benefits of having uniform truss modules outweigh the structural penalties as it will greatly simplify assembly and lower manufacturing costs.

Tessellation↗

Micro-grid for Future Planetary Surface Needs

Under the current Artemis Program, the National Aeronautics and Space Administration (NASA) will send its next set of astronauts (first woman and next man) to the Moon by 2024 and establish a sustainable presence on the lunar surface by 2028. The challenge of creating a sustained lunar surface presence is significantly different than previous efforts. Lunar surface operations will require access to continuous and highly reliable power to support mission needs, such as to support ISRU operations. Adding to this challenge, the lunar surface operations are not going to be established over a single effort, rather the system and operations will evolve and grow over time (years). The first initial loads that arrive on the lunar surface will be integrated to their own dedicated power sources. As the lunar surface operations grow, so will the demand for power and at some point these individual loads will require more power than can be generated with any single power device. This power demand drives the need for inter-connecting the loads and power devices to share power between them, resulting in a micro-grid. One of the advantages of developing a lunar surface micro-grid is that allows lunar surface operations to resemble electrical utility operations on Earth; it allows power to be generated where it is convenient and allows power to be consumed where it is convenient, rather than negotiating between generation and consumption. The micro-grid concept also provides another benefit of affording the ability to increase overall system reliability by integrating dissimilar power generation and energy storage devices together, for example modifying the power generation strategy to include both solar arrays and nuclear. Creating a lunar surface micro-grid has its advantages, however there are significant challenges associated with an evolvable micro-grid concept. The challenges include how to efficiently transmit large amounts of power (10kW+) long distances (1kW+), how to effectively integrate dissimilar power generation and energy storage devices to maximize power consumption and minimize downtime, and how to physically connect these devices together with a connector that can survive the lunar environment (dust, extreme cold temperatures) and is capable of both astronaut and robotic operation. The basic components of the micro-grid have to be designed to ensure the system is sustainable, modular, and reconfigurable. An interface to the micro-grid has to be designed that allows for additional technologies, some of which may not yet be fully designed, to easily integrate into the micro-grid concept. This presentation discusses these lunar challenges in some more depth and offers a path forward in designing an evolvable micro-grid to meet the needs of the lunar surface operations and proposes a Universal Micro-grid Interface Converter to connect these dissimilar power sources and mission loads to the micro-grid.

Jeffrey Csank↗

Tessellation and Numerical Simulation of the in-Space Assembled Telescope (iSAT) Reflector

A novel tessellation method has been developed to allow the use of uniform truss modules to form curved or doubly curved surfaces. To illustrate the method, the structural support for the doubly curved in-Space Assembled Telescope primary reflector is developed. The method intentionally leaves gaps at the nodes between identical connecting modules; the gaps are relatively small, on the order of 0.5% of the lattice characteristic cell size. Uniquely shaped nodal connectors called multi-nuts are generated to fill in the nodal gaps and connect adjacent modules. With optimization techniques, the size of these nodal gaps can be minimized to thereby minimize the incurred structural efficiency losses. Finite element analyses of the primary reflector were performed, and the structural efficiency losses amounted to a natural frequency reduction of 5%. The benefits of having uniform truss modules outweigh the structural penalties as it will greatly simplify assembly and lower manufacturing costs.

Tessellation↗

Alternative Setup for Long-Duration Low-Duty-Cycle 600°C Ambient Testing of SiC Integrated Circuits

A scalable, compact oven testbed system for simultaneously evaluating a multitude of high temperature integrated circuits (ICs) for prolonged operating times of up to 600 °C has been prototyped. The new testbed system enables long-duration high temperature testing in sufficient statistical quantities consistent with standard aerospace electronics engineering standards. This setup is comprised of multiple compact ovens housing chips or packages mounted to ceramic circuit boards. Each oven is a compact 15.2 cm length by 15.2 cm width by 12.7 cm depth with a maximum 400 Watts of heating power. The custom-made silicon oxide ceramic heating block inside each oven is based on a 3D printed design adapted for the easy insertion of the IC device under test (DUT). This innovative design provides the quick insertion of ICs with or without a ceramic package into a 600 °C environment by utilizing a movable 11.43 cm long ceramic substrate with electrical traces extending from the oven hot zone to external standard plastic-based board connectors. Another key oven design feature is the minimization of the DUT exposure to electromagnetic interference (EMI) by utilizing a filtered DC power source to reduce heating element noise. Additionally, the ovens can be configured in a parallel arrangement allowing global data monitoring over a single industrial RS422 serial port. This feature is important for scaling up to test multiple ICs semi-simultaneously. A USB serial port is provided to independently control the operating parameters of each oven such as the oven target temperature and oven ramp rate. The oven temperature can reach up to 600 °C with a confirmed +/- 4 °C maximum deviation across the test zone region. The ramp rate can be programmed from 1 °C/minute up to 10 °C/minute. Furthermore, a programmable switchboard is used to interface with the DUT. This switchboard comprises a National Instruments Peripheral Component Interconnect eXtension for Instrumentation (NI PXI) system and a breakout board to send and receive power, analog or digital test signals. By using this unique oven testbed system, a variety of ICs can now be tested in parallel using the same test components configured for a diverse set of requirements.

DC Powered Oven↗

Lessons for Future In-Space Telerobotic Servicing from Robotic Refueling Mission

The Robotic Refueling Mission (RRM) was a multi-phased technology development effort by the National Aeronautics & Space Administration (NASA) and the Canadian Space Agency (CSA). The program leveraged the existing robotic systems and expertise of the International Space Station (ISS) program and the tool design and satellite servicing expertise of NASA’s Exploration & In-space Services (NExIS) Projects Division at Goddard Space Flight Center (GSFC) to evaluate new hardware and techniques for on-orbit telerobotic servicing. Between 2011 and 2021, two external ISS payloads housed over a dozen robotic tools and adapters designed to service a variety of existing and novel satellite interfaces. Robot operators at NASA’s Johnson Space Center (JSC) and CSA used the Special Purpose Dexterous Manipulator (SPDM) to retrieve and operate these tools for tasks such as cutting wires or multi-layer insulation blanketing, removing valve caps, mating electrical connectors, transferring fluids, and performing visual inspections inside a vehicle. Each phase of RRM involved years of preparation. Tool and interface designs were prototyped and evaluated using both NASA and Canadian ground robotic systems. Procedures were developed by GSFC engineers and vetted in partnership with JSC and CSA robot operators. GSFC engineers were trained to provide real-time support during on-orbit operations. These preparatory efforts and the successful on-orbit evaluations yielded an array of lessons for future in-space telerobotic missions. Designing robotic tools for the space environment requires special consideration of materials, indicators, and differences between ground and flight use cases and environments. When there is a limited window for on-orbit operations, devoting time and high-fidelity hardware to ground testing can be critical. Needs during potential troubleshooting are more essential to camera view quality, frame rate, and position requirements more than nominal operations. Detailed hardware manuals, nominal and contingency procedures, along with clearly defined operations team roles and protocols are vital for efficiency. RRM also demonstrated how the ISS can be utilized to increase the technology readiness levels required for future missions and led to additional technology partnerships between NExIS and the ISS program. The lessons from RRM are currently being applied to designs, operations concepts, and ground test methodology for missions such as On-orbit Servicing, Assembly, and Manufacturing1(OSAM-1)and Mars Sample Return.

Zakiya Tomlinson↗

How to Educate Decision Makers on the Value and Necessity of Modal Testing and Model Correlation: Tips for Young Engineers

Engineers need to effectively communicate the justification and value of their modal testing and model correlation in terminology familiar to decision makers as it relates to the program’s risk tolerance. This communication must relate to the program’s risk tolerance and the metrics used to judge the performance of both the program and individual decision makers. The challenge is the terminologies familiar to engineers and decision makers are quite different and seemingly unrelated. The engineering profession has developed a specific terminology to solve highly technical issues, which are many times themselves unique to very specific engineering problems. It is all too easy for engineers to believe that everyone in their organization, including the decision makers, has an intrinsic understanding of what they do and the value it brings to the program’s success. This is especially true for young engineers who have recently spent the last four plus years in an academic engineering learning environment, which has a highly technical research oriented atmosphere. Effective communication with decision makers is increasingly important as the technical breadth and practical program and project experience level for up and coming decision makers diminishes. It is not unusual for the decision makers to have technical knowledge in a domain different from structural dynamics (e.g., electronics or systems). Competition among satellite manufactures has increased the focus on programmatic cost and ability to deliver on schedule. NASA programs are also seeing more restrictive programmatic cost and schedule constraints, which impact both analysis and testing. It should also be noted that a comprehensive suite of tests are required to verify a satellite’s design capability with some margin. These tests include static strength verification tests, shock, acoustic, and vibration tests (sine and random) of systems, subsystems, and components. Each of these verification tests provide opportunities for model correlation and risk reduction. It is important to recognize dynamic loads/modal test models may not include all of the flight hardware (i.e., harness, coax, waveguides, connectors, etc.) and the previously mentioned tests are still required for qualification/verification of the design. This paper provides tips to young engineers on how to bridge this communications gap, have a better understanding of the environment in which decision makers operate, and assist them to better support successful missions. While this paper primarily focuses on modal testing and model correlation as related to spacecraft missions, the concepts and recommendations presented here are equally applicable to other fields such as aeronautics, automotive, power generation, etc.

Decision Maker↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool the majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit for the ammonia leak was the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Thermal Control↗

How to Educate Decision Makers on the Value and Necessity of Modal Testing and Model Correlation: Tips for Young Engineers

Engineers need to effectively communicate the justification and value of their modal testing and model correlation in terminology familiar to decision makers as it relates to the program’s risk tolerance. This communication must relate to the program’s risk tolerance and the metrics used to judge the performance of both the program and individual decision makers. The challenge is the terminologies familiar to engineers and decision makers are quite different and seemingly unrelated. The engineering profession has developed a specific terminology to solve highly technical issues, which are many times themselves unique to very specific engineering problems. It is all too easy for engineers to believe that everyone in their organization, including the decision makers, has an intrinsic understanding of what they do and the value it brings to the program’s success. This is especially true for young engineers who have recently spent the last four plus years in an academic engineering learning environment, which has a highly technical research oriented atmosphere. Effective communication with decision makers is increasingly important as the technical breadth and practical program and project experience level for up and coming decision makers diminishes. It is not unusual for the decision makers to have technical knowledge in a domain different from structural dynamics (e.g., electronics or systems). Competition among satellite manufactures has increased the focus on programmatic cost and ability to deliver on schedule. NASA programs are also seeing more restrictive programmatic cost and schedule constraints, which impact both analysis and testing. It should also be noted that a comprehensive suite of tests are required to verify a satellite’s design capability with some margin. These tests include static strength verification tests, shock, acoustic, and vibration tests (sine and random) of systems, subsystems, and components. Each of these verification tests provide opportunities for model correlation and risk reduction. It is important to recognize dynamic loads/modal test models may not include all of the flight hardware (i.e., harness, coax, waveguides, connectors, etc.) and the previously mentioned tests are still required for qualification/verification of the design. This paper provides tips to young engineers on how to bridge this communications gap, have a better understanding of the environment in which decision makers operate, and assist them to better support successful missions. While this paper primarily focuses on modal testing and model correlation as related to spacecraft missions, the concepts and recommendations presented here are equally applicable to other fields such as aeronautics, automotive, power generation, etc.

Decision Maker↗

Event-Driven Modeling and Execution of Robotic Activities and Contingencies in the Europa Lander Mission Concept Using BPMN

TRACE (Traceable Robotic Activity Composer and Executive) is a tool designed to address the model-ing, verification, and execution of planned and con-tingent activities during robotic space missions. These activities can be modeled (i.e., planned) graph-ically in TRACE using the Business Process Model and Notation (BPMN) language. This standardized language is used to model a sequence of robotic ac-tivities tied together by logical constructs, events, and time. TRACE includes verification tools to en-sure feasibility before mission models are executed by TRACE’s executive, which is integrated into the autonomy subsystem via a connector. In this paper, we describe TRACE in detail as it would apply to a conceptual Europa Lander surface mission with planned excavation and sample collection activities, as well as, contingency activities when execution is off-nominal—all highlighting our novel use of BPMN as a lingua franca for the pipeline from mis-sion planning to autonomous execution.

Lim, Grace↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit of the ammonia leak were the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Thermal Control↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high-definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit of the ammonia leak were the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Darnell Cowan↗

Dust Mitigation Technology to Enable Survive the Night Capabilities

Introduction: As we return to the Moon, the lunar regolith (i.e. lunar dust) covering the surface will be an obstacle to nominal operations. Accounts from Apollo astronauts and analysis of hardware returned from the surface illustrate just how deleterious the dust can be [1]. During Apollo missions, the lunar dust adhered to hardware mechanically and electrostatically [2]. Surviving the Night: Mitigating the lunar dust will be critical to surviving the night. Going hand-in-hand with other extreme environment considerations, dust mitigation is critical to mission success. Dust Impacts on Other Systems: The lunar dust can have negative implications for power, thermal, mechanisms, and several other systems or sub-systems. For example, Apollo encountered marked degradation of performance in heat rejection systems for the lunar roving vehicle, science packages, and other components because of the lunar dust [1]. For power alone, dust can cause internal clogging for power connectors, heat rejection issues, excessive dust on reflective surfaces, reduced power output for solar arrays, and so on. Dust Mitigation Strategy: In addition to considering technology solutions, it is important for hardware, systems, and or components to have a dust mitigation strategy. At a high level, hardware that will encounter the lunar dust should consider these things when defining a dust mitigation strategy: • Understand Natural Environment • Understand Induced Environment • Understand Tolerance to Dust • Write Dust Requirements • Select Dust Mitigation Solutions • Test Hardware in Dusty Environment More information on each of these can be provided to hardware owners. Dust Mitigation Technology Development: NASA has a series of technologies that may be available for hardware that needs to survive the lunar night. Many of these solutions are leveraging dust mitigation technology development efforts from NASA’s Space Technology Mission Directorate (STMD), as well as efforts from ESDMD programs, industry, and academia. Through a series of STMD programs (both internal to NASA and through partnerships), there are several technologies in development as considerations as dust mitigation solutions for hardware. Within STMD, the Game Changing Development Program (GCD) has funded several internal dust mitigation projects including low to mid TRL development, demonstrations on CLPS landers of high TRL solutions, and creating standards and best practices for dust mitigation. STMD dust mitigation efforts also include a series of partnerships for developing technologies and advancing the state of dust mitigation at NASA. This includes the Lunar Surface Innovation Consortium (LSIC), Small Business Innovation Research, Early Stage Innovations (ESI), Space Technology Research Grants (STRG), Announcement of Collaboration Opportunities (ACOs) and Tipping Points (TPs), and Challenges and Crowdsourcing, among others. There are also a series of dust mitigation solutions that have been widely used terrestrially, or during Apollo. In recent years, several studies have produced more data on the efficacy of these potential solutions in the lunar environment. Dust Mitigation Solutions: Dust mitigation solutions generally fall into four categories: • Dust Tolerant Mechanisms • Passive Dust Mitigation Capabilities • Active Dust Mitigation Capabilities • Dust Measurement Capabilities There are a series of solutions that may prove beneficial for hardware that needs to survive the lunar night, including new technology development as well as proven, terrestrial solutions. This presentation will discuss in more detail what some of these solutions are for payloads going to the surface. References: [1] J. R. Gaier, NASA/TM—2005-213610, The Effects of Lunar Dust on EVA Systems During the Apollo Missions [2] T. J. Stubbs, et al. Impact of Dust on Lunar Exploration, 2005

dust mitigation↗

The Wizard Staff: A Mobile Tool Supporting Human Exploration on The Lunar Surface

The Wizard Staff is a rechargeable, battery powered mobile tool with multiple uses for lunar surface exploration. It supports human activity as a surface survey tool, provides external illumination to enhance safety, delivers networking, communications, and navigation features to remote sites, and assists crew rescue with an emergency beacon and rigid splint structure. As a survey tool, it assists crewed geologic field site exploration with external lights, cameras, and LiDAR to illuminate, map, and record the sample collection process. As a relay station, it provides a surface intranet communications and navigation node for extended exploration far from the lander or habitation module. A separately developed Search-and-Rescue (SAR) handheld device can broadcast a signal to the Gandalf Staff containing crew position and biometric data. The staff then formats the message and sends it orbiting satellite(s) for emergency response via the LunaNET on a dedicated frequency similar to terrestrial applications using an Emergency Position-Indicating Radiobeacon (EPIRB). The staff is designed with an upper and lower segment. Components in the upper segment are the LiDAR, external lighting arrays, cameras, communications equipment, intelligence devices, and user interface for crew operations. The lower segment is a set of FeLiPO4 battery cells packed into the 2” diameter carbon fiber tube. When the battery pack is discharged, a spring connector (designed for the dusty lunar environment) easily disconnects the two segments for replacement with another fully charged battery pack. The lower segment can be used for Incapacitated Crew Rescue (ICR) as a rigid splint. As a stand-alone science platform, the Wizard Staff provides infrastructure for instruments and sensors to record the lunar environment over long periods of time. After a crew installs the components on the lunar surface, the platform delivers data to the lunar lander or base station for analysis. The stand-alone mode requires an auxiliary power source (e.g. solar array) and energy storage system (e.g. battery), so it could also be used as an electrical recharging station. A working prototype of Wizard Staff has been developed with collaboration between NASA (JSC, MSFC, and GSFC), Texas Space Technology Applications and Research (T STAR), and Texas A&M University (TAMU) using $300k of innovation funding in FY’21 and FY’22. The functional staff weights 36# on Earth (6# on the Moon), stands 2.1m tall and delivers external lighting with an array of 40 LED bulbs generating 1460 Lux at 2m range (near field), or 2 Lux at 50m (far field).

Gandalf Staff↗

Survive the Dust: Dust Mitigation Technology to Enable Survive the Night Capabilities

Introduction: As we return to the Moon, the lunar regolith (i.e. lunar dust) covering the surface will be an obstacle to nominal operations. Accounts from Apollo astronauts and analysis of hardware returned from the surface illustrate just how deleterious the dust can be [1]. During Apollo missions, the lunar dust adhered to hardware mechanically and electrostatically [2]. Surviving the Night: Mitigating the lunar dust will be critical to surviving the night. Going hand-in-hand with other extreme environment considerations, dust mitigation is critical to mission success. Dust Impacts on Other Systems: The lunar dust can have negative implications for power, thermal, mechanisms, and several other systems or sub-systems. For example, Apollo encountered marked degradation of performance in heat rejection systems for the lunar roving vehicle, science packages, and other components because of the lunar dust [1]. For power alone, dust can cause internal clogging for power connectors, heat rejection issues, excessive dust on reflective surfaces, reduced power output for solar arrays, and so on. Dust Mitigation Strategy: In addition to considering technology solutions, it is important for hardware, systems, and or components to have a dust mitigation strategy. At a high level, hardware that will encounter the lunar dust should consider these things when defining a dust mitigation strategy: • Understand Natural Environment • Understand Induced Environment • Understand Tolerance to Dust • Write Dust Requirements • Select Dust Mitigation Solutions • Test Hardware in Dusty Environment More information on each of these can be provided to hardware owners. Dust Mitigation Technology Development: NASA has a series of technologies that may be available for hardware that needs to survive the lunar night. Many of these solutions are leveraging dust mitigation technology development efforts from NASA’s Space Technology Mission Directorate (STMD), as well as efforts from ESDMD programs, industry, and academia. Through a series of STMD programs (both internal to NASA and through partnerships), there are several technologies in development as considerations as dust mitigation solutions for hardware. Within STMD, the Game Changing Development Program (GCD) has funded several internal dust mitigation projects including low to mid TRL development, demonstrations on CLPS landers of high TRL solutions, and creating standards and best practices for dust mitigation. STMD dust mitigation efforts also include a series of partnerships for developing technologies and advancing the state of dust mitigation at NASA. This includes the Lunar Surface Innovation Consortium (LSIC), Small Business Innovation Research, Early Stage Innovations (ESI), Space Technology Research Grants (STRG), Announcement of Collaboration Opportunities (ACOs) and Tipping Points (TPs), and Challenges and Crowdsourcing, among others. There are also a series of dust mitigation solutions that have been widely used terrestrially, or during Apollo. In recent years, several studies have produced more data on the efficacy of these potential solutions in the lunar environment. Dust Mitigation Solutions: Dust mitigation solutions generally fall into four categories: • Dust Tolerant Mechanisms • Passive Dust Mitigation Capabilities • Active Dust Mitigation Capabilities • Dust Measurement Capabilities There are a series of solutions that may prove beneficial for hardware that needs to survive the lunar night, including new technology development as well as proven, terrestrial solutions. This presentation will discuss in more detail what some of these solutions are for payloads going to the surface. References: [1] J. R. Gaier, NASA/TM—2005-213610, The Effects of Lunar Dust on EVA Systems During the Apollo Missions [2] T. J. Stubbs, et al. Impact of Dust on Lunar Exploration, 2005

dust mitigation↗