Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMPANIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Plant maintenance and plant life extension issue, 2008

The focus of the March-April issue is on plant maintenance and plant life extension. Major articles include the following: Exciting time to be at the U.S. NRC, by Dale Klein, Nuclear Regulatory Commission; Extraordinary steps to ensure a minimal environmental impact, by George Vanderheyden, UniStar Nuclear Energy, LLC.; Focused on consistent reduction of outages, by Kevin Walsh, GE Hitachi Nuclear Energy; On the path towards operational excellence, by Ricardo Perez, Westinghouse Electric Company; Ability to be refuelled on-line, by Ian Trotman, CANDU Services, Atomic Energy of Canada, Ltd.; ASCA Application for maintenance of SG secondary side, by Patrick Wagner, Wolf Creek Nuclear Operating Corporation, Phillip Battaglia and David Selfridge, Westinghouse Electric Company; and, An integral part of the landscape and lives, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Steam generator bowl drain repairs, by John Makar and Richard Gimple, Wolf Creek Nuclear Operating Corporation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Mercury control in 2009

Although activated carbon injection (ACI) has been proven to be effective for many configurations and is a preferred option at many plants sufficient quantities of powdered activated coking (PAC) must be available to meet future needs. The authors estimate that upcoming federal and state regulations will result in tripling the annual US demand for activated carbon to nearly 1.5 billion lb from approximately 450 million lb. Rapid expansion of US production capacity is required. Many PAC manufacturers are discussing expansion of their existing production capabilities. One company, ADA Carbon Solutions, is in the process of constructing the largest activated carbon facility in North America to meet the future demand for PAC as a sorbent for mercury control. Emission control technology development and commercialization is driven by regulation and legislation. Although ACI will not achieve > 90% mercury control at every plant, the expected required MACT legislation level, it offers promise as a low-cost primary mercury control technology option for many configurations and an important trim technology for others. ACI has emerged as the clear mercury-specific control option of choice, representing over 98% of the commercial mercury control system orders to date. As state regulations are implemented and the potential for a federal rule becomes more imminent, suppliers are continuing to develop technologies to improve the cost effectiveness and limit the balance of plant impacts associated with ACI and are developing additional PAC production capabilities to ensure that the industry's needs are met. The commercialisation of ACI is a clear example of industry, through the dedication of many individuals and companies with support from the DOE and EPRI, meeting the challenge of developing cost-effectively reducing emissions from coal-fired power plants. 7 refs., 1 fig.

01 COAL, LIGNITE, AND PEAT↗

2010 buyer's guide

This annual buyers' guide provides a resource for identifying the companies that provide the products and services required in the power generation industry. It is divided into 3 sections, namely products, services and companies. More than 1750 suppliers mostly in the USA are listed in over 400 product categories. The Buyer's Guide is also available online at www.power-eng.com.

20 FOSSIL-FUELED POWER PLANTS↗

Compensation as Means for Local Acceptance The Case of the Final Disposal of Spent Nuclear Fuel in Eurajoki, Finland

The paper sheds light on the local negotiations on compensation as a part of the site selection for the spent nuclear fuel repository in Finland. The negotiation took place between the representatives of the Municipality of Eurajoki, the nuclear power company Teollisuuden Voima Ltd (TVO) and the nuclear waste management company Posiva Ltd in the late 1990's. The compensation negotiation process and the development of the requirements are elucidated in detail on the basis of the analysis of the minutes of the meetings of the Vuojoki working party. The paper helps to understand the smooth site selection process in Finland. The context of the local decision-making is viewed from the policy, institutional and economic aspect. It is concluded in the paper that when trying to understand the progress of the Finnish site selection process more emphasis should be put on the role of TVO, the economic dependency of the Municipality of Eurajoki on TVO and the partnership between TVO and the leading local politicians. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TGC36 a dual purpose cask for the transport and interim storage of compacted waste (CSD-C)

According to contractual and international obligations, the German Utilities have to return the residues resulting from the reprocessing of nuclear fuel assemblies (compacted hulls and ends) to Germany. The new dual purpose cask TGC36 is a joint product from the two leading companies in the field development and manufactory of nuclear casks in Europe, GNS and TN International, is intended for the transport to the interim storage facility Ahaus and to be stored there for up several years. For the development and the delivery of the TGC36 cask, GNS and TN International formed the AGC Consortium based on German law to combine the special know how of both partners in the most efficient way. The design and the licensing strategy of the TGC36 are introduced in this paper. In conclusions: GNS and TNI have formed a consortium named AGC to design, license and manufacture an innovative cask for the transport and the interim storage of the compacted wastes resulting from the reprocessing of the German spent fuel. This cask has been optimized in order to offer a high capacity of loading, and allows a payload of 36 canisters, leading to a total mass of approximately 116 Mg in transport configuration. The success of this project requires a special effort from both partner companies, members of the consortium, and implies also an efficient management of simultaneous tasks during the licensing period and the manufacturing time of the first items of the cask. (authors)

42 ENGINEERING↗

Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the efficiency of the plant units, and a power increase of nearly 20 MW was achieved at both plant units. PELE wonderfully manifests one of the strategic goals of our company; developing the competence of our in-house personnel by working in projects. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Environmental Cleanup of the East Tennessee Technology Park Year One - Execution with Certainty SM - 13120

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation in Tennessee. UCOR will close out cleanup operations that began in 1998 under a previous contract. When the Contract Base scope of work [1] is completed in 2016, the K-25 gaseous diffusion building will have been demolished and all waste dispositioned, demolition will have started on the K-27 gaseous diffusion building, all contact-handled and remote-handled transuranic waste in inventory (approximately 500 cubic meters) will have been transferred to the Transuranic Waste Processing Center, previously designated 'No-Path-To-Disposition Waste' will have been dispositioned to the extent possible, and UCOR will have managed DOE Office of Environmental Management (EM)- owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and the Y-12 National Security Complex in a safe and cost-effective manner. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; advanced the deactivation and demolition (D and D) of the K-25 gaseous diffusion building; recovered and completed the Tank W-1A and K-1070-B Burial Ground remediation projects; characterized, packaged, and shipped contact-handled transuranic waste to the Transuranic Waste Processing Center; disposed of more than 90,000 cubic yards of cleanup waste while managing the Environmental Management Waste Management Facility (EMWMF); and provided operations, surveillance, and maintenance activities at DOE EM facilities at ETTP, ORNL, and the Y-12 National Security Complex. Project performance as of December 31, 2012 has been excellent: - Cost Performance Index - 1.06; - Schedule Performance Index - 1.02. At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand in hand with its excellent project performance. Through calendar year 2012, UCOR's recordable injury rate was 0.33, and the company has worked close to 4 million hours without a lost work day injury. UCOR's safety record is one of the best in the DOE EM Complex. This performance was due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key approaches included: - Selected and deployed experienced staff in key leadership positions throughout the organization; - Approached 'Transition' as the 'true' beginning of the cleanup project - kicking off a number of project initiatives such as Partnering, PMB development, D and D Plan execution, etc. - Established a project baseline for performance measurement and obtained EVMS certification in record time; - Determined material differences and changed conditions that warranted contract change - then quickly addressed these changes with the DOE client; - Aligned the project and the contract within one year - also done in record time; - Implemented Safety Trained Supervisor and Safety Conscious Work Environment Programs, and kicked off the pursuit of certification under DOE's Voluntary Protection Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How the NDA Provides Transparency and Visibility of the Technical Deliverability of the R and D Programme - 13303

The Nuclear Decommissioning Authority (NDA) was created under the UK Energy Act 2004 to ensure the UK historic civil public sector nuclear legacy sites are decommissioned safely, securely, cost effectively and in ways that protect the environment. The delivery will involve carrying out many unique projects within a high hazard environment requiring the very highest standards in safety, security and environmental management. Unique problems require unique solutions and there is a substantial amount of research and development required for each project. The NDA's R and D strategic objective is to ensure that delivery of the NDA's mission is technically underpinned by sufficient and appropriate research and development. This drives a requirement to provide transparency and visibility of the technical deliverability of the programme through the technical baseline and accompanying research and development requirements. The NDA need to have confidence in the technical deliverability of the Site License Companies (SLCs) plans, provide overall visibility of R and D across the NDA Estate and ensure that appropriate R and D is being carried out in a timely manner. They need to identify where coordinated R and D programmes may be advantageous as a result of common needs, risks and opportunities and ensure key R and D needs across NDA are identified, prioritised and work programmes are costed and scheduled in the Lifetime Plans for individual sites and SLCs. Evidence of the Site License Company's approach and their corresponding technical underpinning programmes is achieved through submission of a number of outputs collectively known as TBuRDs (Technical Baseline and Underpinning Research and Development Requirements). This paper is a summary of the information generated by an independent review of those TBuRDs. It highlights some of the key messages, synergies and common R and D activities across the estate. It demonstrates the value of a consistent approach to collecting R and D data across multiple Sites with a view to enhancing knowledge transfer and improving delivery efficiency. It will be of interest to all who are running R and D programmes where other programmes may be carrying out similar activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Beyond an Elevator Speech: Define Your Story to Find Success - 13581

Diversify or die has been a familiar industry chant, growing louder over the past five years. As companies seek opportunities in new markets, succinctly communicating who they are and what they do to people they've never met becomes common practice. Large and small, most companies lack a clear, concise story and communication tools to articulate what makes them unique amongst the competition. As a result business is lost with prospects and needs of current customers may never be identified. These, along with a common set of core challenges can be overcome by definition, standardization, on-going education and consistent / accurate communication at the brand level. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Decommissioning of German Research Reactors Under the Governance of the Federal Ministry of Education and Research - 12154

Since 1956, nuclear research and development (R and D) in Germany has been supported by the Federal Government. The goal was to help German industry to become competitive in all fields of nuclear technology. National research centers were established and demonstration plants were built. In the meantime, all these facilities were shut down and are now in a state of decommissioning and dismantling (D and D). Meanwhile, Germany is one of the leading countries in the world in the field of D and D. Two big demonstration plants, the Niederaichbach Nuclear Power Plant (KKN) a heavy-water cooled pressure tube reactor with carbon-dioxide cooling and the Karlstein Superheated Steam Reactor (HDR) a boiling light water reactor with a thermal power of 100 MW, are totally dismantled and 'green field' is reached. Another big project was finished in 2008. The Forschungs-Reaktor Juelich 1 (FRJ1), a research reactor with a thermal power of 10 MW was completely dismantled and in September 2008 an oak tree was planted on a green field at the site, where the FRJ1 was standing before. This is another example for German success in the field of D and D. Within these projects a lot of new solutions and innovative techniques were tested, which were developed at German universities and in small and medium sized companies mostly funded by the Federal Ministry of Education and Research (BMBF). Some examples are underwater-cutting technologies like plasma arc cutting and contact arc metal cutting. This clearly shows that research on the field of D and D is important for the future. Moreover, these research activities are important to save the know-how in nuclear engineering in Germany and will enable enterprises to compete on the increasing market of D and D services. The author assumes that an efficient decommissioning of nuclear installations will help stabilize the credibility of nuclear energy. Some critics of nuclear energy are insisting that a return to 'green field sites' is not possible. The successful completion of two big D and D projects (HDR and KKN), which reached green field conditions, are showing quite the contrary. Moreover, research on D and D technologies offers the possibility to educate students on a field of nuclear technology, which will be very important in the future. In these days D and D companies are seeking for a lot of young engineers and this will not change in the coming years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the completion goals. As field work-scope is completed, progressive reductions of business processes, physical facilities, and staff will occur. Organizations will collapse and flatten commensurate with workload. WCH employees will move on to new endeavors, proud of their accomplishments and the legacy they are leaving behind as being the first and largest environmental cleanup closure contract at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Education and training in the field of nuclear instrumentation and measurement: CEA/INSTN (National Institute for Nuclear Sciences and Technologies) strategy to improve and develop new pedagogical tools and methods

Part of the French Alternative Energies and Atomic Energy Commission (CEA), the National Institute for Nuclear Science and Technology (INSTN) is a higher education institution whose mission is to provide students and professionals a high level of scientific and technological qualification in all disciplines related to nuclear energy applications. In this frame, INSTN carries out education and training (E and T) programs in nuclear instrumentation and radioprotection. Its strategy has always been to complete theoretical courses by training courses and laboratory works carried out on an extensive range of training tools that includes a large panel of nuclear instrumentation as well as software applications. Since its creation in 1956, the INSTN has conducted both education and vocational programs on ionizing radiation detection. An extensive range of techniques have commonly been used during practical works with students and employees of companies who need to get the knowledge and specialization in this field. Today, the INSTN is mainly equipped with usual detectors and electronics in large numbers in order to be able to accommodate up to 48 trainees at the same time in two classrooms, with only two trainees for one workstation in order to optimize their learning. In the field of the neutron detection systems, the INSTN has strongly developed its offer taking advantage of the use of research reactors, such as ISIS reactor (700 kW) at Saclay. The implementation of neutron detection systems specific to the courses offers a unique way of observing and analysing the signal coming from neutron detectors, as well as learning how to set the parameters of the detection system in real conditions. Providing the trainees with an extensive overview of each part of the neutron monitoring instrumentation apply to a nuclear reactor, hands-on measurements on the ISIS reactor play a major role in ensuring a practical and comprehensive understanding of the neutron detection system and their integration in the safety system of nuclear reactors. It also gives a solid background for the follow up and the development of the neutron detection systems. Another field of activity of the INSTN is the development of new teaching tools using software applications. We describe hereafter two applications that have recently been developed by the institute, O.S.I.R.I.S and DOSIMEX. The INSTN and the company OREKA have developed an innovative teaching tool named O.S.I.R.I.S. The tool is built on a virtual 3D environment in which users operate in a totally free way. The action is located in a pressurised water reactor in the environment of a steam generator building. The users are students or professionals who want to learn and train on concrete situations on how to protect the workers against radiation. Through the use of this serious game, users must: establish a predictive dose evaluation, implement the principles of radiation protection, perform the dose result of the operation, analyse the gap between the predictive collective dose and the collective dose achieved, and decide about the lessons to provide feedback. Taking into account the increasing constraints related to radiation protection, it is essential to use computer codes to evaluate the dose rates generated by sources of ionizing radiation. Many powerful codes exist but are often relatively complex to implement and are dedicated to experts. In addition, these codes are often 'black boxes' that does not allow the user to understand the underlying physics. The objective of DOSIMEX codes developed by the INSTN is to give, by the means of a VBA code with a simple interface, the ability to easily conduct a wide range of radiological exposure situations: calculation of gamma, beta, neutron equivalent dose rate, calculation of internal contamination and atmospheric transfer.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Lessons learned from implementation of International Structure for Decommissioning Costing (ISDC) of Nuclear Installations - 17198

The paper presents the experience accumulated at the company DECOM in Slovakia in implementation of the 'International Structure for Decommissioning Costing (ISDC) of Nuclear Installations' in cost estimation for decommissioning projects. The ISDC was issues in 2012 by main international organisation involved in decommissioning - OECD/NEA, IAEA and European Commission. The primary purpose of the ISDC, as highlighted by the issuing organisation, is to promote the transparency and understanding of cost for decommissioning projects by presenting the cost using the standardised ISDC cost format. General experience shows that the ISDC seems to be the only cost structure which is able to present cost for any decommissioning project after converting the cost into the ISDC cost format. The company DECOM started to implement the ISDC already in 1999 by implementing the predecessor of the ISDC known as 'Yellow Book' which was issues in 1999 by the same international organisations; later by implementing the ISDC. Experience of DECOM by implementing the Yellow Book was used also in developing the ISDC. Experience of DECOM relates to the use of the ISDC as the base for cost estimation structures, developing the ISDC-based cost estimations codes and to transformation of cost for decommissioning projects for benchmarking purposes. The ISDC approach to decommissioning cost estimation for research reactors was implemented also by the IAEA; the experience accumulated at DECOM was used to a great extent. The paper presents the DECOM experience mainly in developing the ISDC-based cost estimation structures used in ISDC costing codes and in ISDC benchmarking of cost for decommissioning projects. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Treatment of Activated Carbon, PVC, and Other Wastes using the THOR process - Pilot Plant Test Summary - 17399

This presentation will provide an overview of the first pilot plant study to be conducted for the Japanese Nuclear Market by Kobelco Studsvik Company (A new Joint Venture Company between Studsvik AB and Kobe Steel Ltd.). The test program was scheduled for October 2016, and it was designed to evaluate the treatment of activated carbon, PVC, and other waste types using Studsvik's THOR Process. This new study is being conducted to identify key design parameters required for application of the THOR process in the Japanese Waste Market and to confirm the effectiveness of the THOR technology in meeting the requirements for final waste acceptance. The findings of this pilot plant test will assist in the development of a revised THOR process in Japan that will treat not only spent ion exchange resins but other organic materials generated by Nuclear Power Plants (NPP) during normal operations and D and D activities. The information shared by this new pilot plant study will provide the audience with an understanding of the adaptability of the THOR process for treatment of various radioactive waste types and the results necessary to successful treat different types of carbon, plastic materials, and other waste types. In addition, it will share the lessons learned regarding how a pilot plant study should be planned and optimized to meet the specific requirements of the Japanese Nuclear waste market. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of defense-related uranium mines in the United States and other US DOE office of legacy management domestic and international uranium initiatives - 15335

US DOE's Office of Legacy Management (LM) has taken several initiatives to improve domestic uranium mining and milling operations in the United States and to contribute to the management of legacy uranium mining and milling sites around the world. Initiatives include completing the 2014 Report to Congress on Defense-Related Uranium Mines, managing the Title X Uranium and Thorium Program with the Office of Environmental Management, and assisting IAEA with uranium issues in member state countries. The 2014 Report to Congress identified abandoned uranium mines (AUMs) in the United States that provided uranium ore to the US Atomic Energy Commission (AEC) between 1947 and 1970. The report identified AUM locations, reclamation/remediation status, radiological risks and other hazards, costs for reclamation and remediation, and potential prioritization schemes for mine cleanup. To develop reclamation and remediation cleanup cost estimates and assess risks, AUMs were grouped into six categories by tons of uranium ore produced, ranging from Small (less than 91 metric tons [100 tons]) to Very Large (greater than 453,900 metric tons [500,000 tons]). Radiological risk was calculated using the RESRAD computer code for five exposure scenarios: offsite resident, onsite resident, occasional visitor, recreational visitor, and mine reclamation worker. Results indicate that 69 percent of the AUMs are in Colorado and Utah and 23 percent are in Arizona, Wyoming, and New Mexico; and that the majority of the AUMs (68 percent) were considered Small or Small/Medium production mines, producing less than 908 metric tons (1,000 tons) of uranium ore. Although New Mexico has fewer AUMs (247) than the other states in the Colorado Plateau region, AUMs in that state (primarily those in the Grants Mineral Belt) produced 45 percent of the 79.5 million tons of AEC-purchased uranium ore. About 50 percent of the AUMs are on public land managed by the US Bureau of Land Management; 435 AUMs are on the Navajo Nation. Risk estimates for the onsite resident scenario (plausible on tribal and non-federal land) could result in an incremental cancer risk greater than 10{sup -4}. Radon inhalation was the dominant contributor to radiological risk for the five exposure scenarios evaluated. Different state and federal agencies are conducting cleanup of some AUMs under various remedial and legal authorities. Activities constituting mine 'reclamation' may reduce radiological risks to humans to acceptable levels for many mines on federal public lands if the occasional visitor and recreational visitor exposure scenarios are assumed. Addressing physical hazards (e.g., open shafts) at mines where conditions could cause serious injuries is typically a priority of public land management agencies. At locations where mine-related groundwater contamination occurs, it is a significant contributor to cleanup costs. However, most Small and Small/Medium AUMs were likely developed above the water table, and some wet mines are located in areas where groundwater has high, naturally occurring levels of the same constituents (including radioactive elements) that are typically associated with uranium mines. LM is also administering, with the US DOE Office of Environmental Management, the Title X program, which was developed by Congress to reimburse private companies (i.e., those that held active operating licenses prior to 1978) for a portion of their reclamation costs for mill sites that processed ore sold to AEC. LM recently updated the program guidance document and established internal protocols for annually auditing companies. LM is assisting IAEA on two different initiatives: assisting developing countries with training on the basic steps to take to perform reclamation of uranium mines, and developing technical guidance and case studies related to safety and environmental assessments and post-closure management of uranium legacy sites as part of the IAEA Regulatory Supervision of Legacy Sites initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Success in commissioning a key U.S. radioactive waste burial site through the technical support of Dufrane Nuclear Shielding Incorporated (DNSI) - 15476

With the -phase out- of the South Carolina based Barnwell Radioactive Waste Burial Site, and the stockpile and storage of radioactive waste and irradiated components throughout the U.S. Nuclear Industry for decades, the opening of the Texas Low-Level Radioactive Waste Disposal Compact Facility by Waste Control Specialists (WCS), is a game changer in solving this industry-wide issue. For the first time in decades, generators now have the opportunity to send their waste to a site specifically designed to permanently sequester the waste in a licensed facility that will protect public health and the environment, better than any built to date. As history has shown through the many decades of the U.S. Commercial and Federal Nuclear Industry, site operators and management have relied heavily on contractors and vendors with exceptional expertise and decades of experience to achieve success and meet their goals. The commissioning of WCS was no exception as DNSI was contracted to design, develop, build and deploy a major component required for the opening and successful operation of the WCS site. This component, being the Modular Concrete Canister (MCC), is the -work horse- of the site. With its enormous size, weight and strength, it provides many functions that meet and comply with the site performance assessment (PA) under 10 CFR Part 61, the site WAC, and Texas Low-Level Radioactive Waste Disposal Authority. Offsite contracting the production and delivery of this critical component was a major step toward success in meeting schedule and cost for the much needed opening of the Texas Compact and Federal site. In selecting a shielding vendor, WCS partnered with a U.S. Nuclear Service company with over 30 years of experience which spans the entire U.S. Commercial, Federal, and Nuclear Industry. The task given DNSI was not a simple one, it involved every aspect from start to finish of the design, production and delivery of rectangular, cylindrical and -irradiated hardware- (IH) MCCs, that could accept waste up to 100 Sv /Hr contact dose rates. The enormity of this project was quite clear and required extensive quality control, construction of batch plants, purchase of huge quantities of raw materials, setting up a production site in a neighboring city, relocation of personnel from company headquarters, and safely transporting 8,000 Tons of MCC components 75 miles one-way on West Texas highways daily. Most important of all, this was accomplished safely with no incidents, no component failures or rejects, and on schedule. The start of receipt, of -in-compact waste- and -out-of-compact waste- was conducted virtually in a 3 month period time span. To help guarantee success and quality of product, all forms had surfaces machined, heavy duty elastomer coatings were applied to concrete surfaces, only galvanized anchors were used, and the batch plant was run to strict ASME standards thus testing every 50 cubic yards of concrete poured. With significant teamwork and success from Vendors such as DNSI, WCS and the Texas Compact has evolved as one of the leading radioactive waste sites in the U.S. and the world, providing safe, secure and compliant permanent waste disposal services by using technical expertise and innovation of the highest standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of NPP in Europe? Strategies, Risks and Opportunities - 16124

This paper offers a strategic perspective on the rapidly developing European nuclear decommissioning scene, with a particular focus on the German market. We will identify a number of strategic themes that might be interesting to international companies practicing in decommissioning. The market size and valuation has received attention in several studies published in the last three years due to political concerns surrounding the funding of decommissioning. This paper will focus mainly on the decommissioning and decontamination (D and D) of Nuclear Power Plants (NPPs), commercially operated reactors generating electricity for power grids. There is also a substantial developing market also in D and D of fuel cycle facilities, research reactors and military production sites. However, they represent a rather different technical and financial challenge so will not be explored here. Further, we also restrict our geographic scope to European Union members and Germany in particular, to ensure our observations offer specific value. Our principal contention is that the German national industry holds too little capacity to fully undertake its own decommissioning program; leading to a conclusion that the European program as a whole will require significant support from international companies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bradwell - The first UK Nuclear Site to Enter Care and Maintenance - 18152

Magnox Ltd, a Cavendish Fluor company, is currently decommissioning twelve nuclear sites on behalf of the UK Nuclear Decommissioning Authority (NDA). Ten of these sites are former Power Stations; the other two are closed Research and Development facilities. An overall strategy for decommissioning the Magnox sites has been agreed between Magnox and the NDA. For all but one of these sites the decommissioning strategy involves an extended quiescent period, known as Care and Maintenance (C and M), during which remaining radiological hazards reduce naturally through radioactive decay. After this quiescent period the sites will be restored to an agreed end state through further decommissioning and clearance work. Sites in C and M will not be permanently manned. They will be passively safe such that prompt action will not be required in response to an alarm or fault. Preparing a nuclear site for C and M involves several inter-related strands of work including definition of the intended physical configuration of the site during C and M (the C and M entry state), establishing a safety case to support that configuration, carrying out the physical works needed to deliver the C and M entry state, preparing arrangements and a team to manage the site during C and M and consolidating the knowledge and information needed to support C and M and final clearance of the site. To enter C and M there needs to be a carefully controlled transition of site, personnel and management system into the agreed C and M configuration. Bradwell, a site on the east coast of England, was selected as part of the overall decommissioning strategy for 'early' entry into C and M; Bradwell is scheduled to enter C and M in late 2018, several years in advance of the next scheduled site, with the intent of carrying learning forward from Bradwell to the subsequent sites. Bradwell is now in the final stages of preparation for C and M. Decommissioning commenced on completion of defueling in 2005. A clearly defined C and M entry state was established early in decommissioning and, through interaction with Regulators and internal and external stakeholders, developed as a shared target, thus providing certainty to the scope of the overall decommissioning project. The site has subsequently been systematically decommissioned to meet this target C and M entry state. All legacy waste has been retrieved and packaged into robust disposal containers, the reactor buildings have a new weather envelope, and much of the site is empty space with concrete hardstanding where facilities used to exist and bare rooms where plant used to operate. The remaining radiological and environmental hazards are not significant. During C and M, which is anticipated to last for 70 years, Bradwell will be managed remotely without the requirement for personnel to be present on site, with the possible exception of an ongoing security presence when the site first enters C and M. In terms of UK decommissioning, many of the projects undertaken at Bradwell were first of a kind. The company operates under a programmed organisational and delivery model, which will enable innovation and learning from Bradwell to be carried forward across the whole Magnox fleet. In addition to decommissioning tools and techniques, processes to manage decommissioning, optimise the C and M entry state to reduce the burden on the UK taxpayer and to transition a site into C and M have been developed. This, in addition to taking people from Bradwell and seeding them into Magnox and the broader UK nuclear industry, should help to provide long term cost savings and delivery efficiencies across the entire NDA estate. This paper describes the journey of Bradwell Site through decommissioning and into C and M, highlighting the innovation and challenges that have contributed to the success of delivering the first UK nuclear site into Care and Maintenance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗