Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CERTIFICATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Influencing future exploratory drilling rates-a potential approach for the waste isolation pilot plant - 15307

The Department of Energy/Carlsbad Field Office (DOE/CBFO) is responsible for managing activities related to the disposal of TRU and TRU-mixed waste in the geologic repository at the Waste Isolation Pilot Plant (WIPP), near Carlsbad, New Mexico. The WIPP Compliance Certification Application had a reference concerning natural resources at the site of the Waste Isolation Pilot Plant. This reference suggested that resources could be withdrawn from under the repository area from a distance and not affect the integrity of the repository. This would not eliminate, but would certainly diminish, the rate of exploratory drilling in the distant future. Currently the only scenarios that result in releases from the repository are human intrusion scenarios, without human intrusion radioactive releases to the accessible environment are essentially zero for the very long term future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laboratory testing options for FUSRAP projects - 15462

Remediation projects within the Formerly Used Sites Remedial Action Program (FUSRAP) have many options to consider when evaluating their analytical testing needs. Factors that should be considered in determination of a project's analytical testing needs include which parameter results are considered time-critical, the potential savings in reduction of construction-related delays when time-critical samples are analyzed onsite (including screening) instead of offsite, control of data quality for onsite versus offsite data, and the value of additional knowledge gained by programs such as FUSRAP by employing onsite laboratories. The most important factor turned out to be reduction in construction-related delays. We considered development of an optimum combination of onsite lab/offsite lab capability. This depends on: i. Time critical parameters and the methods required; ii. Estimated Cost for onsite lab construction or facility rental, maintenance, labor, chemicals (reagents and standards), and certification (if desired and deemed necessary) iii. Ability, flexibility, and cost of offsite lab sample testing using project-desired TATs and methods that will meet project action levels iv. Willingness of stakeholders, in particular regulators, in accepting some combination of onsite and offsite testing (for example, onsite screening followed by offsite confirmatory testing for certain parameters) Due to the significant costs in construction of an onsite lab and development of sample testing capability and all which that entails, the recommendations made in this paper will aid other FUSRAP projects in finding an acceptable combination of onsite and offsite testing that is acceptable to all stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing TRU waste processing and storage issues/challenges - 15487

Operational events at the Waste Isolation Pilot Plant (WIPP) facility resulted in suspension of disposal operations and waste shipments to WIPP creating significant challenges for the Department of Energy (DOE) complex. The Oak Ridge Transuranic (TRU) Waste Program which was poised to re-start shipping after a 2.5 year suspension of the Carlsbad Field Office (CBFO) certification activities which resulted in on-site accumulation of the highest activity contact handled (CH) TRU waste containers. As a result, Transuranic Waste Processing Center (TWPC) is nearing its physical storage capacity for CH waste and has already reached storage capacity limits for remote handled (RH) TRU waste. The TWPC storage capacity for RH-TRU waste is very limited and dependent on real time shipping support to continue RH waste processing activities in the facilities Hot Cell. Additionally, changes in dispersion modeling (i.e., dry deposition factor changes) used in the TWPC Documented Safety Analysis (DSA) present Material at Risk (MAR) management challenges to effectively manage off-site dose consequences. These facts necessitated the identification of alternative waste storage options for both CH and RH waste to continue waste processing operations at TWPC. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achievements and process improvements in processing transuranic waste at the TRU Waste Processing Center - 15488

Wastren Advantage, Inc., (WAI) is the DOE Prime contractor for the TRU Waste Processing Center (TWPC) located in Oak Ridge, TN. This paper highlights the TWPCs specific achievements and process improvements associated with both Contact (CH) and Remote Handled (RH), Transuranic (TRU) waste receipt processing and repackaging for disposal. The five key improvement areas and achievements include: - The TWPC installed, tested and operated successfully the Drum Venting System (DVS) to vent over-packed CH-TRU waste drums in several configurations including 55-gallon drums over-packed in 79 or 85-gallon drums. - A new Remote Drum Opener (RDO) system was designed, tested and placed in service to vent drums discovered in overpack boxes in the Box Breakdown Area and to vent overpack configurations that could not be handled in the standard DVS (e.g., 110 gallon overpacks and multiple drum configurations). - The Cask Processing Enclosure (CPE) approach to repackaging RH-TRU waste contained in concrete casks was developed and implemented - Hot Cell outage to incorporate planned equipment modifications and improvements to maintain processing rates. - To improve certification and segregation of CH-TRU from drums that meet Low Level Waste criteria for disposal at Nevada the TWPC added additional equipment/facilities for Non-Destructive Assay (NDA) and Real Time Radiography (RTR). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An underground laboratory in the context of salt disposal research - 15549

Evaluating the basis of need for an underground research laboratory for salt science and engineering is imperative because of the significant commitment of time and money involved. Decades of salt repository studies, numerous experiments, and sophisticated modeling capabilities underpin the scientific database that supports safe disposal of nuclear waste in salt. The safety case for disposal of non-heat-generating waste such as transuranic waste interred at the Waste Isolation Pilot Plant is robust, with the only long-term releases to the environment projected to be by way of human intrusion. The scientific evidence also favors safe disposal of heat-generating waste. Technical evaluations for disposal of heat-generating waste in salt experienced a rather long hiatus in the United States subsequent to certification of the Waste Isolation Pilot Plant and issuance of the Nuclear Waste Policy Act Amendment that ended salt disposal research for the civilian program. Similar salt repository research in Germany was delayed by a ten-year moratorium that ended in 2010. In collaboration with German peers, the United States Department of Energy has reviewed and evaluated thermally driven processes in salt disposal and identified key technical areas in which to prioritize resources. The goal for disposal research in salt is to provide sufficient technical information to license a repository successfully. The necessity or utility of a salt underground laboratory is to be evaluated in the context of an overall research agenda that supports a license application. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Support of SRS salt-stone regulatory compliance - 15586

The SRS salt-stone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. The salt-stone Processing Facility (SPF) is permitted as a wastewater treatment facility per the South Carolina Department of Health and Environmental Control Regulations (SCDHEC) South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-67. The salt-stone Disposal Facility is permitted as a solid waste landfill site, as defined by SCDHEC Regulations R61-107.19. The salt-stone Sampling and Analysis Plan provides the SCDHEC with the chemical and physical characterization strategy for the salt solution and salt-stone waste form. During operation, samples are collected from Tank 50H on a quarterly basis and are analyzed by the Savannah River National Laboratory (SRNL) for over chemical and radioactive components. The analytical results are compared to the salt-stone waste acceptance criteria in a technical report. SRNL also prepares salt-stone samples from the quarterly sample and premix binder materials provided by the SPF to determine the non-hazardous nature of the grout to meet the requirements of the SCDHEC regulation for the 'Characteristic of Toxicity', R.61-79.261.24(b) and the 'Universal Treatment Standards', R.61-79.268.48.4. salt-stone samples are collected, size reduced, packaged, and shipped to an independent United States EPA certified laboratory, or a laboratory that holds an equivalent certification such as one from the National Environmental Laboratory Accreditation Program to perform the EPA Toxicity Characteristic Leaching Procedure (TCLP) extraction of the salt-stone sample. SRNL reviews the results of the TCLP analysis and prepares a report detailing the sample preparation and analysis that is used by the salt-stone Facility to demonstrate the nonhazardous nature of the salt-stone waste form. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shortage of Type B LLRW Casks in the US to Serve Nuclear Plants and National Labs - 15663

In early 2012, the industry experienced sudden shortage of Type B Low Level Radioactive Waste (LLRW) transport casks available for transportation of nuclear waste and sealed sources within the United States (US) of America. Some of the events which created this situation include, but not limited to, opening of a new LLRW Disposal facility (Andrews County, TX) managed by Waste Control Specialists (WCS) for Class A, B and C LLRW, retirement of vast majority of previously certified Type B LLRW transport packages, more stringent regulatory certification requirements and increased demand for LLRW transportation casks to support decommissioning of nuclear power plant and transportation of sealed sources. Cask designers are still in the process of responding to the emerging needs of the industry. This paper will provide a detailed background and discuss the events that have occurred in recent years that have led to a shortage of Type B LLRW transport casks available to service the industry with transportation of resins, used filters, irradiated hardware and sealed sources. In addition, this paper will provide an overview of currently available, being fabricated Type B packages as well as information about the tentative designs of Type B LLRW transport casks to be designed and certified in the US by cask design/manufacturing firms in the near future. In conclusion section, this paper will summarize whether the LLRW Type B transport cask supply market for discussed payloads will be able to adequately respond to the industry demand. Potential ways for long term resolution of this issue will be discussed. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear waste management approach for new build nuclear power plants in the people's republic of China - 15687

EnergySolutions continues to provide waste treatment solutions in the People's Republic of China (PRC). Currently two projects are in the installation phase at different sites (Haiyang, an AP-1000TM site and Yangjiang, a CPR-1000 site). EnergySolutions is also working closely with PRC nuclear regulatory officials for certification of High Integrity Containers (HIC). This paper discusses progress on these two projects, and new information regarding current and future PRC waste management plans. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Importance Ranking of Software Dependability Attributes in the Nuclear Industry

With the current transition from analog to digital instrumentation and control systems in nuclear power plants, the number and variety of software-based systems has significantly increased. Due to the sophisticated nature and the increasing complexity of software, a significant challenge faced by the nuclear industry is the trust one can place in software-based systems once they have been developed. The trust placed in software is typically termed software dependability, a qualifier which encompasses different attributes such as software reliability, safety, security, availability and maintainability. It is recognized that these attributes relate to each other in different ways under various scenarios. The detailed dependencies between software dependability attributes can be found in a previous study. With limited time and budget resources, which dependability attribute should be given the highest priority when certifying software-based systems in the nuclear industry is a fundamental question that needs to be answered. This paper addresses this problem using stakeholders' opinion elicitation. A comprehensive questionnaire was designed to elicit the goals that should be fulfilled by the nuclear industry and to collect the relative importance of the various dependability attributes for each goal. We then used the Analytical Hierarchy Process (AHP) to analyze the data and obtained the relative importance ranking of software dependability attributes in the context of a reactor protection system. The results will provide guidance to resource allocation for the certification of software dependability in the nuclear industry. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Future Transition of WIPP from EM to Another DOE Office - 19256

The U. S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has a primary mission to assist federal government entities disposition transuranic (TRU) radioactive waste. The main resource for disposition is the deep geologic repository known as the Waste Isolation Pilot Plant (WIPP). Other resources include a complete transportation system and a program that assists in the certification and shipment of TRU waste to WIPP known as the National TRU Program (NTP). All of these resources are managed by CBFO, which currently is part of the DOE Environmental Management (EM) program. EM's primary mission for DOE is to clean up the legacy remaining from many years of nuclear weapons research and production. But, CBFO estimates the need for WIPP and NTP will continue beyond the mission of EM and will assist other entities such as the National Nuclear Security Administration (NNSA), the Office of Science (OS) and the Navy. As the inventory of legacy TRU waste is reduced, the inventory of new TRU waste will continue from ongoing missions. So, over the life span of WIPP the primary customers of CBFO will shift from legacy EM sites to newly-generated TRU waste sites. And, somewhere along the way CBFO estimates that it will transition, primarily from an EM support (legacy waste) entity to a primarily a NNSA support (newly-generated waste) entity to facilitate ongoing DOE missions. This paper will address the need for that change at a programmatic level and will include some ideas for conceptual planning for such a transition. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 13: TRU Waste Generator Sites - Implementation of the New US DOE WIPP WAC

This panel focused on the next phase of the US National Transuranic (TRU) Program (NTP) to support shipments to the Waste Isolation Pilot Plant (WIPP: located in Carlsbad, New Mexico, USA). Topics include program changes to increase waste stream approval efficiency, Documented Safety Analysis (DSA)/Waste Acceptance Criteria (WAC), TRUPACT-III and Remote Handled (RH) shipments, lessons learned from NTP waste certification and transportation, and NTP transportation stakeholder engagement and support programs. Presentations proposed include: 1 - National TRU Program Update (Kenneth Princen, US DOE (USA)); 2 - WIPP WAC (Rev 9) Implementation (Mark Pearcy, Nuclear Waste Partnership, LLC (USA)); 3 - Remote-Handled (RH) TRU Waste Update (J.R. Stroble, US DOE (USA)); 4 - National TRU Program Transportation Stakeholder Engagement and Support (James Mason, US DOE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 51: Idaho Transuranic Waste Challenges, Solutions and Implications for the Future (3/5)

This panel focused on the retrieval, characterization, treatment, certification, and shipping of transuranic (TRU) waste at the Idaho National Laboratory (INL) Site, Idaho, USA. The INL began receiving TRU waste from offsite generators (primarily the Rocky Flats Plant in Colorado, USA) beginning in 1954. Until 1970, the INL Site disposed of barrels, boxes, and other debris in a shallow, unlined landfill. Beginning in 1970, the INL Site began storing TRU waste on an asphalt pad, which was then covered with several feet of soil. This practice continued until the late 1980's at which time a large air support building was erected over the waste. In the mid-to-late 1990's, the air support building was removed and a massive building was constructed over the entire dirt mound. Contractors retrieved the waste from the early 2000's through February 2017 to support an Idaho Settlement Agreement milestone that required the retrieval of 65,000 cubic meters of TRU waste and removal from Idaho. This panel focused on the Idaho Transuranic Waste Challenges, Solutions and Implications for the Future. The Idaho Transuranic Waste Program includes buried and stored waste retrieval and processing of contact- and remote-handled transuranic waste. Over the duration of the program, the Idaho site has conducted targeted retrieval of buried waste from the 1950's and 1960's; designed, permitted, built, operated, and completed the mission of a facility to process 65,000 cubic meters of waste; and shipped more than 57,000 cubic meters of waste to WIPP. Presentation proposed: Transuranic Waste Challenges and Solutions (Hoss Brown, Fluor Idaho, LLC (USA), John McCoy, Fluor Idaho, LLC (USA), James Malmo, US DOE (USA), Doug Pruitt, Department of Energy Idaho Field Office (USA), Kenneth Princen, US DOE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EM Program Expectations on Implementation of DOE O 458: Radiation Protection of Public/Environment - 19553

DOE Order 458.1, Radiation Protection of the Public and Environment, was issued in 2011. DOE sites were given 18 months to implement. The revised Order promulgates requirements for property clearance actions and independent verification. DOE Order 458.1 allows for preapproved authorized limits for the clearance of property. However, when property with the potential to contain residual radioactive material does not meet preapproved authorized limits, an authorized limits package must be developed. The Order contains a range of requirements for demonstrating with reasonable assurance that dose constraints are met for any actual or likely future use of the property to be released. EM has developed a draft guidance document that provides the elements of an authorized limits package. These elements are used to review all authorized limits packages that are submitted to EM. Expected elements include property description and process knowledge documentation, current and likely future use, the conceptual site model, dose modeling methodologies, specific authorized limits, dose- or concentration-based constraints, collective dose estimate to the potentially exposed population, stakeholder communications, description of the As Low As Reasonably Achievable (ALARA) analysis, implementation plan, evaluation of difficult to assess surfaces, and independent verification plan. The draft guidance document also provides further explanation of the desired elements of an independent verification (IV) plan. An IV plan should describe the planning phase, implementation phase, assessment phase, and decision phase of an activity. The planning phase includes scope and cost, concurrent with cleanup contractor procurement, and review and approval of site radiological survey clearance program and IV program plans. The implementation phase assures sufficient collection of data and adjustment can be made as necessary. During the assessment phase, data and reports are reviewed, and coordination between the clean-up contractor and IV personnel occurs. A decision of whether or not the clearance actions need to be altered occurs during the decision phase. IV certification that the clearance action is complete also occurs during the decision phase. Issuance of the final guidance document is meant to improve the consultation process and minimize iterative interactions with EM. Standardizing and formalizing property clearance and IV actions also helps assure that cleanup actions are transparent and sustainable for future scrutiny. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Potential Advantages to Employing an Onsite Laboratory at FUSRAP Sites Contaminated with Radionuclides and Metals - 20353

Various factors that support an evaluation of the relative costs, advantages and disadvantages of utilizing an onsite laboratory or an offsite laboratory for remediation of Formerly Utilized Sites Remedial Action Program (FUSRAP) sites contaminated with radionuclides and metals are presented. In terms of how much more quickly an onsite laboratory provides results versus an offsite laboratory, the results of this study provide tools for calculating the amount of cost savings per day for excavation of contaminated soils for various scenarios including: - State, municipal or local property remediation where the remediation schedule becomes time-critical due to the extra cost and inconvenience to the town or municipality caused by the need for increased security and safety personnel, possible road closures and detours, and the inconvenience to the public due to modified or decreased services of State or municipal facilities; - Residential property where the remediation schedule becomes time-critical due to the inconvenience to the homeowner as well as the importance of maintaining good community relations; - Commercial property where the remediation schedule becomes time-critical due to the hardship and potential loss of revenue endured by the property owner; - Open area where treatment of excavation water is required, and - Open area where treatment of excavation water is not required. For every scenario, the number of matrices, radionuclide and metal contaminants of concern and the project duration are important factors. The costs for the onsite laboratory included the capital costs associated with setting up the lab such as trailer(s) or building(s), power and water hookup, analytical testing equipment, balances, computers, desks and bookcases; support equipment such as hot plates, filtration assemblies, safety equipment, ovens, etc.; and supplies such as glassware, pipettes, filters, etc. and ongoing costs such as labor, chemicals and reagents, standards, cost of the laboratory obtaining certification and maintenance. Offsite laboratory sample testing costs are generally very competitive and typically substantially lower than onsite laboratory costs if only the sample testing costs are considered. The great disadvantage of using an offsite laboratory is that they often cannot guarantee rapid turnaround times for results which creates project delays associated with the remediation process including delays determining the completeness of the characterization and remediation processes, delays in backfilling a property and additional costs for treating wastewater (excavation water, stormwater or both). These costs will vary greatly depending upon the area of the country in which the project is located due to the wide range of labor costs for the onsite laboratory and field workers, as well as the contaminants of interest, matrices and most importantly the size of the impacted area and the number of properties located in that area. This paper provides guidelines for calculating the cost savings that may be realized if an onsite laboratory can generate results more quickly than an offsite laboratory by estimating the costs associated with the remediation process for the various scenarios noted above such as work crew labor costs, excavator and dump truck equipment rentals, wastewater treatment costs (if applicable) and the additional costs incurred by homeowners, commercial property owners and towns/municipalities that are reimbursed by the potentially responsible parties. Key assumptions involve the typical quickest turnaround time provided by the onsite and offsite laboratories. Costs for the operation of a wastewater treatment system and the remediation of a site area or property were provided by personnel who have been involved in the operation of a large FUSRAP site in New Jersey for many years. This study provides valuable information for determining the most cost-effective approach for analysis of project samples and therefore may be used on upcoming FUSRAP projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Mixed Waste Treatment Project Overcomes Challenges to Complete Treatment of Debris Waste - 20616

The Advanced Mixed Waste Treatment Project (AMWTP), operated by Fluor Idaho for the Department of Energy Idaho Operations Office, completed the last of its debris waste treatment in the fall of 2019. Concluding that work-scope was certainly not without its challenges. Fluor Idaho and its employees had to adapt to treating extremely challenging waste types, such as high-fissile gram materials and potentially pyrophoric and reactive wastes coming down the stretch. It also had to complete the sizing of large waste boxes from Mound Laboratories in inner-contamination enclosures designed to capture the extremely fine, 'flighty' plutonium-238 in its high-efficiency particulate air filters. Very few waste treatment facilities in the DOE Complex have completed their missions. In fact, most large-scale waste treatment facilities are still under construction with many months or years remaining before 'hot operations' begin. AMWTP is unique because it functioned as a 'one-stop shop.' Transuranic and low-level waste characterization, treatment, certification, and shipping all occurred there. AMWTP concluded the most challenging part of its mission and will continue to ship material out of the state of Idaho for the next decade. This paper will provide a background of the AMWTP mission, and the adaptations to its operating permit, equipment, or treatment processes to address challenging waste types. AMWTP will leave behind a legacy of being one of the most successful waste treatment facilities in the history of the DOE Complex. The facility was well-conceived, well-constructed, and well-executed; it was done right from start to finish. During the course of its waste treatment mission, the facility was required to adapt to changing conditions by treating extremely challenging waste types. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Migration to a fully-integrated control room - 349

The nuclear industry is faced with a pressing need to reduce operating costs in order to remain competitive with other forms of electric generation. While current industry initiatives are focused on incremental gains by streamlining work processes and reducing worker burdens, very few, if any, involve significant reductions in the base workload of a nuclear plant. Migration to a fully-integrated control room affords just such an opportunity. This report describes an NPP digital instrumentation and control (I and C) system design, along with its corresponding human systems interface (HSI) design, which achieves high plant availability, while selectively applying digital equipment redundancy and integrating traditional I and C system partitions, to minimize the digital equipment needed, and thereby minimize initial installation costs and ongoing operations and maintenance (O and M) costs. An additional key component of digital equipment minimization is optimization of the digital interface to conventional plant sensors and controlled plant devices (e.g., pumps, valves), which requires no disturbance to plant cables and results in eliminating thousands of electro-mechanical relay control components. The design is rooted in the highly integrated digital technology applied to the most recent advanced light water reactors under United States (U.S.) Nuclear Regulatory Commission (NRC) design certification review and approval. While this design employs technology from new plants, that technology has been adapted to the modernization of current operating NPPs. Hence, the highly integrated digital I and C and HSI design is referred to as the compact control room digital modernization (CDM). Along with minimal digital equipment, the corresponding HSI design employs compact operator workstations with visual display units (VDU) and soft controls for both the main control room (MCR) and remote shutdown room (RSR), to immediately improve human performance and ultimately facilitate operating staff reduction. Some advanced light water reactors have demonstrated this staff reduction through full scope simulator testing of normal and abnormal plant conditions, with U.S. licensed operating crews from currently-operating U.S. plants. Digital equipment minimization, compact operator workstations, and optimized plant component interfaces that require no disturbance to field cables, also facilitate implementation of the CDM over multiple phases, most of which can be conducted during normal refueling shutdown windows. This phased implementation method includes a novel transition of the I and C, MCR and RSR with an operations centered focus. This paper presents the CDM design, along with qualitative cost/benefit comparisons to currently operating plants with conventional analog I and C and HSI technology; this generation of I and C/HSI is referred to as a conventional control room (CCR). A CCR also includes NPPs that have been upgraded with digital systems, but retain the current partitions between plant I and C systems (i.e., no I and C integration) and retain the current plant system to control board configuration of current NPP control rooms. Even though these comparisons are qualitative, a compelling case is presented for the CDM. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of The Thermophysical Properties and Microstructure of UPu{sub 24}Zr{sub 15} Metallic Fuel

Featuring high burn-up, high fissile and fertile isotopic density, inherent safety characteristics, and favorable thermal response, actinide transmutation metallic fuels are considered to be among the most promising fuel classes for next generation fast reactors. During reactor operation, it is anticipated that fluctuations in chemical potential along the temperature gradient will lead to migration and redistribution of constituents between radial zones of the cylindrical fuel pin, resulting in compositional inhomogeneity and hence unpredictable fuel performance. Limited experimental fuel performance data is available for fuel selection and certification, therefore different compositions of options uranium-plutonium-zirconium (UPu- Zr) alloys have been investigated. Several complementary techniques, including scanning and transmission electron microscopy (SEM and TEM, respectively), differential scanning calorimetry (DSC), and laser flash diffusivity (LFD) techniques were used to characterize the phase distribution, microstructure, and thermophysical properties of unirradiated U-Pu-Zr fuels in both the as-cast and annealed condition. This information is necessary to understand the irradiated microstructure, properties, and performance of U-Pu-Zr fuels.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗