Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Protective helmet assembly

The invention is a protective helmet assembly with improved safety and impact resistance, high resistance to ignition and combustion, and reduced offgassing. The assembly comprises a hard rigid ballistic outer shell with one or more impact absorbing pads fitted to the interior surface. The pads are made of open cell flexible polyimide foam material, each of which is attached to the inner surface of the ballistic outer shell by cooperative VELCRO fastener strips of hook-and-loop material affixed respectively to the rigid outer shell and the impact absorbing pads. The helmet assembly with shell and pads is sized to fit relatively close over a wearer's head.

Dawn, Frederic S.↗

Emergency egress requirements for caution and warning, logistics, maintenance, and assembly stage MB-6 of Space Station Freedom

The safety and survival of the crewmembers has been the prime concern of NASA. Previous studies have been conducted mainly for emergencies occurring during the operating mode of the fully assembled Station. The present study was conducted to evaluate the emergency requirements for the caution and warning, logistics, maintenance, and assembly stage MB-6 of the Station in space. Effective caution and warning is essential to achieve safe egress in emergencies. In order to survive a long period in space, the safety and emergency requirements for maintenance, logistics, and extravehicular assembly operation in space must be met.

Ray, Paul S.↗

Space Station Freedom assembly and operation at a 51.6 degree inclination orbit

This study examines the implications of assembling and operating Space Station Freedom at a 51.6 degree inclination orbit utilizing an enhanced lift Space Shuttle. Freedom assembly is currently baselined at a 220 nautical mile high, 28.5 degree inclination orbit. Some of the reasons for increasing the orbital inclination are (1) increased ground coverage for Earth observations, (2) greater accessibility from Russian and other international launch sites, and (3) increased number of Assured Crew Return Vehicle (ACRV) landing sites. Previous studies have looked at assembling Freedom at a higher inclination using both medium and heavy lift expendable launch vehicles (such as Shuttle-C and Energia). The study assumes that the shuttle is used exclusively for delivering the station to orbit and that it can gain additional payload capability from design changes such as a lighter external tank that somewhat offsets the performance decrease that occurs when the shuttle is launched to a 51.6 degree inclination orbit.

Troutman, Patrick A.↗

Controls of interaction dynamics of orbital assembly

Building structures and spacecraft in orbit will require technologies for positioning, docking/berthing, and joining orbital structures. A fundamental problem underlying the operation of docking and berthing is that of controlling the contact dynamics of mechanical structures actuated by active mechanisms such as robotic devices. Control systems must be designed to control these active mechanisms so that both the free space motions and contact motions are stable and satisfy specifications on position accuracy and bounds on contact forces. For the large orbital structures of the future, the problem of interactive dynamics and control is fundamentally different in several ways than it was for spacecraft docking in the past. First, future space structures must be treated as flexible structures - the operations of docking, berthing, and assembly will need to respect the vibrations of the structures. Second, the assembly of these structures will require multiple-point contact, rather than the essentially single-point positioning of conventional spacecraft docking. Third, some assembly operations require the subassemblies to be brought and held in contact so that successful joining can be accomplished. A preliminary study of contact stability and compliance control design has resulted in the development of an analytical method and a design method to analyze stability. The analytical method analyzes the problem of stability when an actively-controlled structure contacts a passive structure. This method makes it possible to accurately estimate the stiffness of the passive structures with which the contact motion will become unstable. The analytic results suggest that passivity is neither achievable in practice, nor necessary as a design concept. A contact control system need only be passive up to a certain frequency; beyond that frequency the system can be stabilized with sufficiently small gains. With this concept the Center developed a design methodology for achieving desired compliant contact motions. This design method is based on H-infinity norm optimization, which makes it possible to consider both driving point mechanical impedance and systems robustness to modeling uncertainty. A laboratory facility was set up to verify experimentally the analytical and design theory.

Su, Renjeng↗

Automated assembly of a tetrahedral truss structure using machine vision

The Automated Structures Assembly Laboratory is a unique facility at NASA Langley Research Center used to investigate the robotic assembly of truss structures. Two special-purpose end-effectors have been used to assemble 102 truss members and 12 panels into an 8-meter diameter structure. One end-effector is dedicated to truss member insertion, while a second end-effector is used to install panels. Until recently, the robot motions required to construct the structure were developed iteratively using the facility hardware. Recent work at Langley has resulted in a compact machine vision system capable of providing position information relative to targets on the structure. Use of the vision system to guide the robot from an approach point 10 to 18 inches from the structure, offsetting model inaccuracies, permits robot motion based on calculated points as a first step toward use of preplanned paths from an automated path planner. This paper presents recent work at Langley highlighting the application of the machine vision system during truss member insertion.

Doggett, William R.↗

Structural concepts for a lunar transfer vehicle aerobrake which can be assembled on orbit

A multidisciplinary conceptual study was conducted to define a reusable Lunar transfer vehicle (LTV) aerobrake which could be launched on a Space Shuttle or Titan IV and assembled on orbit at Space Station Freedom. A major objective of this study was to design an aerobrake, with integrated structure and thermal protection systems, which has a mass less than 20 percent (9040 lb) of the LTV lunar return mass. This paper describes the aerobrake segmentation concepts, the structural concepts, a joint concept for assembly, and a structural design with analysis of the aerobrake. Results show that a 50-foot diameter LTV aerobrake can be designed for on-orbit assembly which will achieve the 20 percent mass budget.

Dorsey, John T.↗

STS-49 - A demonstration of EMU operational capabilities for Space Station Freedom assembly

One of the primary objectives for Space Shuttle mission STS-49 is to perform three EVAs on consecutive days in a manner similar to those planned for Space Station Freedom (SSF) assembly missions. The preparation and completion of this mission will serve as a pathfinder for future EVA intensive SSF assembly flights. Several operational issues pertaining to the EMU have been addressed in preparation for this mission. Provisioning and orbiter stowage of the EMU and associated hardware have been optimized for four EVA crewmembers. EMU preparatory and maintenance activities have been streamlined to help minimize crew overhead and have been carefully integrated into a very demanding mission timeline. The constraints and limitations have been assessed in providing a backup EMU capability for each EVA crewmember. Several EMU concerns have also been addressed in supporting new EVA task requirements, such as large mass handling and performing SSF assembly operations over the crew cabin and nose of the Shuttle orbiter.

Bleisath, Scott A.↗

In-Space Assembly and Construction Technology Project Summary: Infrastructure Operations Area of the Operations Technology Program

Viewgraphs describing the in-space assembly and construction technology project of the infrastructure operations area of the operation technology program are presented. Th objective of the project is to develop and demonstrate an in-space assembly and construction capability for large and/or massive spacecraft. The in-space assembly and construction technology program will support the need to build, in orbit, the full range of spacecraft required for the missions to and from planet Earth, including: earth-orbiting platforms, lunar transfer vehicles, and Mars transfer vehicles.

Bush, Harold↗

Cryogenic Optical Assembly (COA) cooldown analysis for the Cosmic Background Explorer (COBE)

The Cosmic Background Explorer (COBE) spacecraft, developed by Goddard Space Flight Center (GSFC), was successfully launched on November 18, 1989 aboard a Delta expendable launch vehicle. Two of the three instruments for this mission were mounted inside a liquid helium (LHe) dewar which operates at a temperature of 2 K. These two instruments are the Diffuse Infrared Background Experiment (DIRBE) and the Far Infrared Absolute Spectrophotometer (FIRAS). They are mounted to a common Instrument Interface Structure (IIS) and the entire assembly is called the Cryogenic Optical Assembly (COA). As part of the structural verification requirement, it was necessary to show that the entire COA exhibited adequate strength and would be capable of withstanding the launch environment. This requirement presented an unique challenge for COBE because the COA is built and assembled at room temperature (300 K), cooled to 2 K, and then subjected to launch loads. However, strength testing of the entire COA at 2 K could not be done because of facility limitations. Therefore, it was decided to perform the strength verification of the COA by analysis.

Coladonato, Robert J.↗

Power Reactant Storage Assembly (PRSA) (Space Shuttle). PRSA hydrogen and oxygen DVT tank refurbishment

The Power Reactant Storage Assembly (PRSA) liquid hydrogen Development Verification Test (H2 DVT) tank assembly (Beech Aircraft Corporation P/N 15548-0116-1, S/N 07399000SHT0001) and liquid oxygen (O2) DVT tank assembly (Beech Aircraft Corporation P/N 15548-0115-1, S/N 07399000SXT0001) were refurbished by Ball Electro-Optics and Cryogenics Division to provide NASA JSC, Propulsion and Power Division, the capability of performing engineering tests. The refurbishments incorporated the latest flight configuration hardware and avionics changes necessary to make the tanks function like flight articles. This final report summarizes these refurbishment activities. Also included are up-to-date records of the pressure time and cycle histories.

Source record↗

A process for preparing an assembly of an article and a soluble polyimide which resists dimensional change, delamination, and debonding when exposed to changes in temperature

An assembly of an article and a polyimide is prepared. The assembly resists dimensional change, delamination, or debonding when exposed to changes in temperature. An article is provided. A soluble polyimide resin solution having a low coefficient of thermal expansion (CTE) was prepared by dissolving the polyimide in solvent and adding a metal ion-containing additive to the solution. Examples of the additive are: Ho(OOCCH3), Er(NPPA)3, TmCl3, and Er(C5H7O2)3. The soluble polyimide resin is combined with the article to form the assembly.

Stoakley, Diane M.↗

Concept report: Experimental vector magnetograph (EXVM) operational configuration balloon flight assembly

The observational limitations of earth bound solar studies has prompted a great deal of interest in recent months in being able to gain new scientific perspectives through, what should prove to be, relatively low cost flight of the magnetograph system. The ground work done by TBE for the solar balloon missions (originally planned for SOUP and GRID) as well as the rather advanced state of assembly of the EXVM has allowed the quick formulation of a mission concept for the 30 cm system currently being assembled. The flight system operational configuration will be discussed as it is proposed for short duration flight (on the order of one day) over the continental United States. Balloon hardware design requirements used in formulation of the concept are those set by the National Science Balloon Facility (NSBF), the support agency under NASA contract for flight services. The concept assumes that the flight hardware assembly would come together from three development sources: the scientific investigator package, the integration contractor package, and the NSBF support system. The majority of these three separate packages can be independently developed; however, the computer control interfaces and telemetry links would require extensive preplanning and coordination. A special section of this study deals with definition of a dedicated telemetry link to be provided by the integration contractor for video image data for pointing system performance verification. In this study the approach has been to capitalize to the maximum extent possible on existing hardware and system design. This is the most prudent step that can be taken to reduce eventual program cost for long duration flights. By fielding the existing EXVM as quickly as possible, experience could be gained from several short duration flight tests before it became necessary to commit to major upgrades for long duration flights of this system or of the larger 60 cm version being considered for eventual development.

Source record↗

Weld joint concepts for on-orbit repair of Space Station Freedom fluid system tube assemblies

Because Space Station Freedom (SSF) is an independent satellite, not depending upon another spacecraft for power, attitude control, or thermal regulation, it has a variety of tubular, fluid-carrying assemblies on-board. The systems of interest in this analysis provide breathing air (oxygen and nitrogen), a working fluid (two-phase anhydrous ammonia) for thermal control, and a monopropellant (hydrazine) for station reboost. The tube assemblies run both internally and externally with respect to the habitats. They are found in up to 50 ft. continuous lengths constructed of mostly AISI 316L stainless steel tubing, but also including some Inconel 625 nickel-iron and Monel 400 nickel-copper alloy tubing. The outer diameters (OD) of the tubes range from 0.25-1.25 inches, and the wall thickness between 0.028-.095 inches. The system operational pressures range from 377 psi (for the thermal control system) to 3400 psi (for the high pressure oxygen and nitrogen supply lines in the ECLSS). SSF is designed for a fifteen to thirty year mission. It is likely that the tubular assemblies (TA's) will sustain damage or fail during this lifetime such that they require repair or replacement. The nature of the damage will be combinations of punctures, chips, scratches, and creases and may be cosmetic or actually leaking. The causes of these hypothetical problems are postulated to be: (1) faulty or fatigued fluid joints--both QD's and butt-welds; (2) micro-meteoroid impacts; (3) collison with another man-made object; and (4) over-pressure strain or burst (system origin). While the current NASA baseline may be to temporarily patch the lines by clamping metal c-sections over the defect, and then perform high pressure injection of a sealing compound, it is clear that permanent repair of the line(s) is necessary. This permanent repair could be to replace the entire TA in the segment, or perhaps the segment itself, both alternatives being extremely expensive and risky. The former would likely require extensive EVA to release TA clamps and pose great risk to other engineering subsystems, and the latter would require major de-servicing of the Station.

Jolly, Steven D.↗

Space Habitat, assembly and repair facility

Integrated Space Systems (ISS) has designed a Low Earth Orbit Assembly Facility for submission in the 1992 AIAA/LORAL Team Space Design Competition. This facility, the Space Habitat, Assembly, and Repair Center (SHARC), will be used to construct, assemble, and service space vehicles. SHARC's primary mission will be the construction of interplanetary vehicles, but it will also be able to perform repair and refueling operations of craft which are in an Earth orbit. This facility has been designed using only present and near-present technology. The emphasis is on minimizing cost.

Colangelo, Todd A.↗

Clean assembly and integration techniques for the Hubble Space Telescope High Fidelity Mechanical Simulator

A mechanical simulator of the Hubble Space Telescope (HST) Aft Shroud was built to perform verification testing of the Servicing Mission Scientific Instruments (SI's) and to provide a facility for astronaut training. All assembly, integration, and test activities occurred under the guidance of a contamination control plan, and all work was reviewed by a contamination engineer prior to implementation. An integrated approach was followed in which materials selection, manufacturing, assembly, subsystem integration, and end product use were considered and controlled to ensure that the use of the High Fidelity Mechanical Simulator (HFMS) as a verification tool would not contaminate mission critical hardware. Surfaces were cleaned throughout manufacturing, assembly, and integration, and reverification was performed following major activities. Direct surface sampling was the preferred method of verification, but access and material constraints led to the use of indirect methods as well. Although surface geometries and coatings often made contamination verification difficult, final contamination sampling and monitoring demonstrated the ability to maintain a class M5.5 environment with surface levels less than 400B inside the HFMS.

Hughes, David W.↗

Saddle clamp assembly

A saddle clamp assembly is presented. The assembly is comprised of a hollow cylindrical body centered about a longitudinal axis and being diametrically split into semicircular top and bottom sections. Each section has a pair of connection flanges, at opposite ends, that project radially outward. A pair of bolts are retained on the top section flanges and are threadable into nuts retained on the bottom section flanges. A base member is anchored to a central underside portion of the bottom clamp body section and has a pair of connection tabs positioned beneath the bottom clamp body section connection flanges on opposite sides of the clamp axis. A pair of bolts are retained on the base member connection tabs and are threadable into a pair of nuts retainable on a support structure. The connection tab and connection flanges on each side of the clamp body are axially offset in a manner permitting downward installation/removable tool access to the lower bolts past the connection flanges. An elongated retention tether is used to connect the top clamp body section to the balance of the clamp assembly. This prevents loss of the top clamp body section when it is removed from the bottom clamp body section.

Belrose, Charles R.↗

Process for preparing an assembly of an article and a polyimide which resists dimensional change, delamination and debonding when exposed to changes in temperature

An assembly of an article and a polyimide composition is prepared. The assembly resists dimensional change, delamination, or debonding when exposed to changes in temperature. An article is provided. A polyamic acid solution which yields a polyimide having a low coefficient of thermal expansion (CTE) was prepared. Equimolar quantities of an aromatic diamine and an aromatic dianhydride were reacted in a solvent medium to form a polyamic acid solution. A metal ion-containing additive was added to the solution. Examples of this additive are: TbCl3, DyCl3, ErCl3, TmCl3, Al(C5H7O2)3, and Er2S3. The polyamic acid solution was imidized and is combined with the article to form the assembly.

Stoakley, Diane M.↗

Characterization testing of MEASAT GaAs/Ge solar cell assemblies

The first commercial communications satellite with gallium-arsenide on germanium (GaAs/Ge) solar arrays is scheduled for launch in December 1995. The spacecraft, named MEASAT, was built by hughes Space and Telecommunications company for Binariang Satellite Systems of Malaysia. The solar cell assemblies consisted of large area GaAs/Ge cells supplied by Spectrolab Inc. with infrared reflecting (IRR) coverglass supplied by Pilkington Space Technology. A comprehensive characterization program was performed on the GaAs/Ge solar cell assemblies used on the MEASAT array. This program served two functions; first to establish the database needed to accurately predict on-orbit performance under a variety of conditions; and second, to demonstrate the ability of the solar cell assemblies to withstand all mission environments while still providing the required power at end-of-life. characterization testing included measurement of electrical performance parameters as a function of radiation exposure, temperature, and angle of incident light; reverse bias stability; optical and thermal properties; mechanical strength tests, panel fabrication, humidity and thermal cycling environmental tests. The results provided a complete database enabling the design of the MEASAT solar array, and demonstrated that the GaAs/Ge cells meet the spacecraft requirements at end-of-life.

Brown, Mike R.↗