Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “verifications”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

The Verification and Validation Strategy Within the Second Wind Forecast Improvement Project (WFIP 2)

The Wind Forecast Improvement Project 2 (WFIP2), in the complex terrain of the Columbia Gorge, focuses on a set of weather phenomena that poses particular challenges for wind and wind power forecasting. It further aims to understand and improve the skill of weather forecast models, particularly the National Oceanic and Atmospheric Administration's (NOAA's) High Resolution Rapid Refresh (HRRR), in complex terrain. The project also includes an extensive field campaign in the Columbia River Gorge, during which data from many different instruments were collected. WFIP2 is funded by the U.S. Department of Energy (DOE). Scientists from four U.S. national laboratories, NOAA, Vaisala, and universities contribute to the project with wide and varied interests and skill sets. Therefore, coordinated verification & validation (V&V) efforts across these members allows for the development of a clear picture of model improvements and scientific findings within WFIP2. The WFIP2 V&V team is tasked with providing tools, methods, and guidance to enable repeatable, metrics-based assessment of the Weather Research and Forecasting (WRF) model and associated modeling suites for analysis and forecasting of mesoscale weather phenomena that are important for wind energy in the Columbia River Gorge and other parts of the continental United States. This report summarizes what has been worked on and accomplished within the duration of the WFIP2 project, 4 years, by the V&V team.

17 WIND ENERGY↗

Verification and Validation for Energy System Co-Design and Simulation

This project was only active for two months and was terminated due to a re-organization of the sponsoring initiative. The original purpose of the project was to develop and apply verification and validation (V&V) methodologies for the Energy System Co-Design with Multiple Objectives and Power Electronics (E-COMP) Initiative. This report summarizes the project and the work that was completed in the shortened time frame.

42 ENGINEERING↗

Validation and Verification of TEDS Facility HYBRID Modeling

The HYBRID modeling repository is an in-house developed library of models for selected integrated energy systems (IES) modelling. HYBRID models have been developed since 2015 to describe the physical operation of tightly coupled thermal systems including power generators, thermal transport systems, thermal storage, thermal-to-electric conversion systems, and other thermal applications. Here, validation and verification (V&V) capabilities are demonstrated using the Thermal Energy Distribution System (TEDS) at INL. Building upon prior work, the TEDS model has been updated and verified so that it better represents the installed system configuration and the operating control system. The model control system was changed to allow replication of actual experimental procedures. Experimental operations focusing primarily on thermocline tank performance were devised and performed. Several anomalies were found in the operation data of the experiment facility. V&V activities calibrating a selected input parameter are demonstrated on a single component as well as with a single parameter within the thermocline. Calibrating is then demonstrated on multiple components and a multi-parameter metric for the entire system. The validation methodology is successfully applied to validate the model with experimental data. It is also used to confirm a hypothesis behind one of the anomalies in experimental performance.

25 ENERGY STORAGE↗

Verification of MELCOR Input Decks Used in ITER RPrS Analyses

This report as part of an ITER Task Agreement, documents the verification of the MELCOR Input Computer Decks used in performing the required safety analyses to be presented in the Preliminary Safety Report (Rapport Préliminaire de Séreté, RPrS).

99 GENERAL AND MISCELLANEOUS↗

Energy Star Lighting Verification Program (Program for the Evaluation and Analysis of Residential Lighting)

The Program for the Evaluation and Analysis of Residential Lighting (PEARL) is a watchdog program. It was created in response to complaints received by utility program managers about the performance of certain Energy Star lighting products being promoted within their service territories and the lack of a self-policing mechanism within the lighting industry that would ensure the reliability of these products and their compliance with ENERGY STAR specifications. To remedy these problems, PEARL purchases and tests products that are available to the consumers in the marketplace. The Lighting Research Center (LRC) tests the selected products against the corresponding Energy Star specifications. This final report summarizes the experimental procedure and results of all cycles (Cycles 1 through 8) of PEARL program from the beginning of year 2000 to the end of 2007, along with the description of apparatus used, equipment calibration process, experimental methodology, and research findings from the testing. In each cycle of PEARL program, PEARL Board selects a list of Compact Fluorescent Lamp (CFL) and Residential Lighting Fixture (RLF) models that are Energy Star qualified. In Cycle 5, Cycle 7, and Cycle 8, no fixture models were selected. After that PEARL sponsors procure product samples for each selected model from different stores and locations in the retail market and send them to LRC for testing. LRC then receive and select the samples, and test them against Energy Star specifications. After the testing LRC analyze and report the results to PEARL Board. Totally 185 models of CFL and 52 models of RLF were tested in PEARL program. Along with the evolution of the Energy Star specifications from year 2000 to 2003, parameters that were required by Energy Star changed during the eight years of PEARL program. The testing parameters and number of samples tested in PEARL program also changed during this time. For example, in Cycle 1, three samples of each models were tested for their photometric and electrical parameters only; in Cycle 2, 1000-hour Lumen Maintenance and the Rapid Cycle Stress Test was added and an additional set of six samples of each models were tested for Rapid Cycle Stress Test. Also, Cycle 2 data analysis included the testing and verification results against both the 'then existing' specification dated 2000 and the 'then new' specification dated 8/9/2001. In Cycle 3, Lumen Maintenance at 40% life was added and the number of samples for photometric and electrical testing was increased to five. In Cycle 6, the number of samples for photometric and electrical testing increased again to ten so that five of them were tested in base-up position and five in base-down position. A total of 2375 CFL samples were tested in PEARL program, out of the more than 3000 CFL samples that were purchased for the testing purpose of this program.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Remaining Sites Verification Package for the 600-111, P-11 Critical Mass Laboratory Crib, and UPR-600-16, Fire and Contamination Spread Waste Sites, Waste Site Reclassification Form 2008-045

The UPR-600-16, Fire and Contamination Spread waste site is an unplanned release that occurred on December 4, 1951, when plutonium contamination was spread by a fire that ignited inside the 120 Experimental Building. The 120 Experimental Building was a laboratory building that was constructed in 1949 and used for plutonium criticality studies as part of the P-11 Project. In November 1951, a criticality occurred in the 120 Experimental Building that resulted in extensive plutonium contamination inside the building. The confirmatory evaluation supports a reclassification of this site to Interim Closed Out. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of the extensive radiological survey of the surface soil and the confirmatory and verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

100-IU-6 Operable Unit↗

Cleanup Verification Package for the 118-F-6 Burial Ground

This cleanup verification package documents completion of remedial action for the 118-F-6 Burial Ground located in the 100-FR-2 Operable Unit of the 100-F Area on the Hanford Site. The trenches received waste from the 100-F Experimental Animal Farm, including animal manure, animal carcasses, laboratory waste, plastic, cardboard, metal, and concrete debris as well as a railroad tank car.

100-F Experimental Animal Farm↗

Cleanup Verification Package for the 118-B-1, 105-B Solid Waste Burial Ground

This cleanup verification package documents completion of remedial action, sampling activities, and compliance criteria for the 118-B-1, 105-B Solid Waste Burial Ground. This waste site was the primary burial ground for general wastes from the operation of the 105-B Reactor and P-10 Tritium Separation Project and also received waste from the 105-N Reactor. The burial ground received reactor hardware, process piping and tubing, fuel spacers, glassware, electrical components, tritium process wastes, soft wastes and other miscellaneous debris.

100B/C Area↗

Cleanup Verification Package for the 118-F-8:4 Fuel Storage Basin West Side Adjacent and Side Slope Soils

This cleanup verification package documents completion of remedial action, sampling activities, and compliance with cleanup criteria for the 118-F-8:4 Fuel Storage Basin West Side Adjacent and Side Slope Soils. The rectangular-shaped concrete basin on the south side of the 105-F Reactor building served as an underwater collection, storage, and transfer facility for irradiated fuel elements discharged from the reactor.

100F Area↗

Cleanup Verification Package for the 118-F-5 PNL Sawdust Pit

This cleanup verification package documents completion of remedial action, sampling activities, and compliance with cleanup criteria for the 118-F-5 Burial Ground, the PNL (Pacific Northwest Laboratory) Sawdust Pit. The 118-F-5 Burial Ground was an unlined trench that received radioactive sawdust from the floors of animal pens in the 100-F Experimental Animal Farm.

100-F Experimental Animal Farm↗

Cleanup Verification Package for the118-F-2 Burial Ground

This cleanup verification package documents completion of remedial action, sampling activities, and compliance with cleanup criteria for the 118-F-2 Burial Ground. This burial ground, formerly called Solid Waste Burial Ground No. 1, was the original solid waste disposal site for the 100-F Area. Eight trenches contained miscellaneous solid waste from the 105-F Reactor and one trench contained solid waste from the biology facilities.

100F Area↗

Cleanup Verification Package for the 118-F-1 Burial Ground

This cleanup verification package documents completion of remedial action for the 118-F-1 Burial Ground on the Hanford Site. This burial ground is a combination of two locations formerly called Minor Construction Burial Ground No. 2 and Solid Waste Burial Ground No. 2. This waste site received radioactive equipment and other miscellaneous waste from 105-F Reactor operations, including dummy elements and irradiated process tubing; gun barrel tips, steel sleeves, and metal chips removed from the reactor; filter boxes containing reactor graphite chips; and miscellaneous construction solid waste.

100F Area↗

Cleanup Verification Package for the 126-F-1, 184-F Powerhouse Ash Pit

This cleanup verification package documents completion of remedial action for the 126-F-1, 184-F Powerhouse Ash Pit. This waste site received coal ash from the 100-F Area coal-fired steam plant. Leakage of process effluent from the 116-F-14 , 107-F Retention Basins flowed south into the ash pit, contaminating the northern portion.

100F Area↗

Nuclear data verification based on Monte Carlo simulations of the LLNL pulsed-sphere benchmark experiments (1979 & 1986) using the Mercury code

Livermore's nuclear data group developed a new verification and validation test suite to ensure the quality of data used in application codes. This is based on models of LLNL's pulsed sphere fusion shielding benchmark experiments. Simulations were done with Mercury, a 3D particle transport Monte Carlo code using continuous-energy cross-section libraries. Results were compared to measurements of neutron leakage spectra generated by 14MeV neutrons in 17 target assemblies (for a blank target assembly, H{sub 2}O, Teflon, C, N{sub 2}, Al, Si, Ti, Fe, Cu, Ta, W, Au, Pb, {sup 232}Th, {sup 235}U, {sup 238}U, and {sup 239}Pu). We also tested the fidelity of simulations for photon production associated with neutron interactions in the different materials. Gamma-ray leakage energy per neutron was obtained from a simple 1D spherical geometry assembly and compared to three codes (TART, COG, MCNP5) and several versions of the Evaluated Nuclear Data File (ENDF) and Evaluated Nuclear Data Libraries (ENDL) cross-section libraries. These tests uncovered a number of errors in photon production cross-sections, and were instrumental to the V&V of different cross-section libraries. Development of the pulsed sphere tests also uncovered the need for new Mercury capabilities. To enable simulations of neutron time-of-flight experiments the nuclear data group implemented an improved treatment of biased angular scattering in MCAPM.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Development of a Safeguards Verification Method and Instrument to Detect Pin Diversion from Pressurized Water Reactor (PWR) Spent Fuel Assemblies Phase I Study

A novel methodology to detect diversion of spent fuel from Pressurized Water Reactors (PWR) has been developed in order to address a long unsolved safeguards verification problem for international safeguards community such as International Atomic Energy Agency (IAEA) or European Atomic Energy Community (EURATOM). The concept involves inserting tiny neutron and gamma detectors into the guide tubes of a spent fuel assembly and measuring the signals. The guide tubes form a quadrant symmetric pattern in the various PWR fuel product lines and the neutron and gamma signals from these various locations are processed to obtain a unique signature for an undisturbed fuel assembly. Signatures based on the neutron and gamma signals individually or in a combination can be developed. Removal of fuel pins from the assembly will cause the signatures to be visibly perturbed thus enabling the detection of diversion. All of the required signal processing to obtain signatures can be performed on standard laptop computers. Monte Carlo simulation studies and a set of controlled experiments with actual commercial PWR spent fuel assemblies were performed and validated this novel methodology. Based on the simulation studies and benchmarking measurements, the methodology developed promises to be a powerful and practical way to detect partial defects that constitute 10% or more of the total active fuel pins. This far exceeds the detection threshold of 50% missing pins from a spent fuel assembly, a threshold defined by the IAEA Safeguards Criteria. The methodology does not rely on any operator provided data like burnup or cooling time and does not require movement of the fuel assembly from the storage rack in the spent fuel pool. A concept was developed to build a practical field device, Partial Defect Detector (PDET), which will be completely portable and will use standard radiation measuring devices already in use at the IAEA. The use of the device will not require any information provided by the operator or any prior knowledge of the spent fuel assembly. The device can also be operated without any movement of the spent fuel from its storage position. Based on parametric studies conducted via computer simulation, the device should be able to detect diversion of as low as ten percent of the missing or replaced fuel from an assembly regardless of the location of the missing fuel within the assembly, of the cooling time, initial fuel enrichment or burnup levels. Conditions in the spent fuel pool such as clarity of the water or boron content are also not issues for this device. The shape of the base signature is principally dependent on the layout of the guide tubes in the various types of PWR fuel assemblies and perturbations in the form of replaced fuel pins will distort this signature. These features of PDET are all unique and overcome limitation and disadvantages presented by currently used devices such as the Fork detector or the Cerenkov Viewing Device. Thus, this device when developed and tested could fill an important need in the safeguards area for partial defect detection, a technology that the IAEA has been seeking for the past few decades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

99 GENERAL AND MISCELLANEOUS↗