Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Pipe Overpack Container Fire Testing: Phase II-A

The Pipe Overpack Container (POC) was developed at Rocky Flats to transport plutonium residues with higher levels of plutonium than standard transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) for disposal. In 1996 Sandia National Laboratories (SNL) conducted a series of tests to determine the degree of protection POCs provided during storage accident events. One of these tests exposed four of the POCs to a 30-minute engulfing pool fire, resulting in one of the 7A drum overpacks generating sufficient internal pressure to pop off its lid and expose the top of the pipe container (PC) to the fire environment. The initial contents of the POCs were inert materials, which would not generate large internal pressure within the PC if heated. However, POCs are now being used to store combustible Transuranic (TRU) waste at Department of Energy (DOE) sites. At the request of DOE's Office of Environmental Management (EM) and National Nuclear Security Administration (NNSA), SNL started conducting a new series of fire tests in 2015 to examine whether PCs with combustibles would reach a temperature that would result in (1) decomposition of inner contents and (2) subsequent generation of sufficient gas to cause the PC to overpressurize and release its inner content. In 2016, Phase II tests showed that POCs tested in a pool fire failed within 3 minutes of ignition with the POC lid ejecting. These POC lids were fitted with an all-metal (NUCFIL019DS) filter and revealed that this specific filter did not relieve sufficient pressure to prevent lid ejection. For the test phase discussed in this report, Phase II-A, the POCs are exposed to a 30-minute pool fire, with similar configurations to those tested in Phase II, except that the POC lids are fitted with a hybrid metal-polyethylene (UT9424S) filter instead. This report will: describe the various tests conducted in Phase II-A, present results from these tests, and discuss implications for the POCs based on the test results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Production Facility Prototype Blower 1000 Hour Test Results IV

Long duration operations tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks was not included in these tests. Twelve long duration 500 to 1000 hour tests have been completed since the first test was performed in January of 2016. All twelve long duration tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for the end of the ninth test to the twelfth test is included in this report. Complete details for the previous tests are shown in the reports, Production Facility Prototype Blower 1000 Hour Test Results, II, and III.

42 ENGINEERING↗

FY19 Status Report on Creep Test Data on Commercial Heat of Alloy 790

This report provides an update on the status of the creep rupture testing on the first commercial heat of Alloy 709 in support of the Alloy 709 Code Case development. The report is a Level 3 deliverable in FY19 (M3AT-19AN020502041), under the Work Package AT19AN0205204, “A709 Code Case Testing” performed by Argonne National Laboratory (ANL), as part of the Advanced Reactor Technologies Program. A creep test laboratory has been set up at ANL that comprises of 15 indirectly loaded test frames capable of testing ASTM standard-size specimens of the commercial heat of Alloy 709. The systems are equipped with high temperature furnaces capable of operation up to 1000°C in an air environment. In FY19, 15 creep-rupture tests of the ESR-1100°C solution annealed material, requiring the use of Type K thermocouples, were initiated to support the 100,000-hour Code Case. At the time of writing this report, eight tests were completed. This report presents the data from those completed tests and also microstructural characterization of the fractured specimens. During FY19, efforts were being made to add Type S thermocouples to five of the creep test frames, for performing longer term tests at higher temperatures.

36 MATERIALS SCIENCE↗

The Precision of Product Consistency Tests with Environmental Assessment Glass

Several series of triplicate tests conducting following the ASTM C1285 product consistency test method have been performed using samples of Environmental Assessment glass in Teflon™ and steel test vessels. The results of tests with test parameters within the ranges specified in the PCT method A procedure were used to calculate repeatability and reproducibility precision statistics for tests in each type of vessel. These show the test response and test precision attained in tests conducted in Teflon™ and stainless steel test vessels are statistically indistinguishable.

36 MATERIALS SCIENCE↗

Present Early Test Results at SECARB Industry Briefing [Slides]

Contents include the following presentations: 1) SECARB Phase III Early Test Cranfield, MS; 2) SECARB Phase III Early Test at Cranfield, March 9, 2010; 3) Update on Results of SECARB "Early" Test of Monitoring Large Volume Injection at Cranfield; 4) Progress Update SECARB "Early" Test Monitoring 3.5 Million Tons at Cranfield, March 7, 2012; 5) Cranfield Geophysical Monitoring Status and Results, March 8, 2012; 6) Large Volume CO 2 Injection at Cranfield, Early Field Test of the SECARB Phase III–Near-Surface Monitoring, March 7, 2012; 7) Shallow Groundwater Study at the Cranfield Site, March 12, 2013; 8) Subsurface Monitoring Studies–Results and Integration, March 12, 2013; 9) Review of the Petrophysics for the Cranfield Phase III Project, March 12, 2013; 10) Geomechanics at Cranfield, March 5, 2014; 11) Gulf Coast Carbon Center Near-Surface Update, March 4-5, 2014; 12) Monitoring Design Best Practices, March 5, 2014; 13) Assessing Impacts of CO 2 Leakage on Groundwater Quality and Monitoring Network Efficiency–Case Study at a CO 2 -EOR site, March 11, 2013; 14) Near-surface Stratigraphy and Geophysics, March 11, 2015; 15) Update on Reservoir Modeling and Final Testing and P&A Underway, March 11, 2013; 16) SECARB Early Test Retrospective; 17) Fluid Source Attribution at CCS and CO 2 -EOR Sites, March 8, 2016; 18) SECARB "Early Test" at Cranfield, March 8-9, 2017; 19) Analysis of Seismic Time-Lapse Observations at Cranfield; 20) SECARB Phase III Cranfield Project (Early Test), March 8, 2018; 21) Enhanced Analytical Simulation Tool (EASiTool) Dynamic Capacity Estimation; 22) Net Carbon Negative Oil Mass Accounting–Cranfield Case Study; 23) Knowledge Sharing; 24) Advancing Toward Commercialization Final Stages of the Early Test; 25) CO 2 EOR Feasibility in SECARB Region Limited by CH 4 ; 26) Understanding of CO2 Migration and Entrapment–Cranfield Site

01 COAL, LIGNITE, AND PEAT↗

SAS4A/SASSYS-1 Validation with the FFTF LOFWOS Tests #10-12

The FFTF liquid sodium cooled test reactor was built to assist the development and testing of advanced fuels and material for fast reactors. The goals of the FFTF Passive Safety Testing program included confirming the safety margins of FFTF as a liquid metal reactor, providing data for computer code validation, and demonstrating the inherent and passive safety benefits of its specific design features. The program included thirteen unprotected loss of flow without scram tests. The results of modeling and simulation of LOFWOS Tests #10, #11, and #12 are presented in this report to support validation of Argonne’s SAS4A/SASSYS-1 fast reactor safety analysis code. These three tests did not use the primary loop pony motors and thus transitioned to natural circulation flow rates from varying initial power levels. This validation activity leverages modeling and simulation efforts that originated under an International Atomic Energy Agency Coordinated Research Project (CRP) for benchmark analysis of the FFTF LOFWOS Test #13. The SAS4A/SASSYS-1 model originally developed for the CRP has been extended to include LOFWOS Tests #10-12 and modernized to utilize new code features and modeling practices. Predicted results from SAS4A/SASSYS-1 were compared to measured test data and differences were investigated. Overall, it was concluded that, for LOFWOS Tests #10-12, there was good agreement between the flow, power, and temperature predictions and the measured data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

PELICAN Design, Test Planning, and Commissioning Results

To support design efforts for the Versatile Test Reactor (VTR) core assemblies, an experimental facility has been designed and constructed at Argonne National Laboratory to match the hydraulic flow conditions within the VTR’s primary heat transport system (PHTS). This facility, the Pressure drop Experimental Loop for Investigations of Core Assemblies in advanced Nuclear reactors, PELICAN, provides the ability to measure pressure drop across a full-scale fuel assembly containing prototypic axial reflectors, fuel, and plena components. The PELICAN facility was designed and built to offer maximum flexibility, allowing testing from short sub-sections all the way to the full-length core fuel assemblies. The report presents the high-level program objectives, a summary of the facility design, instrumentation, and control systems, and the testing procedure. The outcomes from facility characterization efforts and first test matrix results are then presented and then, finally, the conclusion contains a summary of the future work to be performed. This test facility was designed to match the hydraulic conditions of the flowing sodium in the VTR using water as a surrogate fluid. To do so, the water is elevated to a temperature of 110°C where its viscosity matches that of sodium, and with a 50-HP centrifugal pump, is capable of generating full scale flow rates to achieve prototypic Reynolds and Euler number flow conditions. To prevent boiling, the system is maintained at elevated pressure of at least 2.7-3.0 bar (40-44 psig). A set of 15 tests have been used to perform checkout activities in order to commission the device, survey the capabilities of PELICAN, and generate experimental data at isothermal conditions and over a range of flow rates up to 44 kg/s (700 GPM) to produce datasets used in the verification and validation of VTR design and modeling efforts. Initial testing focused on facility characterization, which assessed the operational capabilities of various control systems. The thermal control system was qualified, including the thermal response of the loop to the heat added by self- and auxiliary heaters, the chiller and heat exchanger systems for removing excess heat, and their coupled ability to maintain steady-state isothermal conditions as desired. Additionally, the pressure control system was verified to ensure necessary operating environments that promote pump health and prevent boiling of loop inventory at high temperatures could be met. With these systems in place, the first set of matrix tests have been carried out using orifice plates with inner diameters of 2.25-inches and 2.5-inches. Orifice plate flow behavior is well covered in scientific literature, and the results find good agreement with the measured pressure drop vs flow rate and those of theoretical predictions. This initial testing not only helps to validate the experiment, but it also produces a high quality data set for a geometry that is easily reproducible for simulations. Finally, the report is concluded with a discussion of the work to come and provides a snapshot of the test articles in the experimental pipeline whose designs are being inspired by the current designs from the VTR.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Full Length Assembly Testing in PELICAN (Final Report)

In support of the development of the U.S. Department of Energy (DOE) Versatile Test Reactor (VTR), a thermal hydraulics test facility was constructed to generate experimental measurement of the pressure drop across a single full-scale assembly containing prototypic axial reflectors, fuel, and plena components. Constructed and operated at Argonne National Laboratory, the Pressure drop Experimental Loop for Investigations of Core Assemblies in Nuclear reactors (PELICAN) facility was designed to achieve hydraulic conditions identical to those anticipated for a full-scale fuel assembly located in the VTR core in the region with the highest flow rate. Using water as surrogate for liquid sodium, the flow loop was operated at elevated temperatures and pressures to match the thermophysical properties of liquid sodium and ensure matching Reynolds and Euler numbers. The measurement objectives for data generated from this test facility was driven primarily by the validation needs for code calculations and simulations of the reference VTR core. These objectives focused on the need to validate pressure drop results across the various segments of the fuel assembly as they relate directly to the pumping power and safety of the reactor. Presented in this report are experimental results and analytical comparisons based on testing of a full-length assembly in PELICAN. Housed within a hexagonal test section extending 3.4 m in length, the tested assembly features a prototypic lower reflector, grid plates, wire-wrapped rod bundle, upper reflector, and exit region. The rod bundle extends over 1.5 m in length and contains 217 individual wire-wrapped rods with dimensions that best reflect the reference VTR design. The as-tested bundle assembly was fabricated using 316 stainless steel 0.25-inch (6.35-mm) diameter rods wrapped with 0.04-inch (1.016-mm) diameter wire at a helical pitch of 10.51 inch (26.6 cm). Details of the method for in-house wire-wrapping, assembly, and installation are provided later in this report. Experimental measurements of pressure drop at 19 positions along the test assembly were recorded for a range of flow conditions, with special attention paid to key locations within the assembly, including component inlet and outlet, transition, and wire-wrapped rod bundle regions. Testing conditions were based on 110°C water with flow rates ranging from 50 to 450 GPM (3 to 27 kg/s) at the inlet of the test assembly generating Reynolds numbers and velocities up to ~8.0×10 4 and ~7.8 m/s, respectively, within the rod bundle region. Non-dimensional values for the friction factor were then calculated based on these experimental measurements and compared against those predicted by various analytical correlations available from open literature. Predictions by the upgraded Cheng and Todreas, Rehme, and Novendstern correlations fell within 4% to those values measured experimentally.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Gas Generation Testing of Crystalline Silicotitanate Ion Exchange Media

The Direct Feed Low-Activity Waste (DFLAW) process has been proposed to support early production of immobilized low-activity waste (LAW) at the Hanford site. As planned, Hanford tank waste would be sent to the Tank Side Cesium Removal (TSCR) system for solids removal (by filtration) and cesium removal (by ion exchange) during the initial phase of the DFLAW process. The resultant treated waste would be delivered to the LAW Vitrification Facility at the Hanford Tank Waste Treatment and Immobilization Plant (WTP) for immobilization. The ongoing technology maturation of TSCR system components is being conducted by Washington River Protection Solutions, LLC (WRPS). The ion exchange process in the TSCR system will use columns of crystalline silicotitanate (CST) to remove cesium from the LAW. This report describes gas generation testing of the crystalline silicotitanate ion exchange media that was conducted to strengthen the technical basis of the media for use in the TSCR system. Specifically, the described study will inform the safety basis of both the operation of the TSCR system and the interim storage condition of the TSCR ion exchange columns after loading. Previous data on gas generation of CST are limited to a handful of studies using CST or similar media under unrepresentative conditions and durations. The safety basis underlying operation and storage of the CST columns needs to consider the rate and extent of radiolytic flammable gas generation. No existing studies provide a comprehensive set of gas generation data for column operating and storage conditions representative of those expected for TSCR. To address the data gap, this study was conducted under the following conditions (each in duplicate): (1) CST in water at 25°C tested to 300 Mrad total dose, (2) wet CST (soaked in water, then free-drained) at 25°C tested to both 300 Mrad and 900 Mrad total dose, (3) dry CST (air-dried, free-flowing material equilibrated to laboratory conditions) at 25°C tested to both 300 Mrad and 900 Mrad total dose, (4) CST in 5.6M Na simulant at 25°C tested to 300 Mrad total dose, and (5) CST in 5.6M Na simulant with 1% (w/w) total organic carbon as Na 3 -HEDTA at 25°C and 70°C tested to 300 Mrad total dose. For each of the listed conditions, the generation of the following gas species was measured: hydrogen, oxygen, nitrous oxide, and methane. The test data was used to determine the amount of gas generated (total and on a per-component basis), gas generation rates normalized to the CST bed volume tested, and G-values for each gas species. The reported results illustrate that the CST-in-water condition bounds the gas generation rate (at 25°C) of all other conditions, but there is some variability in the hydrogen G-value, depending on the lot of CST tested and the amount of residual moisture present at the start of the test.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Gas Generation Testing of Crystalline Silicotitanate Ion Exchange Media

The Direct Feed Low-Activity Waste (DFLAW) process has been proposed to support early production of immobilized low-activity waste (LAW) at the Hanford site. As planned, Hanford tank waste would be sent to the Tank Side Cesium Removal (TSCR) system for solids removal (by filtration) and cesium removal (by ion exchange) during the initial phase of the DFLAW process. The resultant treated waste would be delivered to the LAW Vitrification Facility at the Hanford Tank Waste Treatment and Immobilization Plant (WTP) for immobilization. The ongoing technology maturation of TSCR system components is being conducted by Washington River Protection Solutions, LLC (WRPS). The ion exchange process in the TSCR system will use columns of crystalline silicotitanate (CST) to remove cesium from the LAW. This report describes gas generation testing of the crystalline silicotitanate ion exchange media that was conducted to strengthen the technical basis of the media for use in the TSCR system. Specifically, the described study will inform the safety basis of both the operation of the TSCR system and the interim storage condition of the TSCR ion exchange columns after loading. Previous data on gas generation of CST are limited to a handful of studies using CST or similar media under unrepresentative conditions and durations. The safety basis underlying operation and storage of the CST columns needs to consider the rate and extent of radiolytic flammable gas generation. No existing studies provide a comprehensive set of gas generation data for column operating and storage conditions representative of those expected for TSCR. To address the data gap, this study was conducted under the following conditions (each in duplicate): (1) CST in water at 25°C tested to 300 Mrad total dose, (2) wet CST (soaked in water, then free-drained) at 25°C tested to both 300 Mrad and 900 Mrad total dose, (3) dry CST (air-dried, free-flowing material equilibrated to laboratory conditions) at 25°C tested to both 300 Mrad and 900 Mrad total dose, (4) CST in 5.6M Na simulant at 25°C tested to 300 Mrad total dose, and (5) CST in 5.6M Na simulant with 1%(w/w) total organic carbon as Na3-HEDTA at 25°C and 70°C tested to 300 Mrad total dose. For each of the listed conditions, the generation of the following gas species was measured: hydrogen, oxygen, nitrous oxide, and methane. The test data was used to determine the amount of gas generated (total and on a per component basis), gas generation rates normalized to the CST bed volume tested, and G-values for each gas species. The reported results illustrate that the CST in water condition bounds the gas generation rate (at 25°C) of all other conditions, but there is some variability in the hydrogen G-value, depending on the lot of CST tested and the amount of residual moisture present at the start of the test.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Bench-Scale Testing of a Novel Biphasic Solvent-Enabled Absorption Process for Post-Combustion Carbon Capture (Final Technical Report)

A new class of biphasic solvents was developed, and the concept of the enabled carbon dioxide (CO 2 ) absorption process was tested for post-combustion carbon capture in our previous lab-scale research. The primary goals of this project were to advance the development of the novel biphasic CO 2 absorption process (BiCAP) and validate its technical advantages by testing the integrated technology at a 40 kWe bench-scale with actual coal-derived flue gas in a power plant environment. The project was led by the University of Illinois at Urban-Champaign (UIUC), and Trimeric Corporation served as a sub-awardee providing support in basic design and techno-economic studies. To achieve the project goals and objectives, solvent management studies, process modeling and optimization, bench-scale equipment design, construction and testing, and technical, economic and environmental assessments have been conducted. The two top-performing biphasic solvents developed in our previous research were used in this project. Biphasic solvent emissions and control were investigated in the laboratory. The emissions of the biphasic solvents from the absorber were comparable to or lower than the reference 30 wt% monoethanolamine (MEA) solution, while they could be more effectively removed in the water wash column. Lab-scale testing of solvent degradation reclamation has revealed that vacuum distillation was feasible for biphasic solvent reclamation. Aspen Plus models were used to optimize the BiCAP, and a CO 2 stripping configuration introducing a secondary cold solvent feed to the stripper was identified to be the most energy efficient. A 40 kWe bench-scale, integrated BiCAP system was successfully designed, fabricated, and installed at the UIUC’s Abbott Power Plant. Parametric testing with synthetic flue gas has demonstrated that the two biphasic solvents required a more than 40% lower heat duty for CO 2 desorption as compared to the reference MEA tested on the same bench-scale skid. Slipstream testing with actual coal flue gas for a total of 31 days in two test campaigns has further demonstrated stable operation of the bench-scale skid. During the first campaign targeting 90% CO 2 removal, the heat duty averaged at 2,183 MJ/tonne of CO 2 captured and during the second campaign targeting 95% removal, the heat duty averaged at 2,450 MJ/tonne of CO 2 captured. A techno-economic analysis has revealed that for integration of the BiCAP into a 650-MWe pulverized coal-fired power plant, the parasitic power loss was reduced by ~20%, and the cost of CO 2 capture was reduced by ~21% ($36.3/tonne on a December 2018 dollar basis) compared to the U.S. Department of Energy (DOE)’s baseline Case B12B. As progression from this bench-scale development effort, a new project “Engineering-Scale Testing of the Biphasic Solvent Based CO 2 Absorption Capture Technology at a Covanta Waste-to-Energy Facility” was awarded by the DOE, launched in February 2023, to allow the team to further test the technology and demonstrate its technical and economic advantages at a pilot scale.

20 FOSSIL-FUELED POWER PLANTS↗

Verification and Regression Testing of a Physically Stabilized Layered Solid Element Formulation in DYNA3D/Paradyn

Recent modeling of filament-wound composite structures drove the need for a new element type within the finite element code DYNA3D/Paradyn. This new layered solid element was implemented and designed to capture the kinematics and constitutive be havior of various lamina layers defined with arbitrary orientations and volume fractions within the element to accurately model a laminated composite material. The new el ement uses a single integration point in each of the lamina layers defined to capture the constitutive behavior, and a novel physical stabilization routine is used to prevent hourglassing while mitigating shear and volumetric locking. This report documents the verification testing and the regression tests added to the DYNA3D/Paradyn software quality assurance test suite to assess the proper implementation of the new layered solid element. There were a total of 27 tests added the DYNA3D test suite, which consist of problems using the layered solid element with a single layer or multiple layers for isotropic and orthotropic material models. These tests are a combination of simple kinematically driven patch tests, beam bending tests, plate bending tests, and more complicated problems. Ultimately, the testing done verifies that the element behaves as expected and is implemented correctly.

42 ENGINEERING↗

Hydraulic Testing of the Lost Lake Aquifer Near Recovery Wells RWM 6 and RWM 7

Hydrologic tests were conducted on the Lost Lake Aquifer Zone (LLAZ) at recovery wells RWM 6 and RWM 7 in accordance with the approved test plan (Dixon, 2023). The objective of the testing was to determine well performance parameters of RWM 6 and aquifer hydraulic properties near RWM 6 and RWM 7. Tests at RWM 6 consisted of a step-drawdown test to determine well performance parameters, a constant rate pump test to determine aquifer hydraulic properties, and an aquifer recovery test also used to determine aquifer hydraulic properties. Well performance parameters determined included specific capacity, well efficiency, and head loss coefficients. Prior to testing at RWM 6, a constant rate pump test was conducted at RWM 7. Data from this testing was used to determine aquifer hydraulic properties near RWM 7.

42 ENGINEERING↗

Compositional Variation Tests on DuraMelter 100 with LAW Sub-Envelope B1 Feed in Support of the LAW Pilot Melter, VSL-02R62N0-5, Rev. 0 (May 2003)

The principal objective of the DM100 tests was to demonstrate the robustness of the vitrification process with respect to feed and glass compositional changes resulting from variations in the simulant-to-additive ratio. The DM100-WV unit was selected for these tests; this melter was used for all of the Part B 1 tests on LAW Envelopes A, B, and C sulfate incorporation that were used to support the subsequent tests on the Pilot Melter as well as for the more recent LAW Sub-Envelope Al, A2, A3 and Cl tests. The same melter was selected for the present tests in order to maintain comparisons between the data sets. In addition, the somewhat smaller glass volume for the same melt surface area as compared to the DM100-BL melter means that more glass turnovers are achieved for a given test duration. The DM100 tests used nominal feed and feed with a 15% surplus in waste simulant. Previous Pilot Melter tests on Envelope A with 10% variations (but with sulfate removal) showed significant impacts on glass production rates that were ultimately corrected by adjustments in the sugar additions. Consequently, robustness with respect to throughput as well as sulfate tolerance are important motivations for these tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing Capabilities for Superconducting Magnets at Fermilab

This presentation will focus on the current testing capabilities for superconducting magnets at Fermilab, highlighting existing systems, recent upgrades, and future plans. The Vertical Magnet Test Facility (VMTF) remains a cornerstone for testing superconducting magnets in R&D applications, maintaining its established capabilities. Stand 4 continues to support the Hi-Lumi AUP production line of magnets in cryostats and has achieved significant improvements through a redesign of lead connections, resolving issues with liquid helium levels and resistance, culminating in a successful endurance test without interruption. Similarly, Stand 7 underwent commissioning and a lead redesign to reduce heat load, while its core testing capabilities remain unchanged. Looking forward, Stand 3 is undergoing a redesign, with plans to restart and begin commissioning by the end of 2025, introducing new features such as background magnetic field testing and upgraded power supplies. Fermilab is also advancing the High Field Vertical Magnet Test Facility (HFVMTF), designed to support the fusion and magnet R&D program, with commissioning scheduled for 2025 and critical components, including the cryostat and power supplies, being delivered. Enhancing all operations, the newly commissioned IB1 cryoplant now offers automated overnight helium production and efficient transfer to a 10,000-liter dewar, streamlining support across all test stands. This talk will provide a comprehensive overview of testing capabilities, and showcasing how Fermilab is advancing its capabilities to meet the evolving demands of superconducting magnet testing.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Central Nevada Test Area, Nevada Fact Sheet

The Central Nevada Test Area (CNTA) is in the Hot Creek Valley of south-central Nevada, approximately 70 miles northeast of Tonopah. The CNTA consists of three parcels totaling 2,560 acres. The parcels are spaced approximately 3 miles apart along a roughly north-south line. The total acreage is currently withdrawn from all forms of appropriation associated with mining laws and leasing. The U.S. Atomic Energy Commission, a predecessor agency of the U.S. Department of Energy (DOE), acquired the CNTA in the early 1960s to develop alternative sites to the Nevada National Security Site (formerly known as the Nevada Test Site) for underground nuclear testing. Three emplacement boreholes (UC-1, UC-3, and UC-4) were drilled on the three parcels at the CNTA for underground nuclear testing. The initial underground nuclear test at CNTA, Faultless, was conducted in borehole UC-1 at a depth of 3,199 feet below ground surface on January 19, 1968. The yield of the Faultless test was estimated to be 0.2 to 1 megaton. Its purpose was to evaluate the environmental and structural effects that might be expected if subsequent, higher-yield underground nuclear tests were conducted in this vicinity. The test resulted in a down-dropped fault block visible at land surface. In addition, seismic results supported the indication that the site was not favorable for larger detonations. The nuclear detonation created a cavity with a radius of approximately 328 feet. The Faultless test did not release any radioactivity at the surface, and no additional tests were conducted at the CNTA.

54 ENVIRONMENTAL SCIENCES↗

Reversible Bending Fatigue Testing on Zry-4 Surrogate Rods

Testing high-burnup spent nuclear fuel (SNF) presents many challenges in areas such as specimen preparation, specimen installation, mechanical loading, load control, measurements, data acquisition, and specimen disposal because these tasks are complicated by the radioactivity of the test specimens. Research and comparison studies conducted at Oak Ridge National Laboratory (ORNL) resulted in a new concept in 2010 for a U-frame testing setup on which to perform hot-cell reversible bending fatigue testing. Subsequently, the three-dimensional finite element analysis and the engineering design of components were completed. In 2013 the ORNL team finalized the upgrade of the U-frame testing setup and the integration of the U-frame setup into a Bose dual linear motor test bench to develop a cyclic integrated reversible-bending fatigue tester (CIRFT). A final check was conducted on the CIRFT test system in August 2013, and the CIRFT was installed in the hot cell in September 2013 to evaluate both the static and dynamic mechanical response of SNF rods under simulated loads. The fatigue responses of Zircaloy-4 (Zry-4) cladding and the role of pellet pellet and pellet clad interactions are critical to SNF vibration integrity, but such data are not available due to the unavailability of an effective testing system. While the deployment of the developed CIRFT test system in a hot cell will provide the opportunity to generate the data, the use of a surrogate rod has proven quite effective in identifying the underlying deformation mechanism of an SNF composite rod under an equivalent loading condition. This paper presents the experimental results of using surrogate rods under CIRFT reversible cyclic loading. Specifically, monotonic and cyclic bending tests were conducted on surrogate rods made of a Zry-4 tube and alumina pellet inserts, both with and without an epoxy bond.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LTE Band 13 and Band 14 Interference Test Summary

Introduction Verizon Wireless operates a nationwide commercial LTE system in Band 13 in the United States. FirstNet will deploy a nationwide Public Safety LTE system in the neighboring Band 14 spectrum to provide first responders with much needed broadband data services. The Idaho National Laboratory’s (INL) Wireless Test Bed (WTB) conducted interference testing between LTE Band 13 and Band 14 systems at typical vertical separation distances encountered on towers with co-located systems. The test configuration mimicked a co-location scenario where Band 13 and Band 14 systems are placed on the same tower with a vertical separation distance of 10 feet. The Band 13 and Band 14 interference testing was conducted in an open-air environment in a location off the INL Test Range that does not have RF emissions in either Band 13 or Band 14. A 30-mile area in the Little Lost River Valley in South Central Idaho was identified that is northwest of the INL range that meets that criterion. The GPS coordinates of the test area are 44° 9’ 14.89” N, 113° 21’ 56.58” W. Based on the noise floor measurements, very little RF noise is present in LTE Band 13 and Band 14 in the remote test location in the Little Lost River Valley in Idaho. This RF isolated area provides a great place to conduct testing of LTE Band 13 and Band 14 performance without effecting or being effected by existing LTE Band 13 or Band 14 systems. The Band 13 baseline average overall throughput was 72.0 Mbps which compares to an overall average throughput of 73.7 Mbps when both Band 13 and Band 14 were transmitting with a typical 10 foot vertical separation. This separation is also required for the antennas to be isolated from each other and not interfere with each other [2]. The Band 14 baseline average overall throughput was 65.2 Mbps which compares to an overall average throughput of 65.9 Mbps when both Band 13 and Band 14 were transmitting with a typical 10 foot vertical separation. These results indicate neither Band 13 nor Band 14 was affected by adjacent channel interference in a co-location scenario with 10 foot vertical separation between radiation centers. Horizontal separation testing should be conducted to verify interference would not exist in a nearby site scenario where Band 13 and Band 14 systems are placed on either adjacent towers or on rooftops of adjacent buildings in close proximity to each other. Interference testing should also be conducted between LTE Band 14 systems and the adjacent Public Safety Narrowband LMR systems. The 1 MHz guard band between LTE Band 14 and the LMR band may not be sufficient enough to prevent interference between these disparate systems. The LMR handsets transmit up to 5W in narrowband channels as narrow as 6.25 kHz bandwidth, which could de-sensitize the Band 14 eNodeB receivers especially in a near-far scenario.

42 ENGINEERING↗