Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “multiple components”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Gas flows in S-E binary systems of galaxies

Tidal interaction between the galaxies in binary systems leads to important consequences. Some peculiarities in galactic morphology as well as the transfer of matter from one galaxy to another may be due to this factor. In particular, gas flows in intergalactic space may be formed. Such flows enriching one component with gas from the other may play a substantial role in the evolution of mixed (S-E) pairs. One can mention several facts corroborating the possibility of the gas transfer from the spiral to the elliptical galaxy. High HI content (10(exp 7) to 10(exp 9) solar mass) is detected in nearly 40 E galaxies (Bottinelli and Gougenheim, 1979; Knapp et al., 1985). Such galaxies are often members of pairs or of multiple systems including an S galaxy, which may be the source of gas (Smirnov and Komberg, 1980). Moreover, the gas kinematics and its distribution also indicate an external origin for this gas (Knapp et al., 1985). In many cases there is an outer gaseous disk. The directions of the disk and of stellar rotation don't always coincide (van Gorkom et al., 1985; Varnas et al., 1987). The galaxy colors in S-E pairs are correlated (the Holmberg effect): bluer ellipticals have spiral components that are usually bluer (Demin et al., 1984). The fraction of E galaxies with emission lines (N sub em) in S-E pairs showing traces of tidal interaction is twice as large (N sub em approx. equals 0.24) as in pairs without interaction (N sub em approx. equals 0.12) (Sotnikova, 1988b). Since the presence of emission lines in a galaxy spectrum strongly depends on gas content, this fact also leads to the conclusion that ellipticals in interacting S-E pairs are enriched with gas. These facts may be considered as a serious indication of the existence of gas transfer. Hence, investigation of this process is of interest.

Sotnikova, N. YA.↗

Articulation Management for Intelligent Integration of Information

When combining data from distinct sources, there is a need to share meta-data and other knowledge about various source domains. Due to semantic inconsistencies and heterogeneity of representations, problems arise in combining multiple domains when the domains are merged. The knowledge that is irrelevant to the task of interoperation will be included, making the result unnecessarily complex. This heterogeneity problem can be eliminated by mediating the conflicts and managing the intersections of the domains. For interoperation and intelligent access to heterogeneous information, the focus is on the intersection of the knowledge, since intersection will define the required articulation rules. An algebra over domain has been proposed to use articulation rules to support disciplined manipulation of domain knowledge resources. The objective of a domain algebra is to provide the capability for interrogating many domain knowledge resources, which are largely semantically disjoint. The algebra supports formally the tasks of selecting, combining, extending, specializing, and modifying Components from a diverse set of domains. This paper presents a domain algebra and demonstrates the use of articulation rules to link declarative interfaces for Internet and enterprise applications. In particular, it discusses the articulation implementation as part of a production system capable of operating over the domain described by the IDL (interface description language) of objects registered in multiple CORBA servers.

Maluf, David A.↗

Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

A dish-Stirling solar-thermal power system

This paper presents results of a preliminary design/economic study of a first-generation point focusing distributed receiver solar-thermal electric system optimized for application to industrial and small community power plants at power levels up to 10 MWe. Power conversion is provided by small Stirling cycle engines mounted at the focus of paraboloidal solar concentrators. The output of multiple power modules (concentrator, receiver, engine, and electric generator) is collected by means of a conventional electrical system and interfaced with a utility grid. Based on the United Stirling P-75 engine, a 1 MWe system employing mass-produced components (100,000 modules/year) could produce electricity at costs competitive with those projected for electricity generated by more conventional means, e.g. with fossil fuels.

Pons, R. L.↗

Multimission advanced configuration

The proposed multimission configuration reduces the number of reflectors present on the spacecraft and their related supporting structure (masts, booms) and at the same time divides the feed system from the reflector system for possible maintenance and/or payload substitution. This implies: An antenna system that is split into two parts: (1) the reflector with the platform (2) the feed subsystem with the payload. Reuse of the same reflector at different frequencies (to achieve this, the reflector system will use additional components, i.e., frequency sensitive subreflectors (FSS)). In case of in-orbit refurbishment or maintenance, the reflector system may remain in orbit with the platform. The presence of the FSS allows separation of the focal position sufficiently for the multiple-contoured beam applications required by future missions. There are two of these reflectors (one for TX function, one for RV deployed) on the east and west sides of the spacecraft, and the solar panels are on the north and south sides. The payloads are aligned along the yaw axis. Apart from the size, this configuration looks like a conventional spacecraft.

Saitto, A.↗

Adaptive interference techniques for mobile antennas

The results of a study performed to investigate effective, low cost adaptive signal processing techniques for suppressing mutual satellite interference that can arise in a mobile satellite (MSAT) communication system are discussed. The study focused on the use of adaptive sidelobe cancelling as a method to overcome undesired interference caused by a multiplicity of satellite transmissions within the field of view of the ground station. Results are presented which show that the conventional sidelobe canceller produces undesired reduction of the useful signal. This effect is due to the presence of the useful component in the reference antenna element. An alternative structure, the generalized sidelobe canceller (GSC), has been proposed to overcome this difficulty. A preliminary investigation of possible implementations of the GSC was conducted. It was found that at most 8 bits would be required to implement the GSC processor under conditions in which the desired signal-to-interference ratio is 25 dB.

Griffiths, Lloyd J.↗

Precise Tracking of the Magellan and Pioneer Venus Orbiters by Same-Beam Interferometry. Part 2: Orbit Determination Analysis

A new radio metric positioning technique has demonstrated improved orbit determination accuracy for the Magellan and Pioneer Venus Orbiter orbiters. The new technique, known as Same-Beam Interferometry (SBI), is applicable to the positioning of multiple planetary rovers, landers, and orbiters which may simultaneously be observed in the same beamwidth of Earth-based radio antennas. Measurements of carrier phase are differenced between spacecraft and between receiving stations to determine the plane-of-sky components of the separation vector(s) between the spacecraft. The SBI measurements complement the information contained in line-of-sight Doppler measurements, leading to improved orbit determination accuracy. Orbit determination solutions have been obtained for a number of 48-hour data arcs using combinations of Doppler, differenced-Doppler, and SBI data acquired in the spring of 1991. Orbit determination accuracy is assessed by comparing orbit solutions from adjacent data arcs. The orbit solution differences are shown to agree with expected orbit determination uncertainties. The results from this demonstration show that the orbit determination accuracy for Magellan obtained by using Doppler plus SBI data is better than the accuracy achieved using Doppler plus differenced-Doppler by a factor of four and better than the accuracy achieved using only Doppler by a factor of eighteen. The orbit determination accuracy for Pioneer Venus Orbiter using Doppler plus SBI data is better than the accuracy using only Doppler data by 30 percent.

Folkner, W. M.↗

On automating domain connectivity for overset grids

An alternative method for domain connectivity among systems of overset grids is presented. Reference uniform Cartesian systems of points are used to achieve highly efficient domain connectivity, and form the basis for a future fully automated system. The Cartesian systems are used to approximated body surfaces and to map the computational space of component grids. By exploiting the characteristics of Cartesian Systems, Chimera type hole-cutting and identification of donor elements for intergrid boundary points can be carried out very efficiently. The method is tested for a range of geometrically complex multiple-body overset grid systems.

Chiu, Ing-Tsau↗

Active control of nonlinear-nonstationary response and radiation of a panel-stringer structure near a supersonic jet

This paper is on the control of nonlinear-nonstationary vibration of an aircraft-type frame-stringer structure and the acoustic radiation resulting from high levels of excitation by a nearby supersonic model jet exhaust. The objective of the control is to reduce the acoustic fatigue and the interior noise in a high-speed aircraft. Control of the structural response is achieved by actively forcing the structure with an actuator at the shock oscillation frequency whose amplitude is locked into a self-control cycle. This controller follows the amplitude modulation that results from the rotation and counter-rotation of the jet column. Results show that the peak level of the power in the structural response due to shock impingement is reduced by a factor of 63, corresponding to a power level reduction of 18 dB. As a result, new broadband components emerge with at least four harmonics contributing to the broadening of the response spectrum. At accelerating and decelerating supersonic speeds, the exhaust from the jet induces higher transient loading on the nearby flexible structure due to the occurrence of multiple shocks from the jet.

Maestrello, Lucio↗

Evidence for a disk in the wind of HD 93521: UV line profiles from an axisymmetric model

Recently it has been suggested (Massa 1992; Howarth & Reid 1993), from the C IV ultraviolet resonance line profile of HD 93521, that there is a high-speed component in the polar outflow from the star as well as a low-speed component in the equatorial regions. In this paper we present theoretical calculations of the line profiles that would be produced by such a model. We find from Hubble Space Telescope (HST) Goddard High Resolution Spectrograph (GHRS) observations of HD 93521 that the observed C IV profile can be produced if the star has an inclination angle very close to 90 deg and if the star is surrounded by a thin disk, whose half-width is approximately 3 deg in latitude. The geometry of this disk is similar to what one would expect from the wind-compressed disk model of Bjorkman & Cassinelli, so this star may provide an ideal observational test of that model. In addition to the C IV resonance line, we examine both the Si IV and N V resonance lines. The Si IV line exhibits low-velocity absorption that is similar to that seen in the C IV line, but the emission is much weaker. On the other hand, the N V line has weaker absorption and much stronger emission than the C IV line. N V is a higher ionization state than C IV, so it is likely that N V is one stage above the dominant state, N IV. Apart from fitting individual line profiles, we also examine the differences between the two Hubble Space Telescope observations of HD 93521. We find evidence for a pair of narrow absorption components, seen at low velocity, as well as evidence for a discrete emission feature in the blueshifted absorption cores of the lines. This blueshifted emission at low velocity can cause what instead appears to be an interstella absorption line. Without multiple observations that can reveal the temporary emission, one must be very careful when determining interstellar column densities to stars like HD 93521.

Bjorkman, J. E.↗

On automating domain connectivity for overset grids

An alternative method for domain connectivity among systems of overset grids is presented. Reference uniform Cartesian systems of points are used to achieve highly efficient domain connectivity, and form the basis for a future fully automated system. The Cartesian systems are used to approximate body surfaces and to map the computational space of component grids. By exploiting the characteristics of Cartesian systems, Chimera type hole-cutting and identification of donor elements for intergrid boundary points can be carried out very efficiently. The method is tested for a range of geometrically complex multiple-body overset grid systems. A dynamic hole expansion/contraction algorithm is also implemented to obtain optimum domain connectivity; however, it is tested only for geometry of generic shapes.

Chiu, Ing-Tsau↗

An Accelerated Development, Reduced Cost Approach to Lunar/Mars Exploration Using a Modular NTR-Based Space Transportation System

The results of integrated systems and mission studies are presented which quantify the benefits and rationale for developing a common, modular lunar/Mars space transportation system (STS) based on nuclear thermal rocket (NTR) technology. At present NASA's Exploration Program Office (ExPO) is considering chemical propulsion for an 'early return to the Moon' and NTR propulsion for the more demanding Mars missions to follow. The time and cost to develop these multiple systems are expected to be significant. The Nuclear Propulsion Office (NPO) has examined a variety of lunar and Mars missions and heavy lift launch vehicle (HLLV) options in an effort to determine a 'standardized' set of engine and stage components capable of satisfying a wide range of Space Exploration Initiative (SEI) missions. By using these components in a 'building block' fashion, a variety of single and multi-engine lunar and Mars vehicles can be configured. For NASA's 'First Lunar Outpost' (FLO) mission, an expendable NTR stage powered by two 50 klbf engines can deliver approximately 96 metric tons (t) to translunar injection (TLI) conditions for an initial mass in low earth orbit (IMLEO) of approximately 198 t compared to 250 t for a cryogenic chemical TLI stage. The NTR stage liquid hydrogen (LH2) tank has a 10 m diameter, 14.5 m length, and 66 t LH2 capacity. The NTR utilizes a UC-ZrC-graphite 'composite' fuel with a specific impulse (Isp) capability of approximately 900 s and an engine thrust-to-weight ratio of approximately 4.3. By extending the size and LH2 capacity of the lunar NTR stage to approximately 20 m and 96 t, respectively, a single launch Mars cargo vehicle capable of delivering approximately 50 t of surface payload is possible. Three 50 klbf NTR engines and the two standardized LH2 tank sizes developed for lunar and Mars cargo vehicle applications would be used to configure the Mars piloted vehicle for a mission as early as 2010. The paper describes the features of the 'common' NTR-based moon/Mars STS, examines performance sensitivities resulting from different 'mission mode' assumptions, and quantifies potential schedule and cost benefits resulting from this modular moon/Mars NTR vehicle approach.

Borowski, S.↗

Technical Challenges for Next Generation Composite Duct Technology

The Access to Space Study identified the requirement for lightweight structures to achieve orbit with a single stage vehicle. The use of composite components partially fulfills that requirement. The purpose of this presentation is to review the technical challenges in the use of composite materials and processes for lines and ducts on next generation launch vehicles. This presentation will identify current requirements for space and missile system components; review the state of the art for existing system components; identify show stoppers to advancing the state of the art; identify technical issues that might limit the application of advanced materials; identify key materials that might provide a high payoff; and identify opportunities for joint partnerships to overcome these multiple technical challenges.

Ledbetter, Frank E., III↗

Novel Engineering and Fabrication Techniques Tested in Low-Noise- Research Fan Blades

A major source of fan noise in commercial turbofan engines is the interaction of the wake from the fan blades with the stationary vanes (stators) directly behind them. The Trailing Edge Blowing (TEB) project team at the NASA Glenn Research Center designed and fabricated new fan blades to study the effects of fan trailing edge blowing as a potential noise-reduction concept. The intent is to fill the rotor wake by supplying air to the rotor blade trailing edge at the proper conditions to minimize the wake deficit, and thus generate less noise. The TEB hardware is designed for the Active Noise Control Fan (ANCF) test rig in Glenn's Aeroacoustic Propulsion Laboratory. For this test, the air is fed from an external supply through the shaft of the rig. It is distributed to the base of each blade through an impeller, where it is forced into a plenum at the core of each blade. In actual engine configuration, air would most likely be bled from the compressor, but only at times when noise is an issue, such as takeoffs and landings. Glenn researchers designed and manufactured the blades in-house, using new techniques and concepts. The skins, which were designed for maximum strength in the directions of highest stress, were molded from multiple layers of carbon fiber. Considerable use was made of rapid prototyping techniques, such as laser sintering. The core was sintered from a lightweight polymer, and the retainer was CNC-machined (computer numerical control machined) from aluminum. All the components were joined with a cold-cure aerospace adhesive. These techniques and processes reduced the overall cost and allowed the new concept to be studied much sooner than would be possible using traditional fabrication methods. Since this test rig did not support the use of blade-monitoring techniques such as strain gauges, extensive bench testing was required to qualify the design. The blades were examined using a variety of methods including holography, pull tests (cyclic and failure), shake tests, rap tests, and nondestructive inspection. Acoustic testing of the ANCF fan using TEB has been ongoing since January of 2001. The fan has completed about 100 hr of testing with no structural, vibrational, or fatigue problems. Far-field acoustic measurements, in-duct mode measurements, precise hot wire surveys, and detailed performance measurements are providing data for evaluating the concept. The far-field noise data show that tone noise was reduced significantly with the initial ANCF TEB fan design. In addition, a significant reduction in unsteady stator loading has been measured, indicating the potential for stator broadband noise reduction. The acoustic benefits will be assessed and important design parameters identified to improve the ability to fully exploit any benefit provided by this technique. On the basis of the success of trailing edge blowing, Glenn plans to continue this research with a higher speed, higher pressure ratio fan operating in an acoustic wind tunnel to simulate flight conditions.

Cunningham, Cameron C.↗

Evaluation of an Active Clearance Control System Concept

Reducing blade tip clearances through active tip clearance control in the high pressure turbine can lead to significant reductions in emissions and specific fuel consumption as well as dramatic improvements in operating efficiency and increased service life. Current engines employ scheduled cooling of the outer case flanges to reduce high pressure turbine tip clearances during cruise conditions. These systems have relatively slow response and do not use clearance measurement, thereby forcing cold build clearances to set the minimum clearances at extreme operating conditions (e.g., takeoff, reburst) and not allowing cruise clearances to be minimized due to the possibility of throttle transients (e.g., step change in altitude). In an effort to improve upon current thermal methods, a first generation mechanically-actuated active clearance control (ACC) system has been designed and fabricated. The system utilizes independent actuators, a segmented shroud structure, and clearance measurement feedback to provide fast and precise active clearance control throughout engine operation. Ambient temperature performance tests of this first generation ACC system assessed individual seal component leakage rates and both static and dynamic overall system leakage rates. The ability of the nine electric stepper motors to control the position of the seal carriers in both open- and closed-loop control modes for single and multiple cycles was investigated. The ability of the system to follow simulated engine clearance transients in closed-loop mode showed the system was able to track clearances to within a tight tolerance (0.001 in. error).

Steinetz, Bruce M.↗

Evaluation of an Active Clearance Control System Concept

Reducing blade tip clearances through active tip clearance control in the high pressure turbine can lead to significant reductions in emissions and specific fuel consumption as well as dramatic improvements in operating efficiency and increased service life. Current engines employ scheduled cooling of the outer case flanges to reduce high pressure turbine tip clearances during cruise conditions. These systems have relatively slow response and do not use clearance measurement, thereby forcing cold build clearances to set the minimum clearances at extreme operating conditions (e.g., takeoff, reburst) and not allowing cruise clearances to be minimized due to the possibility of throttle transients (e.g., step change in altitude). In an effort to improve upon current thermal methods, a first generation mechanically-actuated active clearance control (ACC) system has been designed and fabricated. The system utilizes independent actuators, a segmented shroud structure, and clearance measurement feedback to provide fast and precise active clearance control throughout engine operation. Ambient temperature performance tests of this first generation ACC system assessed individual seal component leakage rates and both static and dynamic overall system leakage rates. The ability of the nine electric stepper motors to control the position of the seal carriers in both open- and closed-loop control modes for single and multiple cycles was investigated. The ability of the system to follow simulated engine clearance transients in closed-loop mode showed the system was able to track clearances to within a tight tolerance ( 0.001 in. error).

Steinetz, Bruce M.↗

Measuring a Fiber-Optic Delay Line Using a Mode-Locked Laser

The figure schematically depicts a laboratory setup for determining the optical length of a fiber-optic delay line at a precision greater than that obtainable by use of optical time-domain reflectometry or of mechanical measurement of length during the delay-line-winding process. In this setup, the delay line becomes part of the resonant optical cavity that governs the frequency of oscillation of a mode-locked laser. The length can then be determined from frequency-domain measurements, as described below. The laboratory setup is basically an all-fiber ring laser in which the delay line constitutes part of the ring. Another part of the ring - the laser gain medium - is an erbium-doped fiber amplifier pumped by a diode laser at a wavelength of 980 nm. The loop also includes an optical isolator, two polarization controllers, and a polarizing beam splitter. The optical isolator enforces unidirectional lasing. The polarization beam splitter allows light in only one polarization mode to pass through the ring; light in the orthogonal polarization mode is rejected from the ring and utilized as a diagnostic output, which is fed to an optical spectrum analyzer and a photodetector. The photodetector output is fed to a radio-frequency spectrum analyzer and an oscilloscope. The fiber ring laser can generate continuous-wave radiation in non-mode-locked operation or ultrashort optical pulses in mode-locked operation. The mode-locked operation exhibited by this ring is said to be passive in the sense that no electro-optical modulator or other active optical component is used to achieve it. Passive mode locking is achieved by exploiting optical nonlinearity of passive components in such a manner as to obtain ultra-short optical pulses. In this setup, the particular nonlinear optical property exploited to achieve passive mode locking is nonlinear polarization rotation. This or any ring laser can support oscillation in multiple modes as long as sufficient gain is present to overcome losses in the ring. When mode locking is achieved, oscillation occurs in all the modes having the same phase and same polarization. The frequency interval between modes, often denoted the free spectral range (FSR), is given by c/nL, where c is the speed of light in vacuum, n is the effective index of refraction of the fiber, and L is the total length of optical path around the ring. Therefore, the length of the fiber-optic delay line, as part of the length around the ring, can be calculated from the FSRs measured with and without the delay line incorporated into the ring. For this purpose, the FSR measurements are made by use of the optical and radio-frequency spectrum analyzers. In experimentation on a 10-km-long fiber-optic delay line, it was found that this setup made it possible to measure the length to within a fractional error of about 3 10(exp -6), corresponding to a length error of 3 cm. In contrast, measurements by optical time-domain reflectometry and mechanical measurement were found to be much less precise: For optical time-domain reflectometry, the fractional error was found no less than 10(exp -4) (corresponding to a length error of 1 m) and for mechanical measurement, the fractional error was found to be about 10(exp -2) (corresponding to a length error of 100 m).

Tu, Meirong↗