Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Baseline Risk Assessment Supporting Closure at Waste Management Area C at the Hanford Site Washington

The Office of River Protection under the U.S. Department of Energy is pursuing closure of the Single-Shell Tank (SST) Waste Management Area (WMA) C under the requirements of the Hanford Federal Facility Agreement and Consent Order (HFFACO). A baseline risk assessment (BRA) of current conditions is based on available characterization data and information collected at WMA C. The baseline risk assessment is being developed as a part of a Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Corrective Measures Study (CMS) at WMA C that is mandatory under Comprehensive Environmental Response, Compensation, and Liability Act and RCRA corrective action. The RFI/CMS is needed to identify and evaluate the hazardous chemical and radiological contamination in the vadose zone from past releases of waste from WMA C. WMA C will be under Federal ownership and control for the foreseeable future, and managed as an industrial area with restricted access and various institutional controls. The exposure scenarios evaluated under these conditions include Model Toxics Control Act (MTCA) Method C, industrial worker, maintenance and surveillance worker, construction worker, and trespasser scenarios. The BRA evaluates several unrestricted land use scenarios (residential all-pathway, MTCA Method B, and Tribal) to provide additional information for risk management. Analytical results from 13 shallow zone (0 to 15 ft. below ground surface) sampling locations were collected to evaluate human health impacts at WMA C. In addition, soil analytical data were screened against background concentrations and ecological soil screening levels to determine if soil concentrations have the potential to adversely affect ecological receptors. Analytical data from 12 groundwater monitoring wells were evaluated between 2004 and 2013. A screening of groundwater monitoring data against background concentrations and Federal maximum concentration levels was used to determine vadose zone contamination impacts on groundwater. Waste Management Area C is the first of the Hanford tank farms to begin the closure planning process. The current baseline risk assessment will provide valuable information for making corrective actions and closure decisions for WMA C, and will also support the planning for future tank farm soil investigation and baseline risk assessments.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Literature Review and Compilation of Nuclear Waste Management System Attributes for Use in Multi-Objective System Evaluations.

The purpose of this work was to compile a comprehensive initial set of potential nuclear waste management system attributes. This initial set of attributes is intended to serve as a starting point for additional consideration by system analysts and planners to facilitate the development of a waste management system multi-objective evaluation framework based on the principles and methodology of multi-attribute utility analysis. The compilation is primarily based on a review of reports issued by the Canadian Nuclear Waste Management Organization (NWMO) and the Blue Ribbon Commission on America's Nuclear Future (BRC), but also an extensive review of the available literature for similar and past efforts as well. Numerous system attributes found in different sources were combined into a single objectives-oriented hierarchical structure. This study provides a discussion of the data sources and the descriptions of the hierarchical structure. A particular focus of this study was on collecting and compiling inputs from past studies that involved the participation of various external stakeholders. However, while the important role of stakeholder input in a country's waste management decision process is recognized in the referenced sources, there are only a limited number of in-depth studies of the stakeholders' differing perspectives. Compiling a comprehensive hierarchical listing of attributes is a complex task since stakeholders have multiple and often conflicting interests. The BRC worked for two years (January 2010 to January 2012) to "ensure it has heard from as many points of view as possible." The Canadian NWMO study took four years and ample resources, involving national and regional stakeholders' dialogs, internet-based dialogs, information and discussion sessions, open houses, workshops, round tables, public attitude research, website, and topic reports. The current compilation effort benefited from the distillation of these many varied inputs conducted by the previous studies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Holistic Approaches to HPC Power & Workflow Management: Preprint

Constraints on power consumption are having pervasive effects on high-performance computing (HPC) systems, the facilities in which they are housed, and the application codes themselves. Whether these constraints are driven by physical limits on available power within a facility, are due to utility demand response, result from opportunities to reduce utility costs, or are imposed by sponsoring agencies, power management must now be added to the traditional goals of application and algorithm correctness, scalability, and performance. The specifics of these power constraints are likely to vary from site to site, and optimal strategies for managing power will vary. In this paper, we present the results of implementing several strategies for managing HPC system power and quantify the impact of these power reductions on application performance. These can be added to the suite of extant options that can be used to manage power and workflow on HPC systems.

97 MATHEMATICS AND COMPUTING↗

An Automated Disruption-Tolerant Key Management Framework for Critical Systems

Key management is critical to secure operation. Distributed control systems, such as Supervisory Control and Data Acquisition (SCADA) systems, have unique operational requirements that make conventional key management solutions less effective and burdensome. This paper presents a novel Kerberos-based framework for automated, disruption-tolerant key management for control system environments. Here, experimental tests and their results are presented to quantify the expected performance overhead of this approach. Additionally, Zeek sensor analytics are presented to aid in monitoring the health and security of the key management framework operation.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Performance Evaluation of Hierarchical Controls for Advanced Distribution Management System-Centered Grid Operations: Preprint

This paper presents a hardware-in-the-loop (HIL) platform to evaluate the performance of voltage regulation using an advanced distribution management system (ADMS) for grid operations to control legacy and grid-edge voltage control devices and coordinate with distributed energy management systems (DERMS) to manage high penetrations of photovoltaics (PV) on a utility distribution system. The HIL platform provides realistic laboratory testing, including accurate modeling (legacy devices, grid-edge devices, and PV) of the real-world distribution system from a utility partner, a real controller (ADMS), software controller DERMS, hardware grid-edge devices, and standard communications protocols. The test results show proper functionalities of the integrated platform and the performance of voltage regulation of the coordinated control systems. Based on laboratory testing, the utility can set up the same grid-automation system to manage DERs, legacy devices, and grid-edge devices to achieve their system-level control and operation objectives (e.g., voltage regulation), thus de-risking potential issues (e.g., instability) for field deployment.

ADMS↗

Integrating the Clearance in NPP Residual Material Management

Previous Experiences in decommissioning projects are being used to optimize the residual material management in NPP, metallic scrap usually. The approach is based in the availability of a materials Clearance MARSSIM-based methodology developed and licensed in Spain. A typical project includes the integration of segregation, decontamination, clearance, quality control and quality assurance activities. The design is based in the clearance methodology features translating them into standard operational procedures. In terms of ecological taxes and final disposal costs, significant amounts of money could be saved with this type of approaches. The last clearance project managed a total amount of 405 tons scrap metal and a similar amount of other residual materials occupying a volume of 1500 m{sup 3}. After less than a year of field works 251 tons were finally recycled in a non-licensed smelting facility. The balance was disposed as LILW. In the planning phase the estimated cost savings were 4.5 Meuro. However, today a VLLW option is available in European countries so, the estimated cost savings are reduced to 1.2 Meuro. In conclusion: the application of materials clearance in NPP decommissioning lessons learnt to the NPP residual material management is an interesting management option. This practice is currently going on in Spanish NPP and, in a preliminary view, is consistent with the new MARSAME Draft. An interesting parameter is the cost of 1 m3 of recyclable scrap. The above estimates are very project specific because in the segregation process other residual materials were involved. If the effect of this other materials is removed the estimated Unit Cost were in this project around 1700 euro/m{sup 3}, this figure is clearly below the above VLLW disposal cost of 2600 euro. In a future project it appears feasible to descend to 839 euro/m{sup 3} and if it became routine values and is used in big Decommissioning projects, around 600 euro/m{sup 3} or below possibly could be achieved. A rough economical analysis permits to estimate a saving around 2000 US$ to 13000 US$ per cubic meter of steel scrap according the variability of materials and disposal costs. Many learnt lessons of this practice were used as a feed back in the planning of characterization activities for decommissioning a Spanish NPP and today are considered as a significant reference in our Decommissioning engineering approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development Of Strategy For The Management Of LLW In The United Kingdom

The Nuclear Decommissioning Authority (NDA) is a UK non-departmental public body with a remit to clean up the civil public sector nuclear legacy. Much work has been done to date on developing contractor competition for the management of NDA-owned sites, including the UK's principal disposal facility: the Low Level Waste Repository (LLWR) in Cumbria. The competition goals and principles are integrated with the framework for the development of a UK Low Level Waste (LLW) management plan, through which the NDA will deliver its commitments to UK Government and stakeholders. Nexia Solutions has undertaken work for the NDA in assessing strategic options and scenarios for the management and disposal of current UK LLW. The volumetric, radiological and strategic limitations of existing disposition routes have been assessed against the inventories and characteristics of LLW forecast to arise. A number of potential alternative scenarios and variants for future LLW management have been modelled and assessed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Current Regulations and Guidance - New Approaches for Risk-Informed Low-Level Radioactive Waste Management

This paper presents the historical foundations and future challenges for commercial low-level radioactive waste (LLRW) management in the United States. LLRW has been managed at government facilities since the beginning of the nuclear age and in the commercial sector since the early 1960's. Over the intervening years many technical, management and regulatory changes have occurred. Significant progress has been made in waste form, waste packaging and in recognizing radionuclides important to performance of disposal technologies and disposal facilities. This presentation will examine approaches using existing regulations and risk-informed approaches to improve guidance, licensing and management of LLRW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating Safety and Lessons-Learned Data with Human Performance for Successful Management and Oversight

This paper documents the improvements Fluor Hanford, Inc. (Fluor Hanford) is making in analyzing and using safety-related and lessons-learned data in cleaning up the U.S. Department of Energy's (DOE's) site at Hanford in southeastern Washington state. Results of the application of Statistical Process Control (SPC) and Dashboards to support planning and decision making have been shared at past Waste Management conferences. Recently, Fluor Hanford has implemented and refined a process called the 'Data Analysis Working Group' to integrate data from several sources, including opinions from subject-matter experts. The process also includes a risk-ranking tool used to prioritize potential risks and past problems for management and oversight of the Hanford cleanup. Human Performance and Lessons Learned information also is included in this process. Fluor Hanford has applied SPC in a non-traditional (that is non-manufacturing) manner. Dr. Shewhart's 75-year-old control-chart methodologies have been updated to modern data processing, but are still founded on his sound, tried and true principles. These methods are playing a key role in safety and quality at Hanford. The performance-indicator system used by Fluor Hanford has been featured by several professional societies in their publications, primarily the American Society of Safety Engineers and the American Society for Quality. The system also has been featured in past Waste Management conferences. Eleven years ago, Fluor Hanford's statistician produced 300 data files and accompanying charts a month. Today, those numbers exceed 3,000 a month, almost one chart for every employee. This activity also includes entering data for approximately 500 safety inspections each month. The challenge is in effectively analyzing and prioritizing this information and providing it to senior management to make pro-active decisions and policies. That challenge is being met by Fluor's Data Analysis Working Group process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Industrial Program of Waste Management - Cigeo Project - 13033

The French Planning Act of 28 June 2006 prescribed that a reversible repository in a deep geological formation be chosen as the reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. It also entrusted the responsibility of further studies and design of the repository (named Cigeo) upon the French Radioactive Waste Management Agency (Andra), in order for the review of the creation-license application to start in 2015 and, subject to its approval, the commissioning of the repository to take place in 2025. Andra is responsible for siting, designing, implementing, operating the future geological repository, including operational and long term safety and waste acceptance. Nuclear operators (Electricite de France (EDF), AREVA NC, and the French Commission in charge of Atomic Energy and Alternative Energies (CEA) are technically and financially responsible for the waste they generate, with no limit in time. They provide Andra, on one hand, with waste packages related input data, and on the other hand with their long term industrial experiences of high and intermediate-level long-lived radwaste management and nuclear operation. Andra, EDF, AREVA and CEA established a cooperation agreement for strengthening their collaborations in these fields. Within this agreement Andra and the nuclear operators have defined an industrial program for waste management. This program includes the waste inventory to be taken into account for the design of the Cigeo project and the structural hypothesis underlying its phased development. It schedules the delivery of the different categories of waste and defines associated flows. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Waste Management in Non-Nuclear Countries - 13070

This paper challenges internationally accepted concepts of dissemination of responsibilities between all stakeholders involved in national radioactive waste management infrastructure in the countries without nuclear power program. Mainly it concerns countries classified as class A and potentially B countries according to International Atomic Energy Agency. It will be shown that in such countries long term sustainability of national radioactive waste management infrastructure is very sensitive issue that can be addressed by involving regulatory body in more active way in the infrastructure. In that way countries can mitigate possible consequences on the very sensitive open market of radioactive waste management services, comprised mainly of radioactive waste generators, operators of end-life management facilities and regulatory body. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A History of the Environmental Management Advisory Board: 20 Years of Service and Partnership - 13219

The Environmental Management Advisory Board (EMAB or Board) was chartered under the Federal Advisory Committee Act (FACA) in 1992 to provide the Assistant Secretary for Environmental Management (EM) with independent and external advice, information, and recommendations on corporate issues relating to accelerated site clean-up and risk reduction throughout the EM complex. Over the course of the past 20 years, the composition and focus of the Board have varied widely to address the changing needs of the program. EMAB began as the Environmental Restoration and Waste Management Advisory Committee, formed to provide advice on an EM Programmatic Environmental Impact Statement. In 1994, the Board was restructured to function more as an executive-level, limited member advisory board whose membership provides insight of leading industry experts and the viewpoints of representatives from critical stakeholder constituencies. Throughout the 20 years of its existence, EMAB has covered a wide variety of topics and produced nearly 200 recommendations. These recommendations have resulted in several policy changes and improvements within EM. Most recently, EMAB has been credited for its contribution to the EM Energy Park Initiative, forerunner of the DOE Asset Revitalization Initiative; creation of the EM Offices of Communications and External Affairs; improvement of acquisition and project management strategies and culture; and several recommendations related to the Waste Treatment Plant and the tank waste programs at Hanford and the Savannah River Site. The wealth of experience and knowledge the Assistant Secretary can leverage through utilization of the Board continues to support fulfillment of EM's mission. In commemoration of EMAB's 20. anniversary, this paper will provide further context for the evolution of the Board, the role FACA plays in its administration, and a look at the members' current objectives and EM's expectations for the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Protecting Lake Ontario - Treating Wastewater from the Remediated Low-Level Radioactive Waste Management Facility - 13227

The Port Granby Project is part of the larger Port Hope Area Initiative, a community-based program for the development and implementation of a safe, local, long-term management solution for historic low level radioactive waste (LLRW) and marginally contaminated soils (MCS). The Port Granby Project involves the relocation and remediation of up to 0.45 million cubic metres of such waste from the current Port Granby Waste Management Facility located in the Municipality of Clarington, Ontario, adjacent to the shoreline of Lake Ontario. The waste material will be transferred to a new suitably engineered Long-Term Waste Management Facility (LTWMF) to be located inland approximately 700 m from the existing site. The development of the LTWMF will include construction and commissioning of a new Wastewater Treatment Plant (WWTP) designed to treat wastewater consisting of contaminated surface run off and leachate generated during the site remediation process at the Port Granby Waste Management Facility as well as long-term leachate generated at the new LTWMF. Numerous factors will influence the variable wastewater flow rates and influent loads to the new WWTP during remediation. The treatment processes will be comprised of equalization to minimize impacts from hydraulic peaks, fine screening, membrane bioreactor technology, and reverse osmosis. The residuals treatment will comprise of lime precipitation, thickening, dewatering, evaporation and drying. The distribution of the concentration of uranium and radium - 226 over the various process streams in the WWTP was estimated. This information was used to assess potential worker exposure to radioactivity in the various process areas. A mass balance approach was used to assess the distribution of uranium and radium - 226, by applying individual contaminant removal rates for each process element of the WTP, based on pilot scale results and experience-based assumptions. The mass balance calculations were repeated for various flow and load scenarios. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Siting and Transportation for Consolidated Used Nuclear Fuel Management Facilities: A Proposed Approach for a Regional Initiative to Begin the Dialogue - 13562

The Blue Ribbon Commission on America's Nuclear Future (BRC) was formed in January 2010 to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle, and to develop a new national strategy. Over two years, the BRC held dozens of meetings and heard from hundreds of Federal, State, Tribal, and local officials, as well as representatives of trade and labor organizations, technical groups, non-governmental organizations, and other stakeholders. The Commission's final report (issued January 26, 2012) offers a strategy to resolve longstanding challenges to responsible management of the United States' nuclear waste legacy. The Commission recommended Congressional action to rewrite parts of the Nuclear Waste Policy Act (NWPA); however, a comprehensive legislative overhaul will likely take years to fully implement. The nature and characteristics of nuclear waste, the activities that generated it, and the past history of federal efforts to manage the waste make it virtually certain that finding workable solutions will be controversial and difficult. As the BRC report suggests, this difficulty can be made insurmountable if top-down, federally-mandated efforts are forced upon unwilling States, Tribes, and local communities. Decades of effort and billions of ratepayer and taxpayer dollars have been spent attempting to site and operate spent fuel storage and disposal facilities in this manner. The experience thus far indicates that voluntary consent and active partnership of States, Tribes, and local governments in siting, designing, and operating such facilities are critical. Some States, Tribes, and local communities have indicated that, given adequate scientific and technical information, along with appropriate incentives, assurances, and authority, they might be willing to consider hosting facilities for consolidated storage and disposal of spent nuclear fuel. The authors propose a new regional approach to identifying and resolving issues related to the selection of a consolidated storage site. The approach would be characterized by informed discussion and deliberation, bringing together stakeholders from government, the non-governmental (NGO) community, industry, and other sectors. Because site selection would result in regional transportation impacts, the development of the transportation system (e.g., route identification, infrastructure improvements) would be integrated into the issue-resolution process. In addition to laying out the necessary steps and associated timeline, the authors address the challenges of building public trust and confidence in the new waste management program, as well as the difficulty of reaching and sustaining broad-based consensus on a decision to host a consolidated storage facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Waste Management in Central Asia - 12034

After the collapse of the Soviet Union the newly independent states in Central Asia (CA) whose regulatory bodies were set up recently are facing problems with the proper management of radioactive waste and so called 'nuclear legacy' inherited from the past activities. During the former Soviet Union (SU) period, various aspects of nuclear energy use took place in CA republics of Kazakhstan, Kyrgyzstan, Tajikistan and Uzbekistan. Activities range from peaceful use of energy to nuclear testing for example at the former Semipalatinsk Nuclear Test Site (SNTS) in Kazakhstan, and uranium mining and milling industries in all four countries. Large amounts of radioactive waste (RW) have been accumulated in Central Asia and are waiting for its safe disposal. In 2008 the Norwegian Radiation Protection Authority (NRPA), with the support of the Norwegian Ministry of Foreign Affairs, has developed bilateral projects that aim to assist the regulatory bodies in Kazakhstan, Kyrgyzstan Tajikistan, and Uzbekistan (from 2010) to identify and draft relevant regulatory requirements to ensure the protection of the personnel, population and environment during the planning and execution of remedial actions for past practices and radioactive waste management in the CA countries. The participating regulatory authorities included: Kazakhstan Atomic Energy Agency, Kyrgyzstan State Agency on Environmental Protection and Forestry, Nuclear Safety Agency of Tajikistan, and State Inspectorate on Safety in Industry and Mining of Uzbekistan. The scope of the projects is to ensure that activities related to radioactive waste management in both planned and existing exposure situations in CA will be carried out in accordance with the international guidance and recommendations, taking into account the relevant regulatory practice from other countries in this area. In order to understand the problems in the field of radioactive waste management we have analysed the existing regulations through the so called 'Threat assessment' in each CA country which revealed additional problems in the existing regulatory documents beyond those described at the start of our ongoing bilateral projects in Kazakhstan, Kirgizistan Tajikistan and Uzbekistan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prioritization Risk Integration Simulation Model (PRISM) For Environmental Remediation and Waste Management - 12097

The PRISM (Prioritization Risk Integration Simulation Model), a computer model was developed to support the Department of Energy's Office of Environmental Management (DOE-EM) in its mission to clean up the environmental legacy from the Nation's nuclear weapons materials production complex. PRISM provides a comprehensive, fully integrated planning tool that can tie together DOE-EM's projects. It is designed to help DOE managers develop sound, risk-informed business practices and defend program decisions. It provides a better ability to understand and manage programmatic risks. The underlying concept for PRISM is that DOE-EM 'owns' a portfolio of environmental legacy obligations (ELOs), and that its mission is to transform the ELOs from their current conditions to acceptable conditions, in the most effective way possible. There are many types of ELOs - - contaminated soils and groundwater plumes, disused facilities awaiting D and D, and various types of wastes waiting for processing or disposal. For a given suite of planned activities, PRISM simulates the outcomes as they play out over time, allowing for all key identified uncertainties and risk factors. Each contaminated building, land area and waste stream is tracked from cradle to grave, and all of the linkages affecting different waste streams are captured. The progression of the activities is fully dynamic, reflecting DOE-EM's prioritization approaches, precedence requirements, available funding, and the consequences of risks and uncertainties. The top level of PRISM is the end-user interface that allows rapid evaluation of alternative scenarios and viewing the results in a variety of useful ways. PRISM is a fully probabilistic model, allowing the user to specify uncertainties in input data (such as the magnitude of an existing groundwater plume, or the total cost to complete a planned activity) as well as specific risk events that might occur. PRISM is based on the GoldSim software that is widely used for risk and performance assessment calculations. PRISM can be run in a deterministic mode, which quickly provides an estimate of the most likely results of a given plan. Alternatively, the model can be run probabilistically in a Monte Carlo mode, exploring the risks and uncertainties in the system and producing probability distributions for the different performance measures. The PRISM model demonstrates how EM can evaluate a portfolio of ELOs, and transform the ELOs from their current conditions to acceptable conditions, utilizing different strategic approaches. There are many types of ELOs - contaminated soils and groundwater plumes, disused facilities awaiting D and D, and various types of wastes waiting for processing or disposal. This scope of work for the PRISM process and the development of a dynamic simulation model are a logical extension of the GoldSim simulation software used by the OCRWM to assess the long-term performance for the Yucca Mountain Project and by NNSA to assess project risk at its sites. Systems integration modeling will promote better understanding of all project risks, technical and nontechnical, and more defensible decision-making for complex projects with significant uncertainties. It can provide effective visual communication and rapid adaptation during interactions with stakeholders (Administration, Congress, State, Local, and NGO). It will also allow rapid assessment of alternative management approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of Disused Radioactive Sealed Sources in the Slovak Republic - 12100

After splitting-up the Czechoslovak Federation in 1993, the system of management of institutional radioactive waste, where disused sources represent its significant part, had had to build from beginning, since all corresponding activities had remained in the Czech part of the Federation. The paper presents the development of legislative and institutional framework of the disused radioactive sealed source management, development of the national inventory and development of management practices. According the Governmental decision (1994), the management of disused sealed sources and institutional radioactive waste at whole was based on maximal utilization of facilities inside nuclear facilities, particularly in the NPP A1 (shut down in the past, currently under decommissioning). This approach has been recently changing by Governmental decision (2009) to construct 'non-nuclear facility' - central storage for remained disused sealed sources collected from the places of use, where they were stored in some cases for tens of years. The approaches to siting and construction of this storage facility will be presented, as well as the current approaches to solution of the disused radioactive sources final disposal. Environmental impact assessment process in regard to the given facility/activity is slowly drawing to a close. The final statement of the Ministry of Environment can be expected in January or February 2012, probably recommending option 1 as preferred [6]. According to the Slovak legislation, the final statement has a status of recommendation for ongoing processes leading to the siting license. Very recently, in December 2012, Government of the Slovak republic decided to postpone putting the facility into operation by the end of June, 2014. (author)

07 ISOTOPE AND RADIATION SOURCES↗

Hanford's 100-HX Pump and Treat Project - a Successful Blend of Science, Technology, Construction, and Project Management - 12412

CH2M Hill Plateau Remediation Company (CHPRC) recently completed construction and start-up of the $25 million 100-HX Groundwater Pump and Treat Project for the Department of Energy (DOE) at its Hanford Reservation site in Washington State. From the onset, the 100-HX Project Leadership Team was able to successfully blend the science and technology of a state-of-the-art groundwater pump and treat system with the principles, tools, and techniques of traditional industrial-type construction and project management. From the 1940's through most of the 1980's, the United States used the Hanford Site to produce nuclear material for national defense at reactor sites located along the Columbia River. While the reactors were operational, large volumes of river water were treated with sodium dichromate (to inhibit corrosion of the reactor piping) and used as a coolant for the reactors. After a single pass through the reactor and before being discharged back to the river, the coolant water was sent to unlined retention basins to cool and to allow the short-lived radioactive contaminants to decay. As a result of these operations, hexavalent chromium was introduced to the vadose zone, and ultimately into the groundwater aquifer and the adjacent Columbia River. In addition, numerous leaks and spills of concentrated sodium dichromate stock solution over the lifetime of reactor operations led to higher concentrations of chromate in the vadose zone and groundwater in localized areas. As a result, the 100 Area was included in the National Priorities List sites under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA). The mission of the 100-HX Project is to significantly reduce the concentration of hexavalent chromium in the groundwater by treating up to 3.8 billion gallons (14,300 mega-liters) of contaminated water over its first nine years of operations. In order to accomplish this mission, groundwater scientists and geologists using sophisticated scientific modeling optimized the 100-HX's approximately 0.7 square mile (181 hecto-meters) extraction and injection well field to support continuous operation of a maximum of 800 gallons (3,028 liters) per minute, 24 hours per day, and 7 days per week. The use of traditional resin technology for the plant's ion exchange system required a change out of the resin every 12 weeks and shipment to an offsite facility 1,500 miles (2,414 kilometers) away for regeneration. Instead, the project leadership pursued newer technology with a disposable resin that could be disposed of on-site and would require less frequent change outs, reducing the project's life cycle costs by more than $16 million. Constructing the facility had its own challenges. The well field location overlapped ecologically sensitive lands where bald eagles and native wildlife use the land for their mating habitat for nearly half of the year. Building locations had to be planned around historically and culturally sensitive areas, and around another contractor's remediation work zones. Also, the size of the well field required a transfer (pumping) facility and installation of more than 60 miles (97 kilometers) of high-density polypropylene pipe, 23 miles (38 kilometers) of power cable, and 28 miles (46 kilometers) of control cable. Along with schedule and budget constraints typical of any fast-track project, the project team dealt with severe resource constraints due to competing projects across the Hanford Site caused by the influx of American Recovery and Reinvestment Act stimulus funding. In addition, the project team itself was stretched between completing another $25 million dollar construction project while designing and constructing this project. In order to save money, the project schedule was compressed by three months from the original baseline schedule. This was made possible by the strong use of project management principles throughout the design, construction, and testing phases, as well as implementation of many lessons learned from a similar construction project. In summary, the 100-HX Project truly was a unique blend of science, technology, construction and project management. In summary, Hanford's 100-HX Pump and Treat Project was a successful blend of science, technology, construction, and project management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗