Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “future accelerators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Accelerating the Design of Space Vehicles

One of NASA's key goals is to increase the safety and reduce the cost of space transportation. Thus, a key element of NASA's new Integrated Space Transportation Plan is to develop new propulsion, structures, and operations for future generations of reusable launch vehicles (RLVs). As part of this effort to develop the next RLV, the ClCT Program's Computing, Networking, and Information Systems (CNIS) Project is developing and demonstrating collaborative software technologies that use the collective power of the NASA Grid to accelerate spacecraft design. One of these technologies, called AeroDB, automates the execution and monitoring of computational fluid dynamics (CFD) parameter studies on the NASA Grid. About the NASA Grid The NASA Grid, or Information Power Grid,. is being developed to leverage the distributed resources of NASA's many computers. instruments, simulators, and data storage systems. The goal is to use these combined resources to sdve difficult NASA challenges, such as iimulating the entire flight of a space vehicle from ascent to descent.To realize the vision of the NASA Grid, the CNIS Project is developing the software framework and protocols for building domain-specific environments and interfaces, new Grid services based on emerging industry standards, and advanced networking and computing testbeds to support new Grid-based applications such as AeroDB.

Laufenberg, Larry↗

Extended State Observer-Based Robust Model Predictive Velocity Control for Permanent Magnet Synchronous Motor

This article proposes an extended state observer based robust model predictive velocity control to decrease system prediction error under parameter uncertainties for permanent magnet synchronous motor (PMSM). We develop a new PMSM model that consists of velocity and acceleration to lump the system information and an external disturbance into a disturbance. The extended state observer (ESO) is designed to estimate the velocity, acceleration, and disturbance. By estimating the state variables and disturbance using the ESO, the model predictive control (MPC) finds the optimal control input by predicting future system behavior. Additionally, the direct current controller is designed so that the direct current converges to zero. Because the proposed method is not designed based on the cascade structure from the viewpoint of velocity control, the optimization control for the velocity and currents can be defined. Thus, the proposed method is robust against external disturbances and parameter uncertainties owing to feedback linearization, state feedback, and ESO-based MPC using the acceleration PMSM model. The proposed control algorithm was experimentally verified and it showed improved velocity tracking performance compared with ESO-based MPC using the conventional PMSM model.

42 ENGINEERING↗

FNAL PIP-II Accumulator Ring

The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the complex will include CW linac operations at beam intensities that have not been seen before \cite{PIP2,RCS_LOI}. The ambitious beam program relies on multi-turn H$^{-}$ injection into the FNAL Booster and then extracted into delivery rings or the Booster Neutrino Beam (BNB) 8 GeV HEP program. A new rapid-cycling synchrotron (RCS) will be required to reach the LBNF goal of 2.4 MW because of intense space-charge limitations. There are many accelerator engineering challenges that are already known and many that will be discovered. This proposal calls for an intermediate step that will both facilitate the operation of Booster in the PIP-II era and gain operational experience associated with high power injection rings. This step includes the design, construction and installation of a 0.8 GeV accumulator ring (upgradeable to 1+ GeV) to be located in the PIP-II Booster Transfer Line (BTL). The PIP-II accumulator ring (PAR) may be primarily designed around permanent magnets or use standard iron core magnet technology with an aperture selected to accommodate the desired high intensity protons at 0.8 GeV.

43 PARTICLE ACCELERATORS↗

Perspectives on the generation of electron beams from plasma-based accelerators and their near and long term applications

This article first gives the authors' perspectives on how the field of plasma-based acceleration (PBA) developed and how the current experiments, theory, and simulations are motivated by long term applications of PBA to a future linear collider and an x-ray free electron laser. Here, we then focus on some early applications that will likely emerge from PBA research such as electron beam radiotherapy, directional but incoherent x-ray beams for science and technology, near single cycle continuously tunable infrared pulses for spectroscopy, and non-perturbative quantum electrodynamics enabled by PBA electron beams. In our opinion, these near term applications could be developed within the next decade with a concerted effort by the community.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Clean Energy Cybersecurity Accelerator: Cohort 2 - runZero Public Report

The U.S. Department of Energy (DOE) Office of Cybersecurity, Energy Security, and Emergency Response (CESER) sponsors the Clean Energy Cybersecurity Accelerator™ (CECA) to expedite the deployment of emerging security technologies that address the most urgent security concerns facing modern and future electric grids. CECA Cohort 2 assessed solutions focused on hidden risks due to incomplete system visibility and device security and configuration. Improving visibility can be achieved through operational technology (OT) asset identification solutions, including capabilities like automatic discovery, vulnerability reporting, and configuration monitoring. Solutions that monitor and identify assets in information technology (IT) networks in other domains are widely used; however, there is far less adoption of monitoring solutions for operational technology environments. Wider adoption may increase with increased confidence in the ability for these solutions to understand and respond to the specific requirements of OT environments. CECA Cohort 2 evaluated the active and passive asset discovery capabilities of market-ready solutions, documented and analyzed results, and identified gaps in functionality or capabilities. This report and describes how these results can help advance the adoption of these and similar solutions in the electric sector.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The US Navy/Canadian DCIEM research initiative on pressure breathing physiology

Development of improved positive pressure breathing garments for altitude and acceleration protection has occurred without collection of sufficient physiological data to understand the mechanisms of the improvement. Furthermore, modeling of the predicted response of future enhanced garments is greatly hampered by this lack of information. A joint, international effort is under way between Canada's Defense and Civil Institute for Environmental Medicine (DCIEM) and the US Navy's Naval Air Warfare Center Aircraft Division, Warminster (NAWCACDIVWAR). Using a Canadian subject pool, experiments at both the DCIEM altitude facility and the NAWCADIVWAR Dynamic Flight Simulator have been conducted to determine the cardiovascular and respiratory consequences of high levels of positive pressure breathing for altitude and positive pressure breathing for acceleration protection. Various improved pressure breathing garments were used to collect comparative physiological and performance data. New pressure breathing level and durahon capabilities have been encountered. Further studies will address further improvements in pressure suit design and correlation of altitude and acceleration data.

Whitley, Phillip E.↗

Full-scale crash test of a CH-47C helicopter

A full-scale crash test of a large troop/cargo carrying CH-47C helicopter was conducted at the Langley impact dynamics research facility. The crash test of this large helicopter was performed as part of a joint U.S. Army-NASA helicopter test program to provide dynamic structural and seat response data. The test, the procedures employed, the instrumentation, a general assessment of the resulting damage, and typical levels of accelerations experienced during the crash are reported. Various energy-absorbing seating systems for crew and troops were installed and instrumented to provide data for use in the development of design criteria for future aircraft. The crash conditions were selected to simulate known crash conditions and are representative of the 95th percentile accident environment for an autorotating helicopter. Visual examination of the crashed test specimen indicated irreparable damage to many of the structural components. The highest accelerations were recorded by the accelerometers located on the cabin floor in the aft section of the helicopter, directly above the primary impact location and on the floor of the cockpit above the secondary impact location(s).

Castle, C. B.↗

MeV Emission from Pulsar Wind Nebulae: Understanding Extreme Particle Acceleration in Highly Relativistic Outflows

The Earth is constantly bombarded from outer space by energetic particles. Where and how these "cosmic rays" are produced is poorly understood, with various particle types and energies likely originating from different sources. Particularly mysterious is the source of high-energy e+/- produced in our Galaxy, especially those responsible for both the high fraction of e+ in the GeV cosmic ray lepton spectrum and the e+/- and observed excess of microwaves and gamma-rays detected towards the Galactic center and bulge. While these particles could be evidence for exotic forms of dark matter, they might also be produced by "normal" astrophysical sources such as pulsars the strongly magnetized, rapidly rotating neutron stars whose rotational energy powers an ultra-relativistic outflow (commonly referred to as a "pulsar wind") whose interaction with the surrounding medium creates a pulsar wind nebula .While the detection of TeV emission from numerous PWNe strongly suggest they contain e+/- with PeV or higher energies, how and to what energies these particles are produced is unknown, let alone their dependence on the properties of the pulsar, pulsar wind, and surrounding medium. A major reason for this uncertainty is the lack of information concerning their MeV properties, since the synchrotron emission from the highest energy e+/- peaks in this waveband. Only by combining the MeV spectrum of PWNe measured by proposed missions with that obtained at lower (primarily radio and X-ray) and higher (TeV) photon energies by current and hopefully future facilities is it possible to measure the full spectrum of e+/- in these sources. The resultant insights into the underlying acceleration mechanism would significantly impact many areas of astrophysics from indirect searches for dark matter to the origin of cosmic rays to the physics of relativistic outflows observed from active galactic nuclei, gamma-ray bursts, and some gravitational wave events.

Gelfand, Joseph D.↗

A Comprehensive Review toward the State-of-the-Art in Failure and Lifetime Predictions of Power Electronic Devices

This paper discusses various types of failure mechanisms, precursor parameters, and accelerated aging- based procedures to estimate the remaining life of power electronic devices. Special attention has been given to summarize the different techniques typically used for measuring the junction temperature, because it plays a vital role during accelerated aging and condition monitoring. We reviewed more than 250 papers, and the references list 139 of them in order to explain and address the advantages and disadvantages of various techniques towards the reliability prognosis. Thus, this paper can be considered as an expedient reference to conduct future research on lifetime prediction of existing power electronic devices.

42 ENGINEERING↗

2025 Status Report - Fiberboard Properties and Degradation Rates for Storage of 9975 Shipping Package in KAC

Fiberboard assemblies in the 9975 package were identified as susceptible to aging and degradation under long-term storage conditions. Thermal, mechanical, and physical properties have been measured on fiberboard samples aging for up to 20 years at accelerated conditions. The aging environments include elevated temperature up to 250 ºF (the maximum allowed service temperature for fiberboard in 9975 packages) and elevated humidity. Accelerated aging results have been analyzed and used to build aging models. Correlations relating several properties (thermal conductivity, energy absorption, weight, dimensions, and density) to their rate of change in potential storage environments have been developed. Combined with an estimate of the actual conditions the fiberboard experiences in K-Area Complex (KAC), these models allow development of service life predictions. KAC completed calculations that supported extending the service life of 9975 packages with 3013 containers in storage from 20 years to 40 years. These calculations addressed the potential for degraded fiberboard properties following 40 years in storage using degradation models. The 40 year storage evaluations assumed the degradation rates from initial values for density, dimensional, and thermal properties were 0.5% per year (i.e., after 40 years, the density, dimensional, and thermal properties of fiberboard were 80% of its initial values). The updated degradation models developed in this report were compared to the assumptions in those calculations, and the current results for fiberboard dimensions, density, axial and radial thermal conductivities, and energy absorption remain consistent with those calculations. Additional data will continue to be collected to permit future refinements to the models and assumptions. Some of the predicted degradation rates presented in this report are purposely high to accelerate aging. These rates relate to environments that do not exist within KAC or are postulated to only occur as upset conditions that are unlikely to persist for an extended period. For a typical package stored in KAC with approximately 10-12 watts internal heat load or less, and ambient temperatures below 90 ºF, the fiberboard assemblies experience storage conditions less severe than any of the aging environments (i.e., under 125 °F) used in this study. Fiberboard in conforming packages with lower internal heat loads should experience little or no degradation and is expected to provide a service life beyond the currently approved 40 year storage period. Packages with higher internal heat loads may not continue to perform their required safety functions beyond 40 years. Ultimately, service life will be determined by the cumulative effect of degradation from all the conditions these packages might encounter. The results and model predictions presented in this report are applicable to 9975 packages with cane or softwood fiberboard overpack assemblies. These degradation models do not address the effects of nonconforming conditions such as the presence of excess moisture and mold or beetle infestations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Parallel Computational Fluid Dynamics: Current Status and Future Requirements

One or the key objectives of the Applied Research Branch in the Numerical Aerodynamic Simulation (NAS) Systems Division at NASA Allies Research Center is the accelerated introduction of highly parallel machines into a full operational environment. In this report we discuss the performance results obtained from the implementation of some computational fluid dynamics (CFD) applications on the Connection Machine CM-2 and the Intel iPSC/860. We summarize some of the experiences made so far with the parallel testbed machines at the NAS Applied Research Branch. Then we discuss the long term computational requirements for accomplishing some of the grand challenge problems in computational aerosciences. We argue that only massively parallel machines will be able to meet these grand challenge requirements, and we outline the computer science and algorithm research challenges ahead.

Simon, Horst D.↗

Bremsstrahlung X-ray spectra of Jupiter and Saturn - Predictions for future planetary spacecraft

Calculations of X-ray spectra due to bremsstrahlung from precipitating auroral electrons of Jupiter and Saturn are presented. The model assumes that a field-aligned potential drop accelerates a primary beam of electrons into the atmosphere where a population of secondary electrons having a power law energy dependence is generated. The spectrum at Jupiter is normalized to the soft X-ray observations of Metzger et al. (1983) at the low-energy end and constrained at the high-energy end by UV auroral energy requirements. The spectrum at Saturn is constructed by analogy to the Jovian case allowing for variation of the beam energy, energy flux, and scale size of the Saturnian aurora. The results indicate that a significant flux of X-rays is emanating from both planets which may serve as a basis for conducting planetary X-ray astronomy as a part of future spacecraft missions to the planets.

Barbosa, D. D.↗

SAGIPS: A scalable Framework for scidac quantom

As part of the Scientific Discovery through Advanced Computing (SciDAC) program, the Quantum Chromodynamics Nuclear Tomography (QuantOM) project aims to analyze data from Deep Inelastic Scattering (DIS) experiments conducted at Thomas Jefferson National Accelerator Facility and the upcoming Electron Ion Collider. The DIS data analysis is performed on an event level by taking into leveraging nuclear theory models and accounting for experimental conditions. In order to efficiently run multiple analyses under varying conditions, a composable workflow was designed where each section (theory, experiment, objective minimization, etc.) has its own dedicated module. This presentation gives an overview over of the current status of this workflow, highlights present and future challenges, and highlights possible extensions to other projects with similar requirements.

Lersch, Daniel [Thomas Jefferson National Accelera↗

Traveling wakefield tube: THz source powered by nonrelativistic electron beam

High peak power, tunable, narrowband terahertz emitters are becoming sought after given their portability, efficiency, and ability to be deployed in the field for industrial, medical, and military applications. The use of accelerator systems producing THz frequencies via Cherenkov radiation, generated by passing an electron beam through a slow-wave wakefield structure, is a promising method to meet future THz requirements. To date, efforts have been dedicated to analysis and design of sources utilizing laser seeded bunched electron beam drivers with relativistic energies beyond 5 MeV. Presented here is a wakefield THz generation scheme based on passing a long quasi-dc nonrelativistic beam (200 keV) through a dielectric loaded travelling wave structure. Reduced energy allows for compactness and portability of the accelerator as the size and weight of the dielectric slow wave structure is vanishingly small compared to the accelerator unit. The presented scheme can serve as a tunable high peak power THz source operated between 0.4-1.6 THz and produces power gain by a factor of five with an average efficiency of 6.8%

43 PARTICLE ACCELERATORS↗

Beam emittance preservation using Gaussian density ramps in a beam-driven plasma wakefield accelerator

A current challenge that is facing the plasma wakefield accelerator (PWFA) community is transverse beam emittance preservation. This can be achieved by balancing the natural divergence of the beam against the strong focusing force provided by the PWFA plasma source in a scheme referred to as beam matching. One method to accomplish beam matching is through the gradual focusing of a beam with a plasma density ramp leading into the bulk plasma. Here, the beam dynamics in a Gaussian plasma density ramp are considered, and an empirical formula is identified that gives the ramp length and beam vacuum waist location needed to achieve near-perfect matching. The method uses only the beam vacuum waist beta function as an input. Numerical studies show that the Gaussian ramp focusing formula is robust for beta function demagnification factors spanning more than an order of magnitude with experimentally favourable tolerances for future PWFA research facilities. This article is part of the Theo Murphy meeting issue ‘Directions in particle beam-driven plasma wakefield acceleration’.

43 PARTICLE ACCELERATORS↗

Clean Energy Cybersecurity Accelerator Cohort 1: Authentication and Authorization

In the 2023 National Cybersecurity Strategy, the Biden-Harris Administration defines the need for a "defensible, resilient digital ecosystem where it is costlier to attack systems than defend them." The strategy cites the Clean Energy Cybersecurity Accelerator (CECA) as an exemplary effort to bolster the security and resilience of clean energy generation. These efforts help "secure the clean energy grid of the future and [generate] security best practices that extend to other critical infrastructure sectors" and promise broad and far-reaching impacts to bridge the capabilities of private industry and the needs of energy production. Cohort 1 of CECA launched in the fall of 2022 with a focus on solutions that provide strong authentication and authorization for industrial control systems to mitigate attacks on the energy grid. Authentication and authorization verify that the identity (authentication) and permissions (authorization) of a user or device are aligned with their assigned roles. Weaknesses in either can have serious repercussions. To assess the strength of Cohort 1's solutions, CECA devised threat scenarios grounded in historical precedents: the CECA team reviewed exploits from real-world case studies of state-sponsored actors to match the assessment's attack paths and targets. Cohort 1 results provided the energy industry, product vendors, and related agencies valuable insights into the efficacy and applicability of solutions in common system configurations under realistic threat scenarios. The results of the assessment highlight points for interrogation and improvement in subsequent technology iterations. CECA's evaluations are part of an ongoing conversation and collaboration to bolster U.S. cyber resilience against adversaries today and in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design and structural assessment of the Spallation Neutron Source 2.0 MW target

The Proton Power Upgrade (PPU) project is underway at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory. The project will double the proton accelerator power from 1.4 MW to 2.8 MW, increase power to the First Target Station (FTS), and enable a future Second Target Station (STS). The power increase partly comes from raising proton energy from 1.0 GeV to 1.3 GeV. The STS will operate at 0.7 MW at 15 Hz when completed. Until then, PPU will provide the capability to operate the FTS at 2.0 MW at 60 Hz. Maximum power at the FTS to date has been 1.4 MW at 60 Hz with 1.0 GeV protons. A new mercury target module design to operate reliably under PPU conditions has been completed after a multi-year effort. The design philosophy and assessment of the structural analysis are described here. This target underwent an unprecedented design and analysis process for SNS using the latest engineering techniques and incorporating years of operating lessons and outcomes from R&D to meet structural design criteria. Finally, it also incorporates high-flow gas injection to further mitigate pulse fatigue stresses as well as cavitation damage to the mercury vessel.

47 OTHER INSTRUMENTATION↗

Onset of fast magnetic reconnection and particle energization in laboratory and space plasmas

The onset of magnetic reconnection in space, astrophysical and laboratory plasmas is reviewed discussing results from theory, numerical simulations and observations. After a brief introduction on magnetic reconnection and approach to the question of onset, in this paper we first discuss recent theoretical models and numerical simulations, followed by observations of reconnection and its effects in space and astrophysical plasmas from satellites and ground-based detectors, as well as measurements of reconnection in laboratory plasma experiments. Mechanisms allowing reconnection spanning from collisional resistivity to kinetic effects as well as partial ionization are described, providing a description valid over a wide range of plasma parameters, and therefore applicable in principle to many different astrophysical and laboratory environments. Finally, we summarize the implications of reconnection onset physics for plasma dynamics throughout the Universe and illustrate how capturing the dynamics correctly is important to understanding particle acceleration. The goal of this review is to give a view on the present status of this topic and future interesting investigations, offering a unified approach.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗