Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “distribution grid”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Phasor-Based Control for Scalable Integration of Variable Energy Resources

We propose an innovative framework termed phasor-based control (PBC) to facilitate the integration of heterogeneous and intermittent distributed energy resources (DER) on the electric grid. PBC presents a unified approach that is agnostic to optimization criteria and to the particular characteristics of participating resources. It is enabled by synchronized, high-precision voltage phasor measurements that allow stating control objectives in grid-specific, rather than resource-specific, terms. We present qualitative justification and examine the general feasibility of this control approach, including the behavior of candidate control algorithms in simulation. Initial results suggest that PBC has significant potential to support stable and resilient grid operations in the presence of arbitrarily high penetrations of DER.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Envisioning the Future Renewable and Resilient Energy Grids—A Power Grid Revolution Enabled by Renewables, Energy Storage, and Energy Electronics

Today’s power grids are facing tremendous challenges because of the ever-increasing power demand, system complexity, infrastructure cost, knowledge base, and policy and regulatory issues to achieve supply–demand power balance and resiliency with respect to more frequent extreme weather events and cyberattacks. It is particularly challenging when the transition toward 100% intermittent renewable energy sources is considered. Many countries are calling for building up more transmission and distribution lines to increase power delivery capacities. This article is an attempt to answer two urgent questions: Is more transmission and distribution infrastructure really needed to meet the increasing power demand? What kind of future grid infrastructure should we envision and build? This article attempts to answer these questions and proposes the concept of community-centric asynchronous renewable and resilient energy grids. By clearly differentiating the concepts of grid resilience and reliability, the importance of building resilient power electronics’ devices and robust system-level control algorithms to achieve 100% renewable energy integrated resilient grids is presented. To identify the shortcomings and propose advancements, power electronics’ technologies are categorized using the proposed concepts of natural source frequencies (NSf), energy storage, direct energy conversion/control and fault protection (DeCaFp), and high-efficiency energy consumption and buffering (heECaB) technology. The ability of networked microgrids to greatly reduce power outages and power system restoration time is demonstrated by leveraging robust decentralized and centralized control algorithms, identified through a comprehensive literature review. Future research areas are proposed to further enhance grid stability, controllability, cybersecurity, and protection against faults in the presence of 100% renewable sources by leveraging the advanced capabilities of NSf, DeCaFp, and heECaB devices and system-level control algorithms.

14 SOLAR ENERGY↗

Three-Dimensional Grid Visualization for Planning Activities: A Dubai Case Study

National Laboratory of the Rockies (NLR), in collaboration with the Dubai Electricity and Water Authority (DEWA) and Infra-X, has undertaken the Energy Visualization Analysis Project. The aim of this project is to enhance analytical and 3D visualization capabilities for distribution network planning and renewable energy integration. As modern grid continues to evolve with large-scale solar PV deployment and emerging distributed energy resources (DERs), the ability to effectively analyze, visualize, and communicate complex grid behaviors has become increasingly critical. The project focuses on developing empirical use cases based on real distribution feeder data and engineering workflows, ensuring the outcomes are directly aligned with operational environment. Through time-series power flow simulations and nodal hosting capacity analysis, the study quantifies the impacts of high PV penetration on voltage and thermal limits within representative 11 kV feeders. These analyses identify specific nodes and conditions where DER integration challenges arise. Furthermore, a Battery Energy Storage System (BESS) optimization algorithm was applied to determine the optimal size and placement of storage systems that can mitigate network constraints and enhance hosting capacity. The comparative results between base-case and BESS-augmented scenarios clearly demonstrate improvements in network stability and load management efficiency. In parallel, the NLR team developed an immersive 3D visualization framework, enabling interactive exploration of grid simulations using commodity head-mounted display (HMD) systems. This framework transforms conventional 2D simulation data into spatially intuitive visual environments - allowing engineers to analyze feeder conditions, PV hosting potential, and BESS effects in real time. This report represents the first foundational phase in establishing a visualization-driven analytical ecosystem. It provides a methodological foundation for data integration, visualization architecture, and simulation-based decision support, paving the way for large-scale adoption of immersive visualization across DEWA's Smart Grid Initiative, R&D activities, and future network resilience studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Verification of Adaptive Protection in Hardware in the Loop for Coordination with Solar Variability

As inverter-based resources continue to be installed at all levels of the electric grid, the fixed protection schemes used at the distribution level will continue to be stressed until they no longer ensure the protection of the grid. Adaptive protection has been proposed as a solution with the ability to update the protection schemes in near real-time to ensure reliability and increase the resilience of the grid. However, weather variability poses a significant challenge to the ability of these methods to keep the selectivity and reliability of these schemes coordinated. If the ramp rates, due to solar variability, of the inverter-based resources change faster than the adaptive protection can issue new settings, the protection system could be uncoordinated, with the wrong device responding to a system fault. The proposed adaptive protection method ensures that due to solar variability, communication, and protection calculation latency, it can issu e coordinated protection settings promptly, in one minute or less. The hardware-in-the-loop results show the protection settings being issued and maintaining system coordination in under a minute.

Summers, Adam↗

The Lithuania 100% Renewable Energy Study - Interim Results: Electricity System Scenarios for 2030 [Slides]

Lithuania's Energy Vision aims to achieve self-sufficiency in electricity generation by 2035 and transition to 100% renewable energy as soon as possible while maintaining affordability, reliability, and energy security. The Lithuania Energy Agency (LEA) is partnering with the National Renewable Energy Laboratory (NREL) to conduct the Lithuania 100% Renewable Energy Study (Lithuania 100) to provide evidence-based analysis for development of Lithuania's National Energy Independence Strategy. The Lithuania 100 Study leverages unique tools and capabilities of NREL to provide rigorous technical analysis of clean energy policies to achieve 100% renewable energy, and assess impacts on electricity grid operations, hydrogen system development, electricity distribution networks, air quality, and human health outcomes. The study is supported by a stakeholder committee chaired by the Ministry of Energy of Lithuania and implemented by four technical working groups. This report provides highlights of key interim results from modeling of Lithuania's near-term electricity grid through the year 2030. Results show that Lithuania has sufficient renewable energy potential, flexible generation capacity, and interconnection with neighboring European Union countries to reliably meet projected 2030 electricity demand with 100% renewable energy. A range of scenarios were modeled, each of which achieves at least 100% renewable energy in electricity, on average over the year, by 2030. Potential demands for hydrogen across industrial and transportation sectors were also evaluated, as well as the cost of hydrogen produced in Lithuania by 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Distribution Cybersecurity: Cybersecurity Considerations of Distributed Resources

This presentation is focused on cybersecurity of the distribution system. It will educate attendees about the evolving cybersecurity threats facing energy infrastructure through exploring relevant cybersecurity incidents. Additionally, Participants will gain an understanding of Distributed Energy Resources and their growing role in grid architecture. Finally, the session will examine critical standards and guidelines, including Cybersecurity Baselines for Electric Distribution Systems and the IEEE 1547.3 standard.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Shunt-Connected FACTS and Synchronous Condensers

In recent years, the electric-transmission system has undergone a significant transformation marked by a greater integration of renewable-energy sources like wind and solar, the phasing out of thermal generation plants, and a concerted effort towards electrifying energy consumption. To keep pace with the integration of renewable-energy sources and the escalating demands of industries and households, it is imperative to expand and modernize the existing power infrastructure. These upgrades are essential to maintain grid stability, enhance power delivery, and boost overall efficiency of the system. However, challenges have emerged with the growing complexity of power grids, particularly in the realms of voltage control, transient stability, and power-quality management.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Automating Component-Level Stress Measurements for Inverter Reliability Estimation

In the near future, grid operators are expected to regularly use advanced distributed energy resource (DER) functions, defined in IEEE 1547-2018, to perform a range of grid-support operations. Many of these functions adjust the active and reactive power of the device through commanded or autonomous operating modes which induce new stresses on the power electronics components. In this work, an experimental and theoretical framework is introduced which couples laboratory-measured component stress with advanced inverter functionality and derives a reduction in useful lifetime based on an applicable reliability model. Multiple DER devices were instrumented to calculate the additional component stress under multiple reactive power setpoints to estimate associated DER lifetime reductions. A clear increase in switch loss was demonstrated as a function of irradiance level and power factor. This is replicated in the system-level efficiency measurements, although magnitudes were different—suggesting other loss mechanisms exist. Using an approximate Arrhenius thermal model for the switches, the experimental data indicate a lifetime reduction of 1.5% when operating the inverter at 0.85 PF—compared to unity PF—assuming the DER failure mechanism thermally driven within the H-bridge. If other failure mechanisms are discovered for a set of power electronics devices, this testing and calculation framework can easily be tailored to those failure mechanisms.

Flicker, Jack (ORCID:0000000212232154)↗

Globally Gridded Groundwater Extraction Volumes and Costs under Six Depletion and Ponded Depth Targets

This repository contains simulated outputs from superwell – a hydro-economic tool for long-term assessment of groundwater cost and supply – providing globally gridded groundwater extractable volumes and associated unit costs ($/km³) for accessible groundwater production, based on a variety of user-defined depletion and ponded depth scenarios. Key model documentation: Niazi, H., Ferencz, S. B., Graham, N. T., Yoon, J., Wild, T. B., Hejazi, M., Watson, D. J., & Vernon, C. R. (2025). Long-term hydro-economic analysis tool for evaluating global groundwater cost and supply: Superwell v1.1. Geoscientific Model Development, 18(5), 1737-1767. https://doi.org/10.5194/gmd-18-1737-2025 Find the source code of the superwell model on GitHub: https://github.com/JGCRI/superwell Repository Overview Main output: superwell_outputs.7z contains 6 files (4.5 GB) named as superwell_py_deep_all_0.*PD_0.*DL.csv. These files present superwell outputs of global groundwater extraction volumes and cost estimates on a 0.5° scale for six scenarios with different Ponded Depth (PD; 0.3 and 0.6 m) and Depletion Limit (DL; 5%, 25%, and 40% of available volume) targets over the entire pumping lifetime of a grid cell superwell_py_deep_all_0.3PD_0.25DL_sample_100.csv contains superwell outputs for 100 data points sampled to match the global inputs' distribution superwell_py_deep_all_0.3PD_0.25DL_Grid_72548.csv contains superwell output for a single grid cell concept_v5.png provides an overview of the superwell workflow Outputs Description year_number: year of pumping depletion_limit: set depletion limit (DL) as a volume fraction of total available groundwater Mappings: continent, country, gcam_basin_id, Basin_long_name, grid_id: geographic identifiers and basin information Inputs: grid_area (km²): area of the grid cell whyclass: hydrogeological classification of the aquifer permeability (m/day), porosity (%), total_thickness (m), depth_to_water (m): aquifer properties. The geo-processed input data has been published separately: https://doi.org/10.57931/2307831 Model outputs: orig_aqfr_sat_thickness (m), aqfr_sat_thickness (m): original and remaining/instantaneous saturated thickness of the aquifer hydraulic_conductivity (m/day), transmissivity (m²/day): hydraulic properties of the aquifer radius_of_influence (m), areal_extent (km²): well radius and area of influence from the center of the well number_of_wells (-): number of wells in a grid cell determined by a ratio of well area and grid area max_drawdown (m), drawdown (m), drawdown_interference (m): well and aquifer drawdown during extraction total_head (m): total lift for the groundwater (depth to water plus drawdown) total_well_length (m): total depth of wells drilled well_yield (m³/day): pumping rate or well yield power (kW), energy (kWh): power and energy required for pumping groundwater Volume Outputs: volume_produced_perwell (m³), cumulative_vol_produced_perwell (m³): production volume metrics per well volume_produced_allwells (m³), cumulative_vol_produced_allwells (m³): aggregate extraction volumes for all wells in a grid cell available_volume (m³): available groundwater in storage for the grid cell as determined by aquifer properties depleted_vol_fraction: fraction of total volume pumped over available volumes in a grid cell (same as depletion limit) Cost Outputs: well_installation_cost ($): well installation cost based on the hydrogeological complexity of the aquifer annual_capital_cost, maintenance_cost, nonenergy_cost ($): nonenergy costs energy_cost_rate ($/kWh): electricity rate energy_cost ($): energy cost of pumping groundwater total_cost_perwell ($), total_cost_allwells ($): total annual energy and non-energy cost for each and all wells in a grid cell a unit_cost ($/m³), unit_cost_per_km3 ($/km³), unit_cost_per_acreft ($/acre-ft): total cost of pumping a unit of groundwater, indicated for different spatial units Key Resources Model documentation: Niazi, H., Ferencz, S., Graham, N., Yoon, J., Wild, T., Hejazi, M., Watson, D., & Vernon, C. (2024; In-prep). Long-term Hydro-economic Assessment Tool for Evaluating Global Groundwater Cost and Supply: Superwell v1. Geoscientific Model Development. Input data: Niazi, H., Watson, D., Hejazi, M., Yonkofski, C., Ferencz, S., Vernon, C., Graham, N., Wild, T., & Yoon, J. (2024). Global Geo-processed Data of Aquifer Properties by 0.5° Grid, Country and Water Basins. MSD-LIVE Data repository. https://doi.org/10.57931/2307831 superwell source code: https://github.com/JGCRI/superwell Cite as Niazi, H., Ferencz, S., Yoon, J., Graham, N., Wild, T., Hejazi, M., Watson, D., & Vernon, C. (2024). Globally Gridded Groundwater Extraction Volumes and Costs under Six Depletion and Ponded Depth Targets. MSD-LIVE Data repository. https://doi.org/10.57931/2307832 Contact Reach out to Hassan Niazi or Stephen Ferencz or open an issue in the superwell repository for questions or suggestions.

Earth Systems↗

Performance Metrics to Evaluate Utility Resilience Investments

In 2019, Sandia National Laboratories (Sandia) contracted Synapse Energy Economics (Synapse) to research the integration of community and electric grid resilience investment planning as part of the Designing Resilient Communities (DRC): A Consequence-Based Approach for Grid Investment project. Synapse produced a series of reports to explore the challenges and opportunities in several key areas, including benefit-cost analysis (BCA), performance metrics, microgrids, and regulatory mechanisms. This report focuses on BCA. BCA is an approach that electric utilities, electric utility regulators, and communities can use to evaluate the costs and benefits of a wide range of grid resilience investments in a comprehensive and consistent way. While BCA is regularly applied to some types of grid investments, application of BCA to grid resilience investments is in the early stages of development. Though resilience is increasingly cited in connection with grid investment proposals and plans, the resilience- related costs and benefits of grid resilience investments are typically not fully identified, infrequently quantified, and almost never monetized. Without complete assessments of costs and benefits, regulators can be hesitant to approve some types of grid resilience investments. This report provides the first application of the framework developed in the 2020 National Standard Practice Manual for Benefit-Cost Analysis of Distributed Energy Resources (NSPM for DERs) to grid resilience investments. We provide guidance on next steps for implementation to enable grid resilience investments to receive due consideration. We suggest developing BCA principles and standards for jurisdiction-specific BCA tests. We also recommend identifying the resilience impacts of the investments and quantification of these impacts by establishing utility performance metrics for resilience. Proactive integration of grid resilience investments into existing regulatory processes and practices can increase the capacity of jurisdictions to respond to and recover from the consequences of extreme events. 1 National Energy Screening Project. 2020. National Standard Practice Manual for Benefit-Cost Analysis of Distributed Energy Resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Co-Simulation of PSS/E, OpenDSS, and PSCAD for Power Systems Stability Analysis With Inverter-Based Resources: Preprint

The increasing penetration of inverter-based resources (IBRs) is reshaping the dynamic behavior of power systems. IEEE standard 1547-2018 suggests that distributed energy resources (DERs) should provide grid services such as voltage and frequency supports. On the other hand, dynamic events caused by IBRs such as sub-synchronous oscillation have been reported. These developments necessitate improvement in the current modeling capabilities to better understand the interdependencies within power systems. These include interactions between transmission and distribution systems, among IBRs themselves, and between IBRs and conventional resources. In this paper, we present a co-simulation model integrating PSS/E, OpenDSS, and PSCAD to analyze IBR impacts on the stability of transmission and distribution systems. A key challenge in developing a co-simulation model is ensuring interoperability among different simulators (interfacing and data flow) while maintaining accurate results. Using the developed model, we simulate the impact of IBRs on power systems in two test cases: 1) fault ride through (FRT) capability during a generation trip contingency; 2) IBR-induced sub-synchronous oscillation. The results show the effectiveness of the co-simulation model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Coordinated frequency regulation among asynchronous AC grids with an MTDC system

With the increasing penetration level of renewable power, the power systems’ inertias are decreasing. To ensure that the frequency is above the threshold of the under frequency load shedding, one effective way is to share the spinning reserves among asynchronous AC grids through HVDC systems. In this paper, a coordinated frequency regulation scheme that enables spinning reserves sharing is proposed for such hybrid AC/DC grids. This scheme is a communication-free method that consists of the droop control, the inertia emulation control and the frequency safety control. The combined response of the three controls can increase not only the frequency nadir but also the settled frequency of the disturbed grid. In addition, the hysteresis comparators and the power injection limits are adopted in the frequency regulation scheme to reduce the coupling effect among AC grids. Thus, under small and harmless disturbance, the frequency regulation scheme will be inactive; the disturbance in strong AC grids would not affect the weak AC systems. The frequency regulation scheme coordinates well with the automatic generation control of the grids. Furthermore, the feasibility and effectiveness of the proposed frequency regulation scheme are verified through simulation studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advance Distribution Management System (ADMS)

This presentation explores the transition from traditional distribution management systems to Advanced Distribution Management Systems (ADMS) as a foundation for smart grid development. It highlights the key benefits of ADMS, including enhanced reliability, improved operational efficiency, and increased situational awareness. The presentation also addresses common implementation challenges such as system integration, data management, and organizational readiness. It concludes with a forward-looking perspective on the evolving role of ADMS and essential takeaways for utilities and stakeholders.

24 POWER TRANSMISSION AND DISTRIBUTION↗

VPP Participation Models: What is the Objective?

Virtual power plants (VPPs) can provide grid services by aggregating and controlling many distributed energy resources. However, their design, operation, level of participation, and outcomes depend on the regulatory and market environments they operate in, DER owner preferences, grid service value, and technical capabilities (e.g., communications, forecasting, controls, user interfaces). Although VPPs are inherently complex, they could enable high shares of behind-the-meter solar plus storage and reduce the cost of electrifying, e.g., personal vehicles and space heating.

demand response↗

Future Electric Power Industry and Grids—Now What Again is Our Destination?

Having a vision that others agree to support and work toward is highly desirable but hard to achieve. We seem to lack a common and shared understanding of the vision—or worse, multiple visions (vivid mental images or documented statements) with varying areas of focus and details: • some appear to be similar but have differing underlying goals and characteristics, or • some reflect differing viewpoints as to effects on various stakeholders. These desirable and undesirable situations apply to realizing visions for enterprise and industry, including the electricity sector. Multiple industry stakeholder groups have developed goals, industry vision statements, and characterizations of the future. The viewpoints are promoted, discussed, refined by their stakeholder group, and often published to promote broad understanding and to inform or influence others. The GridWise Architecture Council asked itself how well-aligned these characterizations of the future are. If these publications collectively set the overall direction for the industry, it is useful to identify their answers to questions such as, where is the electric industry headed, guided by what objectives, and with what role(s) for the customers, electric utilities, and other stakeholders? Are these goals, visions, and future states moving toward a common vision, do they provide value for the stakeholders, and are they likely to meet the objective stated? This paper addresses these questions via an assessment and characterization of a sampling of stakeholder groups’ publicly available vision and future state reports for the electricity industry. Identified electric power grid architectural topic areas needing further work are described, along with GridWise Architecture Council analysis and observation, potential collaborative work efforts, and suggested next steps.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Adaptive Neurocontrol for Grid-Following Inverters

The new generation of power systems involve a large number of autonomous operating units with the flow of data being restricted by privacy concerns or infrastructure hurdles. The systems are also time-varying so the control should adjust in a timely manner to avoid failures that usually have very negative economical implications. Adaptive neurocontrol which takes elements from adaptive control (great for time-varying problems) and model identification (could be in the form of neural network) by using local available data is a compelling tool. In this work, we summarize analytical results for adaptive neurocontrol, followed with numerical verification of how the method could work for future grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Innovative Utility Offerings

As electricity became a critical commodity in modern economies, most countries organized the electric power industry along a similar paradigm, establishing vertically-integrated and regulated utility monopolies with that received regulated returns on capital invested in centralized electrical infrastructure. In today’s rapidly evolving power sector, this business model is being actively redefined as innovative utilities all over the world begin offering more customer-centric products and services at the edge of the distribution system.

case studies↗